~CSRMA ALERT~ REVISED SPCC RULE WILL IMPACT MOST POTW S



Similar documents
Spill Prevention, Control, and Countermeasures (SPCC) Regulations Update

ABOVE-GROUND STORAGE TANKS

OIL POLLUTION PREVENTION REGULATIONS

OIL STORAGE REQUIREMENTS OF THE SPCC REGULATIONS. Christopher J. Ecsedy, P.E. Fuss & O'Neill, Inc. 146 Hartford Road Manchester, CT 06040

Spill Prevention, Control and Countermeasure (SPCC)

ACTIVITY NAME. Training Requirements for Spill Prevention Control and Countermeasures (SPCC) 40 CFR Part 112 Naval Air Station Corpus Christi Texas

Spill Prevention Control and Countermeasure (SPCC) Regulations Fact Sheet

CHAPTER PETROLEUM CONTACT WATER

Spill Prevention, Control and Countermeasure (SPCC) Rule

The Federal Spill Prevention, Control & Countermeasures (SPCC) Rule Overview

SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN

Section 5. Secondary Containment and Impracticability. (as applicable to APSA tank facilities)

Farm Fuel Tank Safety Guide

FACILITY ENVIRONMENTAL COMPLIANCE

SPCC Rule Review. Spill Prevention Control & Countermeasures NON-TRANSPORTATION RELATED ONSHORE AND OFFSHORE FACILITIES

Appendix VIII: Spill Prevention, Control and Countermeasure (SPCC) Plans

Critical Regulations SUMMARY OF. Stormwater Management Regulations (National Pollutant Discharge Elimination System or "NPDES ) 40 CFR 122.

U. S. EPA REGION 8 OIL PROGRAM


DOES YOUR COMPANY NEED AN SPCC PLAN? Larry Seabolt Remtech Engineers Remediation Specialists

U.S. ENVIRONMENTAL PROTECTION AGENCY TIER I QUALIFIED FACILITY SPCC PLAN TEMPLATE

History of the SPCC Rule

SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN. for the PIÑON RIDGE MILL HIGHWAY 90 BEDROCK, COLORADO Prepared by:

SPCC for Food Services

Kurt Wilson Louisiana Dept. of Environmental Quality Business & Community Outreach Division Small Business/Small Community Assistance Program

Bulk Storage Program. Cornell University 8/22/2014

SPILL PREVENTION AND RESPONSE PLAN TEMPLATE FOR BUSINESSES IN DAYTON S SOURCE WATER PROTECTION AREA

Safety Manual Title: Spill Prevention & Response Review Date: 6/1/2014

Facility Scenario - Example Tier I Qualified Facility SPCC Plan

Spill Prevention, Control & Cleanup SC-11

Spill Prevention, Control and Countermeasure Plan (SPCC) Program

Appendix N Framework Spill Prevention, Containment, and Countermeasures Plan Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702

MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION

SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN PREPARED FOR: ARKANSAS STATE UNIVERSITY JONESBORO, ARKANSAS ORIGINAL DATE OF PLAN: APRIL 2005

Spill Control Prevention Plan (SCPP)

How To Safely Handle A Spill

Spill Prevention Control and Countermeasures (SPCC) Plan (Onshore, Nonproduction Facility) Kennesaw State University

SPCC. Created by EPA in 1973 under the Clean Water Act. 10/22/2014. Spill Prevention Control & Countermeasure Plan

TRAINING SPCC/SWPP Training UGA. Automotive Center. Campus Transit

Spill Prevention, Control and Countermeasure (SPCC) Training

Waste Oil Collection / Storage

Spill Prevention, Control, and Countermeasures (SPCC) Course Material

Spill Prevention, Control and Countermeasure Plan Checklist

Environmental Health & Safety

CALIFORNIA ABOVEGROUND PETROLEUM STORAGE ACT (APSA) FREQUENTLY ASKED QUESTIONS October 14, 2011 PROGRAM IMPLEMENTATION & COMPLIANCE

SPILL PREVENTION, CONTROL, AND COUNTERMEASURE (SPCC) REGULATION

Contact Person Sarah Morris-Benavides Revision 1.1 Document Plan Effective Date 07/01/2014 Review Date 03/15/2017.

SPILL PREVENTION, CONTROL AND COUNTERMEASURE (SPCC) PLAN

Steel Tank Institute AST Inspections. Dana Schmidt, PE STI/SPFA

COMPLIANCE MANAGEMENT STRATEGIES. Presented by: Megan Kazmierczak, ECS Eclipse

A Guide to Hazardous Substance Storage Capacity

Outdoor Storage of Raw Materials SC-33

UTILITIES DEPARTMENT

FLORIDA HAZARDOUS WASTE MANAGEMENT REGULATIONS THAT DIFFER FROM FEDERAL REQUIREMENTS

CALIFORNIA ABOVEGROUND PETROLEUM STORAGE ACT (APSA) FREQUENTLY ASKED QUESTIONS

MASSACHUSETTS INSTITUTE OF TECHNOLOGY MASSACHUSETTS INSTITUTE OF TECHNOLOGY CAMPUS SPILL PREVENTION, CONTROL, AND COUNTERMEASURE (SPCC) PLAN

SPILL PREVENTION, CONTROL, AND COUNTER MEASURES PLAN (SPCC)

Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan

Inspections Standard Operating Procedure 5 Aboveground Storage Tanks

A Guide for Used Oil Transporter Training Programs. Following are excerpts from laws and rules pertaining to Used Oil Transporter Certification

UNIVERSITY OF WISCONSIN MADISON

U.S. EPA Office of Solid Waste and Emergency Response

U.S. ENVIRONMENTAL PROTECTION AGENCY TIER I QUALIFIED FACILITY SPCC PLAN TEMPLATE

Spill Prevention Control and Countermeasure Plan

SPILL PREVENTION, CONTROL AND COUNTERMEASURES (SPCC) PLAN

MASTER SPILL PREVENTION CONTROL & COUNTERMEASURE (SPCC) PLAN

MODULE IV Secondary Containment, Oil Spill Control & Spill Prediction

Petroleum Tanks at Municipal Facilities

APPENDIX 4A SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN

SPILL PREVENTION CONTROL AND COUNTERMEASURES PLAN (SPCC)

SPILL PREVENTION, CONTROL AND COUNTERMEASURE (SPCC) PLAN

Chaffee Landfill & CID Hauling Olean Road Chaffee, New York 14030

Spill Prevention, Control and Countermeasures (SPCC) 40 CFR 112. For Bulk Facilities

Secondary Containment: Regulations & BMPs. Beth Powell Vice-President and General Manager New Pig Energy bethp@newpigenergy.com

Pollution Prevention And Best Management Practices For Dry Cleaners Operating In Broward County

Transcription:

~CSRMA ALERT~ September 17, 2004 REVISED SPCC RULE WILL IMPACT MOST POTW S A CSRMA member in the San Francisco Bay Area was recently inspected by the EPA and Bay Area Regional Water Quality Control Board as part of an inspection program to ensure that POTWs are in compliance with a number of requirements including pretreatment programs, laboratory procedures and operational practices. One of the items requested during the inspection was a Spill Prevention, Control, and Countermeasure Plan (SPCC). The District had not implemented an SPCC because it was their understanding, like most POTW s, that wastewater treatment facilities are exempt from this ruling as stated in 40 CFR Part 112.1(d)(6) see http://www.epa.gov/oilspill/spccrule.htm. According to the inspector, the exemption of wastewater facilities from the requirement to implement an SPCC Plan does not pertain to a POTW as a whole. As defined at 40 CFR Part 112.2, a facility can be as small as a piece of equipment or as large as a military base. Using this definition EPA has determined that the term "wastewater treatment facility" refers to single unit processes and not the entire property (facility) of the POTW. As an example, a clarifier (facility) used to remove oil from the surface of the water would be exempt from the requirement to implement an SPCC Plan. However, an above ground storage tank (facility) would not be exempt from the requirement to implement an SPCC. According to the inspector, this is an EPA determination and NOT a local Regional Water Quality Control Board determination. The following EPA website details the differences between the old SPCC rule and the revised SPCC rule: http://www.epa.gov/oilspill/spcccros.htm. Accompanying this CSRMA Alert is a document prepared by Veolia Water that summarizes the SPCC Rule in lay terms and provides a flowchart which will guide you through determining if the SPCC Rule affects your Agency and the steps to compliance if it does. PLEASE BEAR IN MIND THAT YOU MUST LOOK AT EACH AGENCY FACILITY (POTW, PUMP STATIONS, ETC) IN MAKING THE DETERMINATION OF WHETHER THE SPCC RULE APPLIES TO YOUR AGENCY! For More Information, please contact David Patzer, CSRMA Risk Control Advisor at 707.373.9709 or losscontrol@sbcglobal.net

The EPA s Oil Pollution Prevention regulations (40 CFR 112) are intended to prevent oil discharges from certain aboveground and underground storage tanks from reaching navigable waters of the United States or adjoining shorelines. The regulations also provide a framework to ensure effective responses in the event of discharges of oil. The applicability of the regulations is limited to only the storage and use of oil (such as bulk storage of petroleum products, lubricating oil from equipment, fuel oil for generators, etc.). Facilities that meet the applicability criteria of the regulations are required to prepare and maintain SPCC Plans. A facility is not regulated if it meets the criteria of any of the sic (6) available exemptions. VWNA projects will only need to focus on three (3) of these exemptions - capacity thresholds, minimum container size and the waste water treatment facility (WWTF) exemption 1. There is a misconception about the WWTF exemption, so please review the footnote below carefully. Each facility must evaluate their total aggregate storage of oil. Total Aggregate Storage is determined by adding the capabilities of all oil storage containers of 55 gallons or more (e.g. drums, totes, storage tanks, owned transformers, etc.). The full storage capacities must be used in the calculation regardless of whether the tanks/containers are partially filled. If a facility s total oil storage capacity is less than or equal to (<) the threshold volumes, the regulations do not apply to the facility. The threshold capacities are: Completely buried oil storage capacity of < 42,000 gallons; and/or Total aggregate aboveground oil storage capacity of < 1,320 gallons (containers, 55 gallons do NOT count towards total). Following are some examples, showing how to determine total aggregate storage and evaluate whether a SPCC plan is required: A facility has one (1) 240 gallon aboveground storage tank (AST) that contains diesel fuel for an emergency generator, not facility-owned electrical transformers and not storage of lubricating oils in drums or totes (< 55 gallons). The total aggregate storage is less than 1.320 gallons, so a SPCC plan is NOT required. A facility has one (1) 2,000 gallon fuel oil AST for an emergency generator, no facility-owned electrical transformers and not storage o foil in drums or totes. The total aggregate storage is greater than 1,320 gallons. Unless the facility can change out the current AST for one that has a total capacity of 1,300 gallons or less, a SPCC Plan IS required. A facility has one (1) 1,000 gallon fuel oil AST, one (1) 5,000 gallon bioxide AST, three (3) 55 gallon drums of engine and/or hydraulic oil. The bioxide is not included in the total aggregate storage calculation it is not oil. The facility s total aggregate oil storage is less than 1,320 gallons, and an SPCC plan is NOT REQUIRED. A municipally-owned facility, operated by VWNA, has one (1) 1,200 gallon fuel oil AST, two (2) 55 gallon oil drums and three (3) electrical transformers that the municipality owns (each holds 150 gallons of oil). Since the municipality owns the assets (including the transformers), the total aggregate storage is greater than 1.320 gallons, so an SPCC plan IS required. 1-40 CFR 112.1(d)(6). Some components of WWTFs do not meet the exemption and remain subject to the regulations (e.g. oil/water separators, hydraulic equipment, slop tanks, fuel storage for emergency generators, etc.). The exemption applies only to those parts of preliminary -, primary- and secondary treatment processes that do not specifically include any storage or other use: of lio (e.g. aeration basins, clarifiers, trickling filters, digesters, etc).

The flow chart is included with this document (see Table 1. SPCC Determinations Flow Chart) to assist VWNA Operating Services facilities to determine if they are required to have an SPCC Plan under federal regulations (or if the clients is required, and needs to be informed that VWNA can assist them). A summary of SPCC Plan requirements is also included (see Table 2 SPCC Plan Overview). Facilities that are regulated by the Oil Pollution Prevention regulations must meet the following SPCC plan deadlines: Maintain current SPCC Plan an amend it to ensure compliance with new requirements by. Facilities in Operation On or Before 8/13/2002 February 17, 2006 Facilities in Operation After 8/16/2002 n/a Prepare initial SPCC Plan by n/a August 18, 2006 Implement SPCC Plan by August 18, 2006 August 18, 2006

Table 1. SPCC DETERMINATION FLOW CHART Doe facility store any petroleum-based products (e.g. fuel oil for generators, lubricating! oil for equipment, etc.) or waste water than includes oil? Determine total oil storage volume (incl. oil content of industrial waste water in equalization tanks). Does facility operate an oil water separator? Is total oil storage volume For all ASTs combined more than 1,320 gallons? Is total size of all USTs combined more than 42,000 gallons? Can facility change tankage to a total capacity that is LESS than 1,320 gallons? te: known VWNA projects will have this apply. Facility exceeds the regulation s applicability threshold and is required to prepare a SPCC plan Does facility store any drums or totes of lubricating oil or fuel oil? Check all three! AND/OR Are there electrical transformers on site that are owned by the facility? AND/OR Does facility have any production equipment with oil reservoirs (such as mechanical bar screeners)? Does the combined total volume capacity of stored drums, totes, facility-owned transformers, production equipment oil reservoirs and ASTs (whichever items are applicable to the facility) equal more than 1,320 gallons? Can facility: 1) Change size of tank(s); OR 2) Reduce total number of stored drums; OR 3) Eliminate transformer(s); OR 4) Eliminate production equipment So that total oil storage capacity that is LESS than 1,320 gallons? te: this does NOT include forklifts and other such vehicles! Facility is NOT required to prepare SPCC plan. Make necessary changes to reduce total oil storage capacity to LESS than 1,320 gallons.! Total Aggregate Storage is determined by adding the capacities of all oil storage containers of 55 gallons or more (e.g. drums, totes, storage tanks, oil reservoirs of non-vehicular production equipment, facility-owned electrical transformers, etc.). the full storage capacities must be included in the total oil storage volume calculation regardless of whether tanks/containers are partially or completely filled. For calculations involving equalization tanks that contain industrial waste water with oil, contact your EHS&S representative.

Requirements Facility Description & Diagram Reporting Spill Containment Table 2. SPCC PLAN OVERVIEW Comments Describe the physical layout of the facility and have a facility diagram, which must include the location and contents of each container, all transfer stations and connecting pipes. The plan must also address: Type of oil in each container and its storage capacity; Discharge prevention measures; Discharge or drainage controls (e.g. secondary containment); Countermeasures for discharge discovery, response and cleanup; Methods of disposal of recovered materials; and Emergency contact list and phone numbers (specified in 112.7(a)(3)(vi)). If facility is not required to have a Facility Response Plan (note: most VWNA facilities are not required; check with your EHS & S contact), the plan and its supporting material (included in appendices) must be organized to be readily useable in an emergency: Plan must include procedures and information to enable a person reporting a discharge to relate: a exact address/location and phone number of facility; b) specific information abut discharge (e.g. date, time, material, amount, source, cause, etc.); and c) manes of individuals and organizations that have also been contacted. The plan must include a prediction of direction, rate of flow and total quantity of oil which could be discharges as a result of each type of major equipment failure. Appropriate containment and/or diversionary structures or equipment to prevent such predicted discharges must be in place [acceptable prevention systems identified in 112.7(c)(1)]. Tank Truck Racks If facility has a tank car and/or tank truck loading/unloading rack, comply with 112.7(h). Self-Inspections, Inspections and tests must be conducted in accordance with written procedures developed for the Testing & facility and certified by the Professional Engineer (PE) who authorizes the plan (records must be Recordkeeping kept for three years). Test each aboveground container for integrity on a regular schedule and whenever you make material repairs. Training Must designate a person who is accountable for discharge prevention (must report to management). Oil-handling personnel at the facility must receive training (to include: operation and maintenance of equipment to prevent discharges; discharge procedure protocols; applicable pollution control laws/rules/regulations; general facility operations; and contents of the SPCC plan). Facility must conduct annual discharge prevention briefings with oil-handling personnel, to assure adequate understanding of the SPCC plan for the facility and meet the requirements of 112.7(f). Facility Security Engineer Certification Plan Review & Amendment Ensure compliance with the security measures specified in 112.7(g) (e.g. fencing, lighting, etc.). A licensed Professional Engineer (PE) must review and certify the plan. Certification attests that the PE: 1) is familiar with the requirements of the Oil Pollution Prevention regulations; 2) that the PE or an agent for the PE has visited and examined the facility; 3) that the plan has been prepared in accordance with good engineering practice & in consideration of the regulations; 4) that procedures for the required inspections and testing have been established; and 5) that the plan is adequate for the facility. Amend the SPCC plan within six (6) months of a change in the facility design, construction, operation and/or maintenance that materially affects the potential for an oil discharge. Complete a review and evaluation of the SPCC plan every five (5) years (from the date of last review for facilities in operation before August 16, 2002). The review must be documented and kept with the plan. The facility may deviate from requirements but must provide an explanation for non-conformance and a description of equivalent environmental protection. Administrative changes do not need to be certified by a PE. Please contact your VWNA EHS & S representative if you have questions regarding this SPCC summary. )