District 3A ITS Scoping Study. MEMORANDUM VI Implementation Plan



From this document you will learn the answers to the following questions:

What does the system provide?

What does CCTV stand for?

How do Mayday Systems Mayday systems help emergency responders respond to emergencies?

Similar documents
I-29 Corridor ITS Architecture and Systems Engineering Analysis

8 IMPLEMENTATION PLAN. 8.1 Introduction

Intelligent Transportation Systems Technical Report Summary

Traffic Incident Management Enhancement (TIME) Blueprint Version 2.0 Executive Summary

ITS Investment Strategy 10-Year Program, FY07-16

Task 7 Oahu ITS Integration Strategy

EFFORTS ACCOMPLISHED TO DATE

INTELLIGENT TRANSPORTATION SYSTEMS IN WHATCOM COUNTY A REGIONAL GUIDE TO ITS TECHNOLOGY

CHAPTER 8: INTELLIGENT TRANSPORTATION STSTEMS (ITS)

Rhode Island Department of Transportation ITS State Architecture Update

Intelligent Transportation Systems (ITS) Concept of Operations for Arterial Traffic Management

EXECUTIVE SUMMARY. Syracuse Metropolitan Area Intelligent Transportation Systems Strategic Plan

How to Use the MAG ITS Architecture and Website

7.0 Transportation Management

Portable Traffic Management System Smart Work Zone Application

Eastern RTMC.

Appendix A - Cost Estimate Spreadsheet

Olympic Region Traffic Management Center. Olympic Radio

Boston Traffic Management Center Activity Report for FY 2013 Real-time Traffic Signal Adjustments

Florida Statewide ITS Strategic Plan. Integration of ITS into the MPO Transportation Planning Process Issue Paper

Quick-Starting Your. Regional ITS Architecture Update

Delaware Department of Transportation Transportation Management Program

Metropolitan Intelligent Transportation Systems (ITS) Infrastructure 2010 Transportation Management Center

District Wide Traffic Incident Management Strategic Plan

Incident Management. Index. Purpose. Description. Relevance for Large Scale Events. Options. Technologies. Impacts. Integration potential

CHAPTER 8 Integration of Systems

The development of this ITS Communications Plan was a joint project of the Metropolitan Topeka Planning Organization (MTPO) and Kansas Department of

MAP 21 themes. Strengthens America s highway and public transportation systems. Supports the Department s aggressive safety agenda

Incident Management Challenges and Solutions

SURFACE TRANSPORTATION PROGRAM (STP) PROCEDURES FOR THE OKLAHOMA CITY URBANIZED AREA FUNDS

Some questions. What s next? What is the TMA? Why a TMC? What will the Chicago TMC do? What s done so far? Existing systems Related projects

The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan.

APPENDIX A Dallas-Fort Worth Region Transportation System Management Strategies and Projects

TRANSPORTATION Carson Howell, Analyst

Goals & Objectives. Chapter 9. Transportation

STATEWIDE ITS ASSETS 1

Table of Contents Introduction System Needs Potential Projects Background Objectives 5

Transportation Operations & Management Center Implementation Plan

DALLAS FORT WORTH REGIONAL INCIDENT MANAGEMENT PROGRAM AND COMMITMENT LEVEL SURVEY

September 8th 8:30 AM 10:00 AM PL1: Reinventing Policy to Support the New ITS

INDOT Long Range Plan

RPA 14/ATURA Surface Transportation Program (STP) APPLICATION FOR FUNDS

Central Regional Traffic Management Center

Policy for the Design and Operation of Closed-Circuit Television (CCTV) in Advanced Traffic Management Systems September 4, 2001

I-95 Corridor Coalition. Best Practices for Border Bridge Incident Management Executive Summary

Surface Transportation Program (STP) Projects

Chapter 5 Financial Plan

GENERAL. This manual addresses five local programs that are funded under the current Highway Act:

TRANSPORTATION OPERATIONS CENTER (TOC) STRATEGY

Moving Ahead for Progress in the 21st Century Performance Report

DVRPC/District 6 ROP Projects

CHAPTER 13. Transportation Systems Management & Operations

9. OPERATIONS AND MAINTENANCE PLAN. 9.1 Introduction. 9.2 Purpose of Operations and Maintenance Planning. 9.3 Project Operations Planning

Concept Of Operations: Fargo-Moorhead Traffic Operations Center

OM-13: Transportation Management and Operations

Traffic Management Centers

Federal Guidelines for STP-U Funding

Nashville Regional Intelligent Transportation Systems Architecture

SECTION 16 TRAFFIC/SAFETY SECTIONS 16.1, 16.2 AND 16.3 ARE UNDER DEVELOPMENT

CHAPTER 13. Transportation Systems Management & Operations

Intelligent Transportation Systems (ITS)

CHAPTER 4 SURFACE TRANSPORTATION PROGRAM (STP)

!"! # " " $$ January 2008

FREEWAY CORRIDOR TRAFFIC MANAGEMENT

Table of Contents 1. INTRODUCTION INVENTORY OF EXISTING ITS IN THE TULSA REGION...3

Chapter VIII: Long-Term Outlook and the Financial Plan

Transportation Management & Operation

Traffic Operations Center Concepts for South Dakota

Safety Engineering Policy Memorandum

Regional Surface Transportation Program Policy and Allocation

CHAPTER 8 INTELLIGENT TRANSPORTATION SYSTEMS

Transportation System Operations and Intelligent Transportation Systems

FINAL Intelligent Transportation Systems (ITS) Deployment Strategy for the FM Metropolitan Area December 2014 Prepared For Originally Prepared By:

INVESTIGATION OF ASIM 29X, CANOGA, RTMS, SAS-1, SMARTSENSOR, TIRTL & OTHER SENSORS FOR AUTOMATIC VEHICLE CLASSIFICATION

Table of Contents ESF

Activity Report for FY 2010 Real-time Traffic Signal Adjustments

TRAFFIC INCIDENT MANAGEMENT OPERATIONS GUIDELINES Omaha Council Bluffs March 24, 2011

A Case for Real-Time Monitoring of Vehicular Operations at Signalized Intersections

The New Brunswick Intelligent Transportation Systems (ITS) Strategic Plan

LA/VENTURA REGION ITS STRATEGIC DEPLOYMENT PLAN TABLE OF CONTENTS

Mainstreaming Incident Management in Design-Build: The T-REX Experience


OREGON TRANSPORTATION PLAN UPDATE Technology in Transportation. Table of Contents

(This page intentionally left blank.)

Federal Highway Administration 1200 New Jersey Avenue, SE Washington, DC

FINAL Advanced Traffic Management System (ATMS) Concept of Operations

PennDOT Traveler Information and Traffic Management Systems Opportunities for Public Private Partnerships. January 9, 2013

Wireless Traffic Management System

Kansas City Scout Traffic Management Center Monthly Report

Knoxville Regional Transportation Planning Organization. Certification Review Report. April 2012

Engineered solutions within reach TRAFFIC CONTROL & INTELLIGENT TRANSPORTATION SYSTEMS

GAO INTELLIGENT TRANSPORTATION SYSTEMS. Improved DOT Collaboration and Communication Could Enhance the Use of Technology to Manage Congestion

South Carolina Multimodal Transportation Plan Vision, Goals, Objectives, and Performance Measures

Module 2.1. Page 1 of 10. Slide 1

QUALITY TRAFFIC INFORMATION

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011

TIM/PSE Peer-to-Peer Overview

Los Angeles Regional Transportation Management Center

Business Intelligence System for Traffic Data Integration: Linking Roadway, Collision and Traffic Flow Data to Improve Traffic Safety

Intergraph Roadway Information Management Solution. Title Title. Title Title. A White Paper

Transcription:

District 3A ITS Scoping Study MEMORANDUM VI Implementation Plan March 2004 Prepared by

TABLE OF CONTENTS VI. IMPLEMENTATION PLAN... VI-1 A. Overview...VI-1 B. Conceptual Design Approach...VI-1 1. Deployment Schedule and Phasing...VI-1 2. System Component Descriptions...VI-4 3. Migration Plan...VI-11 4. Software...VI-11 5. Systems Integration...VI-11 6. Cost Estimates...VI-11 C. Integration/Scalable Opportunities...VI-13 D. Funding Alternatives...VI-13 1. Government-Funded Programs...VI-14 2. Public-Private Partnerships...VI-15 E. Operations and Management Plan...VI-15 1. Operations...VI-16 2. Maintenance...VI-16 3. Personnel Resources...VI-17 4. Training...VI-18 LIST OF FIGURES Figure VI-1 Short and Intermediate Term Implementation Plan Field Elements VI-3 LIST OF TABLES Table VI-1 Deployment Schedule Table VI-2 Mn/DOT District 3A ITS Scoping Study Implementation Plan VI-2 VI-12 i

VI. IMPLEMENTATION PLAN A. Overview Previous project memoranda have identified and documented the following: outreach, inventory and research activities, existing or baseline transportation related conditions, user problems and needs, and recommended Intelligent Transportation System (ITS) technologies. This document provides an implementation strategy and sequence of deployments at a conceptual level to implement the ITS elements of the District. This document identifies a program of coordinated activities by defining what, where, and when these activities will happen. In addition, this document considers the phasing, staffing, and funding options available for deploying the ITS. B. Conceptual Design Approach The conceptual design of the ITS for District 3A has been developed in a series of steps documented in previous memoranda. The insight and information obtained through these steps from partner agencies was critical in the development of the ITS conceptual design for the District. Based upon the partner agency requirements and expectations, many ITS technologies were identified and assessed. As a result, the most applicable ITS technologies and elements for implementation in the District 3A transportation corridor were identified. 1. Deployment Schedule and Phasing Table VI-1 lists the identified recommended ITS technologies for District 3A. The technologies are grouped by anticipated deployment phase. Short-term projects represent initiatives that are recommended for deployment within the next two years. Intermediate projects should be considered for implementation between three and five years from the date of this memorandum. Deployment of projects that have been identified as long-term should be considered beyond six years from the publication date. However, the phasing of recommended technologies will need to be reevaluated as funding becomes available and as the needs of stakeholders and partner agencies develop over the coming years. VI-1

Table VI-1 Deployment Schedule Short Term (0 2 years) Emergency Vehicle Preemption Closed Loop Signal Control Closed Circuit Television (CCTV) Surveillance Road Weather Information Systems (RWIS) Inductive Loop and Non-Invasive Detection Weather Information Dissemination Systems Dynamic Message Signs (DMS) Interagency Signal System Coordination Automatic Anti-Icing System Route Diversion System Paratransit Reservations/Scheduling/Dispatch Software Computer Aided Dispatch (CAD) Control Center Intermediate Term (3 5 years) Inductive Loop and Non-Invasive Detection Automatic Anti-Icing System Seasonal Service Patrols Closed Circuit Television (CCTV) Surveillance Dynamic Message Signs (DMS) Road Weather Information Systems (RWIS) Automatic Vehicle (AVL) Highway-Rail Alert/Crossing Systems Automated Visibility Warning Systems Paratransit Reservations/Scheduling/Dispatch Software Access for County/City Agencies Long Term (6 10 years) Closed Circuit Television (CCTV) Surveillance Dynamic Message Signs (DMS) Seasonal Service Patrols Transit AVL/MDT Systems Public Vehicle Fleet Management Systems Smart Plows/Agency Vehicle Monitoring Integrated Land/Mobile Radio Integrated Weather Monitoring/Prediction Systems Integrated Communications Systems Paratransit Reservations/Scheduling/Dispatch Software Ongoing Public Agency Outreach for Transportation Management Television/Radio Information on the Internet 511/Traffic Information Telephone Number Mayday Systems Geographic Information Systems (GIS) Coordination of Rural Transit Services VI-2

\\IL01SNT01\projects\040012.002\Memoranda\IPM\Imp Plan Memo.doc VI-3

2. System Component Descriptions Each of the functions of an ITS requires one or more elements or components. A number of these components require hardware that must be physically in place; others are procedures and strategies that are enacted by agency personnel. Generally, these components can be categorized as existing either in the field, as part of a communication linkage, or within a control center. Therefore, the ITS components of District 3A have been broken down into three categories: field elements, integration/control center, and communications. Proposed field element locations for the short and intermediate term vision are shown in Figure VI-1. a. Field Elements (1) Emergency Vehicle Preemption Emergency vehicles occasionally run into heavy queues near signalized intersections. Emergency vehicle preemption is a system that will be installed allowing emergency vehicles to receive a green signal and clear the queue as they approach an intersection. This system consists of a transmitter located inside the emergency vehicle and a receiver and confirmation light mounted on the traffic signal poles or mast arms. Transmitters are typically installed on fire and ambulance vehicles. s District 3A Signals Little Falls Ambulance Services Various Fire Vehicles (2) Closed Loop Traffic Signal Control Closed loop traffic signal control allows for real-time coordination of traffic signals using a centralized software system. A field master communicates directly with the centralized software and in turn, communicates to local traffic signal controllers. Closed loop systems can communicate via fiber optics, wireless, twisted pair, and telephone lines. Closed loop systems maximize the efficiency of corridor traffic signal operations. s Brainerd, Baxter, Little Falls Traffic Signals Central Control Software at and City Engineering (3) Closed Circuit TV (CCTV) Surveillance Pan-tilt-zoom CCTV cameras will be used throughout the district as an effective tool for monitoring traffic conditions and verifying incidents on major routes and at major intersections. Also, several existing camera VI-4

sites will require upgraded communications links to enhance the quality of video at the. Camera s Baxter (HWY 210 @ HWY 371) Brainerd (HWY 210 @ 8 th Ave. and RTE. 3) Fort Ripley Nisswa Garrison Onamia Remer Long Prairie All existing RWIS Sites Communications Upgrade s Baxter (HWY 210 @ Business HWY 371) Brainerd International Raceway (HWY 371 north of Baxter) (4) Road Weather Information Systems (RWIS) Road weather information systems provide site specific weather information for key points in the district. RWIS also provides information for weather prediction models and can be used for traveler information purposes. s Fort Ripley Nisswa Garrison Long Prairie Onamia Remer (5) Dynamic Message Signs (DMS) DMS installations will be either permanent or temporary, depending on location. In general, these electronic signs will provide updates to the motoring public on construction staging, travel times, and incidentrelated information. s HWY 371 (North and South of Baxter) HWY 169 (South of Onamia, North of HWY 18, North of Milaca) HWY 6 (North of HWY 18) HWY 10/371 (North of Little Falls) Motley (Northbound and Eastbound) Aitkin (6) Automatic Anti-Icing System VI-5

Automatic anti-icing systems are installed at locations prone to icy conditions. Anti-icing systems dispense a chemical solution on the roadway when conditions warrant. Anti-icing systems are typically installed on bridge decks. These systems benefit drivers by increasing highway safety at specific locations. s TH 10 Eastbound Royalton Bridge RTE 3 (North of Brainerd) HWY 10 (North of Little Falls) (7) Route Diversion Systems Route diversion systems provide an effective tool for law enforcement to quickly and easily implement an alternate route during major incidents and construction. Route diversion systems typically include static signing, variable message signs, and increased coordination between agencies. Route diversions allow drivers to continue their travels at a reasonable rate of speed in the event that a major route becomes blocked or closed. HWY 371 (North of Baxter) (8) Inductive Loop and Non-Invasive Detection Depending on the location, both intrusive (in-pavement) and nonintrusive detection systems will be used on the freeway segments in the District. The volume, speed, and occupancy data obtained from these detectors will be used to monitor traffic conditions, detect incidents, and provide traveler information. s Fort Ripley Nisswa Garrison Long Prairie Onamia Remer Verndale Rice (9) Seasonal Service Patrols Service patrols provide an early response to motorists involved in crashes and vehicle breakdowns. Service patrols are assigned to a specific route with high traffic volumes and frequent incidents. In District 3A, service patrols would be used during seasonal peaks to alleviate traffic congestion due to incidents. VI-6

HWY 371 (Baxter to Pequot Lakes) (10) Automatic Vehicle (AVL) Automatic vehicle location allows dispatchers to know the exact location and status of their agencies vehicles. AVL maximizes the efficiency of maintenance operations and emergency vehicle response. AVL software is part of a statewide initiative and the migration plan. Districtwide (11) Highway-Rail Alert/Crossing Systems Railroad crossing detection will be used at highway-rail intersections near emergency vehicle response stations and high volume intersections for the coordination of vehicular and train movements. Specifically, railroad crossing detection will provide responders and travelers with information on the blocked crossings. s To be determined (12) Automated Visibility Warning Systems Automated visibility warning systems make use of specialized sensors and variable message signs to alert motorists of low visibility conditions. Automated visibility warning systems are typically used for fog and blizzard conditions. Garrison (South) (13) Transit AVL/MDT Systems Transit AVL/MDT systems provide real time transit locations and communications for transit operators and dispatchers. These systems can be cost effective for small transit operations and increase operational efficiency. s Mille Lacs Crow Wing Wadena b. Integration/Control Center (1) Weather Information Dissemination Systems VI-7

Weather information dissemination systems make use of RWIS data to provide motorists with the latest weather conditions on heavily traveled corridors. The RWIS information would be integrated with the existing 511 traveler information system. - Baxter (2) Interagency Signal System Coordination Interagency signal system coordination allows agencies to access adjacent traffic signal system data for coordination purposes. System coordination maximizes the efficiency of corridor signal operations. Baxter - Brainerd (3) Computer-Aided Dispatch (CAD) Computer aided dispatch is part of a larger ongoing statewide initiative to integrate emergency services and maintenance responders via mobile computer systems. CAD allows dispatchers an additional means to communicate with emergency responders and maintenance operators. - Baxter (4) Control Center The statewide program is in the process of upgrading nine control center facilities throughout Minnesota. The control center is the primary means for communicating with and operating field elements recommended for implementation. The control center also provides an entry point for local agencies, such as cities and counties, to access traveler information data from Mn/DOT and the Minnesota State Patrol. - Baxter (5) Paratransit Reservations/Scheduling/Dispatch Software Paratransit operations software allows paratransit agencies to maximize efficiency of services using computer based scheduling and customer data. s Crow Wing Mille Lacs Wadena VI-8

(6) Public Vehicle Fleet Management Systems Public vehicle fleet management systems are closely linked with automatic vehicle location technology. Public vehicle fleet management provides a database for storing information acquired from the fleet utilizing the AVL technology. - Baxter (7) Smart Plows/Agency Vehicle Monitoring The intelligent vehicle initiative provides state of the art technology for snow plows including collision avoidance systems, driver heads up display, GPS location, and others. Smart plows can increase the safety and efficiency of winter maintenance operations. - Baxter (8) Integrated Weather Monitoring/Prediction Systems Integrated weather monitoring and prediction systems make use of RWIS sensor data and control center software to develop models to predict weather patterns. The information provided by the monitoring and prediction systems can be used by managers for staffing assignments and to provide traveler information for the motoring public. - Statewide (9) Television/Radio Television and radio provide a large audience for traveler information. Television and radio can provide important travel information to their viewers/listeners by accessing pre-approved data. - Baxter (10) Information on the Internet The Internet provides a large audience for traveler information. Traveler information can be provided to Internet users allowing them to access real-time travel information. The Internet is also an entry point into the latest in-vehicle information displays and will eventually provide travel information to drivers on demand. - Baxter/Statewide VI-9

(11) 511/Traffic Information Telephone Number 511 is the dedicated traveler information telephone number. Mn/DOT currently operates an extensive 511 program that can be accessed via phone and the internet. New information will need to be integrated into the 511 system as data becomes available. Baxter/Statewide (12) Mayday Systems Mayday systems provide improved response times for emergency responders by locating and identifying traffic incidents early. The should serve as the answering point and coordinator for any mayday activated responses. Baxter/Statewide (13) Geographic Information Systems (GIS) Geographic Information Systems can be a valuable tool for planning purposes. Data collected from field devices and the should be put into a format that is GIS compatible. The databases would be made available to other agencies such as the regional planning commission, local government, and law enforcement. - Baxter (14) Coordination of Rural Transit Services Rural transit service coordination benefits rural transit agencies, by combining the efforts of scattered transit and paratransit agencies to improve the efficiency and effectiveness of regional transit. Districtwide c. Communications (1) Integrated Communications Systems Integrated communications systems utilizes technologies to coordinate inter-agency operations in real-time. Integrated communications are the first step to exchanging information between agencies. Districtwide VI-10

3. Migration Plan (2) Integrated Land/Mobile Radio Emergency responders use land-mobile radio systems to dispatch units to respond to an incident. Assigned frequencies based upon their parent agency and function, the responders are typically unable to use their radios at the incident site. There are on-going efforts to integrate these systems to improve communications at an emergency. Districtwide The Migration Plan outlines the effort by the Minnesota Department of Transportation and Department of Public Safety to integrate services and deploy regional traffic operations communications centers throughout the state. One such deployment is located in District 3A at the State Patrol District 2800 headquarters. The current facility includes two operator computer workstations. During future expansion to the communications facility, space for a third operator workstation is recommended. The plays a major role in the operations of field equipment recommended for implementation by this study. The also provides a gateway for the availability of travel information by providing regional information to the statewide 511 traveler information system. 4. Software ITS software will be required to operate and control the ITS elements in District 3A, as well as integrate local operations. The program currently makes use of the Virtual Traffic Operations Center (VTOC) software provided by ADDCO, Inc. The VTOC software provides numerous operational modules and can be customized specifically for District 3A. 5. Systems Integration The integration of ITS components with existing elements, systems, and control centers is an issue that has routinely been discussed to date amongst partner agencies. Partner agencies have expressed an interest to have all ITS components and subsystems required for the implementation of the ITS system to be integrated to the extent possible in order to be able to communicate with each other and work together. As such, the ITS should be designed to provide flexibility and accommodate system expansion so that components and subsystems will be easily integrated. 6. Cost Estimates Table VI-2 includes cost estimates for the implementation of the recommended ITS technologies. Costs are shown in 2004 values. related programs are assumed to be already funded through the statewide program. The overall program cost is estimated to be about six million dollars, including annual operations and maintenance costs. VI-11

Table VI-2 Mn/DOT District 3A - ITS Scoping Study Implementation Plan PRIORITY PROJECT LOCATION(S) NUMBER OF UNITS UNIT COST DEPLOYMENT COST ANNUAL OPERATIONS & MAINTENANCE COST Short Term (0-2 years) Emergency Vehicle Preemption - In Vehicle Actuators High Little Falls, Ambulance Services, Various Fire Vehicles 40 $1,500 $60,000 $3,000 Emergency Vehicle Preemption - Traffic Signal Units High District 3A Signals 13 $8,000 $104,000 $5,200 Closed Loop Signal Control - Communications Medium Brainerd, Baxter, Little Falls Signals 17 $10,000 $170,000 $8,500 Closed Circuit TV (CCTV) Surveillance High Baxter (HWY 210 @ HWY 371), Brainerd (HWY 210 @ 8th Ave. & RTE 3), Nisswa**, All 8 Existing RWIS Sites 12 $30,000 $360,000 $18,000 Closed Circuit TV (CCTV) Communications Upgrade High Baxter (HWY 210 @ Business HWY 371), BIR (371 N of Baxter) 2 $15,000 $30,000 $1,500 Road Weather Information Systems (RWIS) High Nisswa 1 $30,000 $30,000 $1,500 Inductive Loop and Non-Invasive Detection High Nisswa**, Verndale**, Rice** 3 $5,000 $15,000 $750 Weather Information Dissemination Systems* Dynamic Message Signs (DMS) High HWY 371 (North & South of Baxter), HWY 169 (South of Onamia, North of HWY 18, North of Milaca), HWY 6 (North of HWY 18), HWY 10/371 (North of Little Falls) 7 $70,000 $490,000 $24,500 Automatic Anti-Icing System High TH 10 EB Royalton Bridge 1 $20,000 $20,000 $1,000 Route Diversion Systems High HWY 371 (North of Baxter) 1 $75,000 $75,000 $3,750 Paratransit Reservations/Scheduling/Dispatch Software Medium Crow Wing 1 $3,000 $3,000 *** Computer-Aided Dispatch (CAD)* Control Center* Sub-Total $1,357,000 $67,700 Intermediate Term (3-5 years) Inductive Loop and Non-Invasive Detection High Onamia**, Remer**, Fort Ripley**, Garrison**, Long Prairie** 5 $5,000 $25,000 $1,250 Emergency Vehicle Preemption - Traffic Signal Units High District 3A Signals 13 $8,000 $104,000 $5,200 Automatic Anti-Icing System High HWY 10 (North of Little Falls), RTE 3 (North of Brainerd) 2 $200,000 $400,000 $20,000 Closed Circuit TV (CCTV) Surveillance Medium Onamia**, Remer**, Garrison**, Fort Ripley**, Long Prairie** 5 $30,000 $150,000 $7,500 Dynamic Message Signs (DMS) Medium Motley (NB and EB), Aitkin 3 $70,000 $210,000 $10,500 Road Weather Information Systems (RWIS) Medium Onamia, Remer, Garrison, Fort Ripley, Long Prairie 5 $30,000 $150,000 $7,500 Automatic Vehicle (AVL)* Highway-Rail Alert/Crossing Systems Low TBD 10 $16,000 $160,000 $8,000 Automated Visibility Warning Systems Low Lake Mille Lacs 2 $75,000 $150,000 $7,500 Paratransit Reservations/Scheduling/Dispatch Software Low Mille Lacs, Wadena 2 $10,000 $20,000 *** Access for County/City Agencies**** High Brainerd, Baxter, Little Falls, Crow Wing County, Cass County, Morrison County 6 $25,000 $150,000 $7,500 Sub-Total $1,519,000 $74,950 Long Term (6-10 years) Closed Circuit TV (CCTV) Surveillance Medium TBD 2 $30,000 $60,000 $3,000 Dynamic Message Signs (DMS) Medium TBD 2 $70,000 $140,000 $7,000 Seasonal Service Patrols Low HWY 371 (Baxter to Pequot Lakes) 5 $30,000 $150,000 NA Transit AVL/MDT Systems Low Mille Lacs, Crow Wing, Wadena 15 $10,000 $150,000 $7,500 Interagency Signal System Coordination TBD Brainerd/Baxter 1 $20,000 $20,000 $1,000 Closed Loop Signal Control - Control Software TBD Brainerd/Baxter/ 1 $200,000 $200,000 $10,000 Public Vehicle Fleet Management Systems* Smart Plows/Agency Vehicle Monitoring* Integrated Land/Mobile Radio* Integrated Weather Monitoring/Prediction Systems* Integrated Communications Systems* Paratransit Reservations/Scheduling/Dispatch Software Low Cass, Todd Counties (New Systems) 2 $10,000 $20,000 *** Upgrade Paratransit Software Low Crow Wing, Mille Lacs, Wadena, Cass, Todd 5 $10,000 $50,000 *** Sub-Total $790,000 $28,500 Ongoing Public Agency Outreach for Trans. Man. High 10 $2,000 $20,000 NA Districtwide Television/Radio High 10 $5,000 $50,000 NA Information on the Internet* 511/Traffic Information Telephone Number* Mayday Systems* Geographic Information Systems (GIS)* Coordination of Rural Transit Services Medium Districtwide 10 $5,000 $50,000 NA Sub-Total $120,000 Contingency 20% $757,200 $283,820 Total $4,543,200 $1,702,920 Total Yearly Cost Breakdown (per year, including operations and maintenance costs) Year 1 $758,200 Year 2 $758,200 Year 3 $660,983 Year 4 $660,983 Year 5 $660,983 Years 6-10 (per year) $341,150 Total Program Cost $6,246,120 * Funded under existing Mn/DOT Program ** Part of RWIS Installation *** Transit O&M Costs Programmed by Local Agencies **** Possible Future Access for Cities/Counties with Transit NOTE - All Costs Shown in 2004 Dollars Mn/DOT District 3A ITS Scoping Study - VI-12

Several ITS efforts that are identified as being priority in this plan are expected to move forward as elements of broader statewide projects or programs such as the Transportation Operations and Communications Center () project. Although these proposed efforts would not be pursued at the District level, they are considered integral to the overall vision of this District plan. C. Integration/Scalable Opportunities Many similarities exist between the rural areas of Minnesota and several technologies from the District 3A Scoping Study have been recommended in other areas of the state. Several initiatives that have been discussed could be implemented on a statewide or regional basis. Implementing the technology on a regional or statewide basis would be beneficial in many ways. Procurement of equipment would be more cost effective and compatibility between devices would be almost guaranteed. The learning curve for operations and maintenance would be drastically reduced by using knowledge from other districts that may have already implemented similar systems. The systems identified throughout the state for possible statewide or regional deployment include the following. (Initiatives recommended for implementation in District 3A in bold.) Emergency Vehicle Operations Rural Transit Travel Information Awareness and Dissemination Speed Reduction/Traffic Calming RWIS Upgrades/Additional Installations Deployment and Integration with other s or centers CVO Traveler Information Anti Icing Automatic Vehicle (AVL) Interagency Communications Agency Agreement Documentation Highway Railroad Intersection Safety and Train/Crossing Detection Portable Dynamic Message Sign (PDMS) Deployment D. Funding Alternatives The principal source of government funding for transportation-related projects in the past decade has been through the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA) and the Transportation Equity Act for the 21 st Century (TEA-21) passed in 1998. ISTEA provided and authorized federal funding for highway, highway safety, public transit, and other surface transportation programs. TEA-21 has built on and continues the initiatives established by ISTEA and combines them with new initiatives. These initiatives seek to meet the challenges of improving safety as traffic continues to increase at record levels, while protecting and enhancing communities and the natural environment, and advancing economic growth through providing efficient, safe, and flexible transportation. Specifically as it relates to ITS, TEA-21 established the ITS Deployment Program to facilitate the integrated deployment of ITS in the United States. The ITS Deployment Program includes two main components: the ITS Integration component and the Commercial Vehicle ITS Infrastructure Deployment component. In general, the ITS Integration component provides federal ITS funding for the integration and interoperability of ITS in metropolitan and rural areas; and, the Commercial Vehicle ITS Infrastructure Deployment component provides federal ITS funding to deploy Commercial Vehicle Information Systems and Networks (CVISN). VI-13

In addition to ITS funding programs under TEA-21, several of the following standard funding categories have also been used to fund ITS related activities: 1. Government-Funded Programs a. Congestion Mitigation and Air Quality Program (CMAQ) This funding category can only be applied to projects that do not expand highway capacity for single occupant vehicles and that have quality benefits in Clean Air Act non-attainment areas for ozone and carbon monoxide. b. National Highway System (NHS) The NHS funding category can be applied to any road defined by the State of Minnesota. Project types eligible for funding on these facilities includes: construction; reconstruction; maintenance and operational improvements; safety; traffic management; parking areas; carpool/vanpool projects; and bicycle/pedestrian projects. Projects on NHS routes must be included in the Transportation Improvement Program (TIP). c. Surface Transportation Program (STP) The STP funding category can be applied to any road classified as an urban or rural arterial, urban collector or rural major collector. Project types eligible for funding on these facilities includes: construction; reconstruction and maintenance of roadways and bridges; transit capital projects; safety projects; traffic monitoring, management and control projects; air quality related transportation control measures; and planning and management activities. Projects on STP routes in urban areas must be included in the Metropolitan TIP. d. STP Set Aside for Safety Improvement Program The overall objective of this funding category is to reduce the number and severity of accidents and decrease accident potential on all public roads other than interstates. This funding mechanism includes planning, implementation, and evaluation of safety programs and projects under processes developed by the state and local governments and FHWA. e. Traffic Impact Mitigation Funding This category can be applied to highway construction projects that can cause traffic to divert to alternate routes. In many cases, diversion tends to occur on local streets near the construction area. Typically, construction projects designate funding to help mitigate or reduce the traffic impacts generated by the project. Re-timing of traffic signal systems, additional law enforcement, enhanced freeway patrols in construction zones, and additional traveler information are examples of traffic mitigation measures that have been utilized in other parts of the country. VI-14

f. Other Funding Other potential government funding sources could include emergency government, Department of Natural Resources Hazardous Materials Program (DNR HAZMAT), Minnesota State Police and County Sheriff resource programs, and the state tourism program. These programs could assist with: enhanced freeway patrols; patrol vehicle push bumpers; accident investigation sites; computer-aided dispatch (CAD) and 911 enhancements; incident management legislation; and, traveler information programs. 2. Public-Private Partnerships Public-private partnerships have been used to both leverage and increase funding resources for ITS projects. Some examples of potential private partners that have assisted with service patrols, traveler information, and communications networks located in other areas of the country are: utility and telecommunications companies; commercial radio and TV companies; trucking organizations; and insurance companies. Beyond these ITS funds and alternatives, it is expected that partner agencies will continue to seek supplemental ITS funds from other normal federal funding programs and resource sharing opportunities such as those noted above. This approach is consistent with national trends towards mainstreaming ITS activities into the more traditional transportation project funding requests. It should also be noted that national trends are also moving towards making provisions for federal funding of operations and management related activities. This is particularly relevant to District 3A because of the significant effort that will ultimately be involved in operating and maintaining the ITS. As such, partner agencies should stay abreast of any developments in this area in particular in order to maximize the potential for supplemental and future ITS funds. E. Operations and Management Plan The success of the ITS will depend on the commitment of the partner agencies to provide adequate resources to operate and maintain the system. Typically, the focus is on the costs of constructing and installing the ITS elements and little attention is given to the follow-on operations and maintenance of the system. In addition, this problem has been magnified in recent years by the increasing complexity of the ITS components being implemented. It is recommended that these documents be prepared by an ITS consultant using a process that would include such items as surveys, interviews, and meetings. These meetings would discuss partner expectations; evaluate alternative operational scenarios, strategies and control tactics; evaluate maintenance alternatives; and provide a neutral forum for resolving conflict and reaching a consensus on operational and maintenance-related issues. The ITS Operations Plan would be written to provide guidance for the day-to-day operations of the ITS elements, and to define the jurisdictional roles and responsibilities of each partner agency. An ITS Maintenance Plan would be written to define the maintenance roles and responsibilities for each partner agency s specific ITS components of the project. In addition to addressing VI-15

operational and maintenance procedures, these plans would need to address the staffing, training, and support equipment requirements of each agency. 1. Operations operations should be standardized on a statewide basis to maximize the effectiveness of the program and enable information sharing between centers. The program plans to act as a communications hub for the following services: emergency response, enforcement, incident management, transit services (where possible), maintenance operations, traffic management, and traveler information. operations staff will need to be proficient communicators for all of the services to be provided. Comprehensive training and an operations guide will provide resources and basic functional information for the operators. Local agencies involved with the operations should also be trained on the basic applications and limitations for the. The planned hours of operation are 24 hours a day, seven days a week. operators would continue their primary duties of answering 911 calls and communicating with state patrol field officers. The additional information available to the operators would enhance their ability to provide field officers with information. Increased capabilities would also allow dispatchers to communicate pertinent information to the media, traveling public, and other agencies. 2. Maintenance a. Design Modification/Configuration Management Problems with the design or operation of ITS often develop, or only become apparent, after implementation. As a result, a design modification can be required to correct a recurring problem or to update the ITS equipment to current design standards and specifications. Typical design modifications could include the addition or removal of special equipment, new software functions, changes in displays, configurations, or locations, and upgrading ITS equipment or communications system components. However, once a system has been placed in operation, no changes to the system should be made without assessing their impact on existing operations and maintenance. Policies and procedures should be established and followed to approve and document all changes to the equipment and system configurations hardware or software. b. Preventative Maintenance This level of maintenance is the most labor intensive. However, it is also the most efficient and least intrusive on system operations. It typically consists of periodically testing the equipment to validate its performance, predicting and preventing system failures by routinely replacing expendable hardware, and cleaning the equipment and its enclosures. The intent of preventative maintenance is to keep the ITS components and equipment operating at their asinstalled conditions. As a result, interruptions are scheduled to minimize their impact on system operations. VI-16

c. Responsive Maintenance 3. Personnel Resources With responsive maintenance, agencies limit maintenance to only those systems experiencing problems and outages. This level of maintenance includes both field procedures used to restore operation as well as shop procedures to repair and rehabilitate the malfunctioning equipment. In general, responsive maintenance has six steps: 1) Notification; 2) Site Security; 3) Fault Isolation; 4) System Restoration; 5) Equipment & System Rehabilitation; and 6) Documentation. Depending on the nature of the problem and its severity, Steps 4 and 5 can be combined. Responsive maintenance will keep the system operating between the as-built and failed-system conditions. Each partner agency should have a plan describing acceptable responses in terms of staff and timeliness for every ITS subsystem and their major component. These three levels of maintenance can be broken down further into functional classifications: local-control, system-control, and physical plant. Examples of local-control items include intersection vehicle-detectors, traffic signal interconnects, traffic signals and other ITS equipment hardware. System-control items include the communications backbone and local distribution, video surveillance subsystem, vehicle detection subsystem, dynamic message signs and their subsystem, local and distributed firmware, computer hardware, and software. The physical-plant includes, for example, furniture, the heating and air conditioning system, and the electrical power distribution, and telephone systems. Over the last decade, the FHWA, in partnership with other transportation organizations (FTA, ITS America, etc.), has comprehensively investigated the staffing levels, personnel skills, and training requirements for ITS applications and traffic control systems. Their research has identified that a majority of ITS applications and traffic control systems are not operating at their full potential. They identified the predominant problems as: A lack of commitment to provide adequate funding and staffing for day-to-day operations and comprehensive maintenance The staff s lack of technical knowledge of how the ITS related hardware and software functions, as well as the general principles of traffic operations and how to use the ITS equipment To ensure that the greatest benefit from the implementation of the ITS plan, adequate operational and maintenance staffing levels and expertise must be provided. Several ITS components will be new and current personnel will not have the time to operate and maintain these new ITS field devices and communications systems. In addition, maintaining the ITS system elements will require different skill-sets from those that are currently used for existing system operations. Accordingly, it is important that the partner agency staff be included in the discussions throughout the ITS design and deployment process. This will help to ensure that the appropriate knowledge will be provided on the operations and maintenance of all ITS components. Though the VI-17

Migration Plan identifies future needs for equipment and facilities, the plan fails to address the future staffing needs for the ITS program. 4. Training The new ITS element will require that the staff of the partner agencies be involved in a variety of new functions and responsibilities. Accordingly, these personnel will need to be trained on the ITS hardware, software, and communications systems, along with any algorithms that may be used, in order to perform their jobs in a capable manner. At the very least, staff must have a basic understanding and be knowledgeable and capable of working with those aspects of the ITS that directly interface with their agency s operations. Therefore, it is recommended that operations, maintenance, and software training be conducted periodically throughout the ITS deployment and that it include all impacted employees. To initiate this training, two recommended training sessions include the Incident Management Training Program sponsored by the FHWA and the ITS Peer-to-Peer Program sponsored by the FHWA, Federal Transit Administration, and Federal Motor Carrier Safety Administration. These sessions along with other training sessions will provide public sector transportation stakeholders with a convenient method to tap into the growing knowledge base of ITS experience and receive short-term assistance on operating and maintaining the ITS element. All of these ITS related training sessions should be videotaped for use by future employees. In addition, these videotapes should form the basis of an on going ITS training program for the partner agency staff. VI-18