ICAO-ENAC PBN PROCEDURE DESIGN COURSE



Similar documents
PBN Aeronautical Charts and Procedure Design

EPN, seminar AFIS, september 2013 Instrument approach procedures, PBN, GNSS

CAR/SAM STRATEGY FOR THE EVOLUTION OF AIR NAVIGATION SYSTEMS

ANI Procedure Design Training Program and Concept

Título ponencia: RNP APCH Implementation

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI

Performance-based Navigation and Data Quality

Direct Approach Consulting Inc.

IMPLEMENTATION OF PERFORMANCE BASED NAVIGATION (PBN)

ASIA/PACIFIC REGIONAL PERFORMANCE-BASED NAVIGATION IMPLEMENTATION PLAN

Título ponencia: Helicopter IFP. Point-in-Space (PinS)

Quality Assurance Manual for Flight Procedure Design

Area Navigation (RNAV) and Required Navigation Performance (RNP)

A. Amendments to AMC/GM to Part-FCL

ADVISORY CIRCULAR AC

CNS/ATM SYSTEMS IN INDIA

ILS Replacement. ACI World Safety Seminar November 2008 Kempinski Hotel Beijing Lufthansa Centre

ALAMEDA DO AEROPORTO Caixa Postal, Maputo REGULATIONS NEW FORMAT FLIGHT PLAN

AIS TRAINING GUIDANCE MANUAL USING A COMPETENCY-BASED APPROACH

Area Navigation (RNAV)/Wide Area Augmentation System (WAAS) Instrument Approach Procedures (IAP s) and the New Charting Format.

LONDON SOUTHEND AIRPORT AIRSPACE CHANGE PROPOSAL. Executive Summary and About the Consultation Documents and Document Contents

Performance Based Navigation (PBN)

Block 0: Capabilities within our Grasp

Required Navigation Performance Authorization Required (RNP AR) Procedure Design Manual

Civil Aviation Authority of Nepal Regulatory Employees Training Plan

AIM TRAINING DEVELOPMENT MANUAL

Título ponencia: Guidance for GBAS Operations Implementation

ICAO Amendment 1 - Australian Flight Planning Guidance

Doc 9849 AN/457. Approved by the Secretary General and published under his authority. First Edition International Civil Aviation Organization

International Civil Aviation Organization South American Regional Office

Understanding Compliance with Automatic Dependent Surveillance Broadcast (ADS-B) Out

Airports Authority of India

Development and Validation of Procedures. ICAO PBN Seminar Development and Validation of Procedures

ICAO FLIGHT PLAN MODIFICATIONS 2012

ICAO Safety Management Systems (SMS) Course Information and outline

DFS Deutsche Flugsicherung GmbH

SYSTEM GLOBAL NAVIGATION SATELLITE SYSTEM LANDING TECHNOLOGY/PRODUCT DEVELOPMENT

O Copyright Civil Aviation Department 2010

Quality Assurance DOC 9906 Vol 1 Step 5&6: Apply Criteria & Document and Store

Air Traffic Management

OPERATIONS CIRCULAR. OC NO 2 OF 2014 Date: 1 st May Continuous Descent Final Approach (CDFA) 1. PURPOSE

Air Traffic Service Providers Entry Control Procedures Manual 3. Approved Provider s Operations Manual

International Civil Aviation Organization The Fourth Meeting of the APANPIRG ATM Sub-Group (ATM /SG/4) Bangkok, Thailand, July 2016

INTEGRITY AND CONTINUITY ANALYSIS OCTOBER TO DECEMBER 2013 QUARTERLY REPORT FROM GPS. Integrity and Continuity Analysis 08/01/14 08/01/14 08/01/14

Michael Harrison Aviation Management Associates Alternative PNT Public Meeting Stanford University August Federal Aviation Administration

13.0. Safety Management and Airspace Protection

Safety Oversight Audit Section

Quality Assurance Manual for Flight Procedure Design

NOTICE TO AERODROME CERTIFICATE HOLDERS (NOTAC) No. 02/2013

CREDIT REPORT FOR PILOT LICENCES OBTAINED DURING MILITARY SERVICE. (according to Article 10 of Commission Regulation (EU) No 1178/2011)

Meeting of the Cooperation Arrangement for the Prevention of Spread of Communicable Diseases Through Air Travel

airsight Company Profile

OPERATING MINIMA FOR AEROPLANES AND HELICOPTER OPERATIONS PURPOSE REFERENCE 4.0 DEFINITION

Título ponencia: Towards the GBAS Operational Approval. Organizado por:

Advisory Circular. U.S. Department of Transportation Federal Aviation Administration. AC No: Change: Date: 06/22/2011 Initiated by: AFS-460

Título ponencia: GBAS Concept

GENERAL INFORMATION ON GNSS AUGMENTATION SYSTEMS

Workpackages. This view provides the list of the SESAR Workpackages More information can be obtained by selecting a Workpackage.

CHANGE TO AERONAUTICAL INFORMATION MANUAL TO INCORPORATE NEW ICAO FLIGHT PLAN FILING REQUIREMENTS PLANNED EFFECTIVE DATE 11/15/2012

Air Operations 965/2012 Specific Approvals Annex V Part SPA Subpart GEN PBN

SBAS 2015 SPACE BASED AUGMENTATION SYSTEM WORKSHOP

EUROCONTROL Guidelines for Cold Temperature Corrections by ATS

International Civil Aviation Organization

Ref.: AN 13/2.5-09/45 19 June 2009

12 AERO Second-Quarter 2003 April CAPT. RAY CRAIG 737 CHIEF PILOT FLIGHT OPERATIONS BOEING COMMERCIAL AIRPLANES

PBN Operational Approval Application and Documentation. ICAO PBN Operational Approval Course

51 st CONFERENCE OF DIRECTORS GENERAL OF CIVIL AVIATION ASIA AND PACIFIC REGIONS

WHICH AIR TRAFFIC CONTROLLER TO CONTACT

Performance management Identification of metrics

EASA New Regulation on Air Operations. Dated : 05/01/2012. Version : Version 2. Antoine BLIN & Arnaud SCHAEFFER Consultants. Technical Director

A Strategic Vision of Air Traffic Management in New Zealand to 2025

Civil Aviation Authority of Nepal Training Program

THE SESAR CONCEPT AND SWIM. David Bowen Head of ATM Operations & Systems SESAR Joint Undertaking

Equipping Our Human Resources to work in a regional framework Towards Global ATFM Delivering ATM Ops Performance via Regional Network Collaboration

AVIATION TRAINING ACADEMY

International Virtual Aviation Organization. Hong Kong. Division Report Annual Report

INTERNATIONAL CIVIL AVIATION ORGANIZATION GUIDE FOR GROUND BASED AUGMENTATION SYSTEM IMPLEMENTATION

DRAFT WHITE PAPER ON CIVIL AVIATION CRAFTING NEW POLICY FOR SA AVIATION

Communication, Navigation, Surveillance (CNS) engineers and executives of Airports Authority of India

FLORIDA STATE COLLEGE AT JACKSONVILLE COLLEGE CREDIT COURSE OUTLINE

MSAS current status. Japan Civil Aviation Bureau S TSAT A ATELLITE-BASED S UGMENTATION. MTSAT Satellite-based Augmentation System

a Brief Background DEFINITION

MANUAL ON SIMULTANEOUS OPERATIONS ON PARALLEL OR NEAR-PARALLEL INSTRUMENT RUNWAYS (SOIR)

First Edition 2009 International Civil Aviation Organization

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION OPP. SAFDARJUNG AIRPORT, NEW DELHI

FAA Familiarization Briefing

EUROCONTROL Training Activities 2013

AVIATION SPECIALIST. Inspects aviation schools for conformance with state laws, rules, and regulations.

Aeronautical Information Services

CAD 360 AIR OPERATOR'S CERTIFICATES

Manual of All-Weather Operations

Translating the Region s Vision of a Seamless Sky into Reality Session. Soe Paing. Deputy Director Department of Civil Aviation Myanmar

PRESENTATION. Patrick Ky Executive Director EUROPEAN COMMISSION

Implementation of performance-based navigation (PBN) in the SAM Region FOLLOW-UP ON ACTIVITIES OF THE PBN OPERATIONAL IMPLEMENTATION PROJECT

Transport Spectrum Tune-Up Aviation Spectrum Issues. Eddy D Amico, RF Spectrum Manager Airservices Australia. November 2009

Type Certification and Entry into Service. Ing. Giuseppe Serpico

GAGAN-FOP/PMR-05. Indian SBAS System - GAGAN

Masters. Scienceof. Accredited by the French Ministry of higher education

MOS Part 171 Aeronautical Telecommunication and Radio Navigation Services

Transcription:

ICAO-ENAC PBN PROCEDURE DESIGN COURSE REFERENCE AND TITLE Performance Based Navigation Concept : Procedure design course for PBN applications: RNAV1 SID and STAR, RNP APCH (Non Precision Approach and APV Baro-VNAV) Two weeks, 10 class days A maximum of 15 trainees COURSE DURATION NUMBER OF PARTICIPANTS: WHEN AND WHERE From Course and documents in English without translation. INSTRUCTORS Sandrine Fournie, Denis Cabrieres and Sebastien Barrau are instructors at ENAC (French Civil Aviation University). Sandrine is a PANS-OPS instructor. She is involved in the French group regarding French PANS-OPS regulation and implementation. She was one of the instructors for previous PBN course in Cuba and Africa. Denis is a PANS-OPS instructor for more than 25 years. He is involved in the French group regarding French PANS-OPS regulation and implementation. Sebastien is a PANS-OPS instructor. He is involved in the French group regarding French PANS-OPS regulation and implementation. He is participating in ICAO Instrument Flight Procedure Panel (IFPP) meetings as advisor to the French member.he was instructor for previous ICAO PBN course in India, Hong Kong, Middle-East region and Africa. For further information on the course content, contact: sandrine.fournie@enac.fr denis.cabrieres@enac.fr sebastien.barrau@enac.fr 1

OBJECTIVES The purpose of the course is to apply procedure design criteria to the development of procedures for a select set of the navigation specifications in the Performance Based Navigation Manual dealing with terminal and approach operations. The general concept of PBN is presented, then the procedure design criteria associated with some specific applications such as Basic-RNP 1, RNAV 1, RNP APCH and baro-vnav are studied and applied and the procedure design is documented. Terminal objective 1: The trainee will design a Basic-RNP 1 or RNAV 1 SID procedure based on use of GNSS sensor Terminal objective 2: The trainee will design a Basic-RNP 1 or RNAV 1 STAR procedure based on use of GNSS sensor Terminal objective 3: The trainee will design an RNP Approach procedure (APV Baro- VNAV), based on RNP APCH operations Terminal objective 4: The trainee will design an RNP approach procedure (NPA), based on RNP APCH operations Terminal objective 5: Standard Given completed procedure design with all associated documents and data The trainee will document a Basic-RNP 1 or RNAV-1 SID and STAR, an RNP approach procedure (NPA), and an RNP approach procedure (APV Baro-VNAV), for validation, publication and traceability Accurately, in a reasonable time, and in accordance with PANS OPS, Doc 8168, Annex 4, Annex 15, Quality Assurance Manual for Flight Procedure Design and other guidance 2

PARTICIPANTS People involved in procedure design or with serious background in procedure design. Prerequisites: Student should be trained and experienced in design of non-rnav SID, STAR and NPA procedures as well as ILS procedures. (reference Doc 8168-OPS/611, Volume II, Part I and Part II). Trainees should have fundamental knowledge of Performance Based Navigation as in: o completion of the ICAO Web-based PBN Training (http://icao.int/pbn ) o attendance at an ICAO Introduction to PBN Seminar or review of the ICAO draft PBN Manual Air Traffic Management Students should have fundamental knowledge of Air Traffic Management (ATM) as in ICAO doc. 4444 (PANS-ATM). Navigation, Navigation Systems, Aircraft Performance and Geography Students should have knowledge of Navigation, Navigation Systems, Aircraft Performance and Geography. For instance, knowledge to the level obtained in any pilot s license with Instrument Rating (IR) ground school would be acceptable. Aeronautical Information Services Students should have fundamental knowledge of Annex 15 (Aeronautical Information Services). Aerodrome safeguarding Students must be familiar with the basic requirements for aerodrome safeguarding (Annex 14 Obstacle limitation surfaces, Aerodrome reference codes). Geodesy Students should have fundamental knowledge in Geodesy and be familiar with WGS84 Charting Student should be familiar with the fundamental charting requirements of Annex 4 with regard to SID, STAR and Approach charts. Language : Student should have adequate English language communication skills Sample of prerequisite exercises are provided in advance. This training course does not use specific procedure design software and therefore trainees will design procedures manually. For that reason, students should bring a ruler, protractor, compass, and calculator. 3

ASSESSMENT An initial assessment is conducted before the course through a sample of elementary exercises that are checked by instructors prior to the course. Those exercises are sent to the attendees two months before the course, to be returned one month before the course for evaluation. Progress tests are conducted during the course. Eventually, the presentation of the project enables assessment of the capacity of the trainee to meet the terminal objectives, by applying the criteria to actual procedure designs and, as a secondary objective, to demonstrate the capacity of the trainee to summarize, to write a technical report and to present a procedure design study. TOPICS COVERED PBN concept: General overview. Description of navigation specifications, Avionics, aircraft equipment and airworthiness regulations Which application for which airspace? Performance notion of accuracy, precision, continuity, availability GNSS concept: Aircraft based augmentation system (ABAS) Satellite based augmentation system (SBAS) in a PBN context Ground based augmentation system (GBAS) in a PBN context Quality assurance (Quality Assurance Manual for Flight Procedure Design) Document and store procedure for traceability Data origination Procedure design process Procedure design criteria (Pans-Ops, Volume II, Part III, Sections 1, 2): Underlying criteria General criteria such as o Minimum length of segments o Turn protection o T and Y concept o TAA Procedure construction (Pans-Ops, Volume II, Part III, Section 3 and proposed amendments) Departure criteria applicable for Basic-RNP 1 and RNAV 1 /2 Standard arrival for Basic-RNP 1 and RNAV 1/2 Approach procedure for RNP APCH operations APV barovnav procedure Document procedure for validation and publication (Pans-Ops, Volume II, Part III, Section 5) Charting and coding 4

MEANS Theoretical lectures : Presentation and explanation of the rules and principles described in PANS OPS, Doc 8168-OPS/611 Laboratory exercises Lectures are followed by practical exercises, scheduled on a daily basis, that illustrate the elementary application of criteria in a simplified environment, in order to reinforce theoretical input. Comprehensive On-the-Job Training (OJT) Project: Part of the second week is devoted to an OJT project. It consists of the design of an RNAV 1 SID and STAR, an RNP APCH NPA and an APV Baro-VNAV procedure. The OJT project is conducted in teams of three. It is based on an actual airport environment in order to simulate the actual job conditions. The design is conducted step by step under assistance and tutorial of instructors. The project also includes the design of drafts of SID and STAR charts and Instrument Approach Charts, a technical report and coding instructions. 5