Environmental Protection and Testing: The Housing Authority s Experience

Similar documents
G. Common Defects in Buildings - Leakage

MAGA Engineering Sri Lanka Economic benefits of standards. October 2011 March 2012

Exhibit B. Property Acquisition and Disposition Division Residential Design & Performance Standards

8.7 DRAINAGE MAINTENANCE SERVICES CONTRACT AMENITY JAMES LENIHAN, DRAINAGE MAINTENANCE ENGINEER

Environmental Site Inspection Checklist

HUGO BOSS ENVIRONMENTAL COMMITMENT. Our claim. Our approach

BUSINESS, TRANSPORTATION AND HOUSING AGENCY CALIFORNIA DEPARTMENT OF HOUSING AND COMMUNITY DEVELOPMENT

Building Condition Assessment Report

Archant London Environmental Awards

Response, Reliability and Results in the delivery of leak detection services

Minimum Housing and Health Standards

Ironwork in Highways -Whole Life Cost Perspective. Reducing cost through collaboration

Design and Build of Passenger Terminal Building North Extension At Macau International Airport (RFQ-198) Section 6 Bill of Quantities

Quality Product Certification Scheme for Mechanical Couplers (QS/MC)

Half the cost Half the carbon

Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone:

A Guide to Repairs & Maintenance

CONTRACTOR SAFETY MANAGEMENT PROCEDURE

Acceptance Codes APPENDIX - A. Acceptance Criteria

Questions to be responded to by the firm submitting the application. Why do you think this project should receive an award? How does it demonstrate:

Chelsea s energy saving campaign

MILTON HALL BCO AWARDS 2014 THE WORKSPACE CONSULTANTS LLP

PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE

Georgia Tech Aerospace Server French building Server Room. Server Room Policy Handbook: Scope, Processes and Procedure

RESPONSIBILITY FOR REPAIRS AND MAINTENANCE FAIR FUNDING: April 2002

Response, Reliability and Results. for Managed Property

Toilet Plumbing. Here is a selection of different types of W.Cs and urinals. Can you match the pictures to the names below?

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

Applying ICT and IoT to Multifamily Buildings. U.S. Department of Energy Buildings Interoperability Vision Meeting March 12, 2015 Jeff Hendler, ETS

CitySwitch Green Office Sustainability Action Plan Small Business

Example Specialist Other contact

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

WILDCAT CANYON ROAD SPECIFICATION NO SLIDE REPAIR BIDDER'S PROPOSAL (continued)

Portable Air Conditioner. OWNER S MANUAL Read these instructions before use. Model: MN12CES / MN10CESWW

APEC CAPABILITIES PROJECT MANAGEMENT / SUPPORT

LONDON BOROUGH OF BROMLEY STANDARDS FOR HOUSES IN MULTIPLE OCCUPATION (HMO) INTRODUCTION

code of practice for household customers

Portable Air Conditioner. OWNER S MANUAL Read these instructions before use. Model: MM14CCS. Voltage rating: 115V~60Hz Power rating : 1400W

10 tips for getting more reliability from your air-conditioning system [reliability]

USER INSTRUCTIONS FOR GET PORTABLE 12k BTU AIR CONDITIONER MODEL No. GPACU12HR

Year project completed or estimated year of completion: October 2014

Building Condition Assessment Report

Renovation instructions

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling

Our repairs and maintenance service

WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE

Portable Air Conditioner. OWNER S MANUAL Read these instructions before use. Model: MF08CESWW. Voltage rating: 115V~60Hz Power rating : 800W

C. Section TESTING LABORATORY SERVICE.

HOWARD UNIVERSITY. I. Policy Statement. II. Rationale. III. Entities Affected by the Policy. IV. Definitions. Policy Number:

Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge.

Twenty-ninth Meeting of the Business Facilitation Advisory Committee

SECTION ABANDONMENT OF SEWER MAINS

A Class Air Source Heat Pump User Guide

SECTION SITE PREPARATION

Steel procurement in major projects: Guidance on the application of social issues. Purpose

Installation Guide. Bath and Wall Surrounds SERIES B

Hanson Building Products. precast basement solutions

Underground Commercial Electric Service

COMMERCIAL REPORT / STOCK CONDITION SURVEY. Sydenham Hill Estate Sydenham Hill London SE 23

Our Triple Bottom Line...

Bus: Fax: Toll Free:

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

Engineering Policy 146. Severe Weather Management Plans

How to report a repair

Sustainable Resource Management Ltd

1. Safety. 2. The Lining Contractor. DEPARTMENT OF AGRICULTURE, AND FOOD Farm Development Service November 2002 S126

San Antonio Water System Standard Specifications for Construction ITEM NO POINT REPAIRS AND OBSTRUCTION REMOVALS

Wireless Systems. Make Non-traditional Measurements Possible

Soils, Foundations & Moisture Control

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH Purpose and Application.

ADVICE NOTE WATER LEAKS. How to prevent water leaks in your flat

Section 5.0. Basements. Wall insulated externally. Wall insulated internally. Ba02. Product: Polyfoam ECO Floorboard Ba01.

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

Home Inspection Report

ALWAYS ON GLOBALSWITCH.COM

A Solid Foundation Solution for Homeowners. from. Our products are made with 90% Recycled Material Down. Right. Solid. GREEN.

How To Insure Against Problems With Your Home Warranty

Vehicle Tracking Pad

glyndwr.ac.uk/sustainability environmental sustainability strategy

LS 2540 SEWER LATERALS AND INSPECTION TEES

JAWAHARLAL NEHRU UNIVERSITY

CEPAS. Construction Stage. Comprehensive Environmental Performance Assessment Scheme for Buildings Edition

WATER LEAKS AND DAMAGE

REVIEWED ICT DATA CENTRE PHYSICAL ACCESS AND ENVIROMENTAL CONTROL POLICY

CalMod Design-Build Electrification Services

Energy and Carbon Saving Case Study

RULES FOR THE SETTING UP OF SUSTAINABLE BRANCHES Summary

Mechanical insulation to increase building efficiency. Saving money, energy and the planet.

Construction Technologies Career Field Pathways and Course Structure

6. Principles of effective plumbing systems


What Causes Foundation Leaking?

GE Oil & Gas. Air cooled heat exchangers Robust and reliable for all loads and applications

ASBESTOS CONTAINING MATERIALS POLICY

MAINTENANCE MANAGEMENT

- Save lives and reduce material damage

Holistic Approach in Delivering Government Buildings The Low Carbon Concept

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

Transcription:

Environmental Protection and Testing: The Housing Authority s Experience Ms Ada FUNG, JP Deputy Director of Housing (Development and Construction) Hong Kong Housing Authority Innovation and Technology Commission s Networking Dinner : 19 January 2011

2 Environmental Protection & Testing 1. Introduction Sustainable Development 2. Applying Innovative Procurement, Green Design & Construction 3. Applying Intelligent Solutions & IT 4. Conducting Applied Research for Green Solutions 5. Quality Assurance & Material Testing

3 Environmental Protection & Testing 1.Introduction Sustainable Development 2. Applying Innovative Procurement, Green Design & Construction 3. Applying Intelligent Solutions & IT 4. Conducting Applied Research for Green Solutions 5. Quality Assurance & Material Testing

Public Housing in Hong Kong - a Sustainable Community 4 Vision To help all families in need to gain access to adequate and affordable housing Mission To provide affordable quality housing, management, maintenance and other housing related services in a proactive and caring manner Cost-effective and rational use of public resources Competent, dedicated and performance-oriented team Core Values 4 C s

5 We have a stock of about 700,000 flats, and we are building an average of about 15,000 flats per year. About 30% of Hong Kong s 7 million people are residing in public rental housing. Sustainable Development : To meet present social, economic and environmental needs but NOT at the expense of future generations. We provide a green and healthy living environment for our community. Environmental 環 境 Social 社 會 Economic 經 濟

6 Environmental Protection & Testing 1. Introduction Sustainable Development 2.Applying Innovative Procurement, Green Design & Construction Three- envelope Tendering System for Integrated Procurement Contract Two- level Lighting System for Lobbies, Corridors and Staircases 3. Applying Intelligent Solutions & IT 4. Conducting Applied Research for Green Solutions 5. Quality Assurance & Material Testing

7 Procuring for Innovations : Incentivizing Innovations Remember 2 Envelope Systems? to select designers (or contractors ) based on evaluation of both (1) Technical and (2) Price - envelopes (proposals) HK Housing Authority aims to move Construction from 4Ds to 4Cs: from Dirty, Dangerous, Demanding, Damaging/ Disruptive to Caring, Customer-focused, Creative, Committed launched a 3 Envelope System in 2009, with the additional Envelope requiring Tenderers to propose any specific Innovations. 1 st (Technical) envelope only relates to Client Design and proposal, hence must conform to that. But 2 nd envelope will list any alternatives as innovations (in 2a); and secondly list corresponding benefits and costs (in 2b). Unsuccessful tenderers will be paid a one-off lump sum for acquisition of intellectual property right for their innovations, specially on Design & Build projects as in the pilot project now underway.

8 Procuring for Innovations : The Three- envelope System Total non-price Score: 45% Price Score: 55% Envelope 1 Corporate + Technical Envelope 2 Innovation Envelope 3 $$$

9 Procuring for Innovations : Assessment, Scoring & Selection of Innovation Proposals Step 1 Open Envelope 2a and Assess Technical Submissions Envelope 2a Technical Submission Accept Proposal If Complying with All 5 Assessment Criteria Assess & Classify Benefit Level HIGH (0.8%) MEDIUM (0.5%) LOW (0.2%) Step 2 Open Envelope 2b and Prioritize Proposals Envelope 2b Price Adjustment Accept Proposal If Price Adjustment Is Reasonable Prioritize Proposals By Price Adjustment (lowest first) Step 3 Select Proposals As Many As Possible Total Technical Score 5% Total Price Adjustments $200M

10 Energy Performance of New Residential Buildings Energy Performance of Existing Residential Buildings The Challenge and The Solution 2- Level Lighting System Design Manual: Barrier Free Access 2008 requires 85 Lux at Common Areas for needy people 386,243 kwh would have been consumed per annum A duty set of lighting system will provide 30 Lux around the clock, it s the minimum requirement of the Code of Practice for Means of Escape Standby sets of lighting system at different areas to elevate to 85 Lux when switched/ triggered on Extra $800,000 for the control, conduit and cable Only 264,799 kwh will be consumed per annum, save 121,444 kwh, 7 years payback

11 2- Level Lighting System Saving Mode Bright Mode Press the Button 30 Lux 85 Lux Standby SetOff On for 10 mins Corridor Entrance

Energy Performance of Existing Residential Buildings 12 2003/04 The Downward Trend of Electricity Consumption 900 850 800 750 700 650 878 2008/09 kwh / Flat / Annum 808 2019/20 Projection 2001/02 2002/03 2003/04 2004/05 2005/06 2006/07 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 753 Trim down over-illuminated lighting level Employ high efficiency T5 Fluorescent Tube to replace T8 Fluorescent Tube Employ high efficiency Electronic Ballast to replace Electromagnetic Ballast in lighting system Employ Photo Sensor to control lighting on/off Set timer according to season to control lighting on/off Modernize lifts with advanced Variable Voltage Variable Frequency control system

13 The Challenge The electricity consumed by lighting serving the common areas of all the HA s existing residential blocks is approximately 250 gwh per annum 20% saving would mean 50 gwh or $50M or 35,000 tonnes of CO 2 emission reduction

14 The Solution LED Lighting could be a solution to the challenge HA is actively motivating the industry to design and produce LED Lighting bulkhead fitting that can be used to replace the existing Compact Fluorescent Lighting bulkhead fitting If successful, the private buildings can follow and Hong Kong can benefit

15 Environmental Protection & Testing 1. Introduction Sustainable Development 2. Applying Innovative Procurement, Green Design & Construction 3.Applying Intelligent Solutions & IT Use of Building Information Modeling (BIM) Use of Geographic Information System (GIS) Use of Radio- frequency Identification (RFID) 4. Conducting Applied Research for Green Solutions 5. Quality Assurance & Material Testing

16 Required Expected Possible Impractical Impossible

Building Information Modeling 17 3D Views Excavate the upper platform Excavate the middle platform Platform A Platform A Platform B Platform B Fill the lower platform Formation of Temporary Soil Platforms - Cut and Fill Balancing to minimize the import and export of fill materials

18 Building Information Modeling Daylight Analysis Apply BIM analysis software on a typical modular flat to achieve the daylighting target and minimize the use of artificial lighting

19 Building Information Management Construction Coordination - Avoid clashes, abortive works and wastes

20 Web- based GIS in Housing Authority Our new intranet-based Geographic Information System (GIS) helps our colleagues to collect and integrate geospatial information to assist in public consultation, site planning, design and construction works and handling of public enquiries. Integrate to HA s information technology infrastructure as Single-Sign-On (SSO) Enabled Application Support 50 concurrent users

21 AEC Parties using GIS/BIM Development & Construction (DCD) Suppliers A SE BSE LA LS QS CE GE ES P Main Contractor s EMD Estate Management (EMD) Sub Contractor s HM MS Consultant s Other Government Departments Water Supplies Drainages Services Highways Lands Fire Services Planning Civil Engineering & Development EMSD Utility Companies Telephone Broad Band Gas Electricity

22 GIS and BIM applications developed from two arenas and different vendors GIS BIM Data transfer Data lost 2D Maps and simple 3D models Comprehensive 3D BIM models

23 Use of RFID in monitoring the manufacturing, delivery and installation of Building Components RFID tag embedded during manufacturing Central Database Record (Cloud Computing) Inspection and RFID scanning Delivery to site Inspection and RFID scanning In Factory On Site Handover (Database for Building Maintenance)

24 Use of RFID in Disposal of Construction & Demolition Material Dump Truck arrive the Site RFID Scanning RFID Reader Central Database Record (Cloud Computing) Collection of C& D Materials Record Plate No. of Dump Trucks Total Weight of Dump Truck Loading Condition Chit Form & DDF No. RFID Tag Loading Condition RFID Scanning Dump truck arrive the site

25 Use of RFID in Ready Mixed Concrete Delivery Concrete Truck leave the Plant RFID Reader Mix ID RMC Plate No. Concrete Grade Batching Time RFID Scanning RFID Tag Central Database Record (Cloud Computing) Arriving Time Exceed Allowable Time Limit? Concrete Truck arrive Site RFID Scanning RMC Delivery RFID Reader RFID Reader Leaving Time RFID Scanning Concrete truck Leave the site

26 Use of RFID in Concrete Cube Compression Test Embed RFID tag in Cube Making Input relevant data via RFID scanning and via cloud computing Central Database Record (Cloud Computing) Delivery to Laboratory Testing Automatic Data Capturing and Sample Verification by RFID (including weight, dimension and compressive strength)

27 Environmental Protection & Testing 1. Introduction Sustainable Development 2. Applying Innovative Procurement, Green Design & Construction 3. Applying Intelligent Solutions & IT 4.Conducting Applied Research for Green Solutions Temperature Indicating Strip (lift) W- trap Twin Tank Use of Marine Mud Use of Concrete Cores 5. Quality Assurance & Material Testing

28 Temperature Indicating Strip Background: Lift incident at Fu Shin Estate in 2008 Incident: Lift fell to ground level Cause: Failure of counterweight pulley bearing

29 Temperature Indicating Strip Issue: Early detection of fault of pulley bearings Traditional method: Regular visual inspection Listen to any abnormal noise Feel any abnormal heat with hand

30 Temperature Indicating Strip Fault Detection Early Identification of Fault More objective and quick-fix solution: Temperature Indicating Strip on pulley assemblies (to alert maintenance personnel of any abnormality) Temperature Indicating Strip: self-adhesive type give irreversible colour change permanently record the highest temperature of pulley assemblies

31 W- trap System The outbreak of SARS in March 2003 has aroused concern about dried up floor traps and transmission of virus into the bathroom / kitchen from a contaminated soil and waste stack. BD,HD & FEHD s Guidelines

32 W- trap System Collaboration with City University of Hong Kong to study the W-trap system in 2003. A series of tests successfully verified the operational stability.

33 W- trap System Buildings Department approved in principle the use of W- trap for connection to the floor drains in toilets to maintain water seal.

34 W- trap System Design Guide and Technical Specification compiled for project implementation. Implemented in all new PRH projects since the completion of first project, East Harbour Crossing Site 3 (Yau Lai Estate), in 2008. 150 CONNECTING TO S&W STACK WITH 50 WASTE PIPE WATER SEAL LEVEL CONNECTING TO SHOWER AREA WITH 50 WASTE PIPE CONNECTING TO FLOOR DRAIN WITH 40 WASTE PIPE WATER SEAL LEVEL

35 Twin Tanks System Background Cause Before Stoppage Regular cleansing of fresh / flush water tank in every 3 months During Stoppage Store up clean water IMPLICATION Cleansing workers at work Use fresh water for flushing After Resumption Wash away muddy water

36 Twin Tanks System Objectives

37 1. Achieve Green Management by reducing water wastage. (Saving water 2.8 million litre per year) 2. Achieve better customer service through un-interrupted water supply. 3. Achieve durability of structure with reduced maintenance and repair works. (Saving $2 millions for replacement of water tanks in each block in 30 to 40 years) 4. Shek Mun Estate - the first estate using the twin tanks completed in May 2009. Full implementation in all public rental housing projects at design stage from May 2008 onwards. Twin Tanks System Summary Adopting Twin Tank System and Associated Enhancements

38 Cement-Stabilisation for Backfilling Use of Marine Mud Marine mud is stiff, moist, low strength and high compressibility Mix 5% cement and 15% granular material Mix marine mud with other materials Marine Mud on Site Backfill cement-stabilized marine mud around substructure

39 Use of Marine Mud Production of Eco-Block Cement Recycled Aggregates Block Casting Machine Marine Mud Eco-paving block

40 Use of Concrete Cores Disposable rock cores collected from store Used as planter kerbs

41 Environmental Protection & Testing 1. Introduction Sustainable Development 2. Applying Innovative Procurement, Green Design & Construction 3. Applying Intelligent Solutions & IT 4. Conducting Applied Research for Green Solutions 5.Quality Assurance & Material Testing Use of Product Certification Use of Quality Assurance Systems

42 Product Certification Promoting quality assurance through upstream control, Housing Authority spearheads implementation of product certification in its construction projects in stages in 2010/2011 for seven major building materials: 1. Fire-rated timber doors ( 防 火 門 ) 2. Panel Wall Partitions ( 板 間 牆 ) 3. Cement Products (for architectural use) ( 袋 裝 水 泥 ) 4. Tile Adhesives ( 磁 磚 黏 合 劑 ) 5. Ceramic Tiles ( 磁 磚 ) 6. Repair Mortars ( 修 葺 砂 漿 ) 7. Aluminium Windows and 4-Bar Hinges Assembly ( 鋁 窗 及 窗 鉸 組 件 )

43 Product Certification HA s Surveillance Check of Building Materials on Site Project Team Contractor Proposed Material Submission Manufacturers rejected test / retest failed materials rejected from site Check on quality based on test certificates and track records Materials arrival on site Regular Surveillance Testing submission accepted test / retest passed Materials Accepted for Use Product certification to be introduced

44 Product Certification What is Product Certification ( 產 品 認 證 )? Product Certification is the process whereby a product is certified to achieving prescribed standards and quality requirements, through regular factory surveillance and periodic sampling and testing of products by third party of accredited certification body. Benefits Promoting industrial quality through upstream control Continuous surveillance of production process in factory to ensure consistent production quality Greater confidence on product quality to recognized standards Product Certification Mark to enhance product reputation, and hence business opportunities and competitiveness

45 Product Certification An Upstream Quality Control Manufacturers Hong Kong Accreditation Service (HKAS) 香 港 認 可 處 Independent Certification Bodies 獨 立 認 證 機 構 Products manufactured in factories Regular factory surveillance ( 監 察 ) on process and sampling for testing of products Failed Remedial action, suspension of certification etc. Passed Issuance/ Renewal of Product Certificates at regular intervals Delivery of Products to Sites

46 Quality Assurance Systems ISO 9000 quality ISO 14000 - environmental OHSAS 18000 - safety ISO 26000 corporate social responsibility ISO 31000 risk management ISO 50000 energy

47 Environmental Protection & Testing We care for our people. We care for our environment. To achieve Sustainable Development, we apply innovative procurement, green design & construction, intelligent solutions & IT. To ensure effective use of resources, we conduct Applied R&D for green & innovative solutions. To mitigate risks, we assure quality throughout the supply chain.

48 Environmental Protection & Testing We care for our people. We care for our environment. To achieve Sustainable Development, we apply innovative procurement, green design & construction, intelligent solutions & IT. To ensure effective use of resources, we conduct Applied R&D for green & innovative solutions. To mitigate risks, we assure quality throughout the supply chain. Thank You!