Renewable Energy Feed-in Tariff Projects Regulations

Similar documents
QUALIFICATIONS REQUIREMENTS FOR INVESTORS TO PARTICIPATE IN FEED-IN TARIFF SCHEME

Feed-in Tariff for Wind and Solar Energy in Egypt

Full Scale Program for Renewable Energy in Egypt

Egypt Renewable energy Projects. Eng. Lamya Youssef Head Of FIT Unit Central Unit Egyptian Electricity Transmission Company EETC

Current and expected contribution of RES-E in NA countries

The Status of the Wind Power Market in Egypt. Dr. Walid El-Khattam Ain Shams University (Cairo, Egypt) The Egyptian Electricity Regulator (EgyptERA)

Electricity in Egypt

Arab Republic of Egypt Ministry of Electricity & Energy New & Renewable Energy Authority (NREA)

Renewable Energy in the manufacturing and tourism industry in Egypt. Regulatory Framework and market potential

Future of Renewable Energy in Egypt

ORGANIZATION CHART OF MINISTRY OF ELECTRICITY & RENEWABLE ENERGY MoERE

Development in Egypt. Egyptian Electricity Holding Company - EEHC

Overview of the Electricity Sector in Egypt

Renewable Energy in Egypt

Renewable Energy Strategy for 2020 and Regulatory Framework. Eng. Hatem Amer Egyptian Electric Regulatory and Consumer Protection Agency

Current Status and Future Prospects for the Power Market in Egypt

Eng.Mostafa. Ibrahim Khamis. Dr. Shaher Anis Mahmoud. Eng.Ehab. Ehab Ismaeel Amin. Acc. Hazem Ahmed Abdelhalim

Prospects of the Renewable Energy in Egypt

Wind Energy in Egypt

Solar in Egypt: New feed-in-tariff scheme to develop PV

Renewable Energy in Egypt. October 2013

Sustainable and Renewable Energy Development Authority (SREDA) of Bangladesh Role and Responsibility

RENEWABLE ENERGY DEVELOPMENT IN LITHUANIA ACHIEVEMENTS AND DRAWBACKS

Solar Energy in Africa Experiences from Ghana

welcome! Turkish Renewable Energy Market Rome 29 th April 2015 Levent Çelepçi

RES in Egypt: state of the art and future developments

MINISTRY OF ENERGY FEED-IN-TARIFFS POLICY ON WIND, BIOMASS, SMALL-HYDRO, GEOTHERMAL, BIOGAS AND SOLAR RESOURCE GENERATED ELECTRICITY

WIND PROJECT DEVELOPMENT : BUSINESS OPPORTUNITIES AND SUITABLE BUSINESS MODELS FOR VIETNAM

FEED-IN OF EXCESS ENERGY AND SELF CONSUMPTION: NEW REGULATIONS IN GHANA S ENERGY SECTOR JULIUS NKANSAH-NYARKO ENERGY COMMISSION

New Energy Investment Forum

Alternative Energy Made in Florida. Solar Power Plants for Commercial, Government, and Utility

Financing Energy Efficiency and Renewable Energy through the India Renewable Energy Development Agency

Energy Efficiency in the Greek Hotel Sector November 17th, 2009, Berlin, Germany Current Situation of PV systems deployment in Greece

Policy and regulatory barriers to renewable energy deployment in South East Europe

International Solar Energy Arena January 23rd, 2009, Istanbul STEAM (Strategic Technical Economic Research Center)

FIXED CHARGE: This is a cost that goes towards making the service available, including

Response to the Energy White Paper Issues Paper PREPARED BY EMC ENGINEERING FOR THE AUSTRALIAN GOVERNMENT DEPARTMENT OF INDUSTRY

Energy efficiency & Renewable Energy, Challenges and Opportunities in Egypt

PG&E and Renewable Energy. Chuck Hornbrook Senior Manager Solar and Customer Generation

Financing Solutions for Renewable Temporary / Off-grid Power. Daniel Zywietz, CEO, Enerwhere

Energy Finance in the Middle East: Uncertainties and Opportunities Maamari Auditorium, OSB AUB, 22 January 2016

Photovoltaics in Germany Market Development and Perspectives

Background document on retroactive measures, moratoria, unplanned support reduction, cancellation of support or other harmful measures

Energy and Local Participatives in Germany 2011

SOLAR ENERGY DEVELOPMENT IN THAILAND

INVESTMENT IN WIND ENERGY IN VIETNAM: THE RIGHT TIME HAS COME?

Stationary Energy Storage Solutions 3. Stationary Energy Storage Solutions

RENEWABLE ENERGY INVESTMENTS Rising Star In Fast Developing Market Turkey

Renewable Energy Certificate Mechanism for India. ABPS Infrastructure Advisory. Background

FEED-IN TARIFF (FiT) IN MALAYSIA

THE GREEN ELECTRCITY MARKET IN DENMARK: QUOTAS, CERTIFICATES AND INTERNATIONAL TRADE. Ole Odgaard Denmark

THE INDIAN MARKET FOR RENEWABLE ENERGY THE 100 GW SOLAR INITIATIVE

Methodology for Solar Power Projects

STATEMENT. H.E Mr. Hassan Younes Minister of Electricity and Energy. Egypt. Session of the Commission. on Sustainable Development

Law of the Republic of Kazakhstan «ABOUT SUPPORT OF USE OF RENEWABLE SOURCES OF ENERGY»

The Energy Transition in Germany Past, Present and Future

Frequently Asked Questions About. Japan s Feed-in- Tariff System

Regulation for Renewable Energy Development: Lessons from Sri Lanka Experience

SOLAR ENERGY DEVELOPMENT IN THAILAND

Renewable Energy Promotion Policies in Chinese Taipei

Energy Storage Systems. New solutions for a new energy environment

Regulation by the Feed-in Tariff: Experiences from Germany

SAMPLE TERMS OF REFERENCE FOR ELECTRICITY SECTOR PRIVATIZATION TRANSACTION ADVISORY SERVICES

Solar Project Pricing Index

Photovoltaic in Mexico Recent Developments and Future

EEU Perspectives towards more Sustainable Energy Sector in Egypt

Infrastructure Development Funding and Financing

International Workshop on Renewable Energy Policies in Developing Countries, November 22-23, 2010 Washington, DC

INDONESIA S COUNTRY REPORT ENCOURAGING CLEAN ENERGY INITIATIVE

Renewable Electricity and Liberalised Markets REALM. JOULE-III Project JOR3-CT GREECE ACTION PLAN. By ICCS / NTUA K. Delkis

New and Renewable Energy Policy in Republic of Korea

CANADIAN RENEWABLE ENERGY POLICIES. Matthew H. Brown InterEnergy Solutions 2007

THE AMENDED RENEWABLE ENERGY SOURCES ACT 2014 (EEG 2014)

The Indonesian electricity system - a brief overview

Japan. Nagahide Sato and Sadayuki Matsudaira Nishimura & Asahi

Turkey Promulgates Renewable Energy Regulations

DELIVERING RENEWABLE ENERGY INVESTMENTS IN EGYPT: CHALLENGES AND OPPORTUNITIES

DBSA RENEWABLE ENERGY FINANCING

2014 Residential Electricity Price Trends

COMPETITIVE ELECTRIC ENERGY MARKET IN GREECE

Prospects and Incentives for Use of Alternative Energy Technologies in the Arab Electric Power Generation Sector

The Real Cost of Electrical Energy. Outline of Presentation

Legislative and institutional framework for renewable energies in Algeria.

KERALA STATE ELECTRICITY REGULATORY COMMISSION

NARUC International Relations Committee Meeting February 5, 2012 Washington, D.C. Jay Godfrey Managing Director, Renewable Energy

The Renewable Energy Sector in Cyprus

A Green Sector Overview

Renewable Energy market in Egypt

Transcription:

for Consumer Protection and Renewable Energy Feed-in Tariff Projects Regulations Oct. 2014 EgyptERA s crew has prepared this document so as to answer all the questions related to the renewbales supporting scheme generally, and the feed-in tariff specifically

INTRODUCTION Egypt faces a major challenge in providing a sufficient amount of electrical from its primary energy resources, especially oil and natural gas that contributes to 95% of the total energy resources needed for generating electricity in Egypt. Studies show that, even though Egypt possesses a reserve of primary energy resources; Egypt will face a deficit to cover its demand from these resources due to rapid utilization and increase of extraction costs. Expectations indicate that retaining balance between oil and natural gas production and their usage within three (3) years can be achieved after overcoming the economic challenges facing the oil and natural gas sector. However, according to the Egyptian energy strategy for 2030 and its update to 2035, it is expected that Egypt will be a net importer of oil and natural gas within ten (10) years from the start of the third decade of this century. This situation represents an additional challenge for the Egyptian economy which will become more vulnerable to the price fluctuations in the international energy markets, which can t be predicted or controlled. In addition, this will lead to Egypt s loss of foreign currency and the decrease in the competitiveness of the national economy. Therefore, there has to be diversification of the energy resources to maximize the benefits of using local resources which are characterized by continuous and stable prices such as investing in generation electricity from renewable resources that are rich in Egypt. Moreover, on Sept. the 17 th, the Cabinet of Ministers approved in its session no. 11 the issuance of feed-in tariffs for electricity projects produced from renewable energy resources (PV - Wind). A total target is to authorize 4300 MW to be achieved over the first period of applying the feed-in tariffs. This target includes 300 MW for small PV installations below 500 kw, 2000 MW for large size PV installations, which range between 500 kw up to 50 MW and the remaining 2000 MW is from wind energy installations with projects capacities ranging from 20 MW up to 50 MW. The value of the tariff will be revisited as either the target is achieved or the two years regulatory period is elapsed, which happens first. 1

The electricity transmission company (EETC) or distribution companies are committed to purchase the produced electricity from RE power plants at the prices announced by the Cabinet of Ministers through Power Purchase Agreements (PPA) for 25 years for the PV projects, and 20 years for the wind projects. Accordingly, the Egyptian Electricity Utility Regulatory Authority (EgyptERA) has set the required regulations and procedures for executing the Renewable Energy Feed-in Tariff (RE - FiT) projects which includes: - Procedures for execution of RE FiT projects up to 500 kw of PV Installations - Procedures for execution of RE FiT projects more than 500 kw 2

Feed-in Tariffs for Renewable Energy Projects First: PV Projects Feed-in Tariffs: PV Power Plant Installed Capacity Corresponding Feed-in Tariff Residential 84.4 P.T./kWh Installed Capacity 200 kw 90.1 P.T./kWh 200 kw Installed Capacity < 500 kw 97.3 P.T./kWh 500 kw Installed Capacity < 20 MW 13.6 $.Cent/kWh 20 MW Installed Capacity 50 MW 14.34 $.Cent/kWh - The PV projects feed-in tariff has a flat rate during the entire 25 years contractual period. - The PV projects feed-in tariff, for installed capacities more than 500 kw, is being paid with Egyptian pounds according to the following equation: PV Projects Feed-in Tariff (L.E.) =[15% of Feed-in Tariff ($.Cent) X 7.15 (L.E.)] + [85% of Feed-in Tariff ($.Cent) X exchange rate on the bill issuance day, as stated in the contract] - The upper limit for the total contractual PV installed capacities are: a) 300 MW for projects with installed capacities up to 500 kw, and b) 2000 MW for projects with installed capacities from 500 kw and up to 50 MW. 3

Second: Wind Projects Feed-in Tariffs: Full Operating Hours (FOH) 2500 Feed-in Tariff for the 1 st tariff segment (5-year period) ($.Cent/kWh) Feed-in Tariff for the 2 nd tariff segment (15-year period) ($.Cent/kWh) 11.48 2600 10.56 2700 9.71 11.48 2800 8.93 2900 8.19 3000 7.51 3100 8.93 3200 8.33 3300 7.76 3400 7.23 3500 6.73 9.57 3600 6.26 3700 5.81 3800 5.39 3900 4.98 4000 4.60 - The wind projects feed-in tariff has a segment tariff structure (5-year and 15-year periods) for a total of 20-year contractual period. - The wind projects feed-in tariff is being paid in Egyptian pounds according to the following equation: Wind Feed-in Tariff (L.E.) =[30% of Feed-in Tariff ($.Cent) X 7.15 (L.E.)] + [70% of Feed-in Tariff ($.Cent) X exchange rate on the bill issuance day, as stated in the contract] - If the value of the FOH lies in between 2 of the above FOHs, approximation is made to the nearest larger value in the same table. 4

- The upper limit for the total contractual wind installed capacity is 2000 MW. What are the Facilities Provided by the Government for the Supporting Schemes? 1. Setting the necessary regulations for public land allocation for projects, which are in need for this, through usufruct rights covering the Power Purchase Agreement (PPA) lifetime. 2. The grid, either transmission or distribution depending on the case, is committed to offer priority on dispatch for renewable energy, and offers PPA based on take or pay. 3. Issuing the necessary sovereign guarantees for projects above 20 MW. 4. Provision of concessions from Ministry of Finance through soft loans: 4% interest rate for residential projects and up to 200 kw and 8% interest rate for projects ranging between 200 kw and 500 kw. 5. Forcing the Supreme Council of Energy decisions to inject investments of 2 Billion Egyptian Pounds for establishing transmission and distribution grids. How to Apply for the Feed-in Tariff Mechanism? Concerning the PV projects that are below 500 kw, the applications are to be handled to the department of renewable energy and energy efficiency in each distribution company. However, for the PV projects that are greater than 500 kw and Wind projects, applications are to be handled to the Central Unit for Feed-in Tariff located at EETC s headquarters. 5

Applicants have to attach the necessary documents according to the types of projects which are available in the above mentioned locations and at the following websites: www.egyptera.org www.egelec.com www.eetc.net.eg www.nrea.gov.eg Egyptian Electric Utility for Consumer Protection and (EgyptERA) Egyptian Electricity Holding Company (EEHC) Egyptian Electricity Transmission Company (EETC) New and Renewable Energy Authority (NREA) 6

Procedures for Establishing RE projects under the FiT Program First: Procedures for Establishing PV project under a FiT Program for Installed Capacities less than 500 kw: A. The PV-System Integrator(s) (PV-SIs) should seek Certification from New and Renewable Energy Authority (NREA) in order to be allowed to work in the field of installing, operating and maintaining on-grid PV projects (Annex 1). B. Projects with such small capacity, according to NREA s requirements, are exempted from obtaining generation license from EgyptERA. C. Project Execution: 1. The investor chooses one of the certified PV-SIs. 2. The PV-SI carries out the necessary studies and prepares the project s technical file (Annex 2) to be submitted to the Department of Energy Efficiency & Renewable Energy in the concerned distribution company (Annex 3). 3. Within two (2) weeks from the date of receiving the application, the distribution company shall study connecting the project to the distribution network and carry out the necessary measurements to assume compliance with the relevant distribution and PV installation low voltage codes. The PV-SI shall complete the project within six (6) months from getting the approval from the distribution company. 4. The distribution company shall sign a connection contract and a PPA according to the current FiT with the investor. 5. The distribution company shall check the computability of the project installation with the submitted and approved technical file. The distribution company shall connect the project to the distribution network and install a meter after paying the required fee according to Annex 3. Finally, the distribution company shall ensure the operation s soundness open a bank account for the investor with five (5) working days from the date of completion the project. 7

Procedures for Establishing PV project under the FiT Program for Installed Capacities less than 500 kw Investor Choosing a Certified PV-SI PV-SI PV-SI Project file to Distribution Company Distribution Company Distribution Company Studies, measurements & compliance with technical Codes PV-SI Distribution Company Signing Connection and FiT Contracts Investor Relative Entities Processes 8

Second: Procedures for Establishing a RE project under the FiT Program for Installed Capacities more than 500 kw A. Evaluation 1. The investor addresses The Central Unit for Feed-in Tariff Projects (Annex 4) to acquire an Evaluation Application for establishing either a PV project with installed capacity more than 500 kw or a wind project of at least 20 MW, according to the Qualification Requirements for Renewable Energy Investors wishing to Participate in the Feed-in Tariff Program (Annex 5). 2. The Central Unit evaluates and answers the investors inquiries one (1) month from the date of receipt of the application, according to the requirements and the evaluation mechanism stated in Annex 5. B. Land Acquisition for the Project 1. The investor, who wants to acquire state-owned land for his/her project, has to address The Central Unit for Feed-in Tariff Projects. This unit studies the investor s request and facilitates his/her land acquisition for the project. 2. The authority that provides the land signs a usufruct agreement with the investor. C. Establishment of the Project Company 1. The investor establishes the Project Company in accordance to law (8) for year 1997, that governs the guarantees and incentives of investments. 2. The investor shall conduct the technical and financial feasibility studies for the project. 9

D. Temporary Generation License The Project Company acquires a temporary generation license for one (1) year that can be renewed only once from EgyptERA according to the license requirements. However, the license can be renewed for a third year if the investor provides logical reasons to EgyptERA s committee. In the meanwhile, the Project Company will fulfill the following requirements: 1. All measurements, technical studies, and required permits. 2. Raising the capital of the Project Company to the level of equity share according to technical and financial feasibility studies. 3. Agreement on financial closure E. Permanent Generation License and Final Signing of the Contracts After the completion of all requirements mentioned in D, a permanent generation license is obtained, and consequently, the Project Company signs the contracts with relevant authorities and PPA under the current FiT program. F. Construction The power plant must be built within eighteen (18) months from the obtained temporary generation license date. G. Commissioning and Commercial Operation The commissioning and commercial operation shall be completed. 11

Procedures for Establishing a RE project under the FiT Program for Installed Capacities more than 500 kw Central Unit for FiT Evaluation Investor Authority availing Land Investor Project Company Establishment General Authority for Investment Temporary License EgyptERA Completion of Studies Relevant Authorities Project Company Financial Closure Relevant Authorities Permanent License EgyptERA Final Signatures Relevant Authorities Relative Entities Construction Relevant Authorities Processes Commissioning and Commercial Operation 11

12