Beacon Hill Sewer District Standard Specifications



Similar documents
SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH Purpose and Application.

LS 2540 SEWER LATERALS AND INSPECTION TEES

DIVISION 4300 STORM DRAINAGE

SECTION POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

Sewage Compliance Form Instructions

Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES SITE UTILITIES

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines

Town House Center Highway North Huntingdon, PA 15642

BUILDING SEWER CONNECTION REQUIREMENTS

SECTION GRAVITY SANITARY SEWERS

SECTION 7 UNDERDRAIN SERVICE

CHAPTER 6 - SANITARY SEWER

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION STORM DRAIN SYSTEMS PART 1 - GENERAL

Section SEWER PIPE INSTALLATION AND TESTING

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

SECTION SANITARY SEWER AND STORM DRAIN SYSTEMS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS

Exhibit A. Rules and Regulations for House Connections and Sewer Extensions

Customer Procedures and General Information for Sewer Customers

SECTION POLYVINYL CHLORIDE (PVC) PIPE

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

Specifications for Residential Property Owners Connection to New Public Sewer

EFFECTIVE FEBRUARY note: drainage permit required to call for a dampproof inspection

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

SECTION 9.02 BUILDING SUBSURFACE DRAINS (PERIMETER, ETC.)

STANDARD SPECIFICATIONS SECTION INSTALLATION OF GRAVITY SEWER PIPELINES. 1. Trenching, Backfilling and Compacting: 02223

SECTION STORM DRAINAGE TABLE OF CONTENTS

ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS. for (PVC) SANITARY SEWER MAIN CONSTRUCTION

SECTION STORM DRAINAGE SYSTEM

SECTION STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

SECTION PRECAST CONCRETE UTILITY STRUCTURES

Wastewater Capital Projects Management Standard Construction Specification

3A General Information A. Concepts... 1 B. Conditions... 1

Section 2100-Trenching and Tunneling

SECTION 7- STORM SEWER

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA (7300 Short Road, Serene Lakes)

SECTION FACILITY STORM DRAINAGE PIPING

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

CLEANING, INSPECTION, AND TESTING OF SEWERS

SECTION BUILDING SEWERS. B. Connection of building sanitary drainage system to municipal sewers.

Part 9 SUBDRAIN DESIGN AND LAYOUT

San Antonio Water System Standard Specifications for Construction ITEM NO SLIP-LINING SANITARY SEWERS

Let Us Give Utilities the Respect that they Deserve.

Section 402. STORM SEWERS

THE CORPORATION OF THE CITY OF GUELPH. THEREFORE the council of the Corporation of the City of Guelph enacts as follows:

SECTION STORM DRAIN SYSTEM

SECTION POLYVINYL CHLORIDE (PVC) PIPE

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 21

SECTION SANITARY SEWER PIPE

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

8.01 STORM SEWERS, CATCH BASIN LEADS, AND EXTENSIONS

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014

INDEX STORM DRAINAGE PRE-APPROVED NOTES, DESIGN CRITERIA, & PLANS

San Antonio Water System Standard Specifications for Construction ITEM NO POINT REPAIRS AND OBSTRUCTION REMOVALS

Standard Specifications For Private Sewer Laterals

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION

SANITARY SEWER SPECIFICATIONS

ASTM C76, Class III, Wall B, except as modified herein. Clean natural sand, ASTM C33. Artificial or manufactured sand will not be permitted.

Jefferson County, Alabama Environmental Services Department. Standard Specifications for Sanitary Sewer Service Lines and Connections

The Manitoba Water Services Board SECTION Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES

Ultra-Rib PVC Storm Sewer Pipe 8" - 30"

INDEX. Sec. No. Items Page Nos.

FY08 SEWER POINT REPAIRS BID TABULATION

Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS

550 PIPE CULVERTS, SEWERS AND DRAINS

SECTION 6A STORM DRAIN DESIGN Mar S E C T I O N 6A STORM DRAIN - DESIGN

SECTION G SEWERS (STORM, SANITARY AND FDC)

SECTION 3 SANITARY SEWER DESIGN

SECTION EARTH MOVING

CITY OF ST. CA THARINE S. cn- Olc.4 BY-LAW NO. WHEREAS the Council of the Corporation of the City of St. Catharines, is

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER

Sewer Line Rehabilitation

ARLINGTON HEIGHTS MUNICIPAL CODE CHAPTER 22 SEWERS

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

SECTION 9. All sewer laterals shall tie into the sewer main lines unless approved by the City Engineer.

CW GRAVITY SEWERS TABLE OF CONTENTS

SECTION 5 DRAFTING STANDARDS

SECTION REINFORCED CONCRETE PIPE. A. The following is a list of SPECIFICATIONS, which may be related to this section:

AWWA Small Systems Pipe Repair Checklist, as published in July 2008 Opflow Question of the Month

Does Part of My Basement Floor Have to Be Removed to Install. Where Does the Water from the Sump Pump Go?...Page 5

Transcription:

Beacon Hill Sewer District Standard Specifications Residential Gravity Side Sewer Including Design Criteria and Standard Construction Drawings

Residential Gravity Side Sewer Design Criteria 1. Provisions A. It shall be unlawful to construct, extend, relay, repair, and make connection to or the disconnection of any side sewer inside the property line without contacting the District. A determination will be made upon that contact as to whether a permit shall be required for the work to be done. B. Due to extraordinary debris entering the BHSD system during the process of connecting side sewer laterals BHSD must be notified prior to making connection. Property owners may be held responsible for failure to do so. C. No side sewer trench shall be filled or any sewer covered until the work has been approved by the District. PLEASE CONTACT THE DISTRICT 24 HOURS BEFORE INSPECTION IS NEEDED 2. Illegal Connections A. It is unlawful to divert or cause to be diverted any storm sewer, surface runoff, or underground drainage to any sewer, manhole or other appurtenant structure or portion of the sewer system. B. No person shall discharge or cause to be discharged any storm sewer, surface water, ground water, roof runoff, sub-surface drainage, cooling water, or unpolluted industrial process water to any portion of the sewer system. C. No roof drains or yard drains of any type shall be connected to the sanitary sewer in this manner. BEFORE COMMENCING ANY EXCAVATION, NOTICE MUST BE GIVEN TO OWNERS OF ALL UNDERGROUND FACILITIES THROUGH A ONE NUMBER LOCATOR SERVICE. NW UTILITY NOTIFICATION CENTER 1-800-424-5555. 3. Excavation A. Excavation should be made at the measurement given by the District at the time the permit is issued, but the side sewer contractor shall prospect two (2) feet in all directions from the distance and depth given. B. The side sewer contractor or other persons doing the work shall prevent any damage to the sewer main, tee or stub out. C. ANY TAP TO THE MAINLINE SHALL BE MADE BY THE DISTRICT.

D. Manholes shall be accessed by District personnel only. 4. Trench Safety A. Should it be necessary for a BHSD employee to enter a trench with a depth greater than four (4) feet, the trench shall meet safety requirements referred to in W/AC Chapter 296-15, Part N- Excavation, Trenching and Shoring. B. In many cases benching or sloping of the trench walls is sufficient to meet safety requirements for trench safety greater than four (4) feet in depth, there is always the chance that site inspection will show shoring is needed. Should this be the case, there will be no entry until shoring has been put in place. C. A representative of BHSD shall be on site during the excavation to inspect the trench and soil conditions. The representative will decide what safety measures are necessary for entry by BHSD employees. D. If water is entering the ditch or water is standing in the bottom of the ditch, shoring and a de-watering system will be required before a BHSD employee enters the trench. E. It is the responsibility of the homeowner/contractor to contact BHSD prior to any excavation to eliminate any possible delay associated with Trench Safety requirements. 5. Trench Preparation A. The bottom o the trench must be smooth and free of large rocks which may cause damage to the side sewer pipe. Where unsuitable bedding is found, as determined by the District, the contractor or other persons doing the work, shall over excavate and prepare a bedding as follows: 1. Soft Foundation Over excavate as directed by the District and install 1 2 inches of base rock, to a point 3" below the pipe. From this point to the pipe, install properly graded sand or 5/8" minus gravel bedding. 2. Hard Foundation over excavate a minimum of 3" and install a bedding of properly graded sand or 5/8" minus gravel bedding. 6. Alignment A. Pipe shall be laid with a minimum grade of 1/4" per foot for 4" pipe and 1/8" per foot for 6 " pipe, on uniform line and grade between bends and connections. B. Any grade less than this may be approved at the manager s discretion upon execution of a signed release holding BHSD harmless from any and all damage.

7. Materials A. Pipe and fittings must be PVC Schedule 3034 or ABS Schedule 40, with solvent weld or rubber casketed joints. B. NO 90 DEGREE FITTINGS ARE ALLOWED. C. NO FERNCO FITTINGS ARE ALLOWED FOR PLASTIC TO PLASTIC CONNECTION UNLESS AUTHORIZED BY BHSD PERSONNEL. D. Eccentric reducers are required for connection to PVC mainline. E. Alternate materials must be approved by the District on a case by case basis. F. Minimum pipe size for single family residence is 4" diameter. 8. Installation A. Sewer pipe shall be laid true to grade with the bells upgrade. B. Pipe shall be firmly bedded for the full length of the pipe in the prepared trench bottom. C. Pipe shall be centered prior to the joining. Joints shall be installed in strict compliance with the manufacturer's recommendations. Spigot ends shall be thoroughly cleaned before applying glue or lubricant to the pipe or rubber gasket. The interior surface of the bell or sleeve previously laid shall be thoroughly cleaned and coated with glue or lubricant as recommended by the manufacturer. After the section being laid has been carefully aligned, the joint shall be completed. 9. Clean Outs A. Clean outs shall be constructed of the same material and size as the service run. B. A clean out is required within the first pipe joint off the mainline, immediately outside the foundation at least 2' from the house or connection point and for every 100 feet and/or 135 degree change in direction. C. The clean out off the main shall be constructed of a wye and 45 degree bend with the branch installed upward. D. The clean out outside the foundation shall be constructed of a two way sani-tee or a wye and 45 degree bend with the branch installed upward. E. If a riser is desired above ground for the clean out, it must be protected with a casting and cover.

F. BHSD has the discretion to require the clean out at the foundation to be raised based on the length of the lateral or the site conditions. G. DO NOT GLUE RISERS INTO ANY CLEAN OUT PRIOR TO BHSD LATERAL INSPECTION AND AIR TEST. 10. Backfill Trench A. After the line has passed the 4 psi air test and the installation has been diagrammed by BIISD personnel, the line shall be bedded and backfilled in a manner which will prevent damage to the pipe. B. Keep rocks and large debris away from the surface of the pipe to prevent long term damage.

Beacon Hill Sewer District Gravity Lateral Connection Diagram 4 In. Clean Out (Must be above ground) 4" Clean Out Above or Below ground with an approved cover Wye or 2 way "sani Tee" ` 4 5 Degree Bend 2 Ft Min. B.H.S.D. Mainline Slope: 4" pipe =114 " per foot Pipe Type: PVC 3034 or ABS schedule 40 Must have a clean out every 100 feet and/or every 135 degree change. Do not install risers onto clean outs until BHSD has performed the proper inspection. Do not use 90 degree bends. The maximum bend allowed is 45 degrees Property Line July 3, 2003