Master Planning/Programming Approach



Similar documents
aaca NCSA 01 The National Competency Standards in Architecture aaca Architects Accreditation Council of Australia PO Box 236 Civic Square ACT 2608

TEC Capital Asset Management Standard January 2011

Healthcare 101 Committee Member James E. Sykes, AIA, LEED AP BD+C MorrisSwitzer Environments for Health, LLC

June 7, 2010 Page 1 of 5

IT PROJECT GOVERNANCE GUIDE

General Notes Time allowed 1 hour. Answer all 60 multiple choice questions Use the proforma answer sheet provided.

Prototyping Techniques for

Department of Veterans Affairs VHA HANDBOOK Washington, DC July 1, 2011 INTERIOR DESIGN OPERATIONS AND SIGNAGE

Texas Children s Hospital Collaborative Project Delivery Strategies & Structure

MATRIXX Professional Services

REQUEST FOR PROPOSAL WAYFINDING AND SIGNAGE CONSULTANT

Request for Proposal East Tower Nursing Unit and Infrastructure Upgrade Grossmont Hospital

Background: Business Value of Enterprise Architecture TOGAF Architectures and the Business Services Architecture

University of Wisconsin Platteville IT Governance Model Final Report Executive Summary

Schematic Design: Quality Management Phase Checklist Project Phase Checklist Series

Space Planning. Gretchen Addi, Associate AIA, and Jacqueline Lytle, IIDA, Associate AIA. Summary CLIENT NEEDS

THE ART OF COMMERCIAL REAL ESTATE

design review guide for secondary schools

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: 1 DISCUSSION ITEM

32nd Infection Prevention & Control Nurses College Conference. Designing Healthcare Facilities; managing the requirements of healthcare professionals.

COMPANY PROFILE MISSION VISION. Code Enterprise is a Web & Mobile Application company with its roots deeply imbued in the European affiliate market.

RIBA Plan of Work 2013: Consultation document. You are invited to complete the online questionnaire by 12 August 2012.

Executive Assistant Competency Profile

STEPS IN THEATRE PROJECT PLANNING

Big Data Engineer Position Description

CA/NV AWWA SCADA Seminar SCADA Master Planning. Presented by: Philip Gaberdiel Cell: ext

Five Myths Surrounding the Business of Population Health Management

Guide on Developing a HRM Plan

Capital Project Delivery Handbook

How To Use Centricity Emr

Dimensional Data Modeling for the Data Warehouse

County of San Mateo Health System

Role and Skill Descriptions. For An ITIL Implementation Project

VEHICLE INFRASTRUCTURE INTEGRATION (VII) U.S. DOT DAY-1 APPLICATION DEVELOPMENT PLANS

Managing Asbestos Policy

ISSUE BRIEF. Understanding the Hospital Planning, Design, and Construction Process. Introduction. Background. Phase 1: Project Definition and Planning

Do not open this paper until instructed by the invigilator. Please note: This question paper must not be removed from the examination room.

Enterprise Architecture Governance Procedure

St. John s University. College of Pharmacy and Allied Health Professions. Annual Objectives Revised 7/22/10

Communicating with Allied Trades

V I S I O N REV. 1

Electronic Records / Clinical Information Systems (CIS) and Global Markets. November 2014

Designing a Metrics Dashboard for the Sales Organization By Mike Rose, Management Consultant.

DATE REVISION xxxbyxxx. IT Modernization: EA Information Management. DATE: September 2003 AUTHOR: Enterprise Architecture Team

Welcome to Morpheus. Over 20 years heritage of creating exceptional properties.

TheUCI Libraries Strategic Plan

STRATEGIC PLAN One Island health system supporting improved health for Islanders

PUBLIC ACCOUNTANTS COUNCIL HANDBOOK

Covance Construction Management Staffing Plan Chandler, Arizona

Using the Autodesk Revit GSA Spatial Template


HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT STRATEGY

Overview of the System Engineering Process. Prepared by

CHAPTER 8 ASSET MANAGEMENT

Table of Contents. Page 1

Students Association of Mount Royal University Strategic Plan

Data Conversion Best Practices

Strategic Plan

Work Breakdown Structure & Schedules

How To Design An Interior Design

The Global Supply Chain Goes Collaborative

ST/SGB/2004/8. Secretariat. United Nations. Secretary-General s bulletin Organization of the Office of Human Resources Management.

Welcome & background.

CON Academic and Student Affairs FY15/16 Core Functions by PCF. Assistant Dean

Operations Excellence in Professional Services Firms

NCOE whitepaper Master Data Deployment and Management in a Global ERP Implementation

VCE PRODUCT LIFE CYCLE END OF LIFE POLICY OVERVIEW

DUAL CREDIT PROGRAM ARTICULATION AGREEMENT

CODE: E.003 Financial Services BUDGET AND BUSINESS PLANNING POLICY. 1.2 The essential activities covered by this policy include:

Appendix A Sample Job Descriptions for a Coordinator/Manager

Program Lifecycle Methodology Version 1.7

Data Warehousing Fundamentals Student Guide

Course Syllabus HIT 284 HealthCare Quality Management 3 Semester Hour Credits

Fixed Scope Offering for Implementation of Sales Cloud & Sales Cloud Integration With GTS Property Extensions

Transcription:

North Shore LIJ Health System CATHRYN BANG + PARTNERS ARCHITECTS Healthcare Architecture, Planning, Interiors Master Planning/Programming Approach Cathryn Bang + Partners Architects (CBPA) will deliver the master planning/programming tasks by clearly defining approach and process to effectively develop the master plan objectives and programmatic basis. The approach our team would propose is outlined below: Activity 1: Information Base and Working Procedures A. Participate in Steering Committee Meetings and Lead the User Group Meetings necessary to: Discuss the Goals for the project including what makes it unique. - Centers of Excellence - Patient Convenience - Health system-wide Role Model Main Program: Minor Program: Program to find appropriate location: Identify and discuss relevant Master Plan criteria. - Access/Parking - Registration - Medical Records (and future use) - Lab (Clinical Lab, Core Lab, Pathology Lab) - Building Support Define the Specific Scope for the master planning/programming work effort. Develop a Working Schedule& Calendars of Meetings B. Assemble the relevant information for the required patient Volume Analysis. C. Assemble the relevant information for the required Building Analysis. 1

North Shore LIJ Health System CATHRYN BANG + PARTNERS ARCHITECTS Healthcare Architecture, Planning, Interiors Activity 2: Master Planning/Programming A. Conduct an Analysis of the proposed Buildings. Infrastructure/MEP systems for proposed services* Code/regulatory compliance Architectural imagery and aesthetics B. Conduct an Analysis of the Patient Volumes - Current, 1yr, 3 yr, & 5 yr. C. Participate in Steering Committee Meetings and Lead the User Group Meetings necessary to: Identify Needs: Create and/or validate & refine the list of spaces proposed by the User Groups including the support services spaces to ensure that all needs are identified. Fully discuss and reach consensus on issues such as spatial adjacencies, functional relationships and critical performance characteristics for all of the program areas. Discuss the targeted efficiency factor for the proposed buildings and its implications for cost. Building Analysis: Identify and discuss Building Analysis findings and Feasibility Options. Prioritization: Schedule and Phasing Budget: Preliminary Budget** Note: * CBPA normal methodology would employ MEP Consultant. ** CBPA normal methodology would employ Cost Estimate Consultant. 2

North Shore LIJ Health System CATHRYN BANG + PARTNERS ARCHITECTS Healthcare Architecture, Planning, Interiors Activity 3: Developing the Master Plan/Program Document A. Complete the Building Analysis and identify the Feasibility Options for review by the Steering Committee. B. Produce draft Program for review by the Steering Committee. Functional Program Scope of Services Capacity Assumptions/Projected Volume Primary External Adjacencies Planning and Design Requirements Operational Systems Space Program Summary of Spaces Room-by-Room C. Produce draft Plan for review by the Steering Committee. Site Diagrams Blocking & Stacking Diagrams D. Produce draft Phasing for review by the Steering Committee. E. Update and refine the Budget and Schedule for review by the Steering Committee. 3

North Shore LIJ Health System CATHRYN BANG + PARTNERS ARCHITECTS Healthcare Architecture, Planning, Interiors Activity 4: Final Detailed Project Master Plan/Program Document A. Develop Draft Detailed Project Master Plan/Program addressing (but not limited to) the following topics. Project Objectives Building Analysis and Feasibility Options Program Plan Phasing Budget and Schedule B. Review Draft Master Plan/Program with the Steering Committee and produce Final Master Plan/Program Document. 4

PROJECT METHODOLOGY RECOMMENDATION Our processes of starting facility development work first with Master Planning are industry-tested and time-proven. Together we establish the rules that lead to success, while at all times protecting Clients interests.. ACCELERATED MASTER PLANNING We believe a truly creative and vibrant facility can rise within the community while fulfilling the strategic needs of the Client. Our master planning methodology first provides clients with a fully considered approach to the development of the campus, taking into account business aspirations of institution. BENCHMARK CHART: Common Planned Use of Capital Source: Financing the Future Survey

Our work offer a quick and responsive facility scoping master planning solutions. It is to help the client who has operational challenges or expansion ideas establish a direction for facility and services development. This accelerated strategic master planning service provides the information need to move the facility in a strategic direction and to get their projects off the ground. We have developed an efficient method to quickly review and test issues regarding the next steps for the facility. We start with the client s business plan and goals. Then we look at the organization from a functional perspective. We also examine operational issues. In few sessions, we develop strategic project concepts for clients review, along with Phasing and rough order of magnitude Budgets: Discover the Facility Issues and Set Goals Develop project Concept Scenarios for Study and Evaluation Define project Scenarios, order of magnitude Budgets and Phasing Schedules The further outcome is confident planning applications for future development. Methodology we undertake is deeply influenced by its unique economic, historical, geographical, social, and environmental context; model on Healthy Urban Development. Also, our specialists affiliated with Joint Commission International JCI explore how best to ensure the accreditation, and to model on International Best practices for each project. With our progressive approach to the facility planning, there is a tremendous opportunity for us with an entrepreneurial spirit to develop the scenarios of optimal changes in facilities required by Practice Reinventions and Service Innovations.

. EXAMPLE: Strategic Master Plan CAPITAL PROJECT GOALS: o Develop scenarios of Short term, Mid-level and Moderate Investments o Update physical space to reflect MC s move into service line and physician as strategic drivers model. o Improve first impression of MC as Leading Medical Centre. o Remind Community MC s Clinical Excellence programs DELIVERABLES: I. Strategic Vision and Goals Statement(provided by MC) II. Existing Conditions Evaluation: - Updated Blocking & Stacking Diagrams - Departmental SF Matrix III. Future Growth Forecast: - Verify 3 Year Volume Projections provided by MC - Required # Beds and Procedure Room Matrix - Proposed Blocking & Stacking Diagrams (Reflecting future growth needs and expansion capabilities) IV. Meeting Image Improvement Needs: - Proposed improved Site Plan(w/ improved Entry points and Circulations) - Proposed improved Building Exterior Images - Proposed improved Interior Images - Proposed improved Signage V. Strategic Master Planning Option 1, Option 2, and Option 3 VI. Schedule Implications Comparison Matrix VII. Budget Implications Comparison Matrix

Today s dynamic and changing field of healthcare with a continuous stream of new technologies, protocols and consumer demands, in conjunction with the pressures for increased efficiency, require that healthcare providers constantly re-evaluate and renew their operations. In planning and designing facilities, we consider that we are designing for an uncertain future. Building too tightly to a current brief without consideration for future flexibility and adaptability will result in a building which is obsolete the day it is completed. We plan and design healthcare building that meet a complex set of technical and user requirements. Our proper integration of building services, medical technology, and support areas for staff, patient and visitors is central to the development of a successful clinical environment. Advances in medical practice have presented new opportunities to create facilities that provide for delivery of sophisticated care in a setting which is more reflective of the everyday experience of the community it is serving. A healthcare facility could be thought of as a city. A street system, both horizontal and vertical, which provides a clear sense of hierarchy and way finding for the population they serve. Key elements at its centre are designed to last a long time and planned for change, an expandability and adaptable framework to accommodate changing needs. As specialist in the planning and design of healthcare architecture, we bring a wealth of experience from the US as well as internationally. This permits us to both benchmark the planning and design of new facilities against past experience and to understand the physical implications of trends affecting the healthcare field. Some of these forces for change include a response to an aging population, a shift to ambulatory care with improved technology and the implications of greater consumer choice. As a resulting the importance of good planning and design, which includes aesthetics, is on the rise in all areas of healthcare projects.