CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1



Similar documents
CHAPTER 5. Storm Sewer

SECTION STORM DRAINAGE TABLE OF CONTENTS

SECTION 7- STORM SEWER

SECTION STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

Table 4.9 Storm Drain Inlet Protetion Applicable for

SECTION 6A STORM DRAIN DESIGN Mar S E C T I O N 6A STORM DRAIN - DESIGN

SECTION INLETS INLET LOCATIONS

STORM DRAINS CHAPTER 7

SECTION 5: SANITARY SEWER SYSTEM DESIGN

City of La Quinta Public Works Department - Storm Drain Plan Review Checklist

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

INDEX STORM DRAINAGE PRE-APPROVED NOTES, DESIGN CRITERIA, & PLANS

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

CHAPTER 3 STORM DRAINAGE SYSTEMS

CHAPTER II - STORM DRAINAGE

DRAINAGE MANUAL CHAPTER VII STORM DRAINAGE SYSTEMS

8.1.3 General Design Guidelines. The following guidelines shall be used when designing inlets along a street section:

EFFECTIVE FEBRUARY note: drainage permit required to call for a dampproof inspection

STANDARD SPECIFICATIONS & CONSTRUCTION DETAILS MANUAL SECTION 5 - STORM DRAINAGE Design

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

SECTION 5 DRAFTING STANDARDS

CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST

Town of Beaumont. Lot Grading Guidelines

Architectural Processing and Inspections for Home Mortgage Insurance

Storm Drainage Systems

Extreme Wet Weather in Brookfield. How to Keep Your Basement Dry During Heavy Rains and Floods

CHAPTER 4 STORM DRAINAGE SYSTEMS

CITY UTILITIES DESIGN STANDARDS MANUAL

SECTION STORM DRAIN SYSTEM

Chapter 9 Sanitary Sewers

Drainage Design and Stormwater Pollution Prevention Manual

City of West Linn Public Works Design Standards Table of Contents

Beacon Hill Sewer District Standard Specifications

Engineering Specifications February, 2004 Schedule H to Bylaw 7452, Subdivision Bylaw Page 18

2011 HYDRAULICS MANUAL

Storm Drain Inlet Protection

SECTION 3 SANITARY SEWER DESIGN

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS

Storm Drain Inlet Protection

SE-10 STORM DRAIN INLET PROTECTION. Objectives

See Appendix A for additional information, or contact ASTM directly.

City of Shelbyville Site Inspection Checklist

Storm Drain Inlet Protection - IP

FY08 SEWER POINT REPAIRS BID TABULATION

SECTION 200: STORM SEWER CONSTRUCTION STANDARDS

Stormwater/Wetland Pond Construction Inspection Checklist

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES SITE UTILITIES

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

JULY 24, 2009 WEST-END FLOODING INVESTIGATION ACTION PLAN. Presentation to Insurance Companies 19 January 2012

Chapter Thirty-six OVERVIEW Introduction Inadequate Drainage POLICY AND GUIDELINES

SECTION 5 - STORM DRAINS

SECTION POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

SANITARY SEWER SPECIFICATIONS

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST BID PROPOSAL

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

CHAPTER 7 ROAD STORM DRAINAGE SYSTEMS

SECTION STORM DRAINAGE SYSTEM

AGENDA ITEM EXECUTIVE SUMMARY

PUBLIC STORM DRAIN STANDARDS

Homeowner s Guide to Drainage

DESCRIPTION OF WORK:

CITY OF COLTON PUBLIC WORKS/ENGINEERING DEPARTMENT STORM DRAIN PLAN REVIEW CHECKLIST (PROVIDE SEPARATE ON-SITE & OFF-SITE STORM DRAIN PLAN SETS)

SUMP PUMP. City of Ann Arbor & C O L L E C T I O N S Y S T E M G L O S S A R Y

3A General Information A. Concepts... 1 B. Conditions... 1

URBAN DRAINAGE CRITERIA

Construction Site Inspection Checklist for OHC By making use of some simple Best Management Practices (BMPs) a construction site operator can

Local Road Assessment and Improvement Drainage Manual

CHAPTER 9 STORM DRAINAGE DESIGN AND STORMWATER QUALITY REGULATIONS

Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

Permeable Pavement Construction Guide

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

To prevent increased stormwater runoff entering Council s drainage system and causing overloading of the system that in turn might cause flooding.

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09

LS 2540 SEWER LATERALS AND INSPECTION TEES

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F

6-1 Introduction. 1. Storm drain that does not require pressure testing. 2. Lateral that does not require pressure testing.

Outlet stabilization structure

CHAPTER 6 SEWER SYSTEM DESIGN STANDARDS

Storm Drain Inlet Protection for Construction Sites (1060)

THE CORPORATION OF THE CITY OF GUELPH. THEREFORE the council of the Corporation of the City of Guelph enacts as follows:

SECTION 7 UNDERDRAIN SERVICE

SECTION GRAVITY SANITARY SEWERS

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans

Transcription:

CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1

17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm sewer systems throughout the city and within the 1-1/2 mile extra territorial jurisdiction (ETJ). 17.01 ADMINISTRATION All storm sewer projects in the City or within the 1-1/2 mile ETJ shall be designed and constructed in compliance with these standards, shall comply with the Erosion Control Standard of Chapter 22, and shall require the submittal of storm sewer plans and calculations with the construction plans for approval by the City Engineer. 17.02 STANDARDS A. Referenced Standards: Specific technical aspects of all storm sewers shall be designed in accordance with this chapter, all other chapters within this manual, and in accordance with, but not limited to, the following design standards: 1. IDOT Manual of Policies and Procedures 2. IDOT Design Manual 3. IDOT Drainage Manual 4. IDOT Standard Specifications for Road and Bridge Construction 5. Standard Specifications for Water & Sewer Main Construction in Illinois B. General Storm Sewer Design Standards: Storm sewer systems are required in all new subdivisions. All lots shall be provided with an approved outlet by a direct connection available to either storm sewer or an underdrain. The outlet location shall be designed to accommodate the natural drainage of the lot served. Underdrains shall conform to the design standards found in this chapter. 1. General Requirements: a. In non-paved areas, the minimum cover from the top of the pipe to the finished grade shall be 2 ft. b. Minimum cover from the bottom of the pavement to the top of the pipe shall be 1 ft. Minimum cover for stabilized subgrade may be reduced to 6 in. c. No curved alignments shall be allowed. Manholes or inlets shall be provided at all changes in direction. d. Minimum separation between utilities shall conform to Chapter 15 of this Manual. e. All easements shall conform to Chapter 15 of this Manual. f. Minimum public storm sewer size shall be 12-in. diameter. g. Catch basins (as defined by the IDOT standards) or other structures with sumps shall not be allowed for use on public storm sewer systems. 17.2

h. Areas within the rights-of-way that require backfill shall be constructed with CLSM for arterial streets and either CLSM or IDOT Trench Backfill for all other pavements. All other locations shall be backfilled in accordance with Method 1 for storm sewer construction in the IDOT Standard Specifications. 2. Pipe Material: Pipe material shall conform to IDOT Standard Specifications for Road and Bridge Construction. Other pipe material may be allowed if, in the opinion of the City Engineer, the location and use will not create additional maintenance or cost for the City. Alternate pipe materials will require strict adherence to Public Works Department requirements and the industry standard (ASTM, etc.) material and installation requirements. All pipe materials must be IDOT certified. 3. Design Storm: The Minimum Design Storm used in calculating run-off in the Design Formula will be the rainfall intensity associated with a recurrence interval of ten years for the storm period calculated by the Time of Concentration as outlined by the latest Technical Letters or Bulletins produced by Illinois State Water Survey for rainfall frequencies in the City of Champaign. 4. Access: All lots shall be provided with access to a storm sewer for connection by sump pumps, footing drains, etc. When designing a storm sewer, sump pumps shall be calculated at a rate of 0.05 cfs per house. Minimum underdrain slope shall be 1%. Underdrain shall be laid in a filter sock and backfilled with compacted pea gravel to within 12 in. of the ground surface. A filter fabric shall be placed on top of the gravel. Backfill shall consist of 12 in. of topsoil or clay depending upon location. Minimum diameter of underdrain lines owned and maintained by the City of Champaign shall be 6 in. and shall have a smooth interior wall. These public underdrains shall be located in the right-of-way or in easements adjacent to the right-of-way. Cleanouts shall be located at the termination of all public underdrains. Maximum length of an underdrain shall not exceed 200 ft. Underdrains located along side- or rear-yard property lines shall be privately owned and maintained. A pump or sump pump may be required to discharge storm water from a building to a storm sewer or underdrain. In residential areas, roof drains shall not connect directly to an underdrain, but rather discharge to the surface and drain overland to a collection area. 5. General Design Requirements: a. The hydraulic grade line (HGL) for a 10-year storm shall be wholly within the pipe. b. Inlet design and spacing shall conform to IDOT design standards. c. In pavement low areas or sags the maximum allowable storm water depth shall be 6 in. before the overflow enters an overland flood routing system. d. Inflow and outflow pipes shall be constructed with end sections or headwalls. C. Casting / Frame and Grates: 1. Heavy Duty Castings: Storm inlet and manhole castings located in the right-of-way and in areas subject to vehicular traffic shall be heavy duty. The following applications are referenced by Neenah Foundation Catalogue Number, 12th edition. Similar casting provided by another manufacturer may be acceptable and are subject to approval by the City Engineer. 17.3

Casting Location Neenah Casting* Number IDOT Standard Barrier Curb R-3278-A Type 3, 604006 Driveway or Sidewalk Conflict R-3508-A2 Type 10, 604046 Barrier Curb, High Runoff Volume R-3278-AL Type 3, 604011 Backyard or Area Drains R-4340-B Type 8, 604036 Ditch Grates R-4341-A Storm Manholes/Inlets R-1712-C Type 1, 604001 * Or an approved equivalent. 2. Pavement Castings: Castings located within a paved area shall be set in a full bed of mortar and sealed completely around the outside with concrete. 3. Yard / Parkway Castings: Castings located outside a paved area shall be set in a full bed of mastic and shall be constructed with an external chimney seal. 4. Constructed Elevation: Castings located in unpaved areas that are designed to accept storm water flows shall be constructed with the top of the casting 1 in. below the adjacent ground surface. All other castings located in unpaved areas that are not designed to accept storm water flows shall be constructed with the top of the casting 1 in. above the adjacent ground surface. The frame and grate will be constructed to the plan elevation in accordance with Standard Specification for Road and Bridge Construction. A maximum of 8 in. of adjusting rings shall be allowed. D. Major System Design: The Major System is that system that is designed to accommodate storm water flows in excess of the 10-year design frequency. This system may include swales, pavements, detention basins, overflows, large diameter pipes, channels and ditches within or adjacent to the development. See Chapters 19, 20, and 23 of this Manual for the design of the Major System components. E. Manholes: 1. All manholes shall conform to IDOT standards for a Type A manhole. 2. Manholes shall be installed at the end of each storm sewer line, at all changes in grade or alignment, at all storm sewer intersections, and at distances not to exceed 400 ft. Greater spacing may be permitted in storm sewers larger than 48 in. diameter. 3. Minimum drop between influent and effluent pipes in a manhole, if there is no change in pipe diameter, shall be 0.1 ft. and the desirable maximum drop shall be 24 in. 4. When the influent and effluent pipes differ in diameter, no hydraulic losses should be allowed. In manholes where pipe sizes change, the hydraulic grade lines shall be matched by setting the larger effluent pipe invert at 0.8(d eff -d inf ) below the influent pipe invert. An example of calculating the drop across a manhole with a 17.4

F. Inlets: 24 in. outlet (effluent) and a 12 in. inlet (influent) is calculated by the following method: Outlet pipe diameter (in feet) inlet pipe diameter (in feet) = elevation difference in feet (2.0 ft.-1.0 ft.=1.0 ft.). Then the elevation difference times 0.8 (1.0 ft. x 0.8 = 0.8 ft.). The outlet pipe invert is lowered a minimum of 0.8 ft. below the inlet pipe invert. 5. No steps shall be allowed in manholes. 1. All inlets shall conform to IDOT standards for Type A and B inlets. Concrete inverts shall be required for all inlets. 2. Sufficient inlets for local streets shall be provided at all low points and at a maximum spacing of 600 ft. on a continuance pavement grade. Inlet capacity shall be designed in accordance with the IDOT Design Manual. Maximum water depth at all low points shall not exceed 6 in. before discharging into the Major System. 3. Inlet locations for collectors and arterial streets shall be designed in accordance with the IDOT Design Manual. The maximum encroachment of storm water on collector and arterial streets shall be 10 ft. (measured from the back of curb). Maximum water depth at all low points shall not exceed 6 in. before discharging into the Major System. The strictest interpretation of the encroachment limit shall apply. 4. Because of the possibility in sag locations of debris clogging the grates / inlets on collector and arterial streets, as per the IDOT Drainage Manual, a clear opening or perimeter at least twice that required by the capacity equations shall be used. G. Endsections: 1. All end sections shall be provided with protective grates. 2. All end sections shall be permanently protected from erosion by use of grouted riprap, revetment mat or other methods as approved by the City Engineer. H. Headwalls: All headwalls shall be designed and constructed in accordance with IDOT standards. I. Storm Sewer Pump Station: (RESERVED) 17.5