Beachville Presentation

Similar documents
Engineering Policy 146. Severe Weather Management Plans

Flood Mitigation Update

Failing Coastal Wood Infrastructure on the Great Lakes

Muddy River Flood Risk Management & Environmental Restoration Project Phase 1 Construction Activities Next 90 Days August 2015

Welded Mesh Gabions and Mattresses River Protection Design Guide HY-TEN GABION SOLUTIONS Dunstall Hill Trading Estate, Gorsebrook Road,

Evaluating the Condition of Seawalls/Bulkheads

COASTAL DAMAGE INSPECTION SOUTHWEST VITI LEVU, FIJI AFTER CYCLONE SINA

Pine Creek Culvert Upgrade $ 560,000. Located at exiting hump dike, just south of Fire Training Center

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas

Unit Price Averages Reports

Report to INFRASTRUCTURE SERVICES Committee for noting

STRUCTURES Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

Chaudière Crossing Bridge Rehabilitation

How to Estimate the Cost of Support of Excavation for Foundation Installation. CPE Candidate No May 15, 2013

Emergency Spillways (Sediment basins)

The success of the hurricane protection around Chevron s refinery at Pascagoula, MS, during Katrina

ITEM 8(a) MANAGEMENT COMMITTTE 2 JUNE 2015

Incident Management: Before and After Storm Events. Caroline Barford & Caroline Timlett Coastal Engineers

Storm Drain Inlet Protection for Construction Sites (1060)

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011

SECTION EARTH MOVING

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

Rivers Group. Effect of Canterbury Earthquakes on Waimakariri, Kaiapoi, & Halswell Rivers. Flooding & Drainage Perspectives

Division 2 Section Section 02795

Tremie Concrete CM 420 CM 420 CM 420 CM 420. Temporary Structures. Tremie Concrete

Section 2100-Trenching and Tunneling

City of Shelbyville Site Inspection Checklist

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

DESCRIPTION OF WORK:

Session 7: Retrofitted Edge Drains 7.1

Permeable Pavement Construction Guide

Table 4.9 Storm Drain Inlet Protetion Applicable for

SUSTAINABLE URBAN DRAINAGE SYSTEMS

SECTION 1 GENERAL REQUIREMENTS

Minnesota Department of Transportation Best Management Practices (BMP) for Concrete Washout May 2009, v5

Application Form - Contracting Firm

CCU Engineering Specifications. Section PRECAST CONCRETE PRODUCTS

Storm Protection. Storm Protection

Storm Drain Inlet Protection for Construction Sites (1060)

Road water damage control and slope protection along the river

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

Emergency repair of Bridge B421

COST AND MAINTENANCE OF LIVING SHORELINES

Rehabilitation of Locks on the Kentucky River

The Most Advanced Name in Drainage Systems. Geotextile Products

3. Given the geographic extent of the area, amendments have been made to the following regional planning documents

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document

SECTION UNI PERMEABLE INTERLOCKING CONCRETE PAVEMENT

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

GLOSSARY OF TERMINOLOGY

PROPERTY OWNERS INSURANCE PROPOSAL

Buildings Construction Procurement Strategy

RESIDENTIAL COURSE OF CONSTRUCTION QUESTIONNAIRE

BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM

Safe & Sound Bridge Terminology

SUMMARY: LAND TRANSPORT ASSET MANAGEMENT PLAN

How To Install An Overhead Sewer

School Construction Authority Architecture & Engineering

Truck Company Operations

Re: Damages to Alaska Building from Legislative Information Office Construction

NEUPAVE. Permeable Pavers. A Permeable Eco-Friendly Beauty

Membrane for tunnels and underground construction

SECTION SHEETING, SHORING AND BRACING

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

ANNEX 5 RESOLUTION MEPC.127(53) Adopted on 22 July 2005 GUIDELINES FOR BALLAST WATER MANAGEMENT AND DEVELOPMENT OF BALLAST WATER MANAGEMENT PLANS (G4)

Corrosion protection linings. Issue 1

Outlet stabilization structure

Types of Retaining Walls - Gravity walls - Pre-cast crib walls - Gabion walls - Reinforced concrete walls - Sheet pile walls - MS walls (mechanically

Bruce Highway (Cooroy to Curra) Section A (Cooroy southern interchange to Sankeys Road)

The Follo Line Project

Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.

SECTION ABANDONMENT OF SEWER MAINS

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

Storm Drain Inlet Protection

Source: Port Mann Bridge Plans Unveiled Today, CBC News, February 4, 2009.

Newbiggin House Farm,

STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL

What Causes Foundation Leaking?

Permeable Pavement Operation & Maintanence Guide

Lesson 3. Portland Cement and Concrete

Earthquake damage in wastewater systems and postearthquake repair methods; limitation and practice

Construction Site Inspection Checklist for OHC By making use of some simple Best Management Practices (BMPs) a construction site operator can

CHAPTER 8 CIVIL DESIGN

v2 AB Classic 2 AB Jumbo Junior 6 AB Lite Stone v6 AB Classic 4 AB Jumbo Junior 8 AB Lite Stone 10 AB Classic 10 AB Jumbo Junior

Gladstone Harbour Dredged Spoil Disposal Area Bund Wall- What went wrong?

Operations and Maintenance Guidelines for Coal Ash Landfills Coal Ash Landfills are NOT the Same as Subtitle D Solid Waste Landfills

How To Deal With A Flood In Aorere Valley

STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY

Steel construction. Solutions for the renewable energy and offshore sectors. published by energyengineering magazine

March 2006 DIVISION 3 - CW 2140-R3 TABLE OF CONTENTS

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.

Storm Drain Inlet Protection

Section 402. STORM SEWERS

A Guide to New National Flood Maps & New National Flood Insurance Program Premiums and Requirements

Peace River Project Water Use Plan

NIST Technology Showcase FutureScan

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE

SECTION G SEWERS (STORM, SANITARY AND FDC)

Transcription:

Lessons learned from one of New Zealand s most challenging civil engineering projects: rebuilding the earthquake damaged pipes, roads, bridges and retaining walls in the city of Christchurch 2011-2016. Beachville Presentation Story: Beachville Seawall Theme: Construction A presentation which describes the stages of construction of the Beachville Road seawall. This document has been provided as an example of a tool that might be useful for other organisations undertaking complex disaster recovery or infrastructure rebuild programmes. For more information about this document, visit www.scirtlearninglegacy.org.nz

Beachville Seawall

Beachville Project Overview 500m of Seawall along the Heathcote/ Avon Estuary 1.2 Km of Coastal Pathway 10000m2 of Pavement replacement 350m of Storm water repairs Various service diversions to facilitate works

The old Wall Built in the early 1900 s The 2.5m high stone and concrete wall protected Beachville rd. from the Heathcote/ Avon Estuary As a result of the 2011 earthquakes the wall settled up to 500mm and slumped forward up to 1 metre in places. Existing SW outfalls were damaged leaving Beachville Rd susceptible to flooding during bad weather.

Seawall Design 500m long Rock Revetment Impermeable Geotextile wrapped core 1m thick layer of Rock Reno Mattress toe installed on the existing seabed The new structure provides protection from erosion and Reno Mattress Rock Core scour Is Less susceptible to lateral spread And is Easily topped up if damaged in another earthquake

Construction Challenges The main challenge facing us was a tidal range of 2.4m, which at high tide left the seawall core under water. Sheet piling out to the toe of the wall was quickly ruled out due to time/ cost. In the end we decided that we would only sheet pile and dewater the Geotextile Core. This led to the next challenge.. High Tide Low Tide Line of Sheet Piles

Construction Challenges How to install the Reno Mattresses under water? After consultation with Connell Contractors it was decided that Divers would be used to place the Reno s. The mattresses are constructed on shore Lifted by Crane using a specially designed lifting frame Lowered into the water in line with markers buoys placed using GPS Once in the water the Divers direct the lift until the mattress is on the seabed The Divers then release all the hooks, and the process is repeated.

Sheetpiling Using a cantilever guide frame 8m long sheet piles are driven along the bank. Every 30m a return is driven, creating manageable cells than can be dewatered Up to 3 cells on the go at any one time

Dewatering and Excavation Water is pumped from the cell being excavated into the next cell in front, allowing any sediment to settle before making its way into the estuary

Approx. 40,000m2 of Geotextile has been used to date Over 6500m3 of engineered fill has been installed to date Geotextile Core Construction

Reno Mattress Installation First the spools are loaded with the correct amount of geotextile They are then fitting to the lifting frame and reno mattress

Reno Mattress Installation The mattress is lifted into position and lowered under water Divers confirm the position and release the hooks The spool is lifted out of the water and the bidim is rolled up the bank to the surface

Rock Placement Rock is placed in 2 layers: 0.4m of Under Layer 60-200mm Rock 0.6m of Cover Layer 200-400mm Rock Almost 6000m3 of Rock has been placed to date

Precast Wall unit installation 208no. Precast units to be placed in total They are grouted in place, and the joints sealed with Sikaflex Once in position rock is placed carefully along the outer face to complete the seawall!

Beachville Progress Seawall 90% complete with only the southern tie-in and northern seawall to finish in the next 4 weeks. Storm water 80% complete with 20m of pipe left to install. Roading and Coastal Pathway 50% complete and due to finish in September Landscaping Commencing in July and expected to be completed early September Beachville 11200 Finishing Strong September 2016!

Communications Over the past 9 months we have developed a great relationship with the residents of Beachville Rd. From regular notices to open days on site, we have kept the residents in the loop throughout the project. In return we have received regular feedback, letters and most importantly baked goods! This week the Residents Association threw a Morning Tea for the crews on site, to show their appreciation for the work they are doing.