San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS



Similar documents
Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

SECTION STORM DRAIN SYSTEM

San Antonio Water System Standard Specifications for Construction ITEM NO SLIP-LINING SANITARY SEWERS

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION STORM DRAIN SYSTEMS PART 1 - GENERAL

SECTION POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

Section 2100-Trenching and Tunneling

CHAPTER 6 - SANITARY SEWER

LS 2540 SEWER LATERALS AND INSPECTION TEES

Special Specification 7021 Water Main and Sewer Line Replacements

EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines

SECTION STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

Beacon Hill Sewer District Standard Specifications

FY08 SEWER POINT REPAIRS BID TABULATION

Town House Center Highway North Huntingdon, PA 15642

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS. for (PVC) SANITARY SEWER MAIN CONSTRUCTION

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

Sewage Compliance Form Instructions

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014

Let Us Give Utilities the Respect that they Deserve.

SECTION 5: SANITARY SEWER SYSTEM DESIGN

CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST

STANDARD SPECIFICATIONS SECTION INSTALLATION OF GRAVITY SEWER PIPELINES. 1. Trenching, Backfilling and Compacting: 02223

SECTION ABANDONMENT OF SEWER MAINS

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

SECTION SANITARY SEWER PIPE

SECTION BUILDING SEWERS. B. Connection of building sanitary drainage system to municipal sewers.

Customer Procedures and General Information for Sewer Customers

San Antonio Water System Standard Specifications for Construction ITEM NO POINT REPAIRS AND OBSTRUCTION REMOVALS

SECTION POLYVINYL CHLORIDE (PVC) PIPE

8.01 STORM SEWERS, CATCH BASIN LEADS, AND EXTENSIONS

Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL

WILDCAT CANYON ROAD SPECIFICATION NO SLIDE REPAIR BIDDER'S PROPOSAL (continued)

Exhibit A. Rules and Regulations for House Connections and Sewer Extensions

Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe

SECTION 7- STORM SEWER

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA (7300 Short Road, Serene Lakes)

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION

Sewer Water Pipeline Replacement with CERTA LOK RESTRAINED JOINT PVC PIPE

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

SECTION UNDERGROUND ELECTRIC SERVICE

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

SECTION FACILITY STORM DRAINAGE PIPING

SECTION SANITARY SEWER AND STORM DRAIN SYSTEMS

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements

SEWER STANDARDS SECTION 2 SECTION TWO - SEWER STANDARDS CITY OF ELLENSBURG

SECTION 802 GRAVITY SEWER PIPE

SECTION PRECAST CONCRETE UTILITY STRUCTURES

SECTION STORM DRAINAGE SYSTEM

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT

City of Balch Springs, Texas. Request for Proposal (RFP ) Pipe Bursting Sewer Line Replacement

Section SEWER PIPE INSTALLATION AND TESTING

SECTION 724 PIPE CULVERTS

SECTION ABANDONMENT OF WATER MAINS. A. Conform to requirements of Section Submittals.

C. Section TESTING LABORATORY SERVICE.

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH Purpose and Application.

SANITARY SEWER SPECIFICATIONS

DIVISION 4300 STORM DRAINAGE

Nebraska Department of Roads Drainage and Erosion Control Manual December 2011 Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY

INSTALLATION OF INSITUFORM LINER

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES SITE UTILITIES

INDEX. Sec. No. Items Page Nos.

3A General Information A. Concepts... 1 B. Conditions... 1

550 PIPE CULVERTS, SEWERS AND DRAINS

2006 Codes. Please verify the following before calling for inspection

Sewer Line Rehabilitation

SECTION GRAVITY SANITARY SEWERS

SECTION GUARDRAILS

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:

Section Installation of pipe and casing for sanitary sewer by methods of augering.

SEWER DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS

SECTION 603 SANITARY SEWER FORCE MAINS

CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General

LOGAN TOWNSHIP MUNICIPAL UTILITIES AUTHORITY DESIGN, CONSTRUCTION, INSPECTION AND TESTING MANUAL

900 SEWERAGE WORK ITEM PIPE SEWERS COMPLETE IN PLACE

MDWASD 8/1999 SECTION TRENCHING AND BACKFILLING FOR PIPING SYSTEMS

SECTION NONREINFORCED CONCRETE SEWER PIPE

SECTION STORM DRAINAGE TABLE OF CONTENTS

EFFECTIVE FEBRUARY note: drainage permit required to call for a dampproof inspection

Transcription:

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS 854.1 DESCRIPTION: This item shall govern sanitary sewer laterals installed in accordance with these specifications and as directed by the Engineer. This item shall also consist of the installation of a two-way sewer cleanout at the property line. 854.2 SUBMITTALS: Contractor shall submit manufacturer s product data, instructions, recommendations, shop drawings, and certifications. 854.3 MATERIALS: The materials for sanitary sewer laterals shall conform to the specification contained in Item No. 848, "Sanitary Sewers." 854.4 CONSTRUCTION: 1. Sanitary sewer laterals fittings and appurtenances shall conform to the material specifications and shall be installed by the Contractor as specified herein, or as directed by the Inspector or the Engineer and in accordance with the DD-854 Standard Drawing Series. When the lateral is within the Edwards Underground Recharge Zone, it shall be installed in accordance with Standard Drawing DD-854-ERZD. 2. Designation of Lateral: A sewer pipe located between the sanitary sewer main and the customer s premise, is designated as a "sanitary sewer lateral." 3. Lateral Installation: All lateral installations shall be performed in accordance with Item Nos. 848; "Sanitary Sewers" 804, "Excavation, Trenching and Backfill," and as described herein. For sanitary sewer mains that are 12 inch in diameter or smaller, all laterals shall be connected using the appropriate size tee/wye placed in line with the main line. For mains larger than 12 inch, insert-a-tee conforming to ASTM 3034-08, or approved or equal, shall be used. Where waterline crossings with sanitary sewer laterals are less than the regulated separation distances, all lateral piping shall be SDR-26 PVC pipe (ASTM D2241-09), with a pressure rating of 150 psi. Connection to the customer s end of the lateral shall be performed using a flexible coupling, or pre-approved equal. All flexible couplings shall be concrete-encased to prevent movement or breakage of the steel bands. All 854-1 April 2014

San Antonio Water System Standard Specifications for Construction cleanouts at job sites shall have installed an approved heavy duty sanitary sewer cap. Cutting, excavation, and backfill shall be as specified herein and in accordance with applicable sections of Item No. 804, "Excavation, Trenching, Backfill." 854.5 MEASUREMENT: Sanitary sewer laterals shall be measured by the linear feet installed at the various diameter sizes. The measured dimension shall be taken from the centerline of the main to the connection at or just inside the customer's property line. Measurement will be continuous through any fittings in the main. 854.6 PAYMENT: Sanitary sewer laterals shall be paid for at the contract bid price per linear foot complete in place for the type, and size constructed. Price shall be full compensation for furnishing all materials, including pipe, pipe fittings (to include wyes, tees, bends), pumping, bedding, trenching or boring, trench protection, backfilling, tamping, cutting pavement and surface structures of whatever type encountered and replacement with whatever type specified and other incidentals required to complete the work. When the minimum separation distances for any water and sewer piping facilities cannot be maintained per 30 TAC 217.53, contractor shall install SDR-26 PVC pipe (150 psi pressure rated). Payment for this higher pressure rated pipe shall be made at the contract bid price per linear foot complete in place for the type and size constructed. Payment for the installation of the two-way cleanout shall be paid per each under the applicable line item. Only one-way cleanouts are required on the termination point of a dead-end main. - End of Specification - 854-2 April 2014

Section of 8" metallic or plastic pipe Top of Pavement Approved Cast Iron Sewer Cap * 18" 15" 10" Approved Cap 12" 12" Concrete Encasement Backfill to top of 1/8 Bend with 1" maximum aggregate 6" or 8" Pipe / Fittings Sewer Main Standard 1/8 Bend Close end with clay cap and grout in place or use mechanical joint plug Standard Wye branch SEWER * Approved Gate Cap (Heavy Duty) Note: Depending upon the type of service that an 8 inch lateral (on a dead end main) is providing, A standard manhole in liev of is cleanout may be required. Consult with the SAWS Inspector. PROPERTY OF SAN ANTONIO WATER SYSTEM SAN ANTONIO, TEXAS TYPICAL 6" OR 8" CLEANOUT DETAIL (ON DEAD-END MAIN) APPROVED MARCH 2008 REVISED APRIL 2014 SHEET 1 OF 2