Demo Permit Guide For Homeowners

Similar documents
Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act.

Small Business Permit Service

BUILDING APPLICATION CHECK LIST

Requirements to Obtain a Building Permit for a NEW HOME. 1. Completed application form. (Boxes A, B, C, D & E if applicable F and I)

A Building Permit Guide For Homeowners

A HOMEOWNERS GUIDE TO BUILDING PERMITS

Building Permit Application

A HOMEOWNERS GUIDE TO BUILDING IN GREY HIGHLANDS

Guide to Preparing a Quality Management Plan for Registered Code Agencies (under the Building Code Act, 1992 and Building Code )

April 2, 2007 TO: BUILDING CODE USERS

Building Permit Application

TOWN OF RAYNHAM APPLICATION FOR COMMERCIAL BUILDING PERMIT

OWNER BUILDER AS AN WHAT ARE MY RESPONSIBILITIES UNDER THE DEVELOPMENT ACT 1993

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

Building FAQ s. Answers to Frequently Asked Questions about Building & the Building Permit Process

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

Central Area Community Improvement Plan

Municipal Affairs. Property Tax: Adding Amounts to the Tax Roll

BUILDING PERMIT APPLICATION FOR NON-COMPLEX BUILDINGS

INFORMATION SHEET Lambton Renovates Program for Homeowners

THE CORPORATION OF THE TOWNSHIP OF SEVERN BY-LAW NO

HERITAGE PROPERTY TAX RELIEF PROGRAM GUIDELINES & APPLICATION Community Services Department Planning Division

BUILDING MOVE PROCESS INSIDE CITY LIMITS

City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas Phone: (830) Fax: (830)

Basement Flooding Protection. Subsidy Program. Information and Application. For more information:

Check Off (Below) Information That Is Submitted With Permit

A Guide for the Homeowner/Builder

SERVICE LAW FIRM. 78 Mary Street, P.O. Box 40, Stn. Main, Barrie, Ontario, L4M 4S9 Phone.: (705) , Fax.: (705)

ASBESTOS, DEMOLITION OR RENOVATION, SANDBLASTING, AND GRINDING STANDARDS

A Guide to Building Permits for Home Owners / Renovators. Address: 1 Carden Street Guelph, Ontario N1H 3A1

Basement Flooding Loan Program Resulting From a Sanitary Sewer Backup

Development Services Guidelines

SCHEDULE F HOME WARRANTY INSURANCE POLICY

NEW HOME CONSTRUCTION

Knock Down Rebuild. Building Process Building process - knock down rebuild 1

HATFIELD TOWNSHIP DEMOLITION PERMIT APPLICATION PROCEDURES

TOWN OF SPENCER Office of Development & Inspectional Services

FREQUENTLY ASKED QUESTIONS: 1) Q: When is a building permit required?

Administrative Procedures Regarding the Application of Flood Damage Prevention

DATE: June 9, 2014 REPORT NO. CD Gregory Dworak, General Manager, Community Services

A Homeowner s Guide to Building Permits

CITY OF ST. CA THARINE S. cn- Olc.4 BY-LAW NO. WHEREAS the Council of the Corporation of the City of St. Catharines, is

DEVLOPMENT APPLICATION PROCEDURES

REQUESTS FOR ANY INSPECTION MUST BE 24 HOURS IN ADVANCE.

Town of Clinton MECHANICAL/SHEET METAL PERMIT 242 Church Street, Clinton MA Tel: (978) Fax: (978)

Environmental Guidelines for Preparation of an Environmental Management Plan

Commercial Construction Permit Application

BUILDING/PLUMBING PERMIT APPLICATION REQUIREMENTS

City of Miramar Building Division

REAL ESTATE SELLING YOUR HOME

KAWERAU DISTRICT COUNCIL General Bylaw Part 9: On-site Wastewater Disposal Systems (2010)

CONTRACTOR INDUCTION HANDBOOK

Development Variance Permit Application Package

HERITAGE BUILDING REHABILITATION PROGRAM

CITY OF SURREY BY-LAW NO. 6569

PERMIT APPLICATION FORM SELECT ALL THAT APPLY: BUILDING DRIVEWAY ELECTRICAL PLUMBING HEATING DEMOLITION SIGN MOBILE HOME

SUBDIVISION AND DEVELOPMENT REGULATION

Professional Engineers Providing Services for Demolition of Buildings and other Structures

Moving a House in Pasadena

CHAPTER 150: BUILDING REGULATIONS. Adoption of Regulatory Codes by Reference

(House and Land) Approved by the Nova Scotia Real Estate Commission for use by Industry Members under the Real Estate Trading Act.

Drainage By-law. WM-4 Consolidated April 18, This by-law is printed under and by authority of the Council of the City of London, Ontario, Canada

Request for Quote Number: PRC Baseball Diamond Backstop Re-Fence

Practice Note

Depending on the nature of your project, below is a checklist of what this office requires. Make sure you include your .

Control filling, grading, dredging, and other development which may increase erosion or flood damage; and

On Site Sewage System Maintenance Inspections. March Building and Development Branch Ministry of Municipal Affairs and Housing

THE CORPORATION OF DELTA ENGINEERING CONSULTANT PROJECT PROCEDURAL MANUAL

HOME WARRANTY INSURANCE REGULATION

THE CORPORATION OF THE CITY OF MISSISSAUGA FIRE & EMERGENCY SERVICES FEES AND CHARGES BY-LAW

WHS Contractor Management Procedure

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

BY-LAW NUMBER OF THE CORPORATION OF THE CITY OF STRATFORD

Shed Application Package

SUMMARY D.I.Y. HOMEBUILDERS GUIDE

PLEASE NOTE. For more information concerning the history of these regulations, please see the Table of Regulations.

City of Myrtle Beach Construction Services Department Ph: Fax: Moving Permit Requirements

DEMOLITION PERMIT CHECKLIST* B.H.M.C. Section

Building Permit Information House Relocation

Time/Date Stamp when received:

Construction Permit Application Instructions Instructions for completing Construction Permit Applications and Technical Sections are as follows:

CITY OF YORBA LINDA P.O. BOX CALIFORNIA

Botetourt County, Virginia. Frequently Asked Questions

TOWN OF JUNO BEACH 340 Ocean Drive Juno Beach, FL Phone: (561) Fax: (561)

Frequently Asked Questions About Septic System Maintenance Inspections

THE CORPORATION OF THE CITY OF COURTENAY BYLAW NO A bylaw to amend Storm Sewer Bylaw No. 1402, 1986

Appendix 8 Providing Pre-construction information and check list (Regulations 10)

By-law to Regulate Vacant Buildings

TOWN OF OHIO BUILDING PERMIT APPLICATION

Industrial, Commercial, Institutional and Multi Use Residential

TENT AND STAGE CUSTOMER ASSISTANCE GUIDE

BUILDING OR RENOVATING

APPLICANT / CONTACT:_

Fill out all sections or mark with N/A (not applicable)

Development Services Department Building Permit & Inspection Services Shed and Garage Construction Guide for Detached and Semi-Detached Dwellings

THE CORPORATION OF THE MUNICIPALITY OF POWASSAN BY-LAW NO

VILLAGE OF RADIUM HOT SPRINGS Telephone Box 340 Facsimile

INTRODUCTION Purpose Policy Exception for Short-Term Workplace Visits Relevant Legislation and Regulations...

UNDERGROUND OIL STORAGE TANKS

Residential Building Permit Guide

Transcription:

Demo Permit Guide For Homeowners Building Services Tel: 705-436-3710 ext. 3504 or 3506 Fax: 705-436-7120 2101 Innisfil Beach Road, Innisfil, ON L9S 1A1 Website: www.innisfil.ca

A Demo Permit Guide for Homeowners March 2013 WHY DO I NEED A PERMIT? Demolitions require demo permits to ensure public and personal safety. The standards for removing a structure are contained within the Ontario Building Code. The Building Code is Provincial Regulation administered by the Housing Development and Buildings Branch of the Ministry of Municipal Affairs and Housing. Under the Building Code Act, local governments are given authority for the enforcement of the Ontario Building Code. The Ministry of Municipal Affairs and Housing maintains a web site which contains useful information about the Ontario Building Code at www.obc.mah.gov.on.ca. It is the homeowner s responsibility to ensure that a demolition permit is obtained when required prior to demolition. WHEN DO I NEED A PERMIT? The following is a list of when building permit is required for a demolition: Demolishing a structure larger than 10m² AS A HOMEOWNER WHAT DO I NEED TO KNOW? If you are the homeowner and plan to demolish an existing residence there are two (2) major areas that you need to be aware of before making your application. The only two people that are able to apply for a demolition permit are: The property owner on title An authorized agent of the property owner listed on title 1. Conservation Authority Approval You may be demolishing something with in a prescribed distance of a flood plain. Lake Simcoe Region Conservation Authority and Nottawasaga Valley Conservation Authority may have legislation in place that requires their approval. You would need to get approval from the appropriate Conservation Authority before your submission for a permit is deemed complete.

2. Complete Submissions A Demo Permit Guide for Homeowners March 2013 When you are ready to make your application, you will be asked to make a declaration regarding a Complete Submission. By declaring a complete submission, you are telling us that you have completed all of the forms required by the for demolition, including information on your disconnects from utilities, questionnaire about the property, type of building to be demolished and the type of demolition process being used, and your drawings are complete and meet all the requirements set out in our Building Bylaw and Building Code regulations, and that you comply with all Applicable Law. When you declare you have made a complete submission, we are bound by the new legislation to either issue your permit or give you a complete list of deficiencies within a prescribed time period. OTHER APPROVALS In addition to a building permit, you may require other approvals. Our Building Services staff will let you know which approvals are necessary. Some common approvals are listed below: 1. Lake Simcoe Region Conservation Authority Lake Simcoe Region Conservation Authority approvals may be required if your property is located in a flood plain or is adjacent to any watercourse. You can contact the Authority at 1-800-465-0457or www.lsrca.ca. 2. Nottawassaga Valley Conservation Authority Nottawassaga Valley Conservation Authority approvals may be required if your property is located in a flood plain or is adjacent to any watercourse. You can contact the Authority at 705-424-1479 or www.nvca.on.ca. 3. Site Alteration Permit If your property is larger than ½ hectare you may be required to apply for a site alteration permit as per By-law 118-07, building staff will be able to assist you with any questions you may have with this process. 4. Ministry of the Environment -MOE When you demolish you may be required to decommission a well or a septic system or if you are proposing to relocate the debris from the demolition site to another site you may require consent from the Approvals Branch of the Ministry of the Environment (MOE) under the Ontario Environmental Protection Act. You may contact them at 705-739-6441 or 1-800-890-8511for more information.

A Demo Permit Guide for Homeowners March 2013 5. Ontario Ministry of Labour In accordance with the Ontario Occupational Health and Safety Act and Regulations (OHSAR) it is the responsibility of the building owner to ensure the safety of workers from hazardous materials. A detailed survey to determine the types and conditions of hazardous material shall be carried out and provided to the Contractor prior to demolition. For further information, contact: Ontario Ministry of Labour Industrial Health and Safety Branch 2275 Midland Ave, Unit 1 Scarborough, Ontario M1P 3E7 Tel: 416-235-5330 Fax: 416-314-5405 PREPARING YOUR APPLICATION Prepare drawings which accurately illustrate the site of demolition that you propose. SITE PLAN A siteplan (the bird s eye view of the property) will need to be submitted with your application. A site plan identifies buildings and other features in relation to property boundaries. The site plan should identify your existing house and proposed changes. Most of the information required for a site plan can be found on your property survey. You may have received one when you bought your home. If not you may need to hire a surveyor. Please contact the Association of Ontario Land Surveyors at 416-491- 9020, Toll Free 1-800-268-0718 or www.aols.org/home.asp. The following information should be shown on the site plan: Title and scale North arrow Overall building dimensions of all structures on the property Location and dimension of structure to be demolished Property lines and dimensions Existing septic system/ existing well Rights-of-way and easements Setbacks to all property lines from existing and proposed structures Street Name Location of Overhead Power Lines

A Demo Permit Guide for Homeowners March 2013 RELEVANT DETAILS AND DOCUMENTATION All town forms shall be completed and submitted with the application and site plan. SUBMITTING MY APPLICATION A building permit application is available at www.innisfil.ca or at the Town Hall, Customer Service, 2101 Innisfil Beach Road, Innisfil, Ontario, L9S 1A1. If you would like a form emailed or faxed to you please call Building Services at 705-436-3710 extension 3504 or 3506. Your completed application package should be brought to Customer Service during working hours Monday to Friday between 8:30 & 4:30. If you have any questions the Permit Processor will walk you through your application package to ensure that it has all of the following components: An example of a Complete Building Permit Application: 1. Two sets of fully dimensioned and scaled site plan. 2. A building permit fee in cash, Interac or cheque payable to the. The fees are determined by staff at Building Services and are based on the fees, determined in the Fees and Charges By-law. The fee will be calculated by the Building Services Department. 3. Permit Application to Construct or Demolish must be fully completed (all fields filled in). 4. Plans / information submitted must comply with the Ontario Building Code. 5. Must be in compliance with applicable laws. 6. Applicable Agreements must be executed, such as Site Plan Control, Committee of Adjustment and Subdivision Agreement or any other agreement. Please note when a complete application is submitted to Building Services, your plans will be reviewed and you will receive a response within the timeframe stipulated by the Province as to whether your permit will be issued or denied. WHAT HAPPENS NEXT? After the Permit Processor has reviewed your application and considers it complete, it is reviewed by Building Services. In Ontario a complete permit application must be reviewed within a prescribed time period starting the day after Building Services deems it complete.

A Demo Permit Guide for Homeowners March 2013 Each application will be thoroughly reviewed and will receive either: 1. a request for additional information listing out specific items, these items must be fulfilled prior to the continued processing of your application. 2. a call / email to you to let you know if your permit is ready and you may come in and pick it up, you will also be made aware of any adjustments to the fee calculations. Note : A Permit is not considered issued until the applicant has picked it up. INSPECTIONS When you pick up your permit package the following items will be enclosed: 1. A signed copy of your building permit with the prescribed inspections on the reverse. 2. The stamped Customer Copy of your plans/drawings. You may be required any or all of these prescribed inspections: Final (site must be cleared of all debris) Inspections maybe booked with two business days advanced notice by calling Building Services (705) 436-3710 ext 3504.

Application for a Permit To Construct or Demolish This for is authorized under subsection 8(1.1) of the Building Code Act Application number: Date received: For use by Principal Authority Permit number (if different): Roll number: Building Department 2101 Innisfil Beach Road, INNISFIL, ON L9S 1A1 Tel : 705-436-3710 1-888-436-3710 Fax: 705-436-7120 Application submitted to: The, 2101 Innisfil Beach Rd, Innisfil, Ontario A. Project information Building number, street name Unit number Lot/con. Municipality Postal code Plan number/other description Project value est. $ Area of work (m 2 ) B. Purpose of application New construction Proposed use of building Addition to an existing building Alteration/ repair Current use of building Demolition Conditional Permit Description of proposed work C. Applicant Applicant is: Owner or Authorized agent of owner Last name First name Corporation or partnership Street address Unit number Lot/con. Municipality Postal code Province E-mail Telephone number Fax Cell number D. Owner (if different from applicant) Last name First name Corporation or partnership Street address Unit number Lot/con. Municipality Postal code Province E-mail Telephone number Fax Cell number E. Builder (optional) Last name First name Corporation or partnership (if applicable) Street address Unit number Lot/con. Municipality Postal code Province E-mail Telephone number Fax Cell number F. Tarion Warranty Corporation (Ontario New Home Warranty Program) i. Is proposed construction for a new home as defined in the Ontario New Home Yes No Warranties Plan Act? If no, go to section G. ii. Is registration required under the Ontario New Home Warranties Plan Act? Yes No iii. If yes to (ii) provide registration number(s):

G. Required Schedules i) Attach Schedule 1 for each individual who reviews and takes responsibility for design activities. ii) Attach Schedule 2 where application is to construct on-site, install or repair a sewage system. H. Completeness and Compliance with Applicable Law i) This application meets all the requirements of clauses 1.3.1.3 (5) (a) to (d) of Division C of the Building Code (the application is made in the correct form and by the owner or authorized agent, all applicable fields have been completed on the application and required schedules, and all required schedules are submitted). Payment has been made of all fees required, under the applicable by-law, resolution or regulation made under clause 7(1)(c) of the Building Code Act, 1992, to be paid when the application is made. ii) This application is accompanied by the plans and specifications prescribed by the applicable by-law, resolution or regulation made under clause 7(1)(b) of the Building Code Act, 1992. iii) This application is accompanied by the information and documents prescribed by the applicable by-law, resolution or regulation made under clause 7(1)(b) of the Building Code Act, 1992 which enable the chief building official to determine whether the proposed building, construction or demolition will contravene any applicable law. iv) The proposed building, construction or demolition will not contravene any applicable law. I. Declaration of applicant Yes Yes Yes Yes Yes No No No No No I declare that: (print name) 1. The information contained in this application, attached schedules, attached plans and specifications, and other attached documentation is true to the best of my knowledge. 2. If the owner is a corporation or partnership, I have the authority to bind the corporation or partnership. Date Signature of applicant Personal information contained in this form and schedules is collected under the authority of subsection 8(1.1) of the Building Code Act, 1992, and will be used in the administration and enforcement of the Building Code Act,1992. Questions about the collection of personal information may be addressed to: a)the Chief Building Official of the municipality or upper-tier municipality to which this application is being made or, b) the inspector having the powers and duties of a Chief Building Official in relation to sewage systems or plumbing for an upper-tier municipality, board of health or conservation authority to whom this application is made or c) Director, Building and Development Branch, Ministry of Municipal Affairs and Housing777 Bay St., 2 nd Floor. Toronto, ON M5G 2E5 (416) 585-6666

Demolition Permit Questionnaire and Clearances Building Department 2101 Innisfil Beach Road, INNISFIL, ON L9S 1A1 Tel : 705-436-3710 Fax: 705-436-7120 Permit No. Owner of Property: Date: Address of Proposed Demolition: Applicant: Contact Phone / E-Mail: Company / Contractor: Contact Phone / E-Mail: Legal Lot Description: Area: Stories: Building Type / Use: Method of Demolition: Proposed Backfill Material: To Be Completed by the Owner or Authorized Agent Please provide your answer to the following questions by checking the appropriate response Yes No 1. Was the building constructed 70 or more years ago? 2. Are there any contaminants (PCB s or chemicals) stored in the building? 3. Is the building situated on contaminated soil/land? 4. Are there any underground storage tanks on the subject property? (1) 5. Are there any environmental site assessment reports on the subject property? (Submit Reports for Review) 6. Has a designated substances and hazardous materials report (including survey of asbestos, PCB, UFFI, etc.) been undertaken or completed on the subject building? (Submit Reports for Review) (2) 7. Does the building exceed three (3) stories in height or 600 m² in building area? (3) 8. Does the building footprint exceed 600 m² in area? (3) 9. Does the building contain pre-tensioned or post-tensioned members? (3) 10. Will the proposed demolition extend below the level of the footing of any adjacent building(s)? (3) 11. Will there be explosives or lasers used during the course of the demolition? (3) Notes: 1. The tanks, pipelines and/or equipment that contain fuel must be removed from the site in accordance with the regulations and guidelines of the Technical Standards and Safety Authority (T.S.S.A.). For more information, contact 1-877-682-TSSA (8772). Further, environmental site assessment reports will be required when applying for future development. 2. The Occupational Health and Safety Act and Regulations prescribes procedures for demolition involving hazardous materials such as asbestos and lead paint. It is the responsibility of the owner/authorized agent to ensure the safety of workers. Before asking for tenders for demolition, the owner/authorized agent shall cause an inspection to be made to establish whether any friable material that is likely to be handled, dealt with, disturbed or removed contains hazardous materials. For more information, contact The Ontario Ministry of Labour at 1-800-268-8013. 3. The Ontario Building Code: sections 2.3.2.3 and 2.4.1.1(2), requires a Professional Engineer to be retained for the demolition review of any building. Further, the applicant shall submit, at the Time of application, a demolition brief detailing the structural design characteristics of the building and method of demolition. The following service provider must confirm that their services have been disconnected or turned off, and that a permit for demolition or moving of a building may be issued. Provider / Department Name / Title Signature Date Innisfil Hydro 2073 Commerce Park Dr. Innisfil, ON L9S 4A2 705-431-4321 705-431-6872 (Fax) Peter Stephens: Operations Supervisor Extension 296 Enbridge Gas Distribution Service Department 1-877-362-7434 416-495-3928 (Fax) Water / Sewer c/o Customer Service 2101 Innisfil Beach Rd. Innisfil, ON L9S 1A1 705-436-3740 705-436-7120 (Fax) Wes Cyr: Waste Water Superintendent 705-456-6946 Don Bauerlein: Water Superintendent 705-431-8448 Telephone / Internet / Cable Bell Canada 310-BELL (2355) Rogers Canada 1-888-764-3771 Specify Provider

Demolition Permit Guidelines and Notes Building Department 2101 Innisfil Beach Road, INNISFIL, ON L9S 1A1 Tel : 705-436-3710 Fax: 705-436-7120 Please Review the Following Guidelines and Notes Submission Requirements: 1. An Application Form completed in full 2. Demolition Permit Questionnaire completed in full 3. Demolition Permit Clearances Form completed in full, authorized by the appropriate authorities 4. A current Plan of Survey or Site Plan (fully dimensioned) indicating: a. Dimensions of property and lot size b. Location of buildings proposed to be demolished and All other buildings on the lot. This information package has been prepared to assist individuals with the completion of the Demolition Permit Application Form. Demolition Permit applications will only be considered by the Chief Building Official for permit issuance if accompanied by plans, specifications and documentation as listed below. Only complete submissions will be accepted. Demolition permits are processed within ten (10) business days from the date of submission. It is the responsibility of the owner to ensure that the appropriate Conservation Approval (if applicable) is obtained prior to applying for the Demolition permit. Please call Frank Pinto @ 905-895-1281 for the Lake Simcoe Region Conservation Authority and Barb Perreault @ 705-424-1479 ext.245 for the Nottawasaga Valley Conservation Authority. Abandonment of a Well shall be done in accordance with the Ontario Well Water Regulation #903. Please call The Ministry of Environment, Water Well Help Desk @ 1-888-396-9355 for more information. Abandonment of a Septic System requires the septic tank to be pumped and disconnected from the home or building. The tank shall be removed, crushed or filled with sand/soil material. Ontario Building Code (O.Reg. 350/06) Division C, Part 1 1.3.1.1.(1) A person is except from the requirement to obtain a permit under Section 8 of the Act. (a) for a demolition of a building located on a farm. 1.3.1.1.(3) Where a permit is required for the demolition of a building in Sentence 1.2.2.3.(1), descriptions of structural characteristics of the building and the method of demolition shall be including in the application for a permit to demolish the building. 1.3.1.1.(4) No person shall commence demolition of a building or any part of a building or any part of a building before the building has been vacated by the occupants except where the safety of the occupants is not affected. All building/demolition sites must be maintained in safe, clean conditions. A Building Inspector will be visiting your site to verify these conditions. Owner / Agent Signature Date I have answered the questionnaire to the best of my knowledge. I understand the above Notes, and have reviewed the Demolition Permit Guidelines. Rev. 003 12/16/2011