CE ENGINEERING CHANGE ORDER PROCESS CE-ECO-001 DOCUMENT INFORMATION



Similar documents
Superconducting Magnet Division

How To Manage Change Management At Uni

MIE Solutions UK Ltd

Infasme Support. Incident Management Process. [Version 1.0]

CORPORATE QUALITY MANUAL

! " # "$ %" &! '!(!! +!'!! !"! "!!!!!'!!" "!" '!!!!!!'#! ##! ' " '. - !!"#.!!"# )'!!!!" # !!"! '!!! %" . -!!"!. -!!"!'! !!#! !!#!! '!#!!

Using Document Control Software to Meet ISO Document Control Requirements

TTC AUDIT COMMITTEE REPORT NO.

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature

Georgia College & State University

Page 1 of 7 Effective Date: 12/18/03 Software Supplier Process Requirements

Donaldson Buys Value SBOSS. Donaldson Supplier Business Operating System Standard (SBOSS)

DRAWING NUMBER REVISION TITLE PAGE C Planning of Product Realization 1 of 5

TIMICO LIMITED SERVICE SPECIFIC SCHEDULES

Automating Your Engineering Change Process with Autodesk Productstream

Welcome to online seminar on. Oracle Agile PLM. Design to Release & Change Management. Presented by: Rapidflow Apps Inc.

SUPPLIER Form #: 007 AUDIT QUESTIONNAIRE

Configuration Management Self Assessment Checklist

Operations Management

IFS DOCUMENT MANAGEMENT IFS CUSTOMER SUMMIT 2011, CHICAGO

[name of project] Service Level Agreement

ARIBA Contract Management System. User Guide to Accompany Training

TechExcel. ITIL Process Guide. Sample Project for Incident Management, Change Management, and Problem Management. Certified

RTP s NUCLEAR QUALITY ASSURANCE PROGRAM

CONFIGURATION MANAGEMENT PLAN

Supplier Quality Management Handbook

Quality Manual TABLE OF CONTENTS APPROVAL SIGNATURE PAGE AMENDMENT RECORD SCOPE EXCLUSIONS 2.1 3

Autodesk Productstream A practical approach to data management.

INFORMATION ACCESS OPERATIONS LIST OF CORE SERVICES TO MINISTRY CLIENTS

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.

Configuration Management ISO 10007

Texas Real Estate Commission Contract Management Procedures

MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F

Quality Procedures and Work Instructions Manual

ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan)

Enabling Document Compliance with SAP DMS for a Medical Device Company

Supplier Handbook Terms and Conditions

PHASE 9: OPERATIONS AND MAINTENANCE PHASE

Bill of Manufacturing Guide

ITIL Roles Descriptions

Configuration Management Plan

Support Service Level Agreements

Document Control. White Paper By Galaxy Consulting. At Your Service Today Tomorrow We Appreciate The Privilege Of Serving You! Abstract.

Dependent vs Independent Demand. The Evolution of MRP II. MRP II:Manufacturing Resource Planning Systems. The Modules In MRP II System

Copies of this document shall be classified either as Controlled or Uncontrolled, and shall be identified as such on the cover sheet.

Oracle Intro Slide. Why Upgrade from Agile Advantage/8.5 to Agile 9.3 PLM?

LEAN NPI AT OPTIMUM DESIGN ASSOCIATES: PART 1 WHERE ARE WE NOW? RANDY HOLT, OPTIMUM DESIGN ASSOCIATES JAMES DOWDING, MENTOR GRAPHICS

DESIGN PROCESS AND CONTROL

Lockheed Martin Supplier Quality Management Website

OCCUPATIONAL STANDARD (For use in the development of supply chain related job descriptions, performance evaluations, career development plans, etc.

Quality Management System Manual Revision L

Design Consultant Project Management Requirements

Service Management in Microsoft Dynamics NAV 2009

GLOSSARY the terms below are to be interpreted as follows wherever they appear in the classification specification:

Quality Enhancement Unit Environmental Management System Module 6. Document Control

PARADIGMS THAT DRIVE COSTS IN MANUFACTURING. The whole purpose of a business enterprise is pretty simple to make a profit by selling

GOVERNMENT-INDUSTRY DATA EXCHANGE PROGRAM (GIDEP) REQUIREMENTS GUIDE

SUPPLIER QUALITY SYSTEM AUDIT

Are You Using Word, Excel or PowerPoint to Create and Manage Your Assembly Work Instructions and Supporting Documentation?

Chapter 4: Contractor Quality Control

Self-Audit Checklist

SOFTWARE CONFIGURATION MANAGEMENT GUIDEBOOK

Process Owner: Change Manager Version: 1.0

PROCESS GROUP: PLANNING PROCESS GROUP: INITIATION. Oracle Projects. PMBOK Oracle Mapping. Scope Planning. Develop Project Charter

MTN MPLS-VPN Service. Description of Service

CM00 Change Management High Level

RapidResponse Training Catalog

FACTORYTALK PRODUCTIONCENTRE Application Solutions for Manufacturing

APPLICATION FOR THE E911 RURAL COUNTY GRANT PROGRAM

AMC GENERIC WARRANTY POLICY GUIDE

June 16, 2014 Board Meeting - Attachment 7.1 c

Aegis Standard Report Template Examples

Rensselaer County. Contract Management System

DOCUMENT CONTROL PROCEDURE

THE UNIVERSITY OF THE WEST INDIES, MONA CAMPUS

INCIDENT MANAGEMENT SCHEDULE

The Important Role of an Equipment Bill of Material The 2 nd in a series on Integrated Inventory Management

Copy Exact Awareness Training. GT Supplier Change Control

ISO 9001:2008 Clause PR001 Document Control Procedure

Mandatory Addendum to the Owner/Architect Contract For Projects Funded in Whole or in Part with State Capital Outlay Funds

True Product Lifecycle Management Begins When Design Ends. strategy may dictate involvement in all or just a few implemented according to design

DESIGN AND INTEGRATION OF EQUIPMENT. (B) Process Flow Guideline

Using SolidWorks Enterprise PDM For ECO Management... 1

The transition to a complete paperless system for operations process management will yield the following immediate benefits:

Quality Manual. DuraTech Industries, Inc Commerce Street La Crosse, WI MANUAL SERIAL NUMBER 1

This procedure applies to the following categories of documents:

SIEMENS. Teamcenter Change Manager PLM

Quality System Manual

Microsoft Dynamics GP. Manufacturing Management Functions

University of Connecticut Department of Allied Health Sciences

Transcription:

CE ENGINEERING CHANGE ORDER PROCESS CE-ECO-001 DOCUMENT INFORMATION Title: Engineering Change Order Process Document Number: CE-ECO-001(Your Company Standard Naming Here) Date of Issue: Process Owner: Components Engineering Author: Douglas Alexander APPROVALS Director Engineering: CEO: DOCUMENT HISTORY REVISION DATE SUMMARY of CHANGE 1 Initial draft

Page: 1 of 10 1.0 PURPOSE: To define the required activities in the generation, processing and implementation of an Engineering Change Order (ECO). 2.0 SCOPE: This document summarizes the activities involved in the Change Control Process. 3.0 RESPONSIBILITIES: 3.1 Components Engineering is responsible for verifying ECO technical content, cost evaluation, material disposition, effective date and incorporation into manufacturing operations. 3.2 Personnel responsibilities are as follows: 3.2.1 Director of Engineering - The primary contact for ECO initialization. Responsible for coordinating and processing ECOs through initial steps until ECO is released to Operations for implementation. Also responsible for organizing and overseeing ECO review meetings. (This varies from company to company) 3.2.2 Development Engineer - Responsible for technical content of ECOs relating to design and manufacturability of products affected by proposed change. 3.2.3 Planning/Material/Program Manager - Responsible for overall assessment of change impact on schedules, developing effective implementation plans (including material usage and procurement requirements) and verifying proposed effective dates entered on the ECO. They are also responsible for advising Purchasing and Sales of changes which will affect open purchase orders and open sales orders. 3.2.4 Purchasing - Responsible for notifying all suppliers of changes, cancelling purchase orders and RFQ's (Request for Quote). 3.2.5 Operations Support - Responsible for ensuring that technical aspects of changes are incorporated in the manufacturing process (on site and at supplier facilities) and no degradation of quality or reliability occurs as a result of the change. 3.2.6 Components Engineer - Responsible for all component level compliance with the ECO specifications, requirements, processes and material disposition. Component Engineering verifies the technical integrity of the change and ensures, along with the Process Engineer that proper methods and procedures are in place to incorporate the change in production. 3.2.7 Mechanical/Printed Circuit Designers - Responsible for updating assembly, fabrication and schematic drawings.

Page: 2 of 10 3.2.8 Document Control - Responsible for issuing approved ECOs, updating the MRP system, authorizing and monitoring the update of all Product documentation and the timely processing and distribution of related documentation (electronic and hardcopy). 4.0 DEFINITIONS: 4.1 Initiator Any TVS employee representing a technical function, with the assistance of their manager can initiate an ECO. 4.2 Effective Date - Based on type (urgency) of change, effective dates are defined with consideration to quantity on hand, work in process, and items on order. 4.3 ECR - Engineering Change Request, to be completed prior to ECO 4.4 ECO - Engineering Change Order, Document of final record of change 4.5 ECO Review Team - Participants representing impacted departments plus administrative leads 4.6 MRP/PCMRP - Materials Requirements Planning/ Part Master Data Base management system 4.7 Red-lines - Document change mark-ups including schematics, BOMs, and mechanical and assembly drawings 4.8 R & R - Repair and Return, associated with Customer Service 5.0 PROCESS FLOW: Refer to Appendix A (Change Control Process Flow Chart). Paragraph numbers reflect process step numbers i.e. 5.1 = process step number 1. 5.1 Need for an ECO is identified - Change requests come from many sources both internal and external. Change requests can be verbal or in writing and should be directed to the engineer responsible for the particular design, product, or document which may require change. 5.2 Engineer(s) evaluates requested change - The Engineer or Component Engineer will isolate and identify the root cause(s) responsible for creating the need for a change. The Component Engineer along with the Responsible Engineer performs the initial research, modeling and any other background work required to justify the change, including cost benefit analysis. The evaluation process shall include review for impact to product performance in the following areas:

Page: 3 of 10 Design Improvement Manufacturing Process Improvement Reliability Specifications/Documentation Impact Serviceability Component Availability Installability Cost Reduction 5.3 Engineer red lines affected documents - Engineer red lines affected documents in accordance with the procedures. 5.4 Rework Required - Dev/Component Engineer /Sustaining Engineering determine if proposed change is to be incorporated into work in process and at what levels of impact including suppliers and customers. 5.4a R & R/Field Affected - If installed field units would see this problem Dev/Component Engineer Engineer(s) work with Customer Service to outline R&R/Field rework requirements. 5.4b Issue Customer Service Bulletin - Customer Service issues a Customer Service Bulletin to alert customers of potential problems/hazards if necessary. 5.4c Write Rework Instructions - Dev/Component Engineer(s) writes factory rework instructions in accordance with standard red-lines; also writes R&R/Field rework instructions when required. 5.5 Component Problem - If proposed change highlights a technical problem with components or sub-assemblies manufactured by outside suppliers, then the Component Engineer(s), Development Engineer(s) and Purchasing will be notified of the problem. 5.5a tify Supplier - Components Engineering and Purchasing will take whatever advance steps are necessary to best serve the company interests in implementing the proposed change. This may include the introduction of a Suppliers Corrective Action Request, (SCAR), or the initiation of a root cause failure analysis effort. 5.6 Generate ECR - Engineer completes ECR and assembles the change package, including all attachments required for review to detail change for processing by Operations. The change package shall include all documentation (specifications, redlines, rework instructions, etc.) necessary to clearly define the change requirements. 5.7 Transfer to ECO/Operations Coordinator - Engineer reviews the technical aspects of the change with the ECO/Operations Coordinator after passing on the change package via email for earliest possible review. ECO Coordinator verifies that all necessary information to complete the ECR is included as part of the change package. The ECO Coordinator will then submit the ECR to the Engineering management for approval to proceed to the ECO stage. 5.8 Will change affect Form, Fit, Function, or Reliability - The Component Engineer determines if the change affects Form, Fit, Function, or Reliability in

Page: 4 of 10 accordance with Standard Operating Procedures; the information provided by the engineer is entered on the ECO form. If a change is determined to be a Record Change only, Cost Analysis and Material Disposition are not required and ECO is submitted for approval to the ECO review. 5.9 Cost Analysis, Material Disposition, Effective Date - ECO coordinator works with the Component Engineer and Material Planner to complete cost analysis, material disposition, and determine effective date. 5.10 ECO Coordinator completes ECO - ECO coordinator completes ECO and prepares change package for submission to the ECO review team. ECO must be complete prior to being submitted to the ECO review team for sign-off. 5.11 Distribute ECO to review team - ECO coordinator distributes advance copies to ECO review team via Email tification prior to meeting for change validation and resolution of potential problems. 5.12 ECO Review team meeting - ECO coordinator arranges and chairs the ECO review team meeting. The ECO review team conducts a technical and logisitcal review of the proposed change and verifies that all issues relative to the change are properly addresssed. Material disposition, rework instructions, and effective date(s) are agreed upon and verified with MRP. 5.13 Is ECO correct - Corrections which are minor in nature are made during the meeting in order to expedite the ECO. If corrections require additional analysis or input from other sources ECO is returned to the coordinator for resolution. 5.13a ECO Coordinator corrects and redistributes ECO - ECO coordinator acquires needed corrections and redistributes to team members for review if needed. If additional review is not needed coordinator presents ECO at next scheduled team meeting. 5.14 ECO Review Team Signs off ECO - Acceptance and sign-off must be unanimous. The preliminary and final Approval process will be performed via a routing procedure. All names required for approval will be included in the routing. An advisory only list may also be included in the email notification and routing. Only those signatures required for approval will be necessary before the ECO is released. 5.15 Class I or cost > $K - If proposed change is classified as CLASS I (ninterchangeable) or cost of change exceeds $K CEO/VP/Director approval is obtained by ECO coordinator. 5.15a Is Field Upgrade required - If proposed change affects units in the field customers are to be notified and a field upgrade/rework plan is required. 5.15b VP/Director assigns Program Manager - If field upgrade/rework is required Product VP/Director assigns program manager and notes name of person assigned on rework instruction page of ECO.

Page: 5 of 10 5.15c VP/Director signs off ECO 5.16 ECO handed-off to Document Control - ECO coordinator hands off ECO to Document Control for number assignment and incorporation. 5.17 Document Control assigns ECO # - Operations support will review the ECO for proper completion, all required routing signatures, all parts or BOMs effected, revisions are correct, cost sheet is completed, material disposition is addressed, red-lines and rework instructions are attached where required. After verifying the items listed the ECO coordinator or Documentation Control will log the ECO, assign an ECO # and begin processing. 5.18 Document Control updates MRP - Document Control updates PCMRP. 5.19 & 19a CAD Update required - If CAD files require updating Document Control sends ECO and redlines to CAD Services. 5.19b CAD Services updates files - CAD Services schedules work to be done and provides Document Control with updated documents. 5.20 ECO Distribution - Document Control distributes copies of ECO and redlines to all for implementation. 5.21 Updated Documents assembled for sign-off - Upon receiving updated documents from CAD Services and/or other departments which may be charged with updating product documentation, Document Control assembles the ECO and all documentation affected by the ECO and notifies the initiator that the documentation package is ready for sign-off. 5.22 ECO Initiator signs off ECO - ECO Initiator verifies that changes were incorporated into the product documentation as specified by the ECO and any hard copy documentation or drawings are signed by responsible engineer. Initiator signs off ECO releasing updated documentation. 5.23 Master Files Updated - Document Control files original documents in master files, removes and archives obsolete documents, removes and replaces copies in computer files. ECO process is completed.

Page: 6 of 10 APPENDIX A - CHANGE ORDER PROCESS FLOW

Page: 7 of 10 1 Need for ECO identified 2 Engineer evaluates change request 3 Engineer redlines documents 4 Rework Required 4a R&R/Field Affected 5a tify Supplier and create (SCAR) as required 5 Is this a Component Problem 4b Issue Customer Service Bulletin 6 Complete ECR 4c Write Rework Instructions A APPENDIX A - CHANGE ORDER PROCESS FLOW (cont d)

Page: 8 of 10 A 7 Transfer change package to ECO coordinator 8 Will change affect form, fit, or function 9 Complete cost analysis, material disposition, and determine Effective Date 10 ECO Coordinator completes ECO after ECR has been approved as complete 11 Distribute ECO to review team 12 ECO review team meeting B C APPENDIX A - CHANGE ORDER PROCESS FLOW (cont d)

Page: 9 of 10 B C 13 Is ECO correct 13a Coordinator corrects and redistributes ECO 14 ECO Review Team Signs off 15 Class I or cost over $K 15a Field Upgrade 15b VP/Director assigns Program Manager 16 ECO hand-off to Document Control 15c VP/Director signs off ECO 17 Document Control assigns ECO # 18 Customer Approval/tification Required 18a Customer Approval Required 18b Document Control sends copy of ECO to Program/Account Manager D E APPENDIX A - CHANGE ORDER PROCESS FLOW (cont d)

Page: 10 of 10 D E 19 Document Control updates MRP 18c Document Control works with Program/Account Manager to obtain Customer Approval 20 CAD Update Required 20a Document Control sends ECO and redlines to CAD Services 21 Document Control distributes ECO for Implementation 20b CAD Services updates files 22 Updated documents assembled for signoff 23 Initiator signs off ECO 24 Master files updated

Page: 11 of 10 The routing path and signatories. (This is where you would put in your organizations names that match the titles for your ECO routing and approval signature processes.) CEO/VP Engineering Director of Engineering Development Engineer Software Engineer Planning/Materials/Program Manager Manufacturing Manager Purchasing Operations Support Component Engineer Printed Circuit Designer Mechanical Designer Documention Control ECO Coordinator PCMRP Administrator Cad Services Customer Service/Support -R/R