CORPORATE OVERVIEW. Our Mission and Our Name



Similar documents
Building Description Project Description Estimated Cost Notes Total Deferred

9.0 Protecting Service Equipment

Nominal Life Expectancy for Building Components

TFMA 2015 Spring Conference Dallas, TX. John E. Bourdeau Jr: FEMA Region 6, Risk Analysis Branch

9770 CULVER BOULEVARD CULVER CITY, CA Incidental improvements: improvements that do not qualify as minor or

NYC Department of Education Building Condition Assessment Survey BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004

2 STEPS TO CONDUCTING YOUR HVAC ASSESSMENT

COMPREHENSIVE PROPERTY INSPECTIONS

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

DRAPER ELEMENTARY SCHOOL

HOMEOWNER S PERMIT GUIDE

Planned, Limited Notice and Emergency Outage Guidelines

Design Development Quality Management Phase Checklist Project Phase Checklist Series

Veterans Memorial Coliseum Options Study Appendix A - Deconstruction Scope of Work and Cost Estimate August 31, 2015

CITY OF YORBA LINDA P.O. BOX CALIFORNIA

Maintaining Fire Protection Systems

APEC CAPABILITIES PROJECT MANAGEMENT / SUPPORT

U.S. Department of Housing and Urban Development Office of Public and Indian Housing. A Good Place to Live!

Maryland. American Recovery and Reinvestment Act. 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

Mechanical Piping Instrumentation/Electrical & Controls Civil/Structural Fabrication & Machine

Glossary of HVAC Terms

Schedule B to By-law Part A Fees Payable for Permits

FIRE EXTINGUISHER DORM #1 SYMPHONY

Schedule B to By-law

1.2 Refrigerant Equipment. General

Estimated Cost of Repair

What to Expect From the Examination. How to Study the Plumbing Codes

How To Build A Basement House

ADD WATERPROOF VENEER TO EXTERIOR WALLS

Gas Fired Water Heater Installation

In an effort to improve the city s building permit and inspection processes the building permit fee schedule has been revised and updated.

Vision Home Inspection

One of the fundamental design elements that every

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

Construction Technologies Career Field Pathways and Course Structure

DEALING WITH PLUMBING AND HEATING EMERGENCIES

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals

WHEN IS A PERMIT REQUIRED?

National Archives and Records Administration (NARA) Facility Standards for Federal Records Storage Facilities

Arizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST

MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION

Element D Services Plumbing

WARRANTY ADDENDUM TO RESIDENTIAL CONSTRUCTION SALE CONTRACT

Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems

Electrical. This section applies to the design and installation of building power distribution systems.

FLOODS FACT SHEET ADVICE FOR RESIDENTS Approvals for repairing, renovating or rebuilding flood-affected houses

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,

Does Part of My Basement Floor Have to Be Removed to Install. Where Does the Water from the Sump Pump Go?...Page 5

APPLICATION FOR NEW CONSTRUCTION

Exterior Elevated Elements Inspection Guidelines

COOK PHYSICAL SCIENCE BUILDING RENOVATIONS. Engineering & Architectural Services CONCEPT DESIGN MAY 11, BVH Project No.

Movie star Brad Pitt helps Make It Right rebuild the Lower Ninth Ward with affordable LEED Platinum homes

Home Energy Evaluation Report for Fritz Kreiss and Catherine McQueen

Saint Cloud Business Center

Disaster Ready. By: Katie Tucker, Sales Representative, Rolyn Companies, Inc

Flood Risk Considerations

Notice to Property Owners

REBUILDING BELMAR ABFE FLOOD MAPS &THE REBUILDING PROCESS

UNDERSTANDING CENTRAL HEATING SYSTEMS

In Partnership with. TDIndustries Diplomat Drive Dallas, Texas Phone: Fax: Website: TDIndustries.

STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT

School Construction Authority Architecture & Engineering

Jefferson Parish Department of Water Emergency Plan

Chris Clement 701 Bayou Lane Thibodaux, LA

SAMPLE INSPECTION REPORT PREPARED FOR: John Q Public

Inspection Report Atlanta Strip Mall Commercial Building Property Address:

Sample - Existing Building Commissioning Plan

Does Wall Township require an inspection by the building department on resale of a home?

BUILDING SAFETY UNIT

Applications for building permits will not be reviewed until all of the required information has been submitted.

Columbus State Community College MASTER PLANNING

Safety, Health and Accessibility Design Guidelines For Architects, Engineers and Design Firms

MURCH ELEMENTARY SCHOOL

WHITE PLAINS PLUMBING CODE PART 1. GENERAL REQUIREMENTS

29 Broadway- 14 th Fl Tel: New York NY Fax: Due Diligence Report. New York, New York

Replacement of Heating, Ventilation, Air Conditioning (HVAC) Units In Apartments Located at 641 Fifth Avenue. Photo Essay

Mechanical, Plumbing, and Fire Protection Conditions

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

ESTIMATING PLUMBING, HEATING, VENTILATING, AND AIR CONDITIONING (HVAC), AND ELECTRICAL WORK

RFI Response RFP: HSCG88-16-R-PQQ015 Replace HVAC Bldg A & C San Diego, CA.

Property Condition Disclosure Statement

MECHANICAL TRADE SCOPE OF WORK GUIDELINES

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

Water Damage Prevention Risk Management Guidebook

Building Code Inspections and Fees

Elevating Your House. Introduction CHAPTER 5

Hartsfield-Jackson Atlanta International Airport s

INFORMATION BULLETIN 121c Requirements for Plumbing Limited Service and Repair Permits (LSR)

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES

Inspecton Report. Property Address:

Jay R. Smith Mfg. Co.

Transcription:

Company Profile

CORPORATE OVERVIEW Infinity Engineering Consultants, LLC is a multi-discipline consulting engineering firm based in New Orleans, Louisiana. Services include civil, structural mechanical and electrical design as well as land-based marine design. Infinity has in-house design/drafting staff, construction administration and inspection personnel. Infinity is people-centric. We are driven by people. Our employees are like family. Our clients are close friends. We take the time to invest in the relationships of those around us. It s the foundation that allows us to do what we do. We offer our clients individualized attention and responsive communication. We listen and we find solutions. Our Mission and Our Name We are determined to provide the best. The best people, The best products, the best services. We take the extra step to provide our clients with everything they expect and then some. With this philosophy, our potential is boundless, endless. Infinity Engineering Consultants it s our name, but it is also our promise. Infinity Engineering Consultants, LLC, P.O. Box 792745, New Orleans, LA 70179 Phone: 504.304.0548 / Fax: 504.355.0265 www.infinityec.com

PERSONNEL RESOURCES Classification # P. E. Civil/Structural Engineers 7 5 Mechanical Engineers 3 2 Electrical Engineers 4 2 Designers 5 Administrative 3 Total 22 9 INDUSTRIES SERVED Petroleum and Chemical Refineries Cargo Terminals Oil and Gas Processing Facilities Grain Handling Facilities Liquefied Natural Gas Producers (LNG) Port Authorities Municipal, State and Federal Infrastructure Departments Architects and Planners Surveyors General Contractors Insurance Adjusters Maritime Attorneys

City of New Orleans Mahalia Jackson Theater of the Performing Arts Hurricane Repairs This FEMA-funded project involved damage assessment and repair design for mechanical and plumbing components within the 40-year old building damaged by winds and flooding from Hurricanes Katrina and Rita. Damage to the building required complete replacement of basement and first floor mechanical and plumbing utilities, with designs for hazard mitigation to reduce the risk of future damage in accordance with the Stafford Act. Infinity prepared plans and specifications for detailed design of: Pumps and motors with dry-pit submersibles pumps Replacement & relocation of elevator hydraulic power units, hot water heaters, circulation pumps and piping suitable for installation on floors above grade. The new high-efficiency also HPU s utilize less power during operation. Replacement of chillers, pumps, piping, valves, ductwork, and HVAC air handlers Replacement and re-design of restroom, concession stand, and sprinkler system plumbing Replacement of roof-top ventilators destroyed by wind; Steel support structures for the adjustable stage and orchestra pits, and for an emergency diesel generator and fire pump building to be elevated above the ABFE Structural modifications for failing concrete stairs, walls, and ceiling framing Total Construction: $20 million

Plaquemines Parish Percy Griffin Community Center Davant, LA Infinity provided design services for all structural, mechanical, plumbing and electrical components, including construction administration for the completely new 14,000 sf community building. This building is a replacement for the Davant Community Center and Magnolia Senior Center. The building entailed office space, a community center, a full service commercial kitchen, a meeting room, and several multipurpose activity rooms. The building is raised above the area s BFE requiring 2 levels (Ground floor & 1st floor). The mechanical system for the first flood included two variable volume HVAC systems with VAV s, a constant volume system, and a dedicated HVAC system for the elevator machine room. The ground floor lobby also had its own dedicated HVAC system. The project also required vent design, hot & cold water with addition of a hot water recirculation system. Total Construction: $6 million

Jefferson Parish Westwego, LA Alario Center Expansion Infinity performed structural design for the 20,000 sf expansion. Infinity also provided construction administration and inspection services. Total Construction: $6 million

Marrero, LA Marrero Community Center Infinity performed structural, mechanical and electrical, and plumbing design for the 6,000 sf facility. Infinity also provided construction administration. This project was funded by a federal Community Development Block Grant. Total Construction: $1.5 million