SOLAR ENERGY DEVELOPMENT IN THAILAND

Size: px
Start display at page:

Download "SOLAR ENERGY DEVELOPMENT IN THAILAND"

Transcription

1 26 October 2015 SOLAR ENERGY DEVELOPMENT IN THAILAND OVERVIEW As of 26 October 2015: Number of Solar Projects The current number of solar projects which have achieved COD in Thailand is 295 projects, with a total selling capacity of 1244 MW. [Information from ERC s website as of 12 October 2015.] They include: 5 SPP PPAs signed with EGAT, with total selling capacity of 305 MW, details as follows: No. Name of Project Installed Selling COD Capacity Capacity 1. Bangchak Solar, Ayutthaya /07/12 2. Natural Energy Development Lopburi /12/11 3. Serm Sang Palang Ngan Lopburi /02/15 4. EA Solar Nakornsawan /12/13 5. EA Solar Lampang /02/15 Pending COD No. Name of Project Installed Selling SCOD Capacity Capacity 6. EA Solar, Pitsanulok 90 1/12/15 7. SPP Six, Lopburi 41 13/12/ VSPP PPAs signed with PEA/MEA, with total selling capacity of 939 MW. Suspension of Receipt of Applications Receipt of applications for sale of power from solar projects was suspended by both EGAT and PEA in April At that time, a large number of applications had been received, without in the case of PEA any bid security, evidence of financial or technical knowhow, rights to land, etc. On 8 December 2014, applications for 178 ground-mounted solar projects which had submitted PPA applications prior to the suspension in April 2010 were accepted for consideration. According to summary of status of solar projects provided at NEPC meeting no. 3/2558 dated 13 August 2015, 171 applications were accepted with total installed capacity of 983 MW, of which 100 PPAs have been signed with total installed capacity of 584 MW, and 71 applications with total installed capacity of 399 MW are under the process for signing PPAs. memo re solar energy development in thailand v13.doc 1

2 Attachment 1 is an English translation of PEA standard form of 25-year VSPP PPA for applicants for sale of power under original adder system, providing for Feed-in-Tariff in Section 7. Solar PV Rooftop Projects In 2013 and 2015, applications were accepted for solar PV rooftop projects, and 8811 PPAs were signed, with total installed capacity of 167 MW. Ground-mounted solar projects for Government Agencies and Agricultural Cooperatives In 2015, rules have been announced for purchase of power from ground-mounted solar projects for Governmental Agencies and Agricultural Cooperatives. Only one application may be made by an agency or cooperative. One application may not be for more than 5 MW. Applications may be submitted to ERC from 1 to 10 November All supporting documents must be submitted by 20 November The Committee will screen applications and announce the list of applications that have passed qualification screening on 11 December Those applications that pass qualification screening are entitled to participate in the second step of selection by drawing lots on 15 December The power purchase target is prescribed for each area, but will not exceed 800 MW. The power purchase target in Phase 1 is 600 MW (not exceeding 300 MW for government agencies and not exceeding 300 MW for agricultural cooperative). Phase 1 will be for projects, in areas with transmission line availability and potential of other fuels, with SCOD no later than 30 September Phase 2 will be for other areas with SCOD from 1 January 2018 to 30 June The schedule for power purchase by drawing lots or lucky draw is: Schedule Activity 21 September October 2015 The Power Utility opens for application for inspection of the point connecting the power network system under clause 5(1) of Notification dated 17 September November 2015 Filing an application for sale of power in the project ( hrs.) Online applications may be made in ERC s website 20 November 2015 Closing date for documents in support of the application for sale of power in the project (additional) 11 December 2015 Announcement of the list of projects that have passed qualification screening 15 December 2015 Selecting by drawing lots and announcing the result 24 December 2015 ERC will officially announce the projects that have passed the scrutiny and ERC will submit the matter to the RE Committee for information Receipt of New Applications The government has not announced when applications for solar projects in general will be open. BOI Incentives In December 2014, the BOI announced new incentives for promotion of investment, including renewable energy projects. Developers of solar power plants can apply for BOI promotion under category : Production of electricity or electricity and steam from renewable energy, such as solar energy, wind energy, biomass or biogas, etc. except from garbage or refuse derived fuel. The memo re solar energy development in thailand v13.doc 2

3 specific condition required for this category is that the project must be approved by the relevant government agencies. Category will be granted incentives under Group A2 as follows: 8-year corporate income tax exemption, accounting for 100% of investment (excluding cost of land and working capital) Exemption of import duty on machinery Exemption of import duty on raw or essential materials used in manufacturing export products for 1 year, which can be extended as deemed appropriate by the Board Other non-tax incentives Current information can be found in ERC s website and DEDE s website Proposed new legislation In 2014 the IFC worked with DEDE on a draft Alternative Energy Act (primary law to govern alternative energy projects), which is under review by the Ministry of Energy. Timing of possible enactment is uncertain. The intent of the draft Act is to promote all forms of alternative energy sources. The draft Act would establish an Alternative Energy Committee ( AEC ) to facilitate connections (including non-firm connections), minimize costs, risk and delay in project development, introduce a governance process for network design principles and standards, designate zones in which alternative energy sources would be promoted, grant promotion to producers of power from alternative energy sources, and supervise a monitoring process. The AEC would monitor technical developments on energy storage and grid integration of renewables. Secondary legislation would address grid integration of renewables, one-stop-shop, Alternative Energy Fund, and Feed-in-Tariffs. BACKGROUND AND HISTORY 1. Energy Regulatory Commission The Energy Industry Act B.E was published and became effective in December It established a new regulatory regime for electricity and natural gas businesses. One of the purposes of the Act was to restructure the energy industry management by separating policy making, regulation, and operating functions. It provided for the establishment of the Energy Regulatory Commission ( ERC ), whose members have been appointed, and the Office of Energy Regulatory Commission. Operators of energy businesses must obtain several licenses from the Commission. The types of licenses required depend on nature of operation and size of production capacity or distribution capacity. Royal decree, regulations, and notifications to implement the Act have been published. The Commission is responsible for the prevention of abusive use of monopoly power and protection of energy consumers and those adversely affected by the energy industry operation. 2. Policies re Renewable Energy On 26 December 2006, the National Energy Policy Council ( NEPC ) approved EGAT purchasing power from generators using renewable energy, and instructed EGAT to revise its regulations for purchase of power from SPPs using renewable energy. memo re solar energy development in thailand v13.doc 3

4 On 28 January 2009, the Cabinet approved a 15-year Renewable Energy Development Plan ( REDP ), and on 9 March 2009, the NEPC approved additional tariff adders for certain categories of alternative energy. The announced goal was for renewable energy to constitute up to 20% of total energy consumption by On 30 November 2011, the NEPC approved a 20-year energy conservation plan ( ) under which energy consumption by the industrial sector, large-scale business buildings, small business buildings, and residential hours and transportation sector will be reduced. NEPC also approved a 10-year 25% Alternative Energy Development Plan ( AEDP ) to replace the 15-year REDP. During the 14 th ASEAN Summit in Thailand 28 February 1 March 2009, the meeting recognized the challenge of climate change, and agreed to cooperate on energy security, ASEAN energy cooperation, and development of renewable and alternative energy. The Department of Alternative Energy Development and Efficiency ( DEDE ) is responsible for implementation of the alternative energy plan. See its website at On 12 September 2014, General Prayut Chan-o-cha, the Prime Minister presented the Policy Statement of the Council of Ministers, which included: 6.9 The government shall reform the price structures of various types of fuel so that they are consistent with costs, and ensure an appropriate tax burden for different kinds of oil and different types of users, in order to improve efficiency in the country s energy use and deter consumers from wasteful use, see to a new round of exploration and production of natural gas and crude oil both at sea and on land, and see to the construction of more power plants by state and private sector agencies, including the use of fossil fuels and alternative energy, in a manner that is open, transparent, fair, and environmentally friendly, while cooperating with neighbouring countries on energy development. 9.5 Expedite the control of pollution air, refuse and wastewater arising from production and consumption to create a good quality environment for the people by giving first priority to solid waste management; encouraging mechanisms for sorting of refuse for recycling as much as possible; expediting the disposal of accumulated refuse in waste disposal sites located in critical areas, which are mainly state owned land; supporting the transformation of waste into energy wherever possible; setting up special regulations and measures to manage industrial waste, by designating standard-built industrial waste pits separate from community waste disposal sites; developing a monitoring and inspection system to prevent illegal disposal of hazardous, electronic and infectious waste; managing chemicals to lessen the risk and danger of leakage and accidents; attaching importance to comprehensive waste management; and using legal measures and strict enforcement of the law. On 16 July 2013, the NEPC approved two feed-in tariff policies for solar PV rooftop and solar PV community ground-mounted systems. On 15 August 2014, the NEPC approved the preparation of the Power Development Plan ( PDP ) , the Energy Efficiency Development Plan ( EEDP ) , and the Alternative Energy Development Plan ( AEDP ) , and appointed the Ministry of Energy to prepare the plan and send to the NEPC for further consideration. The NEPC also approved three feed-in tariff policies for solar as follows: (i) Approved feed-in tariff at the rate of 5.66 Baht/kWh for a period of 25 years for the pending PPA applications that had already been submitted to EGAT/PEA/MEA prior memo re solar energy development in thailand v13.doc 4

5 the NEPC s resolution on 28 June 2010 and had not yet received letter of acceptance from EGAT/PEA/MEA with total quota of 576 MW. (ii) (iii) Approved an extension of SCOD for solar PV rooftop projects which have signed PPA with PEA/MEA for total capacity of MW from 31 December 2013 to 31 December 2014 and approved accepting new applications for solar PV rooftop for residential rooftop that have installation capacity of less than 10 kw for total capacity of MW, with a feed-in tariff of 6.85 Baht/kWh. These new projects must achieve COD by 31 December Approved the change on the solar PV community ground-mounted systems programme which was approved by NEPC s resolution on 16 July 2013 with the new solar farms in the form of Public Private Partnerships with the governmental sector or agricultural cooperatives programme. This new programme will be for solar farm (ground-mounted solar installations) having installation capacity of not more than 5 MW. The feed-in tariff for this programme will be at the rate of 5.66 Baht/kWh for a period of 25 years with total quota of 800 MW by 31 December The NEPC appointed the ERC to consider and issue the Regulation for the Purchase of Power from Solar Power Project under FiT regime. On 22 October 2014, the NEPC approved the amendment of the NEPC s resolution on 15 August 2014 as follows: (i) (ii) Approved the increase of quota for another 800 MW for those pending PPA applications that already submitted to EGAT/PEA/MEA prior the NEPC s resolution on 28 June 2010 and had not yet received letter of acceptance from EGAT/PEA/MEA and allowed the projects that have the transmission line issues to change their location. Approved an extension of SCOD for solar PV rooftop projects which have signed PPA with PEA/MEA for total capacity of MW from the end of December 2014 to June On 8 December 2014, the Administrative Committee on Promotion Measures for Power Generation from Renewable Energy ( RE Committee ) approved the acceptance of power purchase from solar farm (ground-mounted solar installations) projects (178 projects) that already submitted the PPA applications with EGAT/PEA/MEA prior the NEPC s resolution on 28 June 2010 and had not yet received letter of acceptance from EGAT/PEA/MEA by dividing into two groups as follows: (i) (ii) 25 projects ( MW) which have no issue on transmission line or land. These projects can execute the power purchase agreement within the framework of period under the Regulation for Acceptance of Power Purchase of related Power Utility; whereby the project must achieve the COD by the end of December projects ( MW) which have transmission line or land issues. These projects are entitled to change their locations provided that all proceedings will be completed by 31 March 2015 and inform DEDE so that DEDE will coordinate with EGAT/PEA/MEA for inspection of the propagation of electric transmission lines, proceed for the acceptance of power purchase, and execution of power purchase agreement. All 153 projects must achieve the COD by the end of December memo re solar energy development in thailand v13.doc 5

6 On 16 February 2015, NEPC approved an extension of SCOD for Solar Farm Projects for Governmental Agencies and Agricultural Cooperatives from 31 December 2015 to 30 June On 14 May 2015, NEPC approved the PDP 2015 based on three major criteria as follows: Security of national power system: taking into account distribution of power sources and types in order to be less dependent on natural gas (target is no more than 40% in 2036 from 65% as of now), and rely more on alternative/ renewable energy, clean coal, and electricity import from neighboring countries. At the same time, spare capacity must be no less than 15% of peak load; Economy: by determining appropriate electricity rate that effectively reflects actual cost, production/transmission/sales systems, and provides least impact on people s cost of living. It is estimated that average electricity rate throughout PDP 2015 is at THB 4.587/1 GWh. Ecology: by releasing 37% less carbon monoxide, which is the major cause of global warming, within 2036 through increased production of renewable power, and fullfledged implementation of energy conservation in four key target groups: industry, business buildings, houses, and public sector. This should result in decrease of electricity demand of 89,672 GWh in On 13 August 2015, NEPC approved another extension of SCOD for Solar Farm Projects for Governmental Agencies and Agricultural Cooperatives from 30 June 2016 to 30 September 2016 for the areas that the power transmission systems are ready, and 30 June 2018 for the remaining areas. NEPC also approved the Energy Efficiency Plan (EEP 2015). On 17 September 2015, NEPC approved the Alternative Energy Development Plan (AEDP 2015) 3. ERC Notifications and Regulations concerning new Feed-in Tariffs for Solar Power On 30 December 2014, ERC announced Regulation governing Purchase of Power from Solar Rooftop Power Generation (for Additional Power Purchase to Complete 100 Megawatt) B.E and Regulation governing Purchase of Power from Ground Mounted Solar Farm Projects for Applicants Filing for Sale of Power in the Original Adder System B.E On 2 February 2015, ERC announced Notification governing Purchase of Power from Solar Rooftop Power Generation (for Additional Power Purchase to Complete 100 Megawatt). Under this Notification, ERC announced the additional power purchase from solar rooftop in the amount of MW in order to Complete 100 Megawatt quota. The term of the PPA is 25 years. The projects must achieve COD by 31 December The feed-in tariff (FiT) rate for the energy amount that does not exceed the Capacity Factor of per cent shall be at THB 6.85 per unit. The rate for the energy amount in excess of the Capacity Factor of per cent will be the FiT rate equivalent to the average wholesale of the power purchase rate at the range of kilovolt (average wholesale rate in 12-month period) which EGAT sells to the Distribution Utility plus the electricity cost according to the formula for automatic wholesale price adjustment in average (Ft of average wholesale price in 12-month period). Notwithstanding, such power purchase rate must not exceed the FiT of THB 6.85 per unit. For the energy amount purchased in the first and last contract years of the Power Purchase Agreement, if not a full calendar year, FiT at THB 6.85 per unit shall be used whereby the Capacity Factor shall not apply. memo re solar energy development in thailand v13.doc 6

7 On 17 February 2015, ERC announced Notification governing Purchase of Power from Solar Rooftop Power Generation (for Additional Power Purchase to Complete 100 Megawatt) (amendment) in order to amend the attachment 1 of the Notification. On 6 March 2015, ERC announced Regulation governing Purchase of Power from Groundmounted Solar Farm Projects for Governmental Agencies and Agricultural Cooperatives B.E On 25 March 2015, ERC announced Regulation governing Purchase of Power from Ground Mounted Solar Farm Projects for Applicants Filing for Sale of Power in the Original Adder System (No. 2) B.E in order to amend the provision regarding transfer of PPA. On 14 September 2015, ERC announced Regulation governing Purchase of Power from Ground-mounted Solar Farm Projects for Governmental Agencies and Agricultural Cooperatives B.E. (No.2) 2558 in order to amend an extension of SCOD from 30 June 2016 to 30 September 2016 for the areas that the power transmission systems are ready (Phase 1) and 30 June 2018 for the remaining areas (Phase 2). On 17 September 2015, ERC announced Notification governing Purchase of Power from Ground-mounted Solar Farm Projects for Governmental Agencies and Agricultural Cooperatives B.E together with Annex 1 re Rules for Participation in the Project, Screening and Selection of the Projects of Electricity Generating from Ground-mounted Solar Farm in the Case of Governmental Agencies and Agricultural Cooperatives. On 18 September 2015, ERC announced Notification governing Purchase of Power from Ground-mounted Solar Farm Projects for Governmental Agencies and Agricultural Cooperatives (Additional) B.E together with Annex 2: Data on Grid Capacity and Annex 3: Application for Sale of Power in the Project. On 24 September 2015, ERC announced Notification re application for energy industry operation from ground mounted solar farm projects in the form of FiT for applicants filing in the original adder system. The ERC resolved that applications must be filed under Section 47 of the EIA within 31 October EGAT Regulations On 18 April 2007, EGAT announced Regulation for the Purchase of Power from Small Power Producers exclusively for the generation from renewable energy. SPPs can obtain information from the Power Purchase Agreement Division, EGAT. The Regulation (as amended in 2009) can be found at The Regulations cover the following subjects: A. Objective of Power Purchase from Small Power Producers B. Enforcement C. Characteristics of the Power Generating Processes of SPPs D. Electrical System Standards of SPPs E. Procedures and Consideration Principles of Power Purchase from SPPs F. Conditions of the Power Purchase from SPPs G. Power Purchasing Point and Connection Point H. Costs Incurred for SPPs I. Conditions of the Power Generating Operation and the Maintenance Shutdown of SPPs J. Principles of the Tariff Determination for the Purchase of Power from SPPs K. Failure to Comply with the Power Purchase Agreement (PPA) memo re solar energy development in thailand v13.doc 7

8 L. Performance Security for Compliance to the Power Purchase Agreement after the Commercial Operation Date M. Bill Settlement Conditions N. Damages to the Power System O. Problems Arising from Compliance with the Regulations and Power Purchase Agreements P. Amendments to the Regulations Q. Solution to the Problems Arising from Compliance with the Regulations for Synchronization of Generators to the Power Utility System, the Power System Interconnection Criteria and the SPP Grid Code EGAT has published standard forms of PPAs including Model Non-Firm Agreement (Renewable, without Supporting Fuel (Khor. 1), with Adder). On 10 July 2015, EGAT announced Notification governing Rules for Assignment of Rights and Duties under Application for Sale of Power or Power Purchase Agreement from Small Power Producer (SPP) for Solar Farm Project that filed Application in the Original Adder System. 5. PEA Regulations In 2006, PEA announced Regulation for the Purchase of Power from Very Small Power Producers for the Generation Using Renewable Energy. On 20 May 2008, PEA issued Notification re: Prescription of Increment of Power Purchase Price for Renewable Energy Very Small Power Producers. The Cabinet at its meeting on 24 March 2009 approved and acknowledged the resolution of the NEPC at its meeting No. 2/2009 (No. 124) held on 9 March 2009 re: Proposal to Improve the Guideline for Promotion of Power Generating from Renewable Energy by prescribing the period and purchased power capacity eligible for increment of power purchase price, adjustment of rate of increment of power purchase price for renewable energy power producers classified according to the type of technology and fuel, and revision of Regulations For Purchase of Power. PEA also published standard forms of PPAs including Power Purchase Agreement for the Purchase of Power from a Very Small Power Producer (for the Generation using Renewable Energy). Features of PEA s PPAs signed after 19 August year term, renewable without limit Requirement for a bank guarantee of Baht 200,000 per MW Delay LDs for delays exceeding 60 days in achieving SCOD: 0.33% of guaranteed amount per day 6. Carbon Market Financing There is a growing market for carbon market finance. Thailand established a Designated National Authority ( DNA ) to manage CDM projects, currently the Thailand Greenhouse Gas Management Organization ( TGO ). According to information available from TGO s website as of 11 October 2015, 221 letters of approval for CDM projects have been issued, there are 148 registered Thai CDM projects, and 35 projects have been certified. The TGO is drafting the rules for a carbon fund. It would provide low interest rate loans for CDM, and purchase carbon credits from project developers for sale to the international carbon trading markets (latest data posted in DNA website). memo re solar energy development in thailand v13.doc 8

9 7. Transition from Adder Policy to Feed-in-Tariffs On 19 August 2009, PEA issued Notification re: Prescription of Increment of Power Purchase Price for Renewable Energy Very Small Power Producers (up to 10 MW) under the Resolution of the NEPC dated 9 March For solar energy, an adder of Baht 8 per unit was prescribed for ten years from COD. The special adder for 3 southern most provinces (Yala, Pattani, and Narathiwat) of Baht 1.50 was also prescribed. On 15 January 2010, EGAT issued Notification re Prescription of Increment of Power Purchase Price for Renewable Energy Small Power Producers (10 MW 90 MW). For solar energy, an adder of Baht 8.00 per unit was prescribed, for ten years from COD. The special adder for 3 southern most provinces (Yala, Pattani, and Narathiwat) of Baht 1.50 was also prescribed. On 9 April 2010, PEA issued a notification suspending receipt of applications for sale of power from solar projects and wind projects. On 22 September 2010, PEA issued a notification continuing suspending receipt of application for solar projects. On 5 April 2010, EGAT issued a notification suspending receipt of applications for sale of power from solar project. On 29 October 2010, EGAT issued a notification continuing suspending receipt of application for solar projects. On 20 July 2010, the Thai Cabinet approved resolutions of NEPC adopted on 28 June, 2010, including confirming adder of Baht 8.00 per unit under PPAs which had been signed, and for projects for which acceptances to purchase electricity had been issued. In the case of applications for sale of electricity submitted and pending consideration, the adder of Baht 6.50 per unit would apply. For other renewable energy projects, the Cabinet approved NEPC s guidelines for coordination and follow-up of promotion of renewable power production in compliance with the policy, and establishment of a committee comprising representatives from related agencies of MoE and NESDB, and to approve a Feed-in Tariff system. On 30 March 2011, EGAT issued Notification re Prescription of Increment of Power Purchase Price for Renewable Energy Small Power Producers in order to amend the EGAT Notification dated 15 January 2010 and to approve the special increment of power purchase price (Adder) for renewable energy projects from Small Power Producers that located in the areas of four Districts in Songkla Province, namely, Jana District, Thepa District, Nathawi District and Saba Yoi District, that sell the electric to the system under Regulation for the Purchase of Power from SPP. For solar energy, an adder of Baht 6.50 per unit was prescribed, for ten years from COD. The special adder for four Districts in Songkla Province of Baht 1.50 was also prescribed. On 12 April 2011, PEA issued Notification re: Prescription of Increment of Power Purchase Price for Renewable Energy Very Small Power Procedure Under the Resolution of the NEPC dated 25 November 2010 in order to amend the PEA Notification dated 19 August 2009 and to approve the special increment of power purchase price (Adder) for renewable energy projects from Very Small Power Producers that located in the areas of four Districts in Songkla Province, namely, Jana District, Thepa District, Nathawi District and Saba Yoi District, that sell the electric to the system under the Regulations for the Purchase of Power from VSPP. For solar energy, an adder of Baht 6.50 per unit was prescribed, for ten years from COD. The special adder for four Districts in Songkla Province of Baht 1.50 was also prescribed. On 16 July 2013, the NEPC approved two feed-in tariff policies, which would lead to reopening support of solar power for two packages: memo re solar energy development in thailand v13.doc 9

10 1. Solar PV Rooftop The solar PV rooftop policy applies to solar PV rooftop projects having the installation capacity lower than 1 MW, with a combined capacity of 200 MW. Projects must be installed by December The Feed-in Tariffs for solar rooftops are as follows: Type of Buildings Installation Capacity Feed-in Tariff (Baht) Residential House 10 kw 6.96 per kilowatt-hour Small Business 10 kw 250 kw 6.55 per kilowatt-hour Medium-Large Business/Factory 250 kw 1000 kw 6.16 per kilowatt-hour The Feed-in Tariff will apply for 25 years from the Scheduled Commercial Operation Date ( SCOD ). The NEPC appointed the ERC to consider and issue the guidelines, rules, procedures and conditions for purchase of electricity from solar PV rooftop. The Thai Cabinet at its meeting on 13 August 2013 approved and acknowledged the resolution of the NEPC at its meeting No. 2/2556 (No.145) held on 16 July 2013 as proposed by the Ministry of Energy. On 30 August 2013, ERC announced regulations governing purchase of electricity from solar PV rooftop which came into force on 3 September The ERC Regulation will apply to the purchase of electricity from Very Small Power Producers ( VSPP ) who wish to produce electricity from solar PV rooftop only, and it will not apply to other VSPPs who produce electricity from other sources of renewable energy including the VSPPs who produce electricity from solar PV panels but have not installed the PV panels on the rooftop. On 6 September 2013, ERC announced Notification re purchase of electricity from solar PV rooftop. According to the ERC Notification dated 6 September 2013, the VSPPs who wish to produce electricity from solar PV rooftop and sell to the Metropolitan Electricity Authority ( MEA ) or Provincial Electricity Authority ( PEA ), could file the VSPP application for solar PV rooftop with the MEA or PEA as the case may be from 23 September 2013 to 11 October MEA and PEA would consider the VSPP application on first come first serve basis, and would announce the result of its consideration on the VSPP applications from 14 October 2013 onwards. On 24 March 2014, ERC announced Notification re Solar PV Rooftop shall not be considered as power plant. Under this Notification, a power plant generating from solar PV rooftop will be exempt from a factory operation license but required to notify ERC in accordance with ERC Notification re Determination of Energy Industry Exempt from License Application to be an Industry to Notify B.E On 15 August 2014 and 22 October 2014, the NEPC approved resolutions to give an extension of SCOD for solar PV rooftop projects which signed PPA with PEA/MEA for total capacity of MW from 31 December 2013 to 30 June 2015 and approved the open up of applications for solar PV rooftop for residential rooftop that have installation capacity of less than 10 kw for total capacity of MW, with a feed-in tariff of 6.85 Baht/kWk. These new projects must achieve COD by the 31 December On 30 December 2014, ERC announced Regulation governing Purchase of Power from Solar Rooftop Power Generation (for Additional Power Purchase to Complete 100 Megawatt) B.E and Regulation governing Purchase of Power from Ground Mounted Solar Farm Projects for Applicants Filing for Sale of Power in the Original Adder System B.E memo re solar energy development in thailand v13.doc 10

11 On 2 February 2015, ERC announced Notification governing Purchase of Power from Solar Rooftop Power Generation (for Additional Power Purchase to Complete 100 Megawatt). Under this Notification, ERC announced the additional power purchase from solar rooftop in the amount of MW in order to Complete 100 Megawatt quota. The term of the PPA is 25 years. The projects must achieve COD by 31 December The feed-in tariff (FiT) rate for the energy amount that does not exceed the Capacity Factor of per cent will be at THB 6.85 per unit. The rate for the energy amount in excess of the Capacity Factor of per cent will be the FiT rate equivalent to the average wholesale of the power purchase rate at the range of kilovolt (average wholesale rate in 12-month period) which EGAT sells to the Distribution Utility plus the electricity cost according to the formula for automatic wholesale price adjustment in average (Ft of average wholesale price in 12-month period). Notwithstanding, such power purchase rate must not exceed the FiT of THB 6.85 per unit. For the energy amount purchased in the first and last contract years of the Power Purchase Agreement, if not a full calendar year, FiT at THB 6.85 per unit shall be used whereby the Capacity Factor shall not apply. On 17 February 2015, ERC announced Notification governing Purchase of Power from Solar Rooftop Power Generation (for Additional Power Purchase to Complete 100 Megawatt) (amendment) in order to amend the attachment 1 of the Notification. 2. Community ground-mounted solar The Ministry of Energy together with the National Village and Urban Community Fund Office will develop Solar PV project on the basis of one MW per village, with a combined capacity of 800 MW. All projects were to be installed by December The Feed-in Tariffs for community ground-mounted solar were as follows: Period Year 1 Year 3 Year 4 Year 10 Year 11 Year 25 Feed-in Tariff (Baht) 9.75 per kilowatt-hour 6.50 per kilowatt-hour 4.50 per kilowatt-hour Each village would be able to apply for one solar power project with capacity of 1 MW and the source of fund for financing project (100%) will be a loan from a government bank, either (i) Government Savings Bank or (ii) Bank for Agriculture and Agricultural Cooperatives. The NEPC appointed the ERC to consider and issue the regulations for purchase of electricity from the community ground-mounted solar. However, on 15 August 2014 and 22 October 2014, NEPC approved to replace the solar PV community ground-mounted systems programme with solar farms in the form of Public Private Partnerships with the governmental sector or agricultural cooperatives programme. This new programme was for solar farm (ground-mounted solar installations) having installation capacity of not more than 5 MW. The feed-in tariff for this programme will be at the rate of 5.66 Baht/kWh for a period of 25 years with total quota of 800 MW by the end of December Department of Alternative Energy Development and Efficiency (DEDE) Attached is a set of slides presented by Khun Karnnalin Theerarattananoon from Department of Alternative Energy Development & Efficiency, Ministry of Energy Thailand on 3 September 2015 titled RE/PV Plans PV and Utilities Workshop. memo re solar energy development in thailand v13.doc 11

12 9. Restrictions on amendments to PPAs The Committee on Management of Measures for Promotion of Renewable Power Production, appointed under the National Energy Policy Board, No. 1/2554 on January 26, 2011, (No. 6), instructed the three power authorities to issue a notification prohibiting a change in or amendment to PPAs with renewable energy projects applying for (i) a change in the quantity of the power energy offered for sale, (ii) relocation of the power plant, or (iii) a change in the production technology. EGAT issued such notification dated 14 March It was PEA s internal policy to allow transfers of rights of generators under PPAs only to affiliates of the transferors; affiliates as defined in Section 39 of the Revenue Code. PEA s current practice on postponement of SCODs is to grant up to two 6-month extensions, to allow project owners who has actually started construction to avoid delay LDs. On 10 July 2015, EGAT announced Notification governing Rules for Assignment of Rights and Duties under Application for Sale of Power or Power Purchase Agreement from Small Power Producer (SPP) for Solar Farm Project that filed Application in the Original Adder System. This Notification will apply to those projects under the ERC Regulations on Purchase of Power from Ground-Mounted Solar Power for Applicants for Sale of Power in Adder System B.E On 22 July 2015, PEA announced Notification governing Rules for Assignment of Rights and Duties under Application for Sale of Power or Power Purchase Agreement. This Notification applies to the following projects: (1) The power projects under the ERC Regulation on Purchase of Power from Ground- Mounted Solar Power for Applicants for Sale of Power under original Adder System B.E (2014); (2) The power projects under the ERC Regulation on Purchase of Power from Ground- Mounted Solar Power for Government Agencies and Agricultural Cooperatives B.E. 2558; (3) The power projects under the ERC Regulation on Purchase of Power from Very Small Power Producers, Renewable Power Projects in Feed-in-Tariff Form (excluding solar power projects) B.E (2015). A transfer of rights and duties requires consent of the Power Utility, is subject to 51% of all shares being retained by the assignor until 3 years after COD; and is subject to half the shareholders of the assignor holding 51% of all shares of the assignee. Attachments: 1. PEA standard form of 25-year VSPP PPA for ground mounted solar farm projects under original adder system, with Feed-in-Tariff. 2. Slides of Khun Karnnalin Theerarattananoon from Department of Alternative Energy Development & Efficiency, Ministry of Energy Thailand on 3 September 2015 titled RE/PV Plans PV and Utilities Workshop. memo re solar energy development in thailand v13.doc 12

13 Attachment 1 Based on Thai language version received from PEA on 26 October year VSPP PPA providing for Feed-in-Tariff (Translation) [Letterhead of Provincial Electricity Authority] Power Purchase Agreement Ground Mounted Solar Farm Projects For Applicants for Sale of Power Under Original Adder System B.E (2014) No. Between and Provincial Electricity Authority This Power Purchase Agreement is made at the Provincial Electricity Authority on between residing at no. by hereinafter referred to as the Power Producer on one part, and the Provincial Electricity Authority, office no. 200 Ngamwongwan Road, Khet Chatuchak, Bangkok 10900, by title hereinafter referred to as PEA on the other part. Both parties agree to purchase and sell power with terms and conditions as follows: 1. Purchase and Sale of Power Energy 1.1 The Power Producer and PEA shall comply with the conditions for purchase and sale of power and the power system connection prescribed in the Regulations of the Energy Regulatory Commission on Purchase of Power from Ground Mounted Solar Farm Projects for Applicants for Sale of Power under original Adder System B.E. 2557, according to the Attachment hereto. 1.2 The Attachment hereto shall be deemed part of this Agreement. If any provision therein contradicts this Agreement, the provision in this Agreement shall prevail. 1.3 PEA agrees to purchase and the Power Producer agrees to sell power from the ground mounted solar energy at the Power Purchase Point in the maximum quantity of power energy of megawatts (MWp) (calculated from the maximum output of the photovoltaic panel measured in megawatts peak (MWp) under the standard test conditions set for testing of the photovoltaic panel, using the same circuit and the same power purchase point) at a voltage of volt, and details of the power production system shall be as specified in the application for sale of power and the power connection system. The Scheduled Commercial Operation Date (SCOD) shall be within, and the term of the Power Purchase Agreement shall be 25 years, which shall be counted, as the case may be, as follows: In case of distributing the power into the commercial operation system (COD) prior to the SCOD so stated in the Power Purchase Agreement, the term of the Power Purchase Agreement shall be counted for 25 years from the COD In case of distributing the power into the commercial operation system (COD) on the SCOD so stated in the Power Purchase Agreement, the term of the Power Purchase Agreement shall be counted for 25 years from the SCOD so stated in the Power Purchase Agreement. memo re solar energy development in thailand v13.doc 13

14 1.3.3 In case of distributing the power into the commercial operation system after the SCOD so stated in the Power Purchase Agreement, the term of Agreement shall be counted for 25 years from SCOD so stated in the Power Purchase Agreement, which does not affect the expiry date of the sale of power specified in the Power Purchase Agreement. However, the purchase of power shall be commenced from the commercial operation date (COD), and before distributing the power into the commercial operation system (COD), the Power Producer must produce the license as required by law to PEA. 1.4 If the Power Producer has already executed the Power Purchase Agreement but is unable to distribute the power into the system within the SCOD and wishes to request for extension of the SCOD, he is required to notify PEA in writing not less than 30 days prior to the SCOD. PEA will consider from readiness in 4 aspects, namely readiness of land, technology, source of capital and application for permission under related law. The SCOD may be extended but not later than 31 December 2015, however, the expiry date of sale of power specified in clause 1.3 will not be affected. 2. Application and Termination of Agreement This Agreement shall be effective from the date on which both parties sign, and shall be in full force and effect until it is terminated in the following cases: 2.1 The Power Producer issues a letter to PEA stating its wish to terminate the purchase and sale of power, which shall be effective at least 30 days of the date PEA receives such notice, or which may be earlier or later than such schedule as the parties my agree. 2.2 If either party fails to comply with any clause of the Agreement, the other party shall notify such failing party in writing to make a correction. If the correction is not made, such other party has the right to terminate this Agreement. 2.3 The Power Producer, having signed the Power Purchase Agreement, must comply with the provisions of the Power Purchase Agreement, and is prohibited to change the power purchase point and the equipment used in the power production system without permission from PEA. If the Power Producer fails to do so, PEA will proceed with clause If the Power Producer commits any of the following acts, he shall be deemed to have breached the Power Purchase Agreement, which is deemed terminated immediately, and shall be further subject to a legal prosecution, civil and criminal, without a claim for any damages from PEA which is a party to the Agreement, and shall be subject to penalty of Baht 5,000,000/MW according to the installed capacity under the Power Purchase Agreement Use other fuel in generating power or sell into the system the power energy generated from the source other than that derived from solar power by the photovoltaic panel technology under the Power Purchase Agreement; Install extra photovoltaic panels from those stated in the Power Purchase Agreement. 3. Assignment of Rights and Duties The Power Producer shall not assign the rights and duties in the application for sale of power or the Power Purchase Agreement to other person unless consent is obtained from the Power Utility under the rules of the Power Utility approved by the Energy Regulatory Commission. memo re solar energy development in thailand v13.doc 14

15 If the Power Producer is a juristic person, it is prohibited to change the number of shareholders which causes the original shareholders under the particulars submitted for offer for sale of power in the under original Adder System to be less than one half, and is prohibited to change the number of shares held by such original shareholders to be less than 51 per cent of total shares until the Power Producer has distributed the power into the commercial operation system (COD) for 3 years. 4. Safety Standards and Power System Connection 4.1 The Power Producer and PEA shall comply with the conditions for purchase and sale of power as provided in the Regulations of the Energy Regulatory Commission on Purchase of Power from Ground Mounted Solar Farm Projects for Applicants for Sale of Power under original Adder System B.E. 2557, as appearing in the Attachment hereto. 4.2 For security of the power system, PEA has the right to examine or to request the Power Producer to examine, correct, improve, change the Power Producer s power distribution equipment related to PEA s power system at any time as necessary. PEA, however, reserves the right to add in subsequent time the equipment to PEA s power system and Power Producer s power plant in compliance with the technical standards and the power distribution form of PEA, provided that the Power Producer shall be responsible for all expenses. 4.3 The application form for sale of power and the power system connection together with supporting documents and the documents specified in clause 4.1 shall be deemed part of this Agreement. If any provisions in the Attachment and this Agreement are in discrepancy, the provisions of this Agreement shall prevail. 4.4 Each party shall give advance notice to the other party if there is any change in its power system affecting the protective equipment in the power systems of each party. No action shall be taken on the connection equipment without prior written notice to PEA. 4.5 The Power Producer connecting the power system of PEA shall comply with safety standards and power system connection standards under clause 4.1, and shall comply with requirements for the power network system of PEA currently applicable. The Power Producer shall examine the power distribution system, the controlling and preventive system and the communication system in good working condition after the purchase and sale of power, and results of the examination shall be submitted to PEA for consideration on a yearly basis. However, PEA reserves the right to dispatch its officers to participate in the examination at the stage of annual maintenance in connection with the Power Producer for security and safety of the power system, the operators of PEA and the power producers. Where necessary, PEA has the right to examine or to request the Power Producer to examine, correct, improve, change the Power Producer s power distribution equipment related to the power system of PEA at any time as necessary. 4.6 The Power Producer and PEA are required to install the damage preventive equipment of the power system under the Requirements for the Power Network System then applicable. If damage is caused by defects of the power system equipment or other damage is caused by either party, that party is required to be responsible for such damage. 5. Expense The Power Producer shall be responsible for the expenses in the power system connection, the equipment examination and related expenses under clauses 20 and 22 of Regulations of the Energy Regulatory Commission on Purchase of Power from Ground Mounted Solar Farm Projects for Applicants for Sale of Power under original Adder System B.E. 2557, and other related expenses as memo re solar energy development in thailand v13.doc 15

16 prescribed by PEA. Such expenses must be paid in full before connection to the power network system of PEA. 6. Control and Operation of Power Plant 6.1 The Power Producer connecting at a voltage of 22 kilowatts or more shall strictly comply with the Switching Order of PEA for the purpose of operation and maintenance, except in case where damage to life and property of any party may be caused. 6.2 The Power Producer shall permit PEA to enter its premise to install, perform, maintain, change and/or move the power system connection equipment upon notice to the owner or possessor of the premise. 6.3 If damage occurs to the power network system and/or the third party caused by the act of the connector, the connector shall be liable to such damage. 7. Calculation of Power Purchase and Payment 7.1 The Feed-in-Tariff (FiT) for the power energy quantity not exceeding the Capacity Factor shall be calculated at Bath 5.66 per unit. For the power energy quantity in excess of the Capacity Factor of 16 per cent, the Feed-in- Tariff shall be equivalent to the average wholesale power purchase rate at a voltage of kilovolts (average wholesale rate in 12-month period) which the Electricity Generating Authority of Thailand sells to PEA plus the Average Wholesale Fuel Adjustment Charge (Average wholesale Ft in 12-month period). However, such power purchase rate must not exceed the FiT of 5.66 baht per unit. If the power energy quantity is purchased in the first year and the last year of the Power Purchase Agreement in less than full calendar year, FiT at 5.66 baht per unit shall apply without applying the Capacity Factor. 7.2 If PEA defaults on payment of debt within 30 days of the date PEA receives an invoice, PEA allows the Power Producer to charge interest on the unpaid amount at the rate equal to the currently-applicable interest rate on loan Krung Thai Bank Plc charges to its prime customers, from the defaulting date until payment is made in full. However, the interest rate to be paid to each other shall not exceed fifteen percent (15%) per year. 8. Security or Enforcement of Security to Pay Debt The Power Producer has delivered to PEA the security on form prescribed by PEA. PEA may return or seize the security, or enforce the security to pay debt, as follows: 8.1 If the Power Producer has a complete Installed Capacity Size and is able to distribute power into the commercial operation system within the SCOD, PEA shall return the security to the Power Producer within 15 business days from a business day following the date on which the Power Producer commences the purchase and sale of power (COD). 8.2 If the Power Producer fails to distribute the power within the SCOD for any reason, PEA shall charge the penalty at the rate of 1.11 per cent per day of the security amount from the day following the SCOD until the date the Power Producer is able to commence the purchase and sale of power with PEA, except for force majeure events. If the penalty has been charged in full of the security amount, the Power Purchase Agreement shall be deemed terminated. memo re solar energy development in thailand v13.doc 16

17 If the penalty charged until 31 December 2015 is still less than the value of the security and the Power Producer is not yet able to commence the purchase and sale of power, PEA shall forfeit the security remaining from the penalty, and the Power Purchase Agreement shall be deemed terminated. 8.3 If the Power Producer is able to distribute the power after the SCOD and has to pay the penalty under the first paragraph or other costs, PEA shall return the Security as follows: (1) Return the remainder of the security within 15 business days after deduction of penalty or other costs; (2) Return the security within 15 business days from the day following the date PEA has received the penalty or other costs in full from the Power Producer or the security issuer prior to enforcement of such security through court. 8.4 If the Power Producer or the security issuer fails to pay penalty and other costs caused by the Power Producer s failure to satisfy the conditions for the power distribution into the system correctly and completely as designated by PEA, or the Power Producer who has been considered but fails to execute the Power Purchase Agreement agreed upon under the negotiation procedure, through the fault of the Power Producer, PEA shall forfeit the security. However, if a new act amending the Civil and Commercial Code concerning the suretyship is effective, the Power Producer must place a new suretyship agreement containing the conditions consistent to the new provisions of law on form which will be later prescribed by the Procurement Committee or PEA as security in place of the existing one within 15 days of the date a written notice is received from PEA. If any event occurs, causing change to the security, the Power Producer must deliver to PEA the new security agreement as prescribed by PEA within 15 days of the date a written notice is received from PEA. 9. Force Majeure 9.1 Force Majeure means any event the happening or pernicious results of which could not be prevented even though a person against whom it happened or threatened to happen were to take such appropriate care as might be expected from a person in his position and situation, and includes any one or several of the following events: (1) Government s act, such as a change in the energy policy, a change in law which prevents the parties to the Agreement to comply with any clause of the Agreement; (2) Blockade or warlike act of the enemy, be it declared or undeclared; (3) Uprising, rebellion, riot, espionage, sabotage, strike, lockout under labor law, any eviction, accident, earthquake, storm, fire, flood, epidemic, unusual harsh weather, explosion; (4) Interruption in the power distribution system caused by an accident thereto or to other related equipment in connection to the power system; (5) Seizure of the power plant, property or any right, share or interests from the Power Producer by a state agency or act of a state agency which will severely affect the power plant of the Power Producer or the performance of duties of the Power Producer under the Power Purchase Agreement. memo re solar energy development in thailand v13.doc 17

18 9.2 If any party fails to comply with this Agreement caused by force majeure events under clause 9.1, such party shall not be deemed to have breached the Agreement, and the other party shall not claim any damages. 9.3 The party raising the force majeure event shall: (1) notify the other party of the event as soon as practicable, together with information and details of the event and time for remedy; (2) pay the expense, and actively take a remedial action to end the event soon. However, such action must be possible for such party to take. 10. Dispute 10.1 The Power Producer encountering problems from compliance with the Regulations for Purchase of Power and/or the Power Purchase Agreement shall file the matter in writing with the Energy Regulatory Commission by forwarding the same to the Chairman of the Energy Regulatory Commission at the place where the Energy Regulatory Commission Office is situated Where there is reasonable cause to decide the problem of compliance with the Power Purchase Agreement, ERC shall decide the problem, and the decision of ERC shall be deemed final If the Power Producer is dissatisfied with the decision of ERC, the problem shall be decided by the Thai court. 11. Other Provisions Where there is an amendment to, and/or an issuance of, any regulation, notification, condition, rule, resolution of the National Energy Policy Council additionally from those prescribed at the time of the Agreement, such additional amendment or issuance shall be deemed part of this Agreement. This Agreement is made in two originals having the same contents. The parties, having thoroughly read and understood the contents herein, have hereunder affixed their signatures with the seals (if any) affixed. Each copy is retained by each party. Power Producer Provincial Electricity Authority Signed Power Producer ( ) Title Signed ( ) Title Provincial Electricity Authority Signed Witness ( ) Title Signed Witness ( ) Title memo re solar energy development in thailand v13.doc 18

19 Attachment 2 Slides of Khun Karnnalin Theerarattananoon from Department of Alternative Energy Development & Efficiency, Ministry of Energy Thailand on 3 September 2015 memo re solar energy development in thailand v13.doc 19

20 memo re solar energy development in thailand v13.doc 20

SOLAR ENERGY DEVELOPMENT IN THAILAND

SOLAR ENERGY DEVELOPMENT IN THAILAND 18 December 2014 SOLAR ENERGY DEVELOPMENT IN THAILAND 1. Energy Regulatory Commission The Energy Industry Act B.E. 2550 (A.D. 2007) was published and became effective in December 2007. It established a

More information

C5 :106. The Alleviation of Prices Impact on Electricity Tariff caused by Renewable Energy Adders in Thailand

C5 :106. The Alleviation of Prices Impact on Electricity Tariff caused by Renewable Energy Adders in Thailand 2012 Paris Session http : //www.cigre.org C5 :106 The Alleviation of Prices Impact on Electricity Tariff caused by Renewable Energy Adders in Thailand SIRIWAN WORADEJ Metropolitan Electricity Authority

More information

Power Tariff Structure in Thailand 23 October 2012, Singapore Dr. Pallapa Ruangrong Energy Regulatory Commission of Thailand

Power Tariff Structure in Thailand 23 October 2012, Singapore Dr. Pallapa Ruangrong Energy Regulatory Commission of Thailand Power Tariff Structure in Thailand 23 October 2012, Singapore Dr. Pallapa Ruangrong Energy Regulatory Commission of Thailand Singapore EAS ABOUT THAILAND Population 67 Million Customers (at end-2011) 19

More information

OPERATION ANALYSIS OF LARGE SCALE SOLAR POWER GENERATION IN THAILAND

OPERATION ANALYSIS OF LARGE SCALE SOLAR POWER GENERATION IN THAILAND Sept.3-5, 2013, China AORC-C-4-0001 CIGRE-AORC 2013 OPERATION ANALYSIS OF LARGE SCALE SOLAR POWER GENERATION IN THAILAND Chairerk Thammarak and Worrapong Wonglimamornlert Power Purchase Agreement Division

More information

DRAFT KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE. No. 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015

DRAFT KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE. No. 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015 DRAFT 31.3.2015 KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015 The Kerala State Electricity Regulatory Commission hereby publishes

More information

Japan. Nagahide Sato and Sadayuki Matsudaira Nishimura & Asahi

Japan. Nagahide Sato and Sadayuki Matsudaira Nishimura & Asahi Nagahide Sato and Sadayuki Matsudaira Nishimura & Asahi 1 Policy and law What is the government policy and legislative framework for the electricity sector? The electricity sector in is governed by the

More information

Asian Journal on Energy and Environment

Asian Journal on Energy and Environment As. J. Energy Env. 2005, 6(02), 139-144 Asian Journal on Energy and Environment ISSN 1513-4121 Available online at www.asian-energy-journal.info The Small Hydropower Project as the Important Renewable

More information

Japan. Nagahide Sato and Sadayuki Matsudaira. Nishimura & Asahi

Japan. Nagahide Sato and Sadayuki Matsudaira. Nishimura & Asahi Nagahide Sato and Sadayuki Matsudaira Nishimura & Asahi 1 Policy and law What is the government policy and legislative framework for the electricity sector? The electricity sector in is governed by the

More information

Electricity in Egypt

Electricity in Egypt T: (+20) 2 3760 4592 F: (+20) 2 3760 4593 A: 16 Hussein Wassef Street, Messaha Square Dokki, Giza, Egypt 12311 www.ide.com.eg Electricity in Egypt Policy and Regulatory Reform November 2015 Electricity

More information

E n e r g y, N a t u r a l R e s o u r c e s & E n v i r o n m e n t - J u n e 2 0 1 3

E n e r g y, N a t u r a l R e s o u r c e s & E n v i r o n m e n t - J u n e 2 0 1 3 Rokas E n e r g y N e w s f l a s h 1 sst t IISSUE International Law Firm E L E C T R I C I T Y Restructuring and privatization of PPC Proposals for reducing industrial energy costs Ownership Unbundling

More information

The terms set forth in 220 CMR 18.02 shall be defined as follows, unless the context otherwise requires.

The terms set forth in 220 CMR 18.02 shall be defined as follows, unless the context otherwise requires. 220 CMR 18.00: NET METERING Section 18.01: Purpose and Scope 18.02: Definitions 18.03: Net Metering Services 18.04: Calculation of Net Metering Credits 18.05: Allocation of Net Metering Credits 18.06:

More information

MASSACHUSETTS ELECTRIC COMPANY NANTUCKET ELECTRIC COMPANY NET METERING PROVISION

MASSACHUSETTS ELECTRIC COMPANY NANTUCKET ELECTRIC COMPANY NET METERING PROVISION Sheet 1 Applicability The following tariff provisions shall be applicable to a Host Customer, as defined herein, that requests net metering services from the Distribution Company, with the exception of

More information

How KASIKORNBANK Plans to Support Green Projects

How KASIKORNBANK Plans to Support Green Projects How KASIKORNBANK Plans to Support Green Projects Clean Power Asia 29-30 April 2013, Bangkok Thongchai Kangvanchai KASIKORNBANK Pcl. 1 Content Government s Policy of Promoting Green Energy KBank s Green

More information

Export and project financing

Export and project financing Energy Efficiency Made in Germany Initiative Export and project financing Investment strategy for energy efficiency projects in Thailand www.efficiency-from-germany.info Thailand s Existing Policy & Measures

More information

Glossary of Energy Terms. Know Your Power. Towards a Participatory Approach for Sustainable Power Development in the Mekong Region

Glossary of Energy Terms. Know Your Power. Towards a Participatory Approach for Sustainable Power Development in the Mekong Region Glossary of Energy Terms Know Your Power 2012 Towards a Participatory Approach for Sustainable Power Development in the Mekong Region List of terms Terms Page Terms Page Avoided cost 10 Installed capacity

More information

SOLAR POWER IN SANTA CLARA COUNTY MARKETS AND DEVELOPMENT TRENDS

SOLAR POWER IN SANTA CLARA COUNTY MARKETS AND DEVELOPMENT TRENDS SOLAR POWER IN SANTA CLARA COUNTY MARKETS AND DEVELOPMENT TRENDS COUNTY OF SANTA CLARA PLANNING OFFICE APRIL 2010 1 FOR MORE INFORMATION ABOUT THIS PAPER OR SANTA CLARA COUNTY S PV PROGRAM, CONTACT KATJA

More information

Frequently Asked Questions About. Japan s Feed-in- Tariff System

Frequently Asked Questions About. Japan s Feed-in- Tariff System Frequently Asked Questions About Japan s Feed-in- Tariff System Spring 2013 JAPAN S FEED-IN-TARIFF SYSTEM SPRING 2013 Naoki Watanabe 1. What are the Key Steps in the Process of Getting FIT Approval of

More information

(-Translation-) Rule of Department of Employment. The Criteria for the Consideration for Work Permit Issuance B.E. 2552 (A.D.2009)

(-Translation-) Rule of Department of Employment. The Criteria for the Consideration for Work Permit Issuance B.E. 2552 (A.D.2009) (-Translation-) Rule of Department of Employment On The Criteria for the Consideration for Work Permit Issuance B.E. 2552 (A.D.2009) For the purpose of work permit issuance pursuant to section 9, 11, 23

More information

Renewable Energy Strategy for 2020 and Regulatory Framework. Eng. Hatem Amer Egyptian Electric Regulatory and Consumer Protection Agency

Renewable Energy Strategy for 2020 and Regulatory Framework. Eng. Hatem Amer Egyptian Electric Regulatory and Consumer Protection Agency Renewable Energy Strategy for 2020 and Regulatory Framework Eng. Hatem Amer Egyptian Electric Regulatory and Consumer Protection Agency Objectives of the Agency Regulate, supervise, and control all matters

More information

MINISTRY OF ENERGY FEED-IN-TARIFFS POLICY ON WIND, BIOMASS, SMALL-HYDRO, GEOTHERMAL, BIOGAS AND SOLAR RESOURCE GENERATED ELECTRICITY

MINISTRY OF ENERGY FEED-IN-TARIFFS POLICY ON WIND, BIOMASS, SMALL-HYDRO, GEOTHERMAL, BIOGAS AND SOLAR RESOURCE GENERATED ELECTRICITY MINISTRY OF ENERGY FEED-IN-TARIFFS POLICY ON WIND, BIOMASS, SMALL-HYDRO, GEOTHERMAL, BIOGAS AND SOLAR RESOURCE GENERATED ELECTRICITY Initial Issue: March 2008 1 st Revision: January 2010 2 nd Revision:

More information

SCHEDULE FIT TIER 1 AND TIER 2

SCHEDULE FIT TIER 1 AND TIER 2 SHEET NO. 78 Effective October 22, 2010 SCHEDULE FIT TIER 1 AND TIER 2 Feed-In Tariff - Purchases from Tier 1 and Tier 2 Eligible Renewable Energy Generating Facilities A. Availability: This schedule feed-in

More information

Background document on retroactive measures, moratoria, unplanned support reduction, cancellation of support or other harmful measures

Background document on retroactive measures, moratoria, unplanned support reduction, cancellation of support or other harmful measures Background document on retroactive measures, moratoria, unplanned support reduction, cancellation of support or other harmful measures adopted in recent years in EU Member States affecting photovoltaic

More information

Solar PV Business Models and Key Policy Considerations

Solar PV Business Models and Key Policy Considerations Solar PV Business Models and Key Policy Considerations Sopitsuda Tongsopit, Ph.D. Energy Research nstitute, Chulalongkorn University Presentation at Singapore s Future Solar PV Strategies Conference April

More information

Ministry of National Infrastructures. Charging of Electric Vehicles. Policy Principles

Ministry of National Infrastructures. Charging of Electric Vehicles. Policy Principles Ministry of National Infrastructures Charging of Electric Vehicles Policy Principles Contents Contents 1. Status and future prospects Overview 1.1 The electric vehicle (EV) market in Israel 1.2 Actions

More information

Financing Energy Efficiency and Renewable Energy: Thailand s ENCON Fund

Financing Energy Efficiency and Renewable Energy: Thailand s ENCON Fund International Energy Efficiency Forum, ASTANA, KAZAKHSTAN, 27-30 September 2010 Financing Energy Efficiency and Renewable Energy: Thailand s ENCON Fund Prasert Sinsukprasert Director of Planning Division

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): ENERGY. 1. Sector Performance, Problems, and Opportunities Country Operations Business Plan: Philippines, 2013 2015 SECTOR ASSESSMENT (SUMMARY): ENERGY 1. Sector Performance, Problems, and Opportunities 1. Challenges. Economic growth has been impeded in the Philippines

More information

ELECTRICITY MARKET ACT

ELECTRICITY MARKET ACT 1 NB: Unofficial translation Ministry of Trade and Industry, Finland ELECTRICITY MARKET ACT (386/1995; amendments up to 1172/2004 included) In accordance with a decision by Parliament, the following is

More information

Full Scale Program for Renewable Energy in Egypt

Full Scale Program for Renewable Energy in Egypt Full Scale Program for Renewable Energy in Egypt Contents Evolution of Egypt Needs of Electricity and its supply mix Renewable Energy Policy and Targets Renewable Energy Program Components Conclusions

More information

Unofficial translation. The Electricity (Capacity) Market Rules

Unofficial translation. The Electricity (Capacity) Market Rules Chapter I General Provisions Article 1. Scope of Activity Unofficial translation The Electricity (Capacity) Market Rules These Rules regulate: a) Functioning of Electricity and Guaranteed Capacity Market

More information

Flexible Circuits Inc. Purchase Order Standard Terms and Conditions

Flexible Circuits Inc. Purchase Order Standard Terms and Conditions Flexible Circuits Inc. Purchase Order Standard Terms and Conditions 1. Acceptance- This writing, together with any attachments incorporated herein, constitutes the final, complete, and exclusive contract

More information

Residential Solar Service Agreement (RSSA) Customer Sited Solar Photovoltaic Systems

Residential Solar Service Agreement (RSSA) Customer Sited Solar Photovoltaic Systems Residential Solar Service Agreement (RSSA) Customer Sited Solar Photovoltaic Systems This Agreement is made and entered into this day of, 20, ( Effective Date ) by and between the Orlando Utilities Commission

More information

DELHI ELECTRICITY REGULATORY COMMISSION

DELHI ELECTRICITY REGULATORY COMMISSION DELHI ELECTRICITY REGULATORY COMMISSION DELHI ELECTRICITY REGULATORY COMMISSION (RENEWABLE PURCHASE OBLIGATION AND RENEWABLE ENERGY CERTIFICATE FRAMEWORK IMPLEMENTATION) REGULATIONS, 2011 No. Dated:. NOTIFICATION

More information

Solar Power in China. By Zhou Fengqing

Solar Power in China. By Zhou Fengqing Solar Power in China By Zhou Fengqing Overview Adjust Chinese power structure Feasibility of solar power in China Solar energy as national policies Legislations of solar energy Adjust Chinese Power Structure

More information

CANADIAN RENEWABLE ENERGY POLICIES. Matthew H. Brown InterEnergy Solutions 2007

CANADIAN RENEWABLE ENERGY POLICIES. Matthew H. Brown InterEnergy Solutions 2007 CANADIAN RENEWABLE ENERGY POLICIES Matthew H. Brown InterEnergy Solutions 2007 The following offers an overview of Canadian federal and provincial policies that promote renewable energy. It is excerpted

More information

FEED-IN TARIFF (FiT) IN MALAYSIA www.seda.gov.my

FEED-IN TARIFF (FiT) IN MALAYSIA www.seda.gov.my IN MALAYSIA www.seda.gov.my 1 Introduction to Feed-in Tariff Mechanism Feed-in Tariff mechanism oblige energy utilities to buy renewable energy from producers, at a mandated price. By guaranteeing access

More information

Energy Act 2013 CHAPTER 32. Explanatory Notes have been produced to assist in the understanding of this Act and are available separately

Energy Act 2013 CHAPTER 32. Explanatory Notes have been produced to assist in the understanding of this Act and are available separately Energy Act 2013 CHAPTER 32 Explanatory Notes have been produced to assist in the understanding of this Act and are available separately Energy Act 2013 CHAPTER 32 CONTENTS PART 1 DECARBONISATION 1 Decarbonisation

More information

Terms and Conditions for your Natural Gas and/or Electricity Price Plan.

Terms and Conditions for your Natural Gas and/or Electricity Price Plan. Terms and Conditions for your Natural Gas and/or Electricity Price Plan. This is your Terms and Conditions document. Please retain for your records. ONER916/ONER917/ONER918/ONEM427 1.0 How we define certain

More information

RENEWABLE ENERGY DEVELOPMENT IN LITHUANIA ACHIEVEMENTS AND DRAWBACKS

RENEWABLE ENERGY DEVELOPMENT IN LITHUANIA ACHIEVEMENTS AND DRAWBACKS RENEWABLE ENERGY DEVELOPMENT IN LITHUANIA ACHIEVEMENTS AND DRAWBACKS Ieva Kuodė Ministry of Energy of the Republic of Lithuania SOLINVEST 2015-06-02 RES TARGETS BY 2020 23% the share of energy from renewable

More information

Environment and energy briefing from Burges Salmon published in the March 2014 issue of The In-House Lawyer:

Environment and energy briefing from Burges Salmon published in the March 2014 issue of The In-House Lawyer: Environment and energy briefing from Burges Salmon published in the March 2014 issue of The In-House Lawyer: Electricity market reform: an update on contracts for difference Electricity market reform:

More information

Incentive Programmes for Solar Thermal Technology in Thailand

Incentive Programmes for Solar Thermal Technology in Thailand Incentive Programmes for Solar Thermal Technology in Thailand Department of Alternative Energy Development and Efficiency (DEDE) Thailand s Ministry of Energy Kulwaree Buranasajjawaraporn Director, Innovation

More information

Committee on the Northern Territory s Energy Future. Electricity Pricing Options. Submission from Power and Water Corporation

Committee on the Northern Territory s Energy Future. Electricity Pricing Options. Submission from Power and Water Corporation Committee on the Northern Territory s Energy Future Electricity Pricing Options Submission from Power and Water Corporation October 2014 Power and Water Corporation 1. INTRODUCTION On 21 August 2014, the

More information

Renewable Energy Feed-in Tariff Projects Regulations

Renewable Energy Feed-in Tariff Projects Regulations for Consumer Protection and Renewable Energy Feed-in Tariff Projects Regulations Oct. 2014 EgyptERA s crew has prepared this document so as to answer all the questions related to the renewbales supporting

More information

Kiwi Energy NY LLC 144 North 7 th Street #417 Brooklyn, NY 11249 1-877- 208-7636 www.kiwienergy.us

Kiwi Energy NY LLC 144 North 7 th Street #417 Brooklyn, NY 11249 1-877- 208-7636 www.kiwienergy.us Kiwi Energy NY LLC 144 North 7 th Street #417 Brooklyn, NY 11249 1-877- 208-7636 www.kiwienergy.us Natural Gas / Electricity SALES AGREEMENT Customer Disclosure Statement Page 1 Price: Variable rate per

More information

MANAGEMENT AND REDUCTION OF GREENHOUSE GASES BILL. No. 95

MANAGEMENT AND REDUCTION OF GREENHOUSE GASES BILL. No. 95 1 BILL No. 95 An Act respecting the Management and Reduction of Greenhouse Gases and Adaptation to Climate Change TABLE OF CONTENTS 1 Short title 2 Interpretation 3 Crown bound PART I Preliminary Matters

More information

Overview on SEA output

Overview on SEA output 1 st SEA workshop of the revised PDP VII Overview on SEA output of Project N a t i o n a l P o w e r D e v e l o p m e n t P l a n p e r i o d 2 0 11-2 0 2 0, v i s i o n 2 0 3 0 ( P D P V I I ) P r e

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI Draft Maharashtra Electricity Regulatory Commission (Net Metering for Rooftop Solar Systems) Regulations, 2015 Electricity Act, 2003 No. MERC / Legal

More information

Renewable Energy in the manufacturing and tourism industry in Egypt. Regulatory Framework and market potential

Renewable Energy in the manufacturing and tourism industry in Egypt. Regulatory Framework and market potential Renewable Energy in the manufacturing and tourism industry in Egypt Regulatory Framework and market potential Part 1 Electricity Self-consumption 2 Egypt s Electricity Sector Figures 2013 27 GW Peak Load

More information

CONTRACT FOR THE SALE AND PURCHASE OF ELECTRICITY GENERATED BY WIND POWER

CONTRACT FOR THE SALE AND PURCHASE OF ELECTRICITY GENERATED BY WIND POWER CONTRACT FOR THE SALE AND PURCHASE OF ELECTRICITY GENERATED BY WIND POWER ASSISTANCE TO ENERGY SECTOR TO STRENGTHEN ENERGY SECURITY AND REGIONAL INTEGRATION CONTRACT NUMBER EPP-I-08-03-00008-00 AUGUST,

More information

FACT SHEET. NEM fast facts:

FACT SHEET. NEM fast facts: (NEM) operates on one of the world s longest interconnected power systems, stretching from Port Douglas in Queensland to Port Lincoln in South Australia and across the Bass Strait to Tasmania a distance

More information

Overview of the IESO-Administered Markets. IESO Training. Updated: January, 2014. Public

Overview of the IESO-Administered Markets. IESO Training. Updated: January, 2014. Public Overview of the IESO-Administered Markets IESO Training Updated: January, 2014 Public Overview of the IESO-Administered Markets AN IESO TRAINING PUBLICATION This guide has been prepared to assist in the

More information

Renewable Energy Promotion Policies in Chinese Taipei

Renewable Energy Promotion Policies in Chinese Taipei Renewable Energy Promotion Policies in Chinese Taipei Bureau of Energy, Ministry of Economic Affairs Chinese Taipei November 12, 2014 RE for CT - 1 Current Development of Renewables in Chinese Taipei RE

More information

Response to the Energy White Paper Issues Paper PREPARED BY EMC ENGINEERING FOR THE AUSTRALIAN GOVERNMENT DEPARTMENT OF INDUSTRY

Response to the Energy White Paper Issues Paper PREPARED BY EMC ENGINEERING FOR THE AUSTRALIAN GOVERNMENT DEPARTMENT OF INDUSTRY Response to the Energy White Paper Issues Paper PREPARED BY EMC ENGINEERING FOR THE AUSTRALIAN GOVERNMENT DEPARTMENT OF INDUSTRY i P a g e www.energym adeclean.com CONTENTS

More information

Sustainable and Renewable Energy Development Authority (SREDA) of Bangladesh Role and Responsibility

Sustainable and Renewable Energy Development Authority (SREDA) of Bangladesh Role and Responsibility Sustainable and Renewable Energy Development Authority (SREDA) of Bangladesh Role and Responsibility Welcome to SREDA Siddique Zobair Member (EE & C) Sustainable & Renewable Energy Development Authority

More information

ONTARIO REGULATION proposed to be made under the

ONTARIO REGULATION proposed to be made under the Caution: This draft regulation is provided solely to facilitate dialogue concerning its contents. Should the decision be made to proceed with the proposal, the comments received during consultation will

More information

FIXED CHARGE: This is a cost that goes towards making the service available, including

FIXED CHARGE: This is a cost that goes towards making the service available, including ELECTRICITY BILL COMPONENTS FIXED CHARGE: This is a cost that goes towards making the service available, including installation and maintenance of poles, power lines and equipment, and 24-hour customer

More information

Water Services Act (119/2001)

Water Services Act (119/2001) NB: Unofficial translation Ministry of Agriculture and Forestry, Finland Water Services Act (119/2001) Chapter 1 General provisions Section 1 Objective (1) The objective of this Act is to ensure water

More information

FEED-IN TARIFF CONTRACT (FIT CONTRACT)

FEED-IN TARIFF CONTRACT (FIT CONTRACT) FEED-IN TARIFF CONTRACT (FIT CONTRACT) Version 1.3.2 (October 29, 2010) Deleted: 1 1. CONTRACT IDENTIFICATION # FIT- 2. FIT REFERENCE # FIT- 3. CONTRACT DATE 4. SUPPLIER 5. SUPPLIER S ADDRESS 6. SUPPLIER

More information

Western Australia and the Northern Territory are not connected to the NEM, primarily due to the distance between networks.

Western Australia and the Northern Territory are not connected to the NEM, primarily due to the distance between networks. Australia has one of the world s longest alternating current (AC) systems, stretching from Port Douglas in Queensland to Port Lincoln in South Australia and across the Bass Strait to Tasmania a distance

More information

Renewable Energy Promotion Policies in Taiwan. Bureau of Energy Ministry of Economic Affairs

Renewable Energy Promotion Policies in Taiwan. Bureau of Energy Ministry of Economic Affairs Renewable Energy Promotion Policies in Taiwan Bureau of Energy Ministry of Economic Affairs October 2015 1 Outline Current Development of Renewables in Taiwan Taiwan s New Renewable Energy Policy 2 Current

More information

Credit Information Business Act B.E. 2545

Credit Information Business Act B.E. 2545 - Unofficial English Translation Credit Information Business Act B.E. 2545 BHUMIBOL ADULYADEJ,.REX., Given on the 13 th day of November B.E. 2545; Being the 57 th Year of the Present Reign. By Royal Command

More information

Regulation for Renewable Energy Development: Lessons from Sri Lanka Experience

Regulation for Renewable Energy Development: Lessons from Sri Lanka Experience Regulation for Renewable Energy Development: Lessons from Sri Lanka Experience Priyantha D C Wijayatunga Asian Development Bank, Manila, Philippines * Corresponding author. Tel: +6326326131, Fax: +6326362338,

More information

Republic of Turkey. Date of acceptance: 9 November 2007 PART 1. Goal, scope, definitions and abbreviations. Goal and scope.

Republic of Turkey. Date of acceptance: 9 November 2007 PART 1. Goal, scope, definitions and abbreviations. Goal and scope. Republic of Turkey Unofficial Translation 1 of the Turkish Law No. 5710 2 Concerning the Construction and Operation of Nuclear Power Plants and the Sale of Energy Generated from Those Plants Date of acceptance:

More information

APO COE on GP Model: Green Energy. Dr. Jyh-Shing Yang Senior Supervisor Industrial Technology Research Institute

APO COE on GP Model: Green Energy. Dr. Jyh-Shing Yang Senior Supervisor Industrial Technology Research Institute APO COE on GP Model: Green Energy Dr. Jyh-Shing Yang Senior Supervisor Industrial Technology Research Institute Presentation Outline Taiwan Green Energy Achievements Green Energy Technical Services Future

More information

APPENDIX A: SYSTEM OF ASSURANCE OF NET METERING ELIGIBILITY

APPENDIX A: SYSTEM OF ASSURANCE OF NET METERING ELIGIBILITY APPENDIX A: SYSTEM OF ASSURANCE OF NET METERING ELIGIBILITY Sections 1. Purpose... 1 2. Scope... 1 3. Definitions... 1 4. Obtaining a Cap Allocation... 3 5. Duties of the Administrator and Fees... 5 6.

More information

Tanzania s Experience in Establishing a Regulatory System for Promoting Grid and Off-Grid Small Power Producers (SPPs)

Tanzania s Experience in Establishing a Regulatory System for Promoting Grid and Off-Grid Small Power Producers (SPPs) Tanzania s Experience in Establishing a Regulatory System for Promoting Grid and Off-Grid Small Power Producers (SPPs) AFTEG and the African Electrification Initiative (AEI) AEI Practitioner Workshop -

More information

DRAFT MODEL REGULATIONS for STATE ELECTRICITY REGULATORY COMMISSION UNDER SETION 86 (1) (e) OF THE ACT. No. Dated: October, 2009 NOTIFICATION (DRAFT)

DRAFT MODEL REGULATIONS for STATE ELECTRICITY REGULATORY COMMISSION UNDER SETION 86 (1) (e) OF THE ACT. No. Dated: October, 2009 NOTIFICATION (DRAFT) DRAFT MODEL REGULATIONS for STATE ELECTRICITY REGULATORY COMMISSION UNDER SETION 86 (1) (e) OF THE ACT No. Dated: October, 2009 NOTIFICATION (DRAFT) In exercise of powers conferred under sections 61, 66,

More information

TURKEY MARKETING REGULATION

TURKEY MARKETING REGULATION Province of Alberta MARKETING OF AGRICULTURAL PRODUCTS ACT TURKEY MARKETING REGULATION Alberta Regulation 113/1998 With amendments up to and including Alberta Regulation 135/2015 Office Consolidation Published

More information

Alternative Energy Development Plan (AEDP) 2015

Alternative Energy Development Plan (AEDP) 2015 Alternative Energy Development Plan (AEDP) 2015 Yaowateera Achawangkul, Ph.D. Department of Alternative Energy Development and Efficiency Thailand Integrated Energy Blueprint 4 th June 2015 1 Content 1.

More information

2014 No. 0000 ELECTRICITY. The Contracts for Difference (Allocation) Regulations 2014

2014 No. 0000 ELECTRICITY. The Contracts for Difference (Allocation) Regulations 2014 Draft Regulations laid before Parliament under section 6(8) of the Energy Act 2013, for approval by resolution of each House of Parliament. D R A F T S T A T U T O R Y I N S T R U M E N T S 2014 No. 0000

More information

EEU Perspectives towards more Sustainable Energy Sector in Egypt

EEU Perspectives towards more Sustainable Energy Sector in Egypt EEU Perspectives towards more Sustainable Energy Sector in Egypt Energy Efficiency Unit (EEU) January 21, 2014 The Challenge Energy Supply/Demand Deficit is expected to reach (30-50) Mtoe between (2022-2030)

More information

PROVO CITY UTILITIES NET METERING LICENSE AGREEMENT

PROVO CITY UTILITIES NET METERING LICENSE AGREEMENT PROVO CITY UTILITIES NET METERING LICENSE AGREEMENT Customer-Owned Electric Generating Systems of 25kW or Less This NET METERING LICENSE AGREEMENT ( Agreement ) is between ( Customer ) and Provo City -

More information

PART II. TERMS AND CONDITIONS

PART II. TERMS AND CONDITIONS I acknowledge and agree with the Seller as follows: PART II. TERMS AND CONDITIONS 1. Entire Agreement These Terms and Conditions and the Sign Up Form together make up the agreement with the Seller (my

More information

Terms and Conditions For Mobile Phone Service. Pre-Paid Type. Between The Service Provider And Subscribers

Terms and Conditions For Mobile Phone Service. Pre-Paid Type. Between The Service Provider And Subscribers Terms and Conditions For Mobile Phone Service Pre-Paid Type Between The Service Provider And Subscribers 1. General 1.1 This Terms and Conditions for Mobile Phone Service ( Terms and Conditions ) is binding

More information

Net Energy Metering Southern California Edison

Net Energy Metering Southern California Edison NET ENERGY METERING To encourage small electrical customers to install environmentally friendly sources of electrical power, the State of California has passed laws to make the process of interconnecting

More information

Law of the Republic of Kazakhstan «ABOUT SUPPORT OF USE OF RENEWABLE SOURCES OF ENERGY»

Law of the Republic of Kazakhstan «ABOUT SUPPORT OF USE OF RENEWABLE SOURCES OF ENERGY» Law of the Republic of Kazakhstan «ABOUT SUPPORT OF USE OF RENEWABLE SOURCES OF ENERGY» Draft The present Law regulates public relations in the area of the usage of Renewable Energy Sources, establishes

More information

PG&E and Renewable Energy. Chuck Hornbrook Senior Manager Solar and Customer Generation

PG&E and Renewable Energy. Chuck Hornbrook Senior Manager Solar and Customer Generation PG&E and Renewable Energy Chuck Hornbrook Senior Manager Solar and Customer Generation PG&E and our Business What we do: Deliver safe, reliable, and environmentally responsible gas and electricity to approximately

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION

KERALA STATE ELECTRICITY REGULATORY COMMISSION KERALA STATE ELECTRICITY REGULATORY COMMISSION Notification No. 2096/KSERC/CT/2014 Dated, Thiruvananthapuram 10 th June 2014. In exercise of the powers conferred under sections 66, 86 (1) (e) and 181 of

More information

Model Renewable Energy Wheeling Agreement under Renewable Energy Certificate (REC) scheme

Model Renewable Energy Wheeling Agreement under Renewable Energy Certificate (REC) scheme Model Renewable Energy Wheeling Agreement under Renewable Energy Certificate (REC) scheme This agreement made at on this day of two thousand between M/s. (Renewable Energy Generator name and address) hereinafter

More information

Most household services provide you with a fixed monthly bill: Broadband Internet service

Most household services provide you with a fixed monthly bill: Broadband Internet service Predict-a-Bill Natural Gas Most household services provide you with a fixed monthly bill: Cell phone service Broadband Internet service And now... your natural gas supply! Predict-a-Bill advantage: Developed

More information

UMBRELLA CLIMATE CHANGE AGREEMENT FOR THE STANDALONE DATA CENTRES Agreement dated 11 th July 2014

UMBRELLA CLIMATE CHANGE AGREEMENT FOR THE STANDALONE DATA CENTRES Agreement dated 11 th July 2014 THIS AGREEMENT is made the 11 th day of July 2014 BETWEEN: (1) the Environment Agency ( the Administrator ); and (2) the Sector Association set out in Schedule 2 ( the Sector Association ). RECITALS (A)

More information

RENEWABLE ENERGY RESOURCES PROGRAM REPORT

RENEWABLE ENERGY RESOURCES PROGRAM REPORT RENEWABLE ENERGY RESOURCES PROGRAM REPORT January through December 2008 Illinois Department of Commerce and Economic Opportunity Bureau of Energy and Recycling Renewable Energy Resources Program 620 East

More information

Photovoltaic in Mexico Recent Developments and Future

Photovoltaic in Mexico Recent Developments and Future Photovoltaic in Mexico Recent Developments and Future Rodolfo Martínez Strevel Berlin, Germany May 23th, 2013 Bufete de Tecnología Solar, S.A. (BUTECSA) Production of Primary Energy in Mexico, 2011 % 7,0

More information

LEGAL FRAMEWORK, POTENTIAL AND OUTLOOK FOR BIOENERGY SECTOR IN VIETNAM

LEGAL FRAMEWORK, POTENTIAL AND OUTLOOK FOR BIOENERGY SECTOR IN VIETNAM Conference on Bioenergy in Viet Nam October 6 th, 2014, HCM City LEGAL FRAMEWORK, POTENTIAL AND OUTLOOK FOR BIOENERGY SECTOR IN VIETNAM By Nguyen Duc Cuong Director of Center for Renewable Energy & CDM,

More information

Kingdom of the Netherlands

Kingdom of the Netherlands Kingdom of the Netherlands GENERAL GOVERNMENT PURCHASING CONDITIONS 2014 (ARIV 2014) Adopted by order of the Prime Minister, Minister of General Affairs, of 26 March 2014, no. 3132081 I General Article

More information

DRAFT REGULATIONS FOR ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION UNDER SECTION 86(1)(e) OF THE ACT NOTIFICATION

DRAFT REGULATIONS FOR ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION UNDER SECTION 86(1)(e) OF THE ACT NOTIFICATION DRAFT REGULATIONS FOR ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION UNDER SECTION 86(1)(e) OF THE ACT No. Dated: -12-2011 NOTIFICATION In exercise of powers conferred under sections 61, 66, 86(1)(e)

More information

Arab Republic of Egypt Ministry of Electricity & Energy New & Renewable Energy Authority (NREA)

Arab Republic of Egypt Ministry of Electricity & Energy New & Renewable Energy Authority (NREA) Arab Republic of Egypt Ministry of Electricity & Energy New & Renewable Energy Authority (NREA) Oct. 2012 Institutional framework: Establishing NREA (1986) The national focal point to develop and introduce

More information

To complete the process for a net metering interconnection, please follow the steps below:

To complete the process for a net metering interconnection, please follow the steps below: We appreciate your interest in Pacific Power s net metering program. Before purchasing any net metering equipment, we recommend you review the requirements for interconnecting a net metering system to

More information

Clean State Energy Actions 2011 Update. colorado

Clean State Energy Actions 2011 Update. colorado Energy Efficiency Building Energy Codes Utility Demand-Side-Management Energy Savings Targets/Energy Efficiency Resource Standards Residential: 2003 IECC, required in jurisdictions with a building code

More information

State of South Dakota

State of South Dakota State of South Dakota EIGHTY-THIRD SESSION LEGISLATIVE ASSEMBLY, 00 P0 HOUSE BILL NO. Introduced by: Representatives Feinstein, Ahlers, Burg, Dennert, Elliott, Engels, Gassman, Lucas, Miles, Moore, Nygaard,

More information

welcome! Turkish Renewable Energy Market Rome 29 th April 2015 Levent Çelepçi

welcome! Turkish Renewable Energy Market Rome 29 th April 2015 Levent Çelepçi welcome! Turkish Renewable Energy Market Rome 29 th April 2015 Levent Çelepçi Turkish Map 65,000,000,000 Dollars Current Deficit Overview Turkish Electricity Market-Growth Potential Turkey s importance

More information

Frequently Asked Questions PG&E s Power Purchase Agreement for Small Renewable Generation Feed-in Tariffs

Frequently Asked Questions PG&E s Power Purchase Agreement for Small Renewable Generation Feed-in Tariffs Frequently Asked Questions PG&E s Power Purchase Agreement for Small Renewable Generation Feed-in Tariffs What is the small renewable generation power purchase agreement? Effective February 20, 2008, PG&E

More information

Packaging Management Law 5771 2011

Packaging Management Law 5771 2011 1 This is an unofficial translation. The binding version is the official Hebrew text. Readers are consequently advised to consult qualified professional counsel before making any decision in connection

More information

Concern about climate change and concerted international action to reduce greenhouse gas emissions are powerful new drivers for renewable energy.

Concern about climate change and concerted international action to reduce greenhouse gas emissions are powerful new drivers for renewable energy. Title: AUSTRALIA S RENEWABLE ENERGY CERTIFICATE SYSTEM Authors: David Rossiter and Karla Wass 1 Office of the Renewable Energy Regulator Kings Avenue, Barton ACT 2600, Australia GPO Box 621, Canberra ACT

More information

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON MARCH 29, 2016 JAY STANFORD, M.A., M.P.A. DIRECTOR, ENVIRONMENT FLEET & SOLID WASTE

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON MARCH 29, 2016 JAY STANFORD, M.A., M.P.A. DIRECTOR, ENVIRONMENT FLEET & SOLID WASTE 1 TO: FROM: SUBJECT: CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON MARCH 29, 2016 JAY STANFORD, M.A., M.P.A. DIRECTOR, ENVIRONMENT FLEET & SOLID WASTE LANDFILL GAS UTILIZATION STATUS OF OPPORTUNITIES

More information

Electricity Business Act

Electricity Business Act Electricity Business Act (Act No. 170 of July 11, 1964) Table of Contents Chapter 1 General Provisions Chapter 2 Electricity Business Section 1 Business License, etc. Section 2 Services Subsection 1 Supply

More information

Opportunities for Biogas Digesters

Opportunities for Biogas Digesters Opportunities for Biogas Digesters Presented to the California Bioresources Alliance September 13, 2011 Jody S. London P.O. Box 3629 Oakland, California 94609 510/459-0667 jody_london_consulting@earthlink.net

More information

ACT ON GUARANTEE OF COMPENSATION FOR LOSS CAUSED BY AUTOMOBILE. [Enforcement Date: Feb. 7, 2010] [Act No. 9450, Feb. 6, 2009, Partial Amendment]

ACT ON GUARANTEE OF COMPENSATION FOR LOSS CAUSED BY AUTOMOBILE. [Enforcement Date: Feb. 7, 2010] [Act No. 9450, Feb. 6, 2009, Partial Amendment] The English version is translated and uploaded only for the purpose of no other than PR, and thereby, Act on Guarantee of Compensation for Loss Caused by Automobile in the Korean language will prevail

More information

RENEWABLE ENERGY DEVELOPMENT STATE TAX POLICIES AND INCENTIVES IMPACTING

RENEWABLE ENERGY DEVELOPMENT STATE TAX POLICIES AND INCENTIVES IMPACTING RENEWABLE ENERGY DEVELOPMENT STATE TAX POLICIES AND INCENTIVES IMPACTING RENEWABLE ENERGY DEVELOPMENT PREPARED BY THE NATIONAL CONFERENCE OF STATE LEGISLATURES MARCH 2012 OREGON Contents State Taxes that

More information