WELCOME TO UTTARKASHI



Similar documents
DISTRICT: UTTARKASHI. District Head Quarters: Uttarkashi. Division: Garhwal

NREGA for Water Management

Frequently Asked Questions (FAQs) on Hydropower

WORKSHOP ON CHALLENGES OF URBANISATION IN INDIA WITH FOCUS ON SOLID WASTE MANAGEMENT

FOUR RIVERS RESTORATION PROJECT

Dr S.K. GUPTA Scientist D Central Ground Water Board. 25 th FEB. 2014

Administration of Daman & Diu (UT) Disaster Management Cell Collectorate, Daman. No.COL/DMN/ACCTTS/DISASTER/ / 41 '5 Dated/o /07/2015 ORDER

PRSENTATION ON DRAINAGE SYSTEM DELHI EAST DELHI MUNICIPAL CORPORATION

Small-Micro Hydro Facilitation & Innovative Technologies in Japan

GUIDELINES FOR REPAIR, RENOVATION AND RESTORATION

Planning, Health and Environment Division

House Research Department General Fund Appropriations in Flood Relief Bills

Solar PV panels fitted to roofs. Solar PV panels produce electricity from energy provided by sunlight. 3.5 MWh per system

MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT. By: Payman Hassan Rashed

THE FOUR RIVERS RESTORATION PROJECT AND ITS IMPLICATIONS TO THE CHAO PHRAYA RIVER

septic systems What is a Septic System? How does a Septic System Work?

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT

Tamil Nadu would provide to its residents, high quality infrastructure all over the State comparable with the best in the world

Flooding Fast Facts. flooding), seismic events (tsunami) or large landslides (sometime also called tsunami).

Solar Irrigation in Bangladesh

Best Practice of Flood Hazard Map in Japan

WATER SUPPLY & SANITATION

: Promoters Contribution : Term Loan Total Profitability at optimum level. : Optimum Utilization(3 rd Year)

CHAPTER WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS

A STUDY ON OWN FUND REVENUE GENERATION THROUGH COMMON PROPERTY RESOURCE MANAGEMENT IN MADANMOHANPUR GRAM PANCHAYAT, WEST BENGAL

1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance

INDONESIA - LAW ON WATER RESOURCES,

Basin Management to Protect Ecosystem Health - Lessons from Estonia- Russian Cooperation

Micro-hydro Power. Introduction. What is hydropower? System types. Power the entire farm Generate power to sell back to the national grid

WaReg The Flow Regulator

L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02.

Current Statistics Northern Tier Pennsylvania. Number of Jobs 5,700 94,600 Average Earnings Average industry earnings per worker includes benefits

Climate Change and Sri Lanka. Ajith Silva Director/ Policy and Planning Ministry of Environment and Natural Resources Sri Lanka

Mudflow in Gorno-Badakhshan Autonomous Oblast (GBAO) Tajikistan Situation Report # 4 August 14, 2015

Series 2016A-2 (Green Bonds) Final Proceeds Allocation April 2016

Experience in Wetlands restoration and conservation concerning natural water retention measures. Ministry of Environment and Water, Bulgaria

Training Materials for Scaling-up Climate Change Adaptation and Modified Procedures

Chehalis River Basin Flood Damage Reduction Capital Budget Approved by Legislature in June 2013

Recovery Action Plan Guidelines

The Flow Regulator. Flow regulation

APPENDIX F. Baker County. Mason Dam Hydroelectric Project FERC No. P Turbidity Monitoring Plan

National Environment Awareness Campaign(NEAC) Theme

Format for scrutinising the Hill Station Building Applications ( Current File No /2001-HSBA) The application shall be accompanied by

River Management 2013 Colorado Flood

Analytical Approach for Cost Estimation of Low Head Small Hydro Power Schemes

Domestic Policy Framework on Adaptation to Climate Change in Water Resources: Case Study for India. Working Together to Respond to Climate Change

Township of Enniskillen. Asset Management Plan

City of Jakarta (Tanggerang) Total Greater Jakarta (Jabotabek) Area width

Creating Green Jobs within the Environment and Culture sector.

Development of Rural Drinking Water Security Plan A Case Study from Raipur Block, Bhilwara District, Rajasthan

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document

Water Resource. 1 Initiating and Sustaining Water Sector Reforms : A Synthesis World Bank in collaboration with the Government of India, Ministry of

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)

Flood Repair and Renew Grant Guidance to Applicants

Water Management by Panchayat Raj institutions in Alappuzha District

REPUBLIC OF TURKEY MINISTRY OF FORESTRY AND WATER AFFAIRS

City of Shelbyville Site Inspection Checklist

EMERGENCY PROGRAM MANAGEMENT REGULATION 477/94

Technical Environmental Survey

agricultural economy agriculture CALIFORNIA EDUCATION AND THE ENVIRONMENT INITIATIVE I Unit I Cultivating California I Word Wall Cards 426WWC

Properly maintaining your septic system will help reduce the. It s Your Septic System. Homeowner s Guide. Here s How to Take Care of It

Management of Water and Fisheries Resources to Improve Community Livelihoods in Battambang

Stream Restoration Post-Implementation Annual Monitoring Report Year 2: 2013 Covering the Period of July 2012 to July 2013

Sewerage Management System for Reduction of River Pollution

Sample Micro Hydro Initial Report

Cambodia: Flood Damage Emergency Reconstruction Project

ALTERNATIVE SOURCES OF FUNDING FOR

DIVISION D ELECTRICITY, GAS, WATER AND WASTE SERVICES

Organization Chart for Design Organization

Water Recycles poster

Presentation on Water Quality Conservation in Community

Landslides & Mudflows

FLOOD PROTECTION AND ECOSYSTEM SERVICES IN THE CHEHALIS RIVER BASIN. May Prepared by. for the by Earth Economics

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

32/1/ /PVSE(Part-II) Ministry of New and Renewable Energy SPV Off Grid Division

Water Quality and Water Usage Surveys

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION

TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS. Table of Contents

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area.

MLD: Domestic Maritime Transport Project

GEOTECHNICAL ISSUES OF LANDSLIDES CHARACTERISTICS MECHANISMS PREPARDNESS: BEFORE, DURING AND AFTER A LANDSLIDE QUESTIONS FOR DISCUSSIONS

Steps taken by Delhi Government in arresting environmental degradation on all the fronts: Air, Water, Noise and Waste Management

Ponds- Planning, Design, Construction

RESTORING streams to reduce flood loss

PERFORMA P-47A. Action Plan. Name of work Estimated cost / Approval No. & Date ( Rs. In lacs) Sr. No. Likely date of completion

LIVING WITH FLOOD IN THE MEKONG DELTA, VIETNAM. Tran Thi Trieu, Nguyen Hieu Trung, Le Anh Tuan

AP ENVIRONMENTAL SCIENCE 2012 SCORING GUIDELINES

Background Information: The Mamquam River Floodplain Restoration Project

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1

GENERAL OBLIGATION BONDS

Clean Development Mechanism Project Opportunities in Indonesia

The Water, Energy, Food Nexus: Lebanese Policy and Institutional Analysis

Climate Change Activities in Mauritius

EPR Exempt Flood Risk Activities: descriptions and conditions

Transcription:

PPT ON DISASTER AFFECTED AREAS OF UTTARKASHI IN FRONT OF INTER MINISTERIAL CENTRAL TEAM HONRABLE JOINT SECRETORY (IS II) SHRI M. GOPAL REDDY IAS MINISTRY OF HOME AFFAIRS GOVERNMENT OF INDIA WELCOME TO UTTARKASHI

Flood disaster hits to Uttarkashi at a glance Date- 03-08-2012

UTTARKASHI 2012 SEQUENCE OF EVENTS Location of major disaster incidences in Uttarkashi during the current monsoon season.

Fig. :Daily rainfall received in Uttarkashi in the month of August2012. (source : DMMC Uttarakhand)

Natural Calamity (03.08.2012 ) District Uttarkashi (Uttarakhand) at a Glance Area 8016 Sq. Km. Population 329686 Blocks 6 Tehsils 6 Villages 668 Rivers Ganga &Yamuna Tributaries Assi Ganga, Swari Gad Hanuman Ganga, Rupin, Supin, Tons etc.

Detail of losses due to Flash Flood During monsoon 2012 Villages affected 192 Total Families Affected 2383 Population affected 12115 Agri. Land area affected 71.288 ha. Public Properties damaged 61244.12 Lacs House Damaged (Pucca) A- Fully damaged Houses 132 B- Severely damaged 149 C- Partially damaged houses 313 (Kachha) Fully damaged 09 Livestock losses 436 Dead Persons 35 Injured Persons 20

Details of affected villages / families/ Peoples up to 06/10/2012 Tehsil Name Affected villages Affected families No. of People affected Bhatwari 13 1319 5322 Dunda 39 372 1860 Chinyalisaur 31 72 372 Barkot 43 228 985 Purola 30 41 255 Mori 36 351 3321 Total 192 2383 12,115

Department wise Demand of Fund for repair /Restoration of damaged Infrastructure District Uttarkashi S.N o. Year 2012-13 Department No of Scheme Total Money Required for Restoration (` in Lacs) 8 14939.70 347.90 14591.80 160 9650.96 2799.85 6851.11 3 BORDER ROAD ORGANISATION 15 9000.00 900.00 8100.00 4 IRRIGATION DEPARTMENT UTTARKASHI 327 8980.77 8973.77 7.00 285 4468.50 1970.00 2498.50 6 NAGAR PALIKA PARISHAD UTTARKASHI 32 3910.85 3545.85 365.00 7 FOREST DEPARTMENT UTTARKASHI 270 3763.08 1365.39 2397.69 8 RURAL DEVLOPMENT 432 1365.51 1365.51 0.00 9 ZILA PANCHYAT 433 1352.77 1040.19 312.58 127 982.00 482.40 499.60 13 740.80 92.20 648.60 1 UTTARAKHAND JAL VIDYUT NIGAM Ltd. 2 5 UTTARAKHAND LOK NIRMAN VIBHAG (6th Circle P.W.D. Uttarkashi) UTTARAKHAND JAL SANSTHAN, (WATER SUPPLY SCHEMES) 10 CONSTRUCTION DIVISION, PEYAJAL NIGAM, UTTARKASHI 11 UTTARANCHAL UTTARKASHI POWER UTTARAKHAND CORPORATION Money Required Additional Fund for Repairs of Requirement for Immediate Nature Complete as per SDRF Restoration (4-6) Norms (` in Lacs) (` in Lacs)

12 REVENUE DEPARTMENT BHATWARI, UTTARKASHI TEHSIL 1 500.00 20.00 480 5 425.00 275.00 150.00 302 401.87 281.31 120.56 15 FISHERIES DEPARTMENTS UTTARKASHI 2 255.00 0.00 255.00 16 TOURISM DEPARTMENT UTTARKASHI 6 202.00 0.00 202.00 17 EDUCATION DEPARTMENT UTTARKASHI 42 150.97 142.82 8.15 18 FIRE SERVICE GANGORI UTTARKASHI 1 116.57 0.00 116.57 19 NAGAR PANCHYAT GANGOTRI 1 15.85 15.85 0.00 1 10.96 0.00 10.96 6 6.85 63.18 03.67 22 ANIMAL HUSBANDRY 2 3.56 0.00 3.56 23 HEALTH DEPARTMENT 1 0.55 0.00 0.55 61244.12 23621.22 37622.90 CONSTRUCTION AND MAINTENANCE 13 UNIT (GANGA) UTTARAKHAND PEYJAL NIGAM UTTARKASHI 14 MINOR IRRIGATION 20 BHARAT SHANCHAR UTTARKASHI 21 UTTARAKHAND RENEWABLE ENERGY DEVELOPMENT AUTHORITY UTTARKASHI Total NIGAM LTD 2472

Uttaranchal Jal Vidut Nigam No. of Damaged Scheme 08 Total restoration Cost Rs. 14939.70 Lacs Damage of retaining wall /Fencing /Flushing conduit outlet at Joshiyara Barrage Rsstoration Cost enditure Rs. 70.00 Lacs

UJVNL road from Joshiyara Barrage to Manera Affected length 600 meter Restoration Cost Rs. 50.00 Lacs

Damaged portion of approach Road to Tiloth Motor Bridge Uttarkashi Damage portion length 55meter Restoration Cost Rs. 300.00 Lacs Damage of 60 M approach Road / Tiloth Motor Bridge, Uttarkashi

U.J.V.N.Ltd. (Small Hydro Projects Division, Maneri) Assi Ganga -1St Total Damage Restoration Cost Rs. = 2263.48 Lac

View of Trench Weir & Power duct location before & after flash flood. Restoration cost Rs. 483.61 Lacs Before After

A View of RCC DeDe-silting Tank before & after flood. Restoration cost Rs. =197.84 Lacs Before After

View of Powerhouse Building Restoration Cost Rs. =360.03 Lacs Before flood After flood

Inside view iew of Powerhouse Building before & after flood. Before After

View of machine hall before & after flood. Restoration Cost Rs. = 1000.00 Lacs Before After

View of Control panels in Control Room before & after flood. Before After

DAMAGES OF SMALL HYDRO ELECTRIC PROJECT ASSI ASSI--GANGA GANGA--II INSTALLED CAPACITY 2x2.25 MW Total Project Cost Rs = Damaged Cost Rs = Lacs 3404.00 Lacs 511.35.00

DAMAGED TRENCH WEIR AND INTAKE STRUCTURES Restoration cost Rs. 445.03 Lacs View after 03/08/2012 Before 03/08/2012 Alignment of weir & Power Duct

Intake before 03/08/2012 Intake after 03/08/2012

Damaged Power Duct Power Duct before 03/08/2012 Power Duct after 03/08/2012 Restoration cost Rs. 6.27 Lacs

Damaged de-silting Tank Restoration cost Rs. 20.33 Lacs Desilting Tank Before 03/08/2012 Desilting Tank after 03/08/2012

Damaged Power channel Restoration cost Rs. 1.37 Lacs Power Channel Before 03/08/2012 Power Channel after 03/08/2012

Power Channel before 03/08/12 Landslide below Power Channel after 03/08/12 and still continue sliding

Damaged Power House raft Restoration cost Rs. 65.13 Lacs Penstock alignment Power House location Switchyard TRC outfall Power House Draft tube Raft before 03/08/12 Power House location after 03/08/12

U.J.V.N.Ltd. (Small Hydro Projects Division, Maneri) Kaldi Gad Total Damage Restoration Cost Rs. = 369.10 Lacs

POWER HOUSE & TRC : COST OF DAMAGES= 102.00 LACS 9.0MW KALDIGAD SHP BEFORE FLOOD AFTER FLOOD

KALDIGAD WEIR Cost of Damages : 151.00 Lacs DEAD PORTION OF WEIR BEFORE FLOOD DEAD PORTION OF WEIR AFTER FLOOD

Details of Affected PWD Roads, Bridges and Buildings Tehsil / Div. Division Name Total No. of damaged Roads Total Bridges damaged Immediate Amount needed to openning communica tion (Under SDRF) Additional Fund for restoration of roads /Building/Bri dges Total amount needed for restoration of roads /Building/ Bridges Prov Div PWD Bhatwari PWD Bhatwari 13 6 446.61 3023.96 3470.57 Prov Div PWD Uttarkashi PWD Uttarkashi 14 1 277.98 833.30 1111.28 Cosnt Div PWD Uttarkashi PWD Joshiyara 17 0 389.00 292.00 681.00 Cosnt. Div PWD Barkot PWD Barkot 39 2 370.00 400.50 770.50 Const. Div. PWD Purola PWD Purola 25 5 159.11 666.00 825.86 National Highway Div. PWD, Barkot N/H. Division 2 0 824.06 1135.32 1959.38 Irrig. Div. PWD. uttarkashi PMGSY DIV. 12 0 264.30 205.00 469.30 A.D.B. Asian Dev. Bank 2 0 68.79 294.28 363.07 160 14 2799.85 6851.11 9650.96 Total

Damaged Joshiyara Suspension Bridge Old Span 140 Meter Proposed span 160 meter Estimated restoration cost = Rs 1000 Lacs Joshiyara Suspension Bridge during Damage Joshiyara Suspension Bridge after Damage

NH-94 (Dharasu-Phoolchatti Section), KM-216 Hect.(6-8) 150m Road Washed-Out (Along AsnolGad River) Protection with C.C. Block, wire crates, Retaining Wall, 150m c.c. road to be constructed Restoration Cost = 140.00 lacs

Border Road Task Force Total damaged schemes = 15 Total Restoration cost Rs. = 9000.00 Lacs

Damaged BRO Gangori Motor Bridge Span 55 meter Estimated restoration cost 625.00Lacs Affacted Gangori Town Washed -Out Motor Bridge

DAMAGE OF B/BRIDGE DUE TO LAND SLIDE AT SAWARIGAD ON D-G ROAD & Construction of new Bridge SPAN 33 meter Restoration cost 4000 lac

Damaged BRO by pass road near Manera Damaged Road length 300 meter Restoration cost 1 crore

Damaged BRO Road near Tambakhani Damage Road length 100mt. Restoration cost Rs 1.56 Crore

Damaged BRO Gangotri Motor Road at Laldang (near maneri) Affected length 250 meter Restoration cost Rs. 150 lacs

ROAD WASHED OUT AT KM 45.900 (Ongi) ON D- ROAD Affected length 500 meter Restoration cost 30 lac

ROAD WASHED OUT AT KM 31.700 (Gangori) ON D-G ROAD Damage length 200 meter Restoration cost 2.5 Crore

DAMAGE KM 52.900 (MALLA) ON D-G ROAD Damage Length 150 meter Restoration cost 35 Lac

Damages with Irrigation Department (UKI) Total Division 03 Total Restoration Cost for Damaged Schemes Rs. = 8980.77 Lacs Irrigation Division, Uttarkashi Restoration Cost. Rs. 8053.39Lacs Tubewell Division Dehradun Restoration Cost. Rs. 75.83 Lacs Irrigation Division, Purola Restoration Cost. Rs. 851.55Lacs

Irrigation Department Damaged Assets Damaged Flood Protection wall River side Tiloth Damaged Length 330 Mtrs, Restoration Cost Rs. 50.00 Lacs

After Flood ( 3-8-12) Irrigation Depatt. damaged flood protection works river side at Mando Length 1200 Mtrs. Restoration Cost Rs. 1338.27 Lacs Before Flood

Damaged Flood protection wall at Left Bank of Assi Ganga in Gangori Length 1000 Mtrs. Restoration Cost Rs. 981.46 Lacs

Damaged Flood protection wall at Left Bank of Assi Ganga in Gangori Damaged Length 950 meter Reconstruction cost 9.8 Crore

Damaged Flood protection wall at Left Bank of Bhagirathi River in Joshiyara Length 500 Mt. Restoration Cost Rs. 606.11 Lacks

Damaged site Tiloth Flood Protection works Length 330 Mtrs. Restoration Cost Rs. 50.00 Lacs

Damages of Uttaranchal Jal Snasthan Uttarkashi Tehsil Wise Damaged Drinking Water Pipe Line Schemes Tehsil Bhatwari Tehsil Dunda Tehsil Chinyalisaur Tehsil Barkot Tehsil Purola Tehsil Mori Total schemes Damaged Total schemes Damaged Total schemes Damaged Total schemes Damaged Total schemes Damaged Total schemes Damaged Total Schemes (Nos.) 285 Restoration cost. Rs.4468.50 Lacs = 51 = 69 = 36 = 31 = 25 = 44

Damaged 200mm dia, water supply Pipe line Length-600 Mtrs. At Kohri Gad. Restoration cost Rs.=16.00 Lacs

Damaged 250 mm dia pipe line at Kohari Gad (UKI III) Length- 60Mtrs. Restoration cost Rs.= 2.30 Lacs

Damaged Water Collecting Chamber at Rawada capacity 10,000 Liter. Restoration cost Rs.= 2.80 Lacs

Damaged Pipe line 250 mm dia at Jangara Length-60Mtr. Restoration cost Rs.= 1.70 Lacs

Damaged Pipe line 250 mm dia at Jangara Length- 350Mtrs. Restoration cost Rs.-8.50 Lacs

Damaged UKI-III W/S (250 mm dia) Pipe line near W.T.P Assi-ganga Length-60 Mtr. Restoration cost Rs.=1.30 Lacs

UKI-II W/S Damaged Pipe line 200 mm dia at Assiganga, Length 480 Mtr. Restoration cost Rs.-9.30 Lacs

Nagar Palika Parishad, Uttarkashi Details of Damaged Assets Total No. of Schemes Damaged = 32 Total restoration cost Rs. = 3910.85Lacs

Damaged Shopping Complex & Barat Ghar Near Tiloth Bridge (Restoration cost 180 lacs)

Shopping complex Before Flash flood Shopping complex After Flash flood

Affected Nagar Palika Ghat down side the river at Manikarnika in Uttarkashi Restoration cost 50 lakh Ganga Mandir

Forest Department Damages Rs. 12.00Lacs Bebara Bridge (On Agora-Dodital Track)Total Barahat Range span 8 mt. Span 18 mtrs.

Continued Soil Erosion surrounding the Lake in Dodital

Heavy Landslide in forest area Dodital Early span of stream 12 mtr. Span after flood > 80 mtrs. Kaldi stream Gajoli Stream Asi ganga

ELECTRICITY DISTRIBUTION DIVISION UTTARKASHI. Total Damage of 33 KV, 11 KV/LT line & Transformers Length of damaged 33 KV line Length of damaged 11 KV line Length of damaged LT line Damaged T/F of 16 KVA Damaged T/F of 25 KVA Damaged T/F of 63 KVA Damaged T/F of 100 KVA Damaged T/F of 250 KVA : : : : : : : : 16.50 Km. 53.05 Km. 56.80 Km 03 Nos. 12 Nos. 03 Nos. 02 Nos. 05 Nos. Restoration Cost for Total Damage Rs. 740.80 Lacs

Damaged LT line Pole at Gangori, Tehsil Bhatwari Flood damaged 11 KV line/poles at Gangori Restoration Cost 24.16 Lacs Damaged 250 KVA & 63 KVA Transformer at Gangori, Tehsil Bhatwari

Damaged 11 KV/LT line & Transformers in different locations of Tiloth Area. Restoration Cost 8.37 Lacs Damaged 11 KV line near Balmiki Basti Barahat Damaged / flow away L.T. line Pole at Tiloth

Damaged 11 KV/LT line & Transformers at Joshiyara Areas Restoration Cost 9.10 Lacs Damaged basement area of T/F at Joshiyara

Damaged 33 KV,11 KV/LT line & Transformers at Bhatwari Area. Damaged 33 KV line at Bhatwari Feeder Sainj & Aungi. Damaged11 KV HT line Poles at Bhatwari. Restoration Cost Rs. 82.95 Lacs

Damage of 33 KV, 11 KV/LT line & Transformers at Uttarkashi Town Damaged 250 KVA Transformer RESTORATION COST Rs. 21.40 Lacs

Damaged 33 KV, 11 KV/LT line & Transformers at Sangamchatti Damaged 11 KV line at Sangamchatti / Rawada RESTORATION COST OF Rs. 58.35 Lacs

Damage 33/11 KVA S/S at Hanumanchatti Damaged L.T. power line at Rajgahri, Tehsil Barkot Washed-out power supply sub-station RESTORATION COST Rs. 356.00 Lacs RESTORATION COST Rs. 72.7 Lacs

OFFICE OF THE PROJECT MANAGER, CONSTRUCTION & MAINTENANCE UNIT (GANGA), UTTARAKHAND PEYJAL NIGAM, UTTARKASHI (Formerly Known as Ganga Pollution Control Unit) Sl. No. Name of Item Total Damaged Restoration cost Executed Works (RS in Lacs) Works 1- Sewer Line 8.17 Km. 2.00 Km. 70.00 2- Rising Main 1.96 Km. 0.20 Km. 60.00 3- Sewage Pumping Station 4 No. 2 No. 10.00 4- Septic Tank Cum Upflow Filter (4x0.05 mld) 4 No. 4 No. 250.00 5- Sewage Treatment Plant 2.00 Mld 1 No. - 35.00 Total:- 425.00

SEPTIC TANK CUM UPFLOW FILTER (NEAR FOREST CHOUKI, GANGORI) (ESTT. COST OF RESTORATION = ` 35.00 Lacs) Before 03-08-2012 After 03-08-2012

SEWEGE PUMPING STATION (TAMBAKHANI) (ESTT. COST OF RESTORATION = ` 25.00 Lacs) Before 03-08-2012 After 03-08-2012

Fisheries Department, Uttarkashi Detail of losses Damaged Trout Hatcheries, Buildings Tanks, Laboratory in Kaldiyani (SangamChatti ) & Fish Farm Gangori Total Damaged Area 1.10 hectare Total Damaged cost Rs. 255.00 Lacs

Trout Fish Farm Kaldiyani before Damage Trout Fish Farm Kaldiyani after Damage

Damages in Agriculture Sector (Uttarkashi) Total Area sown - 26984. Hect. Total area affected- 71.282 Hect. Tehsil Name Total agriculture area affected (Ha.) Bhatwari 27.686 Dunda 13.652 Chinyalisaur 0.23 Barkot 19.937 Purola 0.98 Mori 8.803 Total 71.288

Damaged Agricultural land in Nald Gangori -Sangam Chatti Area Total Damaged land 85( ha) Restoration cost 16.525 lakh

Damaged agriculture land with paddy crop in Uttaroun village Total damaged land 102 (ha) Restoration cost 21.34 lakh

Landslide affected Tourist rest house at Bhatwari Restoration cost 150.00 lakh

Miscellaneous Flood Damages Damaged Houses in Ganga Vihar

Damaged house Ganga Vihar Damaged house in GhatuSaur Damaged house in GhatuSaur village Nald

Houses Damaged at Gaongri due to Flood on 3-8-12 Damaged Cooperative Bank building in Gangori Damaged PWD Colony, Hotels,shops near river side at Joshiyara

Emergency meeting called by District Magistrate on flood Disaster Dated 04/08/2012

Hon ble C.M. Visit to affected areas Visit of Hon ble Chief Minister, Uttarakhand Sri Vijay Bahuguna in Flood affected area of Uttarkashi on 16-8-12 ( Gangori )

Flood protection action plan for Uttarkashi city and Gangori Approximate cost 45 Crore

Dodital Area before Disaster NOT IN SCALE N

Disaster affacted Dodital Sangamchatti Area NOT IN SCALE N

Forest Dept. Proposed restoration works

Fund Requirement for Proposed Restoration Sl. No. Name of the scheme Proposed works Quantity Require d Fund (in Lacs) construction on both banks of Assi ganga river at outlet 400 Mtr. 100.00 Bridle path & lake bank protection. 800 Mtr. 150.00 1. River Bank Protection 2. Repair & Reconstruction of Periferri Track. 3. Water shed treatment Planting, Land slide & Habitat restoration works 300 Hact. 700.00 4. Soil & Water Conservation Check Dams & River bank protection works 18 to 20 streams 500.00 5. Dodital Lake Restoration Removal of Slurry & Disposal of muck & trees > 1000 MT. 200.00 6. Restoration of Dayara, Darwa, Bakriya Top meadows Protection of land slides & restoration of habitat 500 Hact. 500.00 Total - 2150.00

Thank you.