ENEC Management System and Quality Assurance Program



Similar documents
Office for Nuclear Regulation

ENEC Procurement Informa1on

Quality Assurance QUALITY ASSURANCE PLAN

Ensuring Quality Going Down the Supply Chain

Nuclear Safety Council Instruction number IS-19, of October 22 nd 2008, on the requirements of the nuclear facilities management system

UAE Nuclear Power Programme : Status and Update

MANAGEMENT SYSTEM FOR A NUCLEAR FACILITY

IAEA Safety Standards for Regulatory Activities

The World Nuclear Supply

Human Factors in Design and Construction Regulatory Perspective

NOT PROTECTIVELY MARKED

R000. Revision Summary Revision Number Date Description of Revisions R000 Feb. 18, 2011 Initial issue of the document.

ROK s Assistance Programs for New comers

International Safeguards Infrastructure Development

MISSION REPORT ON THE INTEGRATED NUCLEAR INFRASTRUCTURE REVIEW (INIR)

How To Decommission A Nuclear Plant

ISRS. For the health of your business SAFER, SMARTER, GREENER

Human Resource Management in Nuclear Safety

QUALITY MANAGEMENT SYSTEM REVIEW AND APPROVAL TEMPLATE (DOE G A, Appendix A, )

CORDEL Cooperation in Reactor Design Evaluation and Licensing

C-41 (May 13) Procurement Engineering and Supply Chain Guidelines in Support of Operation and Maintenance of Nuclear Facilities

4 PROJECT PLAN DOCUMENTS

15 Guiding Principles

Olkiluoto 3 Experience

QMS Manual 2350 Helen Street, N. St. Paul, MN Page 1 of 5. Quality Management System Manual

Capacity Building and Human Resource Development for Nuclear Power Programmes

Quality Management System-A Revision 7 (NRC-approved Version)

REGULATION. Regulation for the System of Accounting for and Control of Nuclear Material and Application of Additional Protocol (FANR-REG-10) Version 0

Implementation of a Quality Management System for Aeronautical Information Services -1-

Quality Assurance Program Plan. July U.S. Department of Energy Office of Legacy Management

IAEA-TECDOC Managing change in nuclear utilities

ABSTRACT. The Guidelines Section F is related to the Purchasing requirements of NSQ100 (Chapter 7.4). Summary

REAL PROPERTY ASSET MANAGEMENT (DOE O 430.1B) REQUIREMENTS CHECKLIST

Operational Excellence Management System

IMPLEMENTATION OF A MANAGEMENT SYSTEM FOR OPERATING ORGANIZATIONS OF RESEARCH REACTORS

RTP s NUCLEAR QUALITY ASSURANCE PROGRAM

International Conference on Human Resource Development for Nuclear Power Programmes: Building and Sustaining Capacity

HEALTH SAFETY & ENVIRONMENT MANAGEMENT SYSTEM

License Application Package Overview MOX Fuel Fabrication Facility 27 September 2006

CORPORATE QUALITY MANUAL

Join the UK Nuclear Renaissance. Procurement & Quality Process

Operations. Group Standard. Business Operations process forms the core of all our business activities

CHAPTER 6. Supply Chain Management CONTENTS

Quality Management Manual

REGULATORY GUIDE (Draft was issued as DG-1267, dated August 2012)

Nuclear Energy of Ukraine - History

QSS 0: Products and Services without Bespoke Contracts.

Draft IAEA Action Plan on Nuclear Safety

The Proposed Quality Competency Framework for the Future Quality Professional

Keywords: inspection; nuclear material control and accountancy (NMC&A); quality management system

Joint ICTP-IAEA School of Nuclear Energy Management November Nuclear Security Fundamentals Module 9 topic 2

QUALITY POLICY MANUAL Document: Revision: E Effective Date: January 15, 2010

QUALITY ASSURANCE GUIDE FOR PROJECT MANAGEMENT

Title: Rio Tinto management system

13 ENVIRONMENTAL AND SOCIAL MANAGEMENT SYSTEM

Horizon NSL Pre-Application Intervention Strategy

Camber Quality Assurance (QA) Approach

3 rd Review Meeting Convention on Nuclear Safety First Anniversary Report Status of Actions on Canada April 2006

Area Manager - Head of Operational Policy & Assurance

Army Regulation Product Assurance. Army Quality Program. Headquarters Department of the Army Washington, DC 25 February 2014 UNCLASSIFIED

Guidance for the Quality Assurance of Fire Protection Systems

CSX Public Safety, Health, and Environmental Management System

Quality & Safety Manual

Sellafield Ltd, Registered in England number

In some cases the exclusion may not be justified depending on who is the customer, and what is the product.

Information Security Policy. Document ID: 3809 Version: 1.0 Owner: Chief Security Officer, Security Services

Wilfred C. LaRochelle Principal Nuclear Consultant HSB Global Standards, USA

Health, Security, Safety and Environment (HSE)

Linac Coherent Light Source (LCLS)

December 5, 2013 VENDOR INSPECTION PROGRAM ANNUAL SELF-ASSESSMENT REPORT FOR FISCAL YEAR 2013

Department of Infrastructure and Planning: Governance Framework for Infrastructure Delivery Special Purpose Vehicles

ABSTRACT. The Guidelines Section A is related to the general requirements of NSQ100 (Chapters 0, 1, 4, 5 and 6). Summary

ISO 9001 Quality Systems Manual

DRAFT REGULATORY GUIDE

QMS. Rev COMPANY PROPRIETARY INFORMATION Prior to use, ensure this document is the most recent revision by checking the Master Document List.

Uncontrolled Document

Business Continuity Management Framework

Enhancing of Regulatory Control in Georgia Main Trends and Current Developments

Code of Conduct on the Safety and Security of Radioactive Sources

West Midlands Police and Crime Commissioner Records Management Policy 1 Contents

International Workshop Agreement 2 Quality Management Systems Guidelines for the application of ISO 9001:2000 on education.

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION. Air Traffic Organization Policy

New Proposed Department of Energy Rules to Clarify and Update Part 810. By Shannon MacMichael and Michael Lieberman of Steptoe & Johnson, LLP 1

The Asset Management Landscape

Nuclear Safety. Policy

IAEA-TECDOC Effective corrective actions to enhance operational safety of nuclear installations

FUNDAMENTALS OF A STATE S NUCLEAR SECURITY REGIME: OBJECTIVE AND ESSENTIAL ELEMENTS

Emdad Services Intergulf General Contracting, Emdad

QUALITY MANAGEMENT SYSTEM MANUAL

Project Management Plan for

IAEA-TECDOC-1328 Solutions for cost effective assessment of software based instrumentation and control systems in nuclear power plants

Transcription:

ENEC Management System and Quality Assurance Program Shami S. Dua Quality Assurance Director IAEA TM on Management System Grading 23-27 January 2012, Vienna, Austria

Safety moment

ENEC Management System & Quality Assurance Background UAE Nuclear Law / FANR Regulations/ Standards ENEC Management System Quality Assurance Program Prime Contractor Program & Alignment with ENEC Status of Implementation ENEC Program / PC Program / Supply Chain Key Processes / Grading Summary Q & A

UAE Nuclear Law - Definitions Management System - A set of interrelated or interacting elements (system) for establishing policies and objectives and enabling the objectives to be achieved in an efficient and effective manner

UAE Nuclear Law - Definitions' Quality Assurance The function of a Management System that provides confidence that specified requirements will be fulfilled

UAE Nuclear Law The Licensee shall ensure that there is a Management System in place and adequate financial and human resources are provided to ensure Nuclear Safety. The Licensee shall determine the responsibility and authority of individual bodies with in its Management System in order to achieve the requirements of the previous paragraph.

FANR* Regulations for Management Systems The Federal Law by Decree No.6 of 2009, Concerning the Peaceful Uses of Nuclear Energy FANR-REG-01: Regulations for Management Systems for Nuclear Facilities Senior Management shall be responsible and shall demonstrate its commitment for the MS and shall ensure it is established, implemented, assessed and continually improved. Ensuring that health, environmental, security, quality and economics requirements are not considered separately from Safety requirements * FANR- Federal Authority for Nuclear Regulations

FANR* Regulations for Management Systems FANR-RG-002; Regulatory Guide Application of Management Systems for Nuclear facilities Acceptable methods and guidance for implementing the requirements specified in FANR-REG-01. IAEA Safety Guide GS-G-3.1 Application of the Management System for Facilities and activities IAEA SG GS-G-3.5 The Management System for Nuclear Installations IAEA SG GS-G-3.3 The Management system for the Processing, Handling and Storage of Radioactive Waste ANSI/ASME/NQA-1 Quality Assurance Requirements for Nuclear Facility Applications * FANR- Federal Authority for Nuclear Regulations

FANR* Regulations for Management Systems Graded Approach: The application of MS requirements shall be graded as to deploy appropriate resources, on the basis of the consideration of: a. The significance and complexity of each product or activity b. The hazards and the magnitude of potential impact (risks) associated with the Safety, security, safeguards, Radiation Protection, environmental, quality and economics elements of each product or activity; and c. The possible consequences if a product fails or an activity is carried our incorrectly. Grading of the application of MS requirements shall be applied to the products and activities of each process * FANR- Federal Authority for Nuclear Regulations

Emirates Nuclear Energy Corporation (ENEC) ENEC was established after the UAE government determined that nuclear energy was a viable and sustainable solution to the nation's energy supply challenges. ENEC will be responsible for the deployment of the UAE's peaceful civil nuclear energy program Design, construction, operations of nuclear power plants Integration with the UAE government and industrial infrastructure Future strategic investments in the nuclear sector, both domestically and internationally

ENEC Management System 2008 / early 2009 Started ENEC formation; Experience of Personnel Benchmarking of MS /QA standards Country of Origin Standards / Practices 2009 February- Concepts & Documentation Structure for MM/MS developed UAE Nuclear Law & FANR established 2009 December ENEC established / Contract signed with KEPCO

ENEC Management System Key Challenges for Management System Development FANR REG-01/RG-02 requiring an integrated Management System Need specific requirements and level of prescription for a country getting into nuclear Country of origin standards Holistic approach to management to achieve corporate goals and objectives

ENEC Management System Origin Based on industry experience Regulations Nuclear Power Plant Safety Analysis Reports International Standards for Nuclear and Radiation Safety and Quality Benchmarking Nuclear Industry Best Practices Performance Framework United States Nuclear Regulatory Commission (NUREGs, etc.) ASME NQA-1, Quality Assurance Requirements for Nuclear Facility Applications IAEA GS-R-3, The Management System for Facilities & Activities Commercial Nuclear Fleet Utilities Government Nuclear Sites European Foundation for Quality Management Fundamental Concepts of Excellence ISO 9000 QMS series

Purpose of ENEC Management System? Management System for Corporate Governance To meet ENEC Business Objectives, Mission & Vision Based on widely used and proven national & international standards and best practices Covers: Health & Safety Environment Security Quality Economics / Business and Other key areas

ENEC Quality Assurance An integral part of ENEC Management System Focus on Nuclear Safety Based on proven & widely used nuclear standards Alignment with country of origin / nuclear supply chain Provides specific & rigorous requirements

Vision Core Values Safety Integrity Transparency ENEC Management System Elements Powering the future growth and prosperity of the UAE through a safe, clean, efficient, and reliable civil nuclear energy program Strategic Goals Mission To deliver safe, clean, efficient and reliable nuclear energy to the UAE grid by 2017 and beyond Business Safety Power by 2017 Fleet Regulatory Quality Cost Security of Supply Human Resources Environment Stewardship International & National Community Security Stakeholders UAE Citizens UAE Governments ENEC Employees Efficiency Functional Elements/Processes Management Processes EAA FANR EAD Business Development Capacity Building Document Control & Records Management Financial Management & Control Fleet Management Human Resources Development Information & Communications Technology Internal Audit Legal & Export Controls Program Governance Program Management Safeguards & Security Strategic Planning & Performance Management CNIA NCEMA IAEA GCC ADWEA ADWEC Construction Management & Oversight Engineering, Design & Technical Services Core Processes Nuclear Operations Planning & Oversight Procurement & Supply Chain Waste Management Transco Urban Planning Council Western Region Authority Others Support Processes Communications & External Affairs Fuel Cycle Management Health, Safety & Environment Knowledge Management Licensing & Permitting Quality Assurance Training

ENEC Management System Structure Enables ENEC s Vision and Mission through strategic planning Focused on organizational goals & objectives Organized by Functional Elements Functions stable, independence from organizational changes Functional leads responsible for their processes, procedures, documentation & implementation Consistent with ENEC Core Values and best practices Supports stakeholder engagement Robust performance monitoring, Corrective Action & Continual Improvement

Hierarchy of Nawah MS/ QA Document Policies MS Manual QA Manual Process Descriptions Supporting Procedures/ Work Constructions

ENEC QA Program Scope & Responsibilities ENEC is the Owner and License Holder for the Nuclear Power Plant Responsible for all activities including program management and oversight of the Prime Contractor (KEPCO) to address: Siting, design, engineering, procurement, construction, commissioning, operation, waste management & decommissioning phases of the NPP Prime Contractor has full scope responsibility for all aspects of the materials to be supplied, activities to be performed and work to be completed to fulfill Owner s requirements to achieve final completion of all units.

ENEC s Integrated Management System INVESTOR IN PEOPLE CIPS GOLD Procurement Integration ISO 9001 Quality Mgt. System ENEC OSHAS 18001 H&S Mgt. System ISO 14001 Environmental Mgt. System M.A.K.E. AWARD Knowledge Based Mgt. BS 25999 Business Continuity Mgt. ISO 27001 Information Security Mgt ISO 20000 IT Delivery & Support

Use of Nuclear and Generic Standards Federal Law No. 6 of 2009 concerning the peaceful uses of nuclear energy. Suppliers and Stakeholders FANR Regulation 01 for Management Systems for Nuclear Facilities. ASME NQA 1-1994 ASME NQA 1 1994 (with1995 addendum) Mandatory requirements Customer Satisfaction

ENEC Management System / QA Program Alignment of PC QA Programs UAE REQUIREMENTS Nuclear Law FANR Regulations ENEC OVERSIGHT 1-Technical & Contract management 2- Quality Vision & Mission Core Values Planning Management controls Functional Elements Stakeholders QA MANUAL PROCEDURES INSTRUCTIONS OTHER ENEC CONTRACT ORS KEPCO E&C PRIME CONTRACT OR Hyundai / Samsung Assessment KNF Doosan ENEC Management Model MAJOR SUB- CONTRACTORS/ SUPPLIERS

Prime Contractor

Assessments & Trends ENEC QS on PC Levels of Quality Oversight on BNNP Program QA (1,2&3) 1=Corp. QA Oversight of ENEC 2=CPO QA oversight of KEPCO & subs 3=KEPCO QA oversight of Subs QS #2 ENEC oversight of KEPCO QS QS#1 KEPCO oversight of contractors (random) Contractor / Supplier QC 100% responsible for inspections

Assessments & Trends ENEC QS on PC Presently ENEC QS is providing Oversight activities on site on a weekly basis Starting the beginning of 2012 ENEC will have permanent staff on site to perform oversight activities on the contractor KEPCO and its Sub contractor HSJV and their sub contractors Surveillance Plan for 2012 is to assign 8 ENEC QS staff in the 1 st quarter and increase to a staff of 12 by the beginning of 4 th quarter Presently no safety related work is being performed site

ENEC MS/QA Program Some of the key processes / procedures: Safety Culture Security Culture Self-Assessment Condition Reporting & Corrective Action Deficiency Notification Report Graded Approach for Management System Requirements Management System / QA Program Review

ENEC MS/QA Program Graded Approach ENEC provides the oversight function, Owner and License Holder : Prime Contractor (KEPCO) has full scope responsibility for all aspects of NPP at BRAKA site Within the PC program, the program is managed based on quality designations: Safety Related (Q) Safety Impact (T) Reliability Critical (R) Industrial Standard (S)

ENEC MS/QA Program Graded Approach ENEC Corrective Action Program: A robust and comprehensive CA program called Condition Reporting, put in place in 2010 Based on IAEA GS-G-3.1/3.5; ASME NQA-1 CRs raised through audits, self-assessments, self raised, areas for improvements, etc. CRs classification- A,B,C, D levels A,B,C level CRs- develop & document CA Plan D level CRs- develop CA Plan, or close to trend A,B level CRs- Causal Analysis (RCA,ACA)

How to initiate a Condition Report Select: Your name Your department Your manager Select Functional Element that should address the issue CR number is automatic Describe the condition and any actions taken Date condition occurred Attach pictures / documents Click submit! Your manager will get an email and will process the CR

Human Performance EQAM requires performance-based training programs for key personnel including Operations, Engineering and technicians We all should identify error precursors and utilize human performance tools! Coaching Peer Check Independent Verification Questioning attitude Procedure use and adherence Stop Think Act Review 3-way communication

Regulated Activities FANR license is required for: Selection of a site for Construction Preparation of a site for Construction Construction of a Nuclear Facility Commissioning of a Nuclear Facility Operation of a Nuclear Facility Safety significant modifications to facility or management system Possession, use, manufacture, handling, import, export, transportation, storage, disposal, of regulated material Introduction or removal of regulated material from facility Any other activity designated by FANR regulations

Licenses Obtained Site Selection License- Approved 28 February 2010: - Allows investigation of site - Not site specific and no end date - License Conditions require FANR notification of changes and an annual report Site Preparation License- Approved 8 July 2010: - Allows construction of non safety-related structures and excavation for safety-related structures - Authorizes work on all 4 units - License Conditions require FANR notification of changes and an annual report Limited Construction License for Manufacturing Approved 8 July 2010: (Amended to add MMIS and Intake/Discharge- 2 March 2011) - Allows fabrication and assembling of selected safety related components, systems and structures - Authorizes work on all 4 units - License Conditions require FANR notification of changes and an annual report

License Applications Submitted Braka Units 1 & 2 Construction License - Submitted 27 December 2010 Will allow manufacturing and construction of Units 1 & 2 Braka Units 1 & 2 Limited License - Submitted 13 October 2011 Will allow preparatory work for first safety-related concrete prior to Construction License

Assessments & Trends ENEC MS/QA Program FANR Inspections: FANR conducted 4 inspections in 2011 No major issues noted for QA Some areas for improvement identified Clarification sought on scope / responsibilities between ENEC; KEPCO and its contractors

BNPP Construction Wharf Excavation

BNPP Site Grading

BNPP Current Statistics More than 3000 staff and labour on site working on Infrastructure and Site Preparation works. Site service road, power supply, communications and water service to support construction completed. Over 70 infrastructure buildings, including housing, workshops, batch plant, construction offices and training facilities under construction or in operation. ENEC employ over 100 staff engaged in Oversight Work through it Chief Program Office.

Overall Summary ENEC has a comprehensive integrated management system for its corporate governance MS is based on best practices and widely used standards A robust, fully functional system, covers all key areas and focused on nuclear safety Quality Assurance Program is an integral part of the MS, focused on nuclear safety, compliant with NQA-1 PC and Supply Chain QA programs are aligned with ENEC QA requirements A balanced and innovative approach to manage nuclear corporation with a broad civil nuclear program

ENEC Management System & QA Program Q & A

Thank You