The Dalian Developer A new approach to oil spill response



Similar documents
Goliat Produced Water Management

Stena S ,200 DWT Product/Chemical Tanker CONQUEST CONQUEROR CONCORD CONCEPT CONSUL CONTEST

Building an LNG driven vessel. LNG developments at Meyer Werft Viking Grace 18_09_2013

5.5 Offshore Platform Production

Shwe Yee Htun-1: Final Environmental Monitoring Report. Status: Final Draft

AN INNOVATIVE SOLUTION FOR FIXED OFFSHORE LNG REGASIFICATION TERMINALS

SSP Offshore. Well Containment. April 2011

Pandora FLNG Wison Offshore & Marine

Deepwater Horizon Accident Investigation Report

LNG as Ship Fuel. Effects on Ship Design, Operations and Supporting Infrastructure

TECHNICAL INFORMATION

MERMAID FLEET PROFILE SUBSEA SERVICES

Engineering and technologies Floating LNG

An Approach To Oil Spill Containment For Floating Drilling Operations In Canadian Beaufort Sea Pack Ice Conditions

GE Measurement & Control. Offshore Platforms & FPSOs Bently Nevada* Asset Condition Monitoring

Total Subsea Solutions

Lessons from Offshore Accidents

LEISTRITZ PUMPEN GMBH. Leistritz Screw Pumps & Systems. Cargo and Liquid Handling

Master Class. Electrical and Instrumentation (E &I) Engineering for Oil and Gas Facilities

OFFSHORE FIELD DEVELOPMENT

WASHING PROCESS OF CARGO TANKS ON TANKERS FOR TRANSPORTATION OF CRUDE OIL

Nautilus Minerals. presentation to AFTP. Paris, October

Training for Operations and Maintenance

Chemical Feed System Operation and Design Considerations

APPROVED. PXP 2009 Tank Leak Detection and Containment at Inglewood Oil Field. Baldwin Hills CSD Conditions L.18. and E.29.e.

Measurement & Analytics. VIS Multiphase Flow Meter High gas content applications solved with no radioactive source - Measurement made easy

Maritime Human Resources Solutions Seminar. Robert Cadigan President & CEO Newfoundland & Labrador Oil & Gas Industries Association

Offshore Structures. Offshore Drilling Equipment

TANKLESS WATER HEATER INSTALLATION DIAGRAMS

FLOWBACK & PRODUCTION TESTING SERVICES

Maersk Resilient. Maximised drilling efficiency and uptime. Optimised for concurrent activities

Case Study of Emergency Disconnect Sequence in the Gulf of Mexico

Our recent customers Siemens / Statoil and Bard Offshore have experienced this. References on request.

Asset Management Conformity Assessment Fitness for Service QHSE. Oil & Gas Services and Tools. For the benefit of business and people

12 November 2008 *** I:\CIRC\MEPC\01\642.DOC INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR

Fire Protection Pumps

Enhanced Hydrocarbon Recovery Via Proven & Safe Chemical Tank Cleaning

Single Point Mooring System (SPM) for an Offshore LNG Terminal

HPHT CAPPING STACKS AND NEW TECHNOLOGY FOR SUBSEA WELL CONTROL. December 3, 2014 Presenter: Mike Cargol

Liquefied Natural Gas (LNG)

Water Treatment for Flooding with Lower Salinity than Formation Water

77 ILLINOIS ADMINISTRATIVE CODE, PART 890 (NEW) ILLINOIS PLUMBING CODE (02/04) SUBPART I: WATER SUPPLY AND DISTRIBUTION

Ethanol Vehicle and Infrastructure Codes and Standards Citations

Application of Nuclear and Aerospace Industry Experience to Offshore Barrier Integrity Management

Tanker Officer Training Standards (TOTS) 4B Chemical Tanker Simulator Verification Course

Allianz Global Corporate & Specialty Global Energy

Deepwater Horizon Summary of Critical Events, Human Factors Issues and Implications

HELI-DECKS & HELI-PORTS

Competency Framework for Marine Engineer Class 6. Competency Framework for Marine Engineer Class 6

Supply, storage and handling of LNG as ship s fuel Björn Munko LNG 17, Houston

Comparison of Spherical and Membrane Large LNG. Carriers in Terms of Cargo Handling

Refinery Equipment of Texas. Mini - Refinery Feasibility Overview

Element D Services Plumbing

Offshore Deployment SYNOPSIS

Guidelines for FEASIBILITY STUDY

TABLE OF CONTENT

Marine Transportation of Compressed Natural Gas

Worldwide Engineering centers in the Middle East

Analysis of the Deepwater Horizon Accident in Relation to Arctic Waters

Fuel Treatment and Conditioning Systems

GAS FLAWLESS - FORM C

5.2 Transportation And Marketing Of Petroleum Liquids General

Recently Completed Projects - Storage Projects

AGR Consultancy Worldwide opportunities. Recruitment and consultancy solutions

EMERGENCY VESSELS BLOWDOWN SIMULATIONS

Competitive Edge through System Engineering

Session 2: Hot Water Supply

MEK4450. Templates & Manifolds. 29 August Templates and Manifolds. This module will cover:

Drilling Rigs and Well Technology. RAPID RIGS AND WELL TECHNOLOGY Cairn India Limited.

NFPA : Basic Requirements for Storage Tanks

Unsteady State Relief Valve Evaluation. External Pool Fire Scenario

DRILLING PRODUCTS AND EXPERIENCE

EQUIPMENT HIRE SERVICES. Preparedness through customised and cost effective oil spill response equipment solutions

This document, and more, is available for download from Martin's Marine Engineering Page -

TANKER - SHORE SAFETY CHECK-LIST

Shale Energy Fluids Management Practices

COMPLIANT LOGISTICS FOR THE OIL & GAS INDUSTRY

PLANT LOCATION AND LAYOUT

THE BALTIC SEA OFFSHORE PROJECTS

(2) Various fire sections enclosed by various classes of fire divisions; (3) Arrangement of fire detectors and manual fire alarm stations;

Liquefied Petroleum Gas Volume 1 : Large Bulk Pressure Storage & Refrigerated LPG

The role of technology and knowhow in the sector

Facility Support Services

Havbunnsproduksjon. NTNU, 15 april 2013 Eldar Lundanes System Responsible for Controls and Data Management, Eastern Region.

AUTOMATIC TANK CLEANING (ATC) LITE On-the-fly automatic tank cleaning and recycling technology

Comparison of Steel Tubes and Thermoplastic Hoses in Umbilical Service

How To Make A High Co 2 Gas Blend

Advances in Arctic Oil-Spill Mitigation, Response Measures and Clean-up Techniques

innovation quality reliability

Mechanical Seal Piping Plans

GE Oil & Gas. Industrial modules. Turnkey power-generation and compression solutions to increase efficiency, reliability & power in restrictive areas

The Competitive Edge. The Foundation For Competing

API Std 53 - Blowout Prevention Equipment Systems for Drilling Wells Last update: August 12, 2015

WATER SUPPLY SYSTEMS FOR 150/5220-4B AAS-100 AIRCRAFT FIRE AND RESCUE PROTECTION

Dry Chemical Systems TWIN AGENT CAPABILITY

OFFSHORE WIND Peter Robert

Full scale tunnel fire tests of VID Fire-Kill Low Pressure Water Mist Tunnel Fire Protection System in Runehamar test tunnel, spring 2009

Floating. Diesel power stations

Case Study: Sand Removal from 3 Phase Production Separators and Vessels

Grain Capacity: No Hold name Hold C.B.M. ULUSOY-11

Transcription:

The Dalian Developer A new approach to oil spill response Presenter: Jim O Sullivan, Vice President Technip USA National Ocean Industries Association Scottsdale, Arizona, October 18, 2012

Contents Introduction to the Dalian Developer (DD) drillship The challenges of oil spill response The DD solution Conclusions 2

DD Introduction Will be the World s largest drillship when completed early next year Motion characteristics equivalent to or better than 6 th generation semi in head seas. Double hull structure built to DNV ICE class C. Identical bow and stern sections for +/- 90 heading change. 2 moon-pools (one for drilling, second for subsea work and production). Equipment / systems modularized and elevated above tank top less integration. Accommodation upgradable to 240 men. Large available deck space (5000sqm) for Extended Well Testing (EWT), Early Production System (EPS) and spill containment equipment. Large storage capacity 1million bbls - for oil, methanol & chemical dispersants, etc. General Particulars: Basic Design: Detailed Design: Class: LOA: Breadth: Depth: Drilling Draft: Displacement: Water Depth: Drilling Depth: Transit Speed: Accommodation: Crude Oil Storage: Variable Deck Load: INOCEAN COSCO DNV DP3 291.25 m 50.00 m 27.00 m 13.00 m 240,750 mt 3,050 m 10,670 m 12 knots 180 men 1,000,000 bbls 32,000 mt 3

Challenges of oil spill response many vessels 4 Macondo scheme Challenges due to many vessels: Availability Coordination Response time Splitting of flow

Opportunity to replace multiple vessels with one main vessel Macondo oil capture scheme DD scheme (Compatible with current Subsea capture & Containment Systems) 5

Global needs for oil spill response Primary Secondary Each deepwater basin in the World will require a contingency plan for oil spill response. The Dalian Developer offers an economically viable solution which could lead to the deployment of multiple units across the World s main offshore deepwater basins. 6

DD EWT and Oil Capture Philosophy Provide an Oil Capture facility that is also an EWT system Oil Capture facility sized for: 100,000bpd total fluids 100k Oil or 70k Oil + 30k water 200mmscfd gas flaring *All safety spec compliant EWT sized for: 30,000bpd Oil, 30% WC Heavy Oil Capable to 17API All export spec compliant 7 * Export crude may exceed salt specs

This image cannot currently be displayed. DD EWT and Oil Capture Process Scheme 8

DD EWT and Oil Capture Process Scheme Two stages of separation plus electrostatic coalescer Heat recovery to minimise heat input Crude washing in EWT mode to meet salt specs (if required) Produced water treatment by hydrocyclones and compact degasser / floatation unit Product oil spec in EWT mode: BS&W < 0.5%vol Salt 10ptb RVP < 12psia Produced water overboard spec: 20-30 mg/l (in both EWT and Oil Capture modes) 9

This image cannot currently be displayed. Process module layout Production Module Upper Level 11 Production Module Lower Level Production Module Elevation (also showing flare tower and offloading hose-reel)

DD EWT and Oil Capture - Utilities 12 The following utility systems are provided topside to support the process facilities: Gas and Fire Detection and Fighting system Methanol pumping / injection Flare System (Flare stack height: 50m plus water screen): 1 MP Flare system 1 LP Flare system Flare ignition package The following utility systems are provided by the vessel to support the process facilities: Electrical Power for heating and pumps (main power system rated at 58MW) Compressed air for instrumentation and controls / hand tools Seawater for process cooling (direct SW only) and deck washdown Firewater for deluge / monitor coverage of process facilities Fresh water for desalting and chemical dilution Potable water for safety showers and eyebaths

DD EWT and Oil Capture Vessel Systems Oil Cargo Tanks and associated cargo pumps Rundown header for tank filling Pump discharge piping with COW (crude oil wash) Tank heating (2x 100% thermal boilers plus tank coils) Tank vent system - incl Inert Gas Generator & P/V valves Offloading System incl metering (ultrasonic) and offloading hose Slop oil system (two dedicated tanks with associated piping / OIW monitoring) Firewater / Foam system for deck coverage (above oil storage tanks) Methanol and Dispersant bulk storage 13

Dalian Developer Layout Flare tower Process package Offloading hose 14

Summary of DD attributes - general Ultra-deepwater, 6 th generation, DP3 drillship Oil Spill Emergency Response & Containment o Capture, process and store well flow o Drilling relief wells o Emergency subsea intervention o Mother-ship / command-center Warehouse Logistics Offshore Hub o Lower dependence on supply chain o Serve multiple vessels in remote offshore areas Extended Well Testing with more reliable reservoir data / history Early production achieving early cash flow Simultaneously drilling & production: o Drilling appraisal wells while testing o Drilling development wells while producing Intervention & Subsea installation works Dual gradient drilling & underbalanced drilling 15

Summary of DD attributes for oil capture A unique concept: the DD is the only mobile drilling unit in the world large enough to capture, process & store oil spills in excess of Macondo s flowrate Safe, simple & reliable: this single asset solution means reduced interface complexity (operations / logistics / communications / procedures / flow splitting issues) compared with the multi-asset system used for Macondo Only tried & tested systems and technologies are used on the DD Rapid response time: limited time needed to disengage from active drilling and transit distance to spill site. The unit has a 12 knot transit speed Suitable as emergency operations hub or command centre: thanks to her size and excess capacities (storage / accommodation / power) High weather resistance: the DD s hull size, motion characteristics and full DP3 system enable her to operate safely even under harsh weather conditions in virtually all major drilling basins worldwide 16

Summary of DD attributes for oil capture The production system is permanently installed and requires no mobilization / commissioning hence response time is significantly reduced Since the system is regularly used for well testing there will be more confidence in it performing its oil capture duty when required On board storage of bulk methanol and dispersant chemical simplifies logistics and avoids the need for subsea storage and injection packages Superior economics: as a fully functioning drillship with Early Well Testing / Early Production System capabilities, her earnings capabilities in normal mode should ensure an attractive return on total investment The unit is under construction: it can therefore be ready for deployment much sooner than a newbuild unit 17

18 Current status of DD

Conclusion The DD is ideal to act as an EWT and Oil Capture capable vessel The EWT system has been optimally designed to minimise the cost of the Oil Capture capability Technip has the capability to design and deliver the complete EWT and Oil Capture system Technip is involved in both MWCS and Total WA initiatives 19

Thank you CONTACTS Global Well Response Ltd Technip 77 Robinson Road #30-02 89 avenue de la Grande Armée Singapore 068896 75773 Paris Cedex 16 France Jonny KLEPSVIK Brian ROBERTS Phone: +65 9647 5662 Phone: +33 (0) 1 47 78 25 37 E-mail: jonny.klepsvik@dvbbank.com Email: baroberts@technip.com www.globalwellresponse.comnip.com 20