Term of Reference For Information Technology (IT) Consultant (Network Administrator) for FCGO IT Systems



Similar documents
Term of Reference For Information Technology (IT) Consultant (Software) for FCGO IT Systems

Term of Reference For Information Technology (IT) Consultant (Software Support) for FCGO IT Systems

SENIOR SYSTEMS ANALYST

INFORMATION TECHNOLOGY ENGINEER V

Expression of Interest

EXPRESSION OF INTEREST (EOI) Citizenship Information Management System (CIMS) Ministry of Home Affairs Singh Durbar, Kathmandu, Nepal

T141 Computer Systems Technician MTCU Code Program Learning Outcomes

FUNCTIONAL AREA 12. Network Administration (NET)

MINISTRY OF FINANCE, PLANNING AND ECONOMIC DEVELOPMENT THE THIRD FINANCIAL MANAGEMENT AND ACCOUNTABILITY PROGRAMME (FINMAPIII) TERMS OF REFERENCE

SAN MATEO COUNTY OFFICE OF EDUCATION CLASS TITLE: ADMINISTRATOR, INFORMATION TECHNOLOGY SERVICES

REQUEST FOR EXPRESSIONS OF INTEREST AFRICAN DEVELOPMENT BANK

CHAPTER 2: Staffing ROLES OF STAFF. Roles Required to Provide Tech Support

NOS for Network Support (903)

NETWORK ADMINISTRATOR

We are seeking a professional to redesign a website. We are wanting a brand new look and feel.

Uganda s IFMS project has been SUMMARY CHARACTERISTICS OF THE IFMS AND ITS ROLE IN SUPPORTING THE BUDGET PROCESS

PHASE 5: DESIGN PHASE

Sample Career Ladder/Lattice for Information Technology

IP Telephony Management

INFORMATION TECHNOLOGY INFRASTRUCTURE ANALYST

II. Supports the department in implementing the strategy established by management.

Progress Report: Building the Capacity of the Ministry of Health and Population on Audit Status Management and the Implementation of its Financial

Central Information Systems Division ICT Manual

SYSTEMS AND NETWORK SECURITY ANALYST (Range 127)

JOB DESCRIPTION QUESTIONNAIRE FOR SUPPORT STAFF

SENIOR INFORMATION SYSTEMS MANAGER

ADMINISTRATIVE STAFF:

VNLINFOTECH JOIN US & MAKE YOUR FUTURE BRIGHT. mcsa (70-413) Microsoft certified system administrator. (designing & implementing server infrasturcure)

Designing and Implementing a Server Infrastructure

Infrastructure Support Engineer Job Profile

Associate in Science Degree in Computer Network Systems Engineering

JOB VACANCIES October 20 th, 2013

Kaspersky Lab Product Support. Enterprise Support Program

Designing and Implementing a Server Infrastructure

Information Technology Manager Training Needs Assessment Evaluation Form. Personal/Position Information

Designing and Implementing a Server Infrastructure

Request for Expressions of Interest IT System Consultant

MICHIGAN AUDIT REPORT OFFICE OF THE AUDITOR GENERAL THOMAS H. MCTAVISH, C.P.A. AUDITOR GENERAL

Certified Information Systems Auditor (CISA)

COURSE OUTLINE MOC 20413: DESIGNING AND IMPLEMENTING A SERVER INFRASTRUCTURE

MINNEAPOLIS PARK AND RECREATION BOARD JOB DESCRIPTION JOB TITLE: Network & Operations Coordinator

CDS and Clearing Limited Thapathali, Kathmandu 7 th Level (Technical) Syllabus

TRUCKEE DONNER RECREATION & PARK DISTRICT INFORMATION TECHNOLOGY ADMINISTRATOR

Hardware. Maintenance

Designing and Implementing a Server Infrastructure

U.S. ELECTION ASSISTANCE COMMISSION OFFICE OF INSPECTOR GENERAL

Exhibit F. VA CAI - Staff Aug Job Titles and Descriptions Effective 2015

Diploma in Information Technology Network Intergration Specialist COURSE INFORMATION PACK

Project Support to Public Administration Reform in Ministry of Agriculture and Rural Development VIE/02/016 TERMS OF REFERENCE

SCOPE: Role Descriptions/Job Profiles

Page 1 of 5. IS 335: Information Technology in Business Lecture Outline Computer Technology: Your Need to Know

Pluralsight Training Pre-Approved for CompTIA CEUs

Select IT Consulting Services RFP Technical and Network Support Specialist Services (Lot Group C)

Information Technician Training Needs Assessment Evaluation Form. Personal/Position Information

TERMS OF REFERENCE (TORs) OF CONSULTANTS - (EAG) 1. Reporting Function. The Applications Consultant reports directly to the CIO

OPEN FOR EDUCATION. CampusNet - Managed Hosting services for Higher Education

TERMS OF REFERENCE (ToR)


Diploma in Information Technology Network Integration Specialist COURSE INFO PACK

OCCUPATIONAL GROUP: Information Technology. CLASS FAMILY: Security CLASS FAMILY DESCRIPTION:

IFMIS: A CASE FOR MALAWI A PAPER PRESENTED AT THE ICGFM WINTER CONFERENCE ON 2 3 RD DECEMBER, 2007 NT MNTHAMBALA

General Computer Controls

NEPAL PORTFOLIO PERFORMANCE REVIEW NPPR 2011

20413C: Designing and Implementing a Server Infrastructure

Functional Area 3. Skill Level 301: Applications Systems Analysis and Programming Supervisor (Mercer 1998 Job 011)

Cisco and VMware Virtualization Planning and Design Service

COURSE 20413C: DESIGNING AND IMPLEMENTING A SERVER INFRASTRUCTURE

TEMPORARY JOB OPENING ANNOUNCEMENT

More than 6 years of experience in IT Projects/Networking /Systems

Designing and Implementing a Server Infrastructure

NORWIN SCHOOL DISTRICT JOB DESCRIPTION. Computer Network Administrator

Cisco Unified Communications Predeployment, Deployment, and Postdeployment Service Bundle

INFORMATION TECHNOLOGY PROGRAMMER/ANALYST

Designing and Implementing a Server Infrastructure 20413C; 5 days, Instructor-led

Cisco Advanced Services for Network Security

Designing and Implementing a Server Infrastructure

Course 20413: Designing and Implementing a Server Infrastructure

GMS NETWORK ADVANCED WIRELESS SERVICE PRODUCT SPECIFICATION

Planning, Deploying and Managing Microsoft Project Server 2013

RFP Attachment C Classifications

System/Data Requirements Definition Analysis and Design

TERMS OF REFERENCE FINANCIAL CONSULTING FIRM 6 MONTHS, NATIONAL

Desingning and Implementing a Server Infrastructure

HELP DESK SUPERVISOR

Putnam/Northern Westchester BOCES Internal Audit Report on Information Technology

DATABASE ADMINISTRATOR (SQL & ORACLE) Location: Richmond, VA (1 position)

Transcription:

Term of Reference For Information Technology (IT) Consultant (Network Administrator) for FCGO IT Systems 1. Background Organization and its functions: Financial Comptroller General Office (FCGO), an organization under the Ministry of Finance (MoF), is the main agency responsible for the Public Financial Management (PFM) system of Government of Nepal (GoN). The treasury operation is the pivotal function of this office as the central level function. In order to manage the treasury, it also carries out the functions mentioned in the Financial Procedure Act, 2055 (B.S.) and Financial Procedure Regulation, 2064 for this office. Actually these laws for this office have mandated the major functions. As per the said law this office mainly oversees budget implementation, treasury administration, budget expenditure implementation, cash and budget management, expenditure and revenue accounting, expenditure and revenue tracking, other receipts management, human resource management, strengthening the accounting system and preparation of consolidated financial statements of the government. There are District Treasury and Controller Offices (DTCOs) in 75 districts under this office. The DTCOs release the budget and manage the fund for the expenditure and control the accounts for the offices operating under the line ministries of GoN. DTCOs are making the payment through implementing the Treasury Single Account (TSA) System. E-Governance Approach: FCGO has adopted the e-governance approach for its business operations. In this endeavor, various functions have been digitized and thus replaced the manual process of the operations. For this, there is a Management Information System (MIS), which has computerized networks for the recording, reporting and business processes as well as other PFM works of spending units through the DTCOs. There are two levels of Computerized information systems in FCGO and DTCOs, which are as follows: Financial Management Information System (FMIS) in FCGO Treasury Single Account District Expenditure Control System (TSA/DECS) in DTCOs The FMIS has been used to produce the budget publication and accounts of GoN for more than a decade based on the transactional level data. In addition to this, there are two systems namely Computerized Government Accounting System (CGAS) and Revenue Management Information System (RMIS). CGAS is planned to be executed in all Paying Offices (POs) of GoN to capture transactions and their accounting, book keeping, and reporting of both expenditure and revenue. For the time being CGAS has been piloted in all 75 DTCO's and 16 Paying Offices of Kaski district. In the current FY 2071/72 FCGO is planning to extend the use of CGAS to few ministries and other offices which are ready to use it. RMIS is an interfacing system, which has been piloted in 3 districts of Kathmandu valley from Srawan, 2071. This system is designed to 1

capture the entry level revenue data through a single online system operated by FCGO and used by banks, paying offices and DTCOs. After the introduction of new Charts of Accounts (CoA) based on Government Finance Statistics (GFS, 2001)code in 2068/69, the following information systems have been redesigned and updated to make them compatible with GFS 2001 codes. Budget Management Information System (BMIS) : This software is used in formulating annual budget in Ministry of Finance (MoF). The data required for budget formulation is also supported by the Line Ministry Budgeting System (LMBS) used at ministries level and FMIS at FCGO. The budget has been published based on the updated BMIS using GFS 2001 codes starting from the FY 2069/2070. Financial Management Information System (FMIS): This system is used for compiling entire data of budget release, expenditure, balances, virement, revenue collection, retention money from DECS. The FMIS gives consolidated information regarding entire financial performance of the districts obtained from DTCOs. FMIS is the means by which the FCGO exercises control over the DTCOs and ensures that data is accurate, complete and in time. It is the main source of reporting of the budget execution, revenue collection and retention money. FCGO produces different financial reports at different intervals using such data. Line Ministry Budgeting Information System (LMB IS): This is used for preparing annual budget at the line ministry level. It facilitates to transfer such data to BMIS used at MoF. TSA DECS is used by all districts for managing budget expenditure, revenue and retention money of Paying Offices of the district. The main feature of this system is that it records payment requests received from paying offices and Cheques printed and issued to them.tsa is now in the course of further enhancement. From the start of current FY commitment recording module has been started as a component of TSA software which is believed to be crucial in budgetary forecasting. FCGO is responsible for smooth and consistent operation and maintenance of IT systems including FMIS, TSA DECS, RMIS and CGAS. Moreover, FCGO intends to engage IT consultants for the support service of these IT systems. These Systems have been developed using Oracle 11g as database engine and Oracle application server as middle tire and Oracle form report 11g as application development software. The systems are documented with both technical and user manual as well. The Government of Nepal has received a grant from the Multi Donor Trust Fund through International Development Association (IDA) for the Strengthening Public Financial Management (PFM) Systems Project, and it intends to a pply part of the proceeds of this grant to payments under the Contract for this assignment. FCGO has installed the following devices (hardware) at Data Site) to run the above mentioned IT systems: Center (Primary 2

Database (RISC) Server Web Logic/Application (RISC) Server Enterprise Rack San Switches External Storage System Tape Library UPS For Backup System Core Firewall Core Switches Intrusion Prevention System (IPS) Cisco Routers 2. Objective of the Consulting Service: The main objectives of the proposed consultancy service are as follows: 2.1 Network Engineering: Design/engineer the network system of the organization for the smooth and non interrupted system services. 2.2 Network Diagnostic: Diagnosis the Networking system for identifying bugs and providing the relevant solution of the problem without interrupting the services provided by FCGO. 2.3 Ensure System Operation: Regular inspection of the system being operated to ensure non-interrupted services. 2.4 Networking Activities: Carry out Networking activities in order to keep the systems intact and workable, 2.5 Support and Maintenance of System: Provide support service for smooth & effective operation and maintenance of the IT systems. 2.6 Knowledge Transfer and Training: Transfer the knowledge and skills for the above functionalities to the FCGO, hub DTCO, associated DTCOs and POs staffs regarding operation and maintenance of the systems with the recent available techniques and provide training on regular basis. 2.7 Manage the Data Flow: The engineer is also required to manage the data flow arrangement from the software and its functioning system. 2.8 Manage Security Features: Assist the hub-district and associated districts to manage the security features of the systems, networking, database and hardware. 3. Scope of the Services In order to attain the objectives and carryout the specific roles and responsibilities the consultant shall cover the following areas of concern in this job category: 3

3.1 Review and study of the IT Systems: study and review of the software platform, back-end, front-end, networking systems and other technical features of the present IT systems of FCGO. 3.2 Engineering and Re-Engineering of the Network System: Design/Engineering or redesign/re-engineering of the network system of the FCGO for the smooth and consistent operation of the applications of the organization. 3.3 Network Monitoring and Diagnostics: Regular Monitoring and Diagnostic of the FCGO networking system, Proper diagnosis of the interrupted network (during interruption) and long term solutio n of the problem with proper documentation. 3.4 Monitor the functionality of the systems in FCGO, districts (Hub and Associated) and paying offices: Monitoring of the functionality of the IT systems in FCGO, the hub districts, associated districts and paying offices and gather the recent status of the systems. If the systems are not functioning well, immediate initiation of remedy actions and informing the Chief of the hub district as well as FCGO IT management. 3.5 Visit the districts and various paying offices as and when required for IT solution and getting the intact and workable systems: visit the districts and various paying offices to monitor the status of the IT system regularly and provide support service in case of nonfunctionality of the system. 3.6 Training and knowledge transfer: The engineer should provide training to users according to the requirements on the systems e.g., FMIS, TSA- DECS, RMIS and CGAS. It is also necessary to prepare training material and update it regularly for the knowledge transfer. 4. Specific Responsibilities to be performed by the Engineer The consultant shall be responsible particularly to perform, but not limited to following tasks and responsibilities under the direction & supervision of IT section of FCGO: Study of Existing Network, Design/Engineer or redesign/reengineer Network architecture for the smooth and consistent services. 4

Regular Management, monitoring and Diagnosis of overall Networks system of FCGO & DTCOs for smooth and non interrupted services. Modify and upgrade the Network systems as required for the smooth and consistent operation of the Applications of the organization. Deal with various users in respect of comments and feedbacks regarding operation of the system and settle them with the direction of IT section of FCGO. Manage Security Features of the systems, database and hardware in the DTCOs including antivirus, firewall etc. Be responsible for data flow management between TSA-DECS and FMIS Manage the consistent connectivity between DTCOs, FCGO and other organizations. Manage & Configure of high End Network Devices (IPS, NAC, Router, Firewall, Core Switches etc.) Manage & Configure of VPN form FCGO to DTCOs, Related Banks and other Paying Office. Updating him/her-self for Familiarity with Network Monitoring Tools and regular monitor the network for uninterrupted services and provide long term remedies with complete documentation of the problems and their solutions. The engineer should work under direct supervision of Head of the IT section of FCGO. Furthermore, s/he should work together with other IT as well as management staffs of the office. 5. Availability of Previous Study Documents and Data: The engineer shall be made available the following books/documents for the accomplishing the obligations under the assignment: Technical Specifications of the IT systems, User's Manuals of the IT systems, Latest status of the systems, and A brief orientation on overview of the Network systems. 6. Consultant's Qualifications and Experience: The consultant should have the following qualification and experience to carry out the assignment: 6.1 Academic Qualification and Training: Bachelor degree in Computer Sciences, Electronics, Telecommunications or equivalent from recognized university/college. Master degree is preferable. Certified CCNA or equivalent Training in Redhat/Linux is preferable. 6.2 Experience: 5

Minimum 5 years of Experience in the field of network administration and management of large enterprise Network of comparable size and complexity after the minimum academic achievement in government or public or private organizations (Organizations with Network architecture connecting Data center, Data Recovery Center at remote locations and branch organizations with both internet and intranet connectivity). Minimum 1 year Experience in the field of Redhat/Linux preferable. 7. Duration of Services: The service period of the engineer shall start from November 2015 and ends after 12 months from the starting date. Downstream of the services: The service of the consultant may be extendable to 1 additional year upon the satisfactory performance of the consultant. 8. Facilities/Utilities and Logistics to be provided by the Client: The engineer him/herself shall be responsible for arranging all required utilities/facilities and logistics for the completion of the assignment. However, the consultant shall be made available the following facilities/logistics during the service period, if required: Shall be made available shared office room with the counterpart employees of the concerned assignment. Shall have access to the computer and communication facilities (e - mail, telephone, fax etc.) during the obligations performing hours at FCGO, the hub DTCO and associated DTCOs premises. The relevant information and documents, if any, from FCGO and the concerned DTCOs. Travel allowance and daily allowance shall be paid as per rules and regulations of GoN applicable for Gazetted Second Class Officer. 9. Reporting Requirements and Deliverables: The engineer should report during or at the completion of the assignment the following reports and deliver the following outputs: 9.1 Reporting Requirements: The Consultant shall prepare and submit the following reports/documents: Action/Work Plan of the Assignment: The engineer should submit the annual work plan / action plan reflecting the detailed job 6

responsibilities mentioned in the ToR. The plan should specify monthly breakdown for the period of fiscal year. The plan needs to be submitted within the fifteen days from the date of signing of the agreement. Monthly Report: The engineer should submit Monthly performance Report (MPR) within seven days after the completion of the preceding month. The format and contains of MPR will be finalized mutually. However, the report should clearly explain the actions performed by the engineer in comparison with the agreed work plan. Annual Report: The engineer should also submit annual report within fifteen days after the completion of the preceding year as per MPR modality. Monitoring Report: The Consultant should submit the regular network monitoring report to IT section of FCGO for confirmation of the smooth operation on weekly basis and on demand. Diagnostic Report: During network disturbances, the consultant should submit Diagnostic Report with complete description of the problem, reason of its occurrence and the long-term remedies for the problem as soon as the problem is resolved. 9.2 Deliverables : The assignments should deliver the followings: All responsibilities and tasks stipulated in the ToR to be performed in the right time and in qualitative manner. Intact and workable network systems in FCGO, the concerned DTCOs and Paying Offices. Network Structure Design Document in every 3 months. Monthly Performance Report (MPR) and Annual Report in E nglish in the given time and format. Survey buildings covered by GWAN infrastructure, Check GWAN infrastructure setup and performance, Recommend network equipment requirements, Recommend configurations for servers, switches, firewall, proxy, VLANs and all other network equipment, Check government wide systems setup and configurations, Establish likely (strategic) interface between the systems and deployment strategy, Recommend best anti-virus software and deployment strategy, Recommend best network monitoring tools and installation strategy. Following deliverables are also expected from the consultants: 7

A Comprehensive Assessment Report of infrastructure and recommendations for requirements for the network in order to improve and enhance its performance. A Site Survey Report on the WAN connectivity, including line of sight, nearest fiber point. A Network Design Document-based on survey, the consultant will prepare a network design document indicating the sites that will be connected through fiber, radio, or any other feasible solution based on specific location and for cost-effective market solutions available for each site. Specifications of hardware and software and any associated scope (TORs) of services for installation, configuration and training on the supplied hardware: The consultant will also define a detailed scope of services if any for installation, configuration and training involved associated with the supplied hardware. 10. Skill Transfer and Training: The engineer should perform the following activities for the skill transfer and training: The engineer should adopt the approach of network related skills transfer to the personnel of FCGO, the concerned DTCOs and Paying offices while working with them. S/he should work as a resource person to impart practical skills especially in the network issues frequently occurred in the IT system like TSA DECS, FMIS, CGAS, RMIS and other system used by FCGO. 11.Selection Method : As per CQS method of world bank guideline of selection & employment of Consultant, January, 2011. 12.Payment Module: Monthly Payment will be done after receiving Monthly Report with Recommendation of IT Section Chief. 13.Evaluation Criteria : 13.1. General Criteria 8

A minimum Bachelor degree in Computer Sciences, Telecommunications or equivalent from recognized university/college. Master in Computer Science or Equivalent is preferable. CCNA or equivalent Certified preferable Minimum age should be 21 year with general awareness about public financial management, and e-governance. S/he should be a Nepalese citizen and should declare as not be involved in the violation of any laws or criminal activities. Minimum 5 years of Experience in the field of network administration and management of large enterprise Network of comparable size and complexity after the minimum academic achievement in government or public or private organizations Minimum 1 year experience in Redhat/Linux or equivalent is preferable. Committed team player and able to coordinate with associated officers and institutions for improving and expanding organizational IT service. 13.2. Specific Criteria Consultant will be selected as per Individual Consultant selection method of the World Bank's Guidelines. Criteria: A. Certification and Documentation 90 Percent Education Qualification 30 Percent Experience (General and Specific) 30 percent Training 15 percent Knowledge Transfer & Dissemination 5 percent Understanding the Objectives and ToR 5 Percent Quality of Methodology 5 Percent B. Practical- 10 Percent (For shortlisted candidates only) Minimum Qualifying Mark: 70 Percent in certification and documentation (i.e 70 % of 90 Marks = 63 Marks) & 70 percent in practical(i.e 70% of 10 Marks = 7). ******* 9