1 WHITE PAPER Data Conversion Best Practices Thomas Maher and Laura Bloemer Senior Healthcare Consultants
2 Hayes Management WHITE PAPER: Data Conversion Best Practices Background Many healthcare organizations are migrating from one vendor s electronic medical record system (EMR) to another vendor s in an attempt to receive federal funding, improve their organization s performance and quality of care, and communicate more effectively with community physicians and ancillary care organizations. A system migration is a huge undertaking. One of the most complicated aspects of a migration is data conversion. Historical patient data must be moved to the new system, yet the new system most likely cannot receive the data in its present format. Therefore, the data must be extracted from the legacy system and transformed into a format that will work in the new system all while the healthcare organization continues to operate. Choices regarding which data is moved and how are made on a case-by-case basis. Which data should be moved to the new EMR? Which could be stored in a data warehouse? Should the legacy system be retained in a read-only state? Should we do chart abstraction? Scanning? For which charts? Which data is unusable, unnecessary, or otherwise does not have to be moved? In this paper, we provide a high-level overview of a conversion project, accompanied by best practices. The majority of the best practices are vendorneutral. However, we have included some that are specific to EpicCare Ambulatory EMR, as we have most experience in this area. As an Epic preferred partner, we sought and received approval from Epic for this content. It is important to establish up front that conversion projects are not linear, but iterative. All phases feed new information back to previous phases, which can then trigger changes throughout. This iterative process continues until each part of the conversion has successfully passed the testing stage. That said, Hayes conversion methodology is comprised of five phases as depicted in the graph below: 1) Discovery, 2) Requirements, 3) Build, 4) Test and 5) Go-live. Some of these phases overlap and timelines vary by organization. The following graph depicts these phases. Figure 1: Data Conversion Phases 2
3 Hayes Management Consulting WHITE PAPER: Data Conversion Best Practices Phase I Discovery The discovery phase sets the foundation for the entire project. It is important to be extremely thorough here as it will make the rest of the project progress more smoothly. Discovery activities include: Gathering initial data (i.e., workflows, data flows) specific to interfaces and data conversions Establishing project governance and project teams Determining the high-level scope baseline, project success metrics, roles and responsibilities, change control practices and document management Developing an initial project plan and drafts of the risk and communications plans Conducting preliminary analysis of existing documentation Analyzing the structure and content of all source conversion systems Reviewing and analyzing the target data model Conducting a validation assessment Best Practices: Discovery Assumptions: Delineate the project s dependencies such as the build, test environments, system resources for full volume testing, etc. Risks: Make a list of risks and their contingency plans. What would jeopardize your deliverables or schedule? (Some examples include: the build is not available as scheduled, late discovery of data issues, un-mappable data that cannot be loaded, etc.) Verify commitments from outside work groups. Diligence in this area will pay off in the long run. Service level agreements: Agreements need to be in place among different project teams for turning around decisions and resolving issues that affect the conversion effort. We highly recommend that service level agreements be put in place that specify expected timeframes. Data content issues: Plan for late discoveries of data content issues. Many are systemic in nature; others are random, resulting from arbitrary system usage. Good analysis can uncover the majority of these patterns prior to and during conversion design. However, some portion of these can be expected to go undetected until they are revealed in testing. Your plan and timeline needs to anticipate these challenges. Governance: Often referred to as an executive steering committee, this group s members should be comprised of decision makers from clinical, administrative and IT areas. They will be responsible for championing the conversion and providing the necessary senior leadership support. They will also be the ultimate arbiters of tough decisions. Define a charter to clarify the role of governance, and choose people who are respected and can together carry the message to and from all stakeholders. 3
4 Hayes Management WHITE PAPER: Data Conversion Best Practices Conversion and mapping teams: The project team requires a combination of people with clinical, technical and project management skills. Here are our suggested team roles: Clinical SME for the legacy system Data extraction SME/developer for the legacy system Interface engine SME/analyst(s) and developer(s) Conversion architecture SME Project management SME Issues and change control SME If you are migrating to EpicCare Ambulatory EMR, you will need EpicCare clinical SME(s) and analyst(s), and EpicCare Bridges SME/analyst(s). The data mapping team will be a conversion project sub-team. It should be comprised of: Data analyst/reporting specialist(s) to assist mappers Pharmacist & pharmacy tech. (medications, allergens and immunizations) Nurse(s) and/or coder(s) (problem list, procedures, other results, flow sheets, histories, directives, health maintenance, others) Radiology coding SME Laboratory coding SME Site SME(s) (providers, locations, document types, visit types, transcription types, preferred pharmacies, others) Phase II Requirements During this phase, detailed interface and conversion requirements are gathered and approved. All functional and technical requirements are documented. Formal requirement walkthroughs are conducted, and gaps are inventoried and addressed. Detailed design documents are the basis for walkthroughs; they receive preliminary approval in this phase. The initial test and cutover plans are created and specific processes related to the build and test cycles, defect resolution and testing sign-off are incorporated into the resulting requirements deliverables. Best Practices: Requirements Conversion architecture: Always look at the conversion of data from a legacy system in the context of three architectural components and their associated processes: 1) extraction of legacy system data; 2) transformation of data in the interface engine, and 3) insertion of the newly formatted data into the new system. The following diagram illustrates a simplified EpicCare conversion architecture using a big bang implementation approach. In a rollout approach, the design would be expanded substantially to include numerous real-time conversion interfaces that would need to run throughout the rollout period to transfer all manual entries from the legacy system. 4
5 Hayes Management Consulting WHITE PAPER: Data Conversion Best Practices Figure 2: Sample EpicCare Conversion Architecture (simplified) Specification sequence: We recommend the following sequence: 1) Work with your new EHR vendor s interface analysts to determine your interface strategy and tasks; 2) design the legacy data extract, and 3) analyze the interface engine transformation. The primary job of the interface engine in an Epic conversion, for example, is to transform the raw extract data into formatted HL7 messages that meet the detailed specifications appropriate for a transaction to be loaded into Epic by Bridges. Data mapping: Plan to deliver the EHR build based on the schedule needed for the conversion data mapping effort. Schedule the mapping effort based on mapping volume and complexity. Make sure you have the appropriate clinical and content expertise available to accomplish each data mapping. Data mapping in the EpicCare technical design: Data mapping works in unison with these primary components by mapping legacy data to EpicCare values in one of three ways: 1. We recommend using Identity, Epic s MPI module, as the first choice. It provides the ability to associate multiple Epic code sets with entries in an Epic master file. 2. Our second choice would be mapping tables in Bridges, Epic s interface module. Bridges tables can be configured so that while a transaction is passed through Bridges, Bridges can look up a value in a cross reference table and deliver the mapped value to the Epic system. 3. As a third choice, you can map tables in the interface engine. The MPI and Bridges tables should be used whenever possible. However, in the rare occasions that neither the MPI nor a Bridges table is available to do the mapping, the table can be built in the interface engine and the cross referencing performed before the transactions reach Bridges. 5
6 Hayes Management WHITE PAPER: Data Conversion Best Practices Design and execution sequence: Your go-live approach must be determined in the discovery phase as it affects design. Clinical design must come before technical design. Implementation design must be complete before conversion design. The build has to be complete to start the mapping process, and certainly before testing. Documentation: Document everything. There are countless decisions made during a conversion project. It is important to write them all down for easy access and reference. This includes: status reports, dashboards and other visual aids, discovery analysis and recommendations, preliminary and final conversion architecture design, detailed design specifications, data mapping analysis and final data mappings, decisions, design changes, issues and change orders. Detailed design specifications: It is highly recommended that you obtain input from people in many different areas of the organization so that each individual can contribute in his/her area of expertise. The final results of these individual analysis steps are then combined into a comprehensive set of specifications that become the detailed blueprints for building the conversions. Format: Many clients have standards for specification formats. Since there will be many specifications, it s important to enforce a standard so that all specifications are consistent. We recommend that the conversion team review the specification format with stakeholders to assure that all aspects of design are accounted for in the standard before the specification writing begins. Content: Every detail must be defined on a field-by-field basis. The specifications need to start with describing how the legacy data will be extracted and transformed, and end with a segment-by-segment, field-by-field HL7 specification that meets the new system s requirements. For conversions to EpicCare, data must have the ability to be loaded using a Bridges interface. Additionally, Bridges interfaces in Epic can behave differently based on variables referred to as profile variables. The specifications must indicate the profile variable settings required in each Bridges interface. It is important to have someone who is certified and experienced in Bridges to assist with profile variable decisions and implementation. Methodology and participants: The methodology for developing comprehensive specifications starts with an assessment of legacy system data content and determining how that content will reside in the new EMR. This initial assessment requires participants who know their respective systems from a user and a build perspective. Specification documentation should be updated and distributed after each design session. Each participant should keep up with reviews of the documentation to assure that everyone is on the same page. The importance of the collaborative nature of the design should not be underestimated. Ideally, this collaboration should include key stakeholders, including those with subject matter expertise on the current use of the legacy system and on the expected usage of the new EMR. Many conversion decisions depend on EHR implementation design decisions; it is during this conversion design stage that input from the new system s implementation design is critical. 6
7 Hayes Management Consulting WHITE PAPER: Data Conversion Best Practices Phase III Build The build phase begins as soon as the core architecture and planning tools are firmly established, which is prior to the completion of the requirements phase. Build phase activities include: Building, configuring, and unit testing all interface and data conversion initiatives. o Data extracts o Data transformation o Data loads Working with relevant third-party vendors to develop, test and implement components. Identifying, analyzing, tracking and reporting system and other related problems and issues as found. Maintaining specifications and other documentation when iterative design changes take place. Best Practices: Build Mapping prerequisite: A conversion requires early delivery of many components of the new EMR system, and therefore requires an iron clad agreement that the EMR build will be accelerated to meet the needs of the conversion (See Discovery Phase, Service Level Agreements). The build must be in place to allow legacy data to be mapped to the new system s structures. Without early delivery of the build, the mapping effort will stall the conversion testing effort while the build and mapping efforts catch up with the technical conversion effort. Mapping: There will be multiple versions of mapping documentation. It is important to manage these so that team members always have the latest version available to them. Mapping is never static. During the course of the conversion, new values will be used in the legacy system and the mapping effort needs to include mapping iterations to identify the new values and make the additions to the mapping tables. Some mapping is quite time consuming. For example, free text is not a primary option in Epic. We ve encountered instances where spelling, minor grammatical differences and errors have accounted for 90% of the mapping effort. Conversion design: In-depth analysis should precede design. It is important to know who will be using the new system. Analysis of the legacy EMR needs to be performed to understand the style and nature of the data. The conversion design needs to be based on the clinical record design coupled with a technical design that meets clinical and technical objectives. If you are migrating to EpicCare, remember that it is patient and encountercentric. Therefore, use patient, encounter and content-centric data design. Interface design: 7
8 Hayes Management WHITE PAPER: Data Conversion Best Practices Patient Demographics You ll need to determine the trusted source of your demographic data. This may be your legacy EMR, or it may be your ambulatory registration system. You will want the most up-to-date source that can be matched to the clinical data converted from the legacy EMR. You ll also want to consider how new and updated registration data will flow to the new EMR in real time once the initial registration conversion is complete. Encounters EpicCare is encounter-centric. It is our experience that most legacy EMR systems are not. Ultimately, what that means is that all chart data that gets loaded into EpicCare is associated with an encounter or visit. Patient contact or visit entries from the legacy EMR will not necessarily be an exact match to those in EpicCare. Appointments Again, for those converting to EpicCare, it is important to utilize the smallest number of encounter types during the conversion load, because the clinical data conversions that will follow the scheduling load will attempt to link the visit entries to the encounters loaded by the scheduling load. Also, during the clinical conversion, historical data from certain document types will be mapped to create specific encounters. For example, a phone encounter will not attempt to perform encounter matching and should always create a new encounter. Future appointments that are converted or that are sent to EpicCare via a real time interface will not create an encounter when they are loaded to EpicCare as an open appointment. The encounter is created when the patient checks in. Generally, an appointment conversion table that maps visit types to encounter types is set up to identify what encounter type will be created when the patient is checked in. Clinical content: This is the real essence of the patient chart and these conversions cannot be considered final until you have made decisions about the chart presentation that your clinicians are expecting. What tabs will appear in your chart review section? Which documents file to which tabs? What is the design of the print groups that display the clinical documents? Your organization could decide that specific transactions will not convert effectively and choose to not convert selected records and use abstraction to complete that portion of the chart. Stakeholder sign-off: It is important to get verification that technical design adheres to functional and clinical design needs. Get stakeholder sign-off on everything. Phase IV Test As requirements are finalized and the execution of the build phase progresses, the testing phase begins. This includes unit, data communications, integration and user acceptance tests. Results are evaluated against the agreed-upon success metrics and validation criteria and should continue until a full volume conversion is tested. All defects discovered during the testing phase follow the appropriate remediation process. During the testing phase, site staff should begin training on interface management and transaction remediation. 8
9 Hayes Management Consulting WHITE PAPER: Data Conversion Best Practices Best Practices: Test Full volume testing: Work with technical support to plan disc space. Build your testing schedule using estimated process times. Perform incremental tests at increasing volumes up to full volume. Test environments: You should have at least two: a primary test environment for incremental volume tests, and a secondary test environment for simulated production. All build updates must be promoted to these environments. Environment refreshes may be required. Tracking: Good testing requires good tracking. Use tracking tools to monitor testing progress, defect countdown, issue resolution, etc. Clinician sign-off: Testing is not complete until the clinicians sign off. Be unrelenting about quality in testing. Use an appropriate mix of electronic and human validation. (Electronic validation is optional. Human validation and signoff by clinical SMEs is essential.) Phase V Go-live There are two go-live options: rollout and big bang. The go-live approach will have been determined and planned in the requirements phase. The big bang conversion can be more challenging than a rollout conversion in terms of training and support resources. However, a rollout approach is technically more complex. Each go-live approach includes: Deployment Cutover support End user support Issue documentation and resolution Validation that the desired project outcomes were achieved Best Practices: Go-live The go-live is where all the work on build, conversion design, data transformation and interfaces come together and in a short time frame. The legacy system is going down and the new system is coming online. Data must continue to flow correctly. Conversion activities are completed just moments before interfaces are started and the system go-live released to the initial users. It is an intense time for the project teams and tight coordination is essential. Bulk and gap conversions: Bulk conversions sometimes take days to complete. As a result, a smaller bulk conversion is needed, often called a gap conversion, because it picks up the data while the bulk conversion is running and helps sync up conversions to the moment of the go-live. Sometimes there are multiple gap conversions that cover incrementally shorter time periods (six weeks, two weeks, two days) to sync up conversions to the go-live moment. As the final gap conversion ends, the interfaces must be started to assure that no transactions occur between the end of the conversions and the start up of the interfaces. 9
10 Hayes Management WHITE PAPER: Data Conversion Best Practices Big-bang vs. rollout: If the go-live approach is a big bang, the legacy system must be locked out to prevent any new transactions once the final gap conversion is complete. If the go-live approach is a rollout, there must be realtime conversion interfaces that transfer all new manual activity in the legacy system to the new EHR. These real-time conversion interfaces will be based on the bulk conversion designs, but must be designed specifically for this transfer of data during the rollout. Just as with all other interfaces, these must start as soon as the last gap conversion ends and then must continue to run until the rollout is complete and input to the legacy system is ceased. Summary A data conversion is a complex choreography of clinical, technical and strategic moving parts. It requires a methodology and the execution of best practices that ensure its cohesion and success. Data conversion is the key to a successful EMR migration, which can provide a healthcare organization with myriad opportunities for better outcomes clinically, operationally, and financially. About Hayes Hayes works with healthcare organizations to increase net revenue and improve patient experience. Hayes is ranked Top Professional Services Firm by KLAS,* and has received multiple Best in KLAS awards since Hayes is also ranked in Healthcare Informatics Top 100 and Inc Hayes consultants are subject-matter experts in IT strategic planning, revenue cycle improvement, system implementation, interoperability and business and clinical operational efficiency. Hayes also offers software solutions to improve efficiency and productivity. To learn more about Hayes services, visit or call us at * Source: Top 20 Best in KLAS Awards: Software & Professional Services. 10
How To Implement An Enterprise Resource Planning Program
ERP Implementation Program Key phases of ERP implementation: Analysis of the company existing or designing new business process descriptions Inventory of the company s existing formal workflows or designing
Implementing Your EHR
Implementing Your EHR Webinar Schedule Optimizing your EHR for Quality Improvement March 23 and 26 Session Objectives Apply best practices for system implementation Evaluate staffing needs for the EHR
Simplify Your Windows Server Migration
SOLUTION BRIEF: ENDPOINT MANAGEMENT........................................ Simplify Your Windows Server Migration Who should read this paper Windows Server 2003 customers looking to migrate to the latest
Six Steps to Achieving Meaningful Use Qualification, Stage 1
WHITE PAPER Six Steps to Achieving Meaningful Use Qualification, Stage 1 Shefali Mookencherry Principal Healthcare Strategy Consultant Hayes Management Consulting Background Providers can qualify for Stage
EMR Implementation Planning Guide
EMR Implementation Planning Guide A Ten-Step Guide to Planning for Successful Implementation of an Electronic Medical Record (EMR) System 1 Contents Purpose of this guide... 3 Step 1: Establishing the
Services. Hospital Solutions: Integrated Healthcare IT and Business Process Solutions that Achieve Breakthrough Results
Services Hospital Solutions: Integrated Healthcare IT and Business Process Solutions that Achieve Breakthrough Results Hospital Solutions Overview Hospital Solutions Backed by more than 20 years of strength
Copyright 2014 Clarizen. All rights reserved. United States: United Kingdom: Israel: France: www.clarizen.com
Clarizen s Advanced On-boarding Program is designed to ensure new enterprise customers adopt and deploy the Clarizen platform as quickly and smoothly as possible. Through the program, you'll benefit from
Successful EHR Change Management
Successful EHR Change Management Roles and responsibilities White paper Table of contents Executive summary... 2 Introduction... 3 Never underestimate the power of the people... 3 People... 4 From resisting
Consulting Project Recap West Virginia University Hospitals Epic Implementation
Consulting Project Recap West Virginia University Hospitals Epic Implementation Page 1 of 7 Project Overview WVUH s Epic implementation, named Merlin, was focused at integrating the electronic clinical
Training Programs for Enterprise-Wide Change
Training Programs for Enterprise-Wide Change Top Five Requirements for Programs that Deliver Prepared by VisionCor, Inc. 1 Contents Summary... 3 Before We Get Started... 3 Program Principles... 4 Business
KMS Implementation Roadmap
KMS Implementation Roadmap Sample Excerpt Prepared by: The Knowledge Compass, Inc. TABLE OF CONTENTS 1. EXECUTIVE SUMMARY 5 1.1 Overview 5 1.2 Project Goals & Objectives 5 1.3 Implementation Approach 5
Fixed Scope Offering for Implementation of Sales Cloud & Sales Cloud Integration With GTS Property Extensions
Fixed Scope Offering for Implementation of Sales Cloud & Sales Cloud Integration With GTS Property Extensions Today s Business Challenges Adopt leading CRM practices and stream line processes Take advantage
Understanding Data Migration Issues in Practice: Four HIM Strategies for successful EMR Replacements
Understanding Data Migration Issues in Practice: Four HIM Strategies for successful EMR Replacements SEAN WEST VP, HEALTHPORT DATA CONVERSION SERVICES Objectives Discover three key considerations to minimize
Effectively Managing EHR Projects: Guidelines for Successful Implementation
Phoenix Health Systems Effectively Managing EHR Projects: Guidelines for Successful Implementation Introduction Effectively managing any EHR (Electronic Health Record) implementation can be challenging.
Milestone Deliverables
Milestone Deliverables The Hands-On Approach To Implementing ERP Projects By Peter Gross Pemeco Inc. 416 Wood Avenue Montréal, Québec H3Y 3J2 Canada Pemeco Inc. Serving Business Since 1978 Table of Contents
Data Migration for Legacy System Retirement
September 2012 Data Migration for Legacy System Retirement A discussion of best practices in legacy data migration and conversion. (415) 449-0565 www.gainesolutions.com TABLE OF CONTENTS The Importance
A Guide to Choosing the Right EMR Software. A Guide to Choosing the Right EMR Software
A Guide to Choosing the Right EMR Software A Guide to Choosing the Right EMR Software Eight Important Benchmarks for Community and Critical Access Hospitals Eight Important Benchmarks for Community and
SEVEN WAYS THAT BUSINESS PROCESS MANAGEMENT CAN IMPROVE YOUR ERP IMPLEMENTATION SPECIAL REPORT SERIES ERP IN 2014 AND BEYOND
SEVEN WAYS THAT BUSINESS PROCESS MANAGEMENT CAN IMPROVE YOUR ERP IMPLEMENTATION SPECIAL REPORT SERIES ERP IN 2014 AND BEYOND CONTENTS INTRODUCTION 3 EFFECTIVELY MANAGE THE SCOPE OF YOUR IMPLEMENTATION
Project Implementation Process (PIP)
Vanderbilt University Medical Center Project Implementation Process (PIP).......... Project Implementation Process OVERVIEW...4 PROJECT PLANNING PHASE...5 PHASE PURPOSE... 5 TASK: TRANSITION FROM PEP TO
Galen Healthcare Solutions
Galen Healthcare Solutions Allscripts to Epic Conversion Q&A 7/10/2013 Embrace the new world of healthcare Agenda Introductions Benefits of a Conversion Different Types of Conversions Conversion Process
SharePoint Project Management: The Key to Successful User Adoption
SharePoint Project Management: The Key to Successful User Adoption Leanne M. Bateman, PMP Principal Consultant February 2012 www.beaconstrategy.com Table of Contents ABSTRACT... 3 ABOUT THE AUTHOR... 3
Enterprise Data Governance
DATA GOVERNANCE Enterprise Data Governance Strategies and Approaches for Implementing a Multi-Domain Data Governance Model Mark Allen Sr. Consultant, Enterprise Data Governance WellPoint, Inc. 1 Introduction:
Facilitated Workshops in Software Development Projects
Facilitated Workshops in Software Development Projects Members of an IT team spent a lot of time and effort working on the requirements for a major project. At the end of three weeks, they had produced
Introduction. Our world has been radically transformed by digital technology We live in an age of information where everything is a click away.
Introduction Our world has been radically transformed by digital technology We live in an age of information where everything is a click away. Medicine is an area full of information that has yet to fully
OE PROJECT CHARTER TEMPLATE
PROJECT : PREPARED BY: DATE (MM/DD/YYYY): Project Name Typically the Project Manager Project Charter Last Modified Date PROJECT CHARTER VERSION HISTORY VERSION DATE (MM/DD/YYYY) COMMENTS (DRAFT, SIGNED,
A Proven Approach for Successful Systems Integration
FIS POSITION PAPER A Proven Approach for Successful Systems Integration David Luttig FIS Consulting Services 1 800 822 6758 Introduction System integration involves integrating existing (often disparate)
Critical Success Factors of Project Management Planning
Critical Success Factors of Project Management Planning Kathy Schroeder, RN, PMP, Senior Director, Tenet Healthcare and Liz Coffey, PMP, Service Line Executive, Global Services DISCLAIMER: The views and
How To Design An Ehr System
The role of design in EHR systems Kevin Richardson received his Ph.D. in Cognitive Psychology in 1991 from the State University of New York at Buffalo. After two years designing interactive training systems
Revealing the Big Picture Using Business Process Management
Revealing the Big Picture Using Business Process Management Page 1 of 20 Page 2 of 20 Introduction In today s business environment, change is inevitable. Changes in technology, organizational structure,
Managing Successful Software Development Projects Mike Thibado 12/28/05
Managing Successful Software Development Projects Mike Thibado 12/28/05 Copyright 2006, Ambient Consulting Table of Contents EXECUTIVE OVERVIEW...3 STATEMENT OF WORK DOCUMENT...4 REQUIREMENTS CHANGE PROCEDURE...5
Draft Document STATE OF MICHIGAN. SACWIS Planning Department of Human Services Strategic Implementation Plan: Project Staffing
STATE OF MICHIGAN SACWIS Planning Department of Human Services Strategic Implementation Plan: Project Staffing Executive Summary The State of Michigan has dedicated integrated team of resources for the
Implementing Continuous Integration Testing Prepared by:
Implementing Continuous Integration Testing Prepared by: Mr Sandeep M Table of Contents 1. ABSTRACT... 2 2. INTRODUCTION TO CONTINUOUS INTEGRATION (CI)... 3 3. CI FOR AGILE METHODOLOGY... 4 4. WORK FLOW...
WHATEVER IT TAKES. Success Story Implementing a New EMR at Port Huron Hospital in Only 12 Months!
WHATEVER IT TAKES Success Story Implementing a New EMR at Port Huron Hospital in Only 12 Months! Building the New While Still Supporting the Old Port Huron Hospital (PHH) is a 186-bed medical complex with
PHASE 1: INITIATION PHASE
PHASE 1: INITIATION PHASE The Initiation Phase begins when agency management determines that a business function requires enhancement through an agency information technology (IT) project and investment
Business white paper. Successful EHR Change Management. Roles and responsibilities
Business white paper Successful EHR Change Management Roles and responsibilities Table of contents 3 Achieve the benefits of EHR 3 Never underestimate the power of the people 4 People 4 From resisting
SEVEN WAYS TO AVOID ERP IMPLEMENTATION FAILURE SPECIAL REPORT SERIES ERP IN 2014 AND BEYOND
SEVEN WAYS TO AVOID ERP IMPLEMENTATION FAILURE SPECIAL REPORT SERIES ERP IN 2014 AND BEYOND CONTENTS INTRODUCTION................................ 3 UNDERSTAND YOUR CURRENT SITUATION............ 4 DRAW
Project Knowledge Areas
From Houston S: The Project Manager s Guide to Health Information Technology Implementation. Chicago: HIMSS; 2011; pp 27 39. This book is available on the HIMSS online bookstore at www. himss.org/store.
BI Dashboards the Agile Way
BI Dashboards the Agile Way Paul DeSarra Paul DeSarra is Inergex practice director for business intelligence and data warehousing. He has 15 years of BI strategy, development, and management experience
The Electronic Medical Records (EMR) System Planning Requirements
The Electronic Medical Records (EMR) System Planning Requirements Purchasing an EMR can be a costly undertaking. It has been estimated that the cost of an EMR for an average three-physician practice can
Fixed Scope Offering for Oracle Fusion HCM. Slide 1
Fixed Scope Offering for Oracle Fusion HCM Slide 1 Today s Business Challenges Adopt leading Global HCM practices. Streamline the HCM processes and achieve measurable efficiencies. Achieve HR excellence
The Role of Design in the Design of EMR Systems
The Role of Design in the Design of EMR Systems By: Kevin Richardson, PhD The recent Healthcare Information and Management Systems Society (HIMSS) report, Defining and Testing EMR Usability: Principles
ASHP Professional Development Section Advisory Group. Professional Development Opportunities for Informatics Pharmacists
ASHP Professional Development Section Advisory Group Professional Development Opportunities for Informatics Pharmacists Introduction Many opportunities exist to help informatics pharmacists gain the knowledge
Agenda. Government s Role in Promoting EMR Technology. EMR Trends in Health Care. What We Hear as Reasons to Not Implement and EMR
Agenda A 360-Degree Approach to EMR Implementation Environmental Overview Information on the HITECH Stimulus Opportunities Hospitals, Physicians and Interoperability Preparing for an EMR Implementation
HOW TO GET STARTED WITH DATA MODELING
By Laura Brandenburg, CBAP Lesson Objective: After completing this lesson, you will understand the role of data modeling in the business analysis lifecycle and why it is important for business stakeholders
Pan-Canadian Nursing Electronic Health Record (EHR)Business and Functional Elements to Support Clinical Practice
Pan-Canadian Nursing Electronic Health Record (EHR)Business and Functional Elements to Support Clinical Practice Reference Document Canada Health Infoway 2014 Cindy Hollister CNIA July 17, 2014 Webinar
EMA Service Catalog Assessment Service
MORE INFORMATION: To learn more about the EMA Service Catalog, please contact the EMA Business Development team at +1.303.543.9500 or [email protected] The IT Service Catalog Aligning
ebook THE SURVIVAL GUIDE FOR MIGRATING TO A CLOUD- BASED CRM
ebook THE SURVIVAL GUIDE FOR MIGRATING TO A CLOUD- BASED CRM Table of Contents 03 04 06 08 09 10 12 INTRODUCTION PROJECT KICK-OFF & EFFECTIVE COMMUNICATION TRAIN, TRAIN, AND TRAIN AGAIN SELL THE PRODUCT
Project Team Roles Adapted for PAAMCO
Project Team Roles Adapted for PAAMCO Project Roles, Authority & Responsibilities Role a defined funciton assumed by or assigned to a person in the project Authority the right to apply project resources,
SharePoint Project Management: The Key to Successful User Adoption
SharePoint Project Management: The Key to Successful User Adoption Leanne M. Bateman, PMP February 2012 Leanne Bateman, 2012. All rights reserved. Table of Contents ABSTRACT... 3 ABOUT THE AUTHOR... 3
HOW TO USE THE DGI DATA GOVERNANCE FRAMEWORK TO CONFIGURE YOUR PROGRAM
HOW TO USE THE DGI DATA GOVERNANCE FRAMEWORK TO CONFIGURE YOUR PROGRAM Prepared by Gwen Thomas of the Data Governance Institute Contents Why Data Governance?... 3 Why the DGI Data Governance Framework
SafeNet Licensing Solution Design Workshop
Software Licensing Workshop: Strategy Design & Architecture Development Service Brief Benefits Expedite the license planning and design process: by taking advantage of SafeNet s license consulting expertise
Key Business Drivers. Copyright 2013, Oracle and/or its affiliates. All rights reserved.
1 Agenda Business Drivers The Solution Oracle Fusion HCM Hexaware s Offerings The Application Scope Hexaware s VELOCITY Methodology for Cloud Solutions Implementation Implementation Timelines Assumptions
Where to Begin? Auditing the Current EHR System
Chapter 1 Where to Begin? Auditing the Current EHR System After implementation, allow for a period of stabilization, so physicians and employees can gain more comfort using the electronic health record
Skatteudvalget 2014-15 (2. samling) SAU Alm.del Bilag 48 Offentligt. Programme, Project & Service Management Analysis
Skatteudvalget 2014-15 (2. samling) SAU Alm.del Bilag 48 Offentligt Programme, Project & Service Management Analysis Table of Content 1 Executive Summary... 3 1.1 Scope of Work... 3 1.2 Methodology for
Electronic Records / Clinical Information Systems (CIS) and Global Markets. November 2014
Electronic Records / Clinical Information Systems (CIS) and Global Markets November 2014 What is a Clinical Information System (CIS)? A Clinical Information System supports the integrated delivery and
Proven Practice Management and EHR Solutions
Proven Practice Management and EHR Solutions The Smart Choice to Enhance Office Productivity, Profitability and Care Quality Your small practice faces big challenges. Finding time and resources to prepare
Introduction. Architecture Re-engineering. Systems Consolidation. Data Acquisition. Data Integration. Database Technology
Introduction Data migration is necessary when an organization decides to use a new computing system or database management system that is incompatible with the current system. Architecture Re-engineering
Post-Implementation EMR Evaluation for the Beta Ambulatory Care Clinic Proposed Plan Jul 6/2012, Version 2.0
1. Purpose and Scope Post-Implementation EMR Evaluation for the Beta Ambulatory Care Clinic Proposed Plan Jul 6/2012, Version 2.0 This document describes our proposed plan to conduct a formative evaluation
TEN TIPS FOR A SUCCESSFUL INFOR IMPLEMENTATION
TEN TIPS FOR A SUCCESSFUL INFOR IMPLEMENTATION Copyright 2015 Panorama Consulting Solutions. All Rights Reserved. 720.515.1377 Panorama- Consulting.com Successfully implementing an Infor ERP system involves
empowersystemstm empowerhis Advanced Core Hospital Information System Technology Comprehensive Solutions for Facilities of Any Size
empowersystemstm empowerhis TM Advanced Core Hospital Information System Technology Comprehensive Solutions for Facilities of Any Size ADT / Patient Registration System + Fully Integrated Patient Registration
Countdown to ICD-10. Deborah Grider, CPC, CPC-I, CPC-H, CPC-P, CPMA, CEMC, CPCD, COBGC, CCS-P, CDIP Senior Manager. AMA Author
Countdown to ICD-10 Deborah Grider, CPC, CPC-I, CPC-H, CPC-P, CPMA, CEMC, CPCD, COBGC, CCS-P, CDIP Senior Manager AMA Author ICD-10 Implementation Guide, Make the Transition Manageable Principles of ICD-10-CM
14 TRUTHS: How To Prepare For, Select, Implement And Optimize Your ERP Solution
2015 ERP GUIDE 14 TRUTHS: How To Prepare For, Select, Implement And Optimize Your ERP Solution Some ERP implementations can be described as transformational, company-changing events. Others are big disappointments
EMA CMDB Assessment Service
The Promise of the CMDB The Configuration Management Database (CMDB) provides a common trusted source for all IT data used by the business and promises to improve IT operational efficiency and increase
Using Evidence-Based Search Marketing to Improve Results and Reduce Costs
Using Evidence-Based Search Marketing to Improve Results and Reduce Costs January 2011 Using Evidence-Based Search Marketing to Improve Results and Reduce Costs Introduction The pace of research and innovation
A. Waterfall Model - Requirement Analysis. System & Software Design. Implementation & Unit Testing. Integration & System Testing.
Processing Models Of SDLC Mrs. Nalkar Sanjivani Baban Asst. Professor, IT/CS Dept, JVM s Mehta College,Sector 19, Airoli, Navi Mumbai-400708 [email protected] Abstract This paper presents an
SALES AND OPERATIONS PLANNING BLUEPRINT BUSINESS VALUE GUIDE
Business Value Guide SALES AND OPERATIONS PLANNING BLUEPRINT BUSINESS VALUE GUIDE INTRODUCTION What if it were possible to tightly link sales, marketing, supply chain, manufacturing and finance, so that
Presenters: Laura Zaremba, ILHIE Acting Executive Director Ivan Handler, Chief Technology Officer Kevin Ferriter, InterSystems Corp, Program Manager
Presenters: Laura Zaremba, ILHIE Acting Executive Director Ivan Handler, Chief Technology Officer Kevin Ferriter, InterSystems Corp, Program Manager June 21, 2012 Every provider in Illinois has at least
ELECTRONIC MEDICAL RECORDS. Selecting and Utilizing an Electronic Medical Records Solution. A WHITE PAPER by CureMD.
ELECTRONIC MEDICAL RECORDS Selecting and Utilizing an Electronic Medical Records Solution A WHITE PAPER by CureMD CureMD Healthcare 55 Broad Street New York, NY 10004 Overview United States of America
Creating a national electronic health record: The Canada Health Infoway experience
Creating a national electronic health record: The Canada Health Infoway experience Presentation by Dennis Giokas Chief Technology Officer, Canada Health Infoway October 11, 2007 Overview The need for EHR
POLAR IT SERVICES. Business Intelligence Project Methodology
POLAR IT SERVICES Business Intelligence Project Methodology Table of Contents 1. Overview... 2 2. Visualize... 3 3. Planning and Architecture... 4 3.1 Define Requirements... 4 3.1.1 Define Attributes...
Electronic Medical Record (EMR) Request for Proposal (RFP)
Electronic Medical Record (EMR) Request for Proposal (RFP) SAMPLE Proposal Due: [INSERT DESIRED DUE DATE] Table of Contents SECTION 1 RFP INFORMATION... 2 I. Introduction... 2 A. Purpose and Background...
The Evolution of PACS Data Migration
Clinical Content Interoperability White Paper The Evolution of PACS Data Migration A Discussion of Current Migration Strategies Shannon Werb Chief Strategy Officer Chief Operating Officer Contents Introduction...
Legacy Epic for Affiliated Physicians
Legacy Epic for Affiliated Physicians Electronic Health Record Legacy Health Offering a complete automated solution Legacy Health is offering private practice physicians a complete solution: Legacy Epic
EHR Meaningful Use Stages 1 and 2. What They Mean To You. Pat Wolfram
EHR Meaningful Use Stages 1 and 2 What They Mean To You Pat Wolfram What We ll Cover Update on Meaningful Use Stages 1 and 2 EMR Trends and Learnings During MU Stage 1 But It s Really More Than Just Meaningful
Business Continuity and Disaster Planning
WHITE PAPER Business Continuity and Disaster Planning A guide to preparing for the unexpected Robert Drewniak Director, Strategic & Advisory Services Disasters are not always the result of high winds and
Epic Implementation Guide for a Multi-Hospital Install
Epic Implementation Guide for a Multi-Hospital Install There is no doubt that installing Epic s systems within a single hospital can be a complicated process, but when you are an organization that is planning
Section 7 RFP reference: 7.2.7 Quality Assurance, Page 64
Section 1 Transmittal Letter Section 2 Introduction (Executive Summary) Section 3 Summary of the Bidder s Understanding of the Project Scope Section 4 Bidder s Products, Methodology, and Approach to the
SDLC for outsourced customized software development
SDLC for outsourced customized software development Introduction The opening up of the world's economy has resulted in a lot of changes in the way an enterprise tackles its Information Technology (IT)