1 Pre-Design CEPAS Comprehensive Environmental Performance Assessment Scheme for Buildings Construction Stage Design 2006 Edition Operation Construction
2
3 Comprehensive Environmental Performance Assessment Scheme for Buildings Construction Stage Assessment Manual Buildings Department HKSAR Government 2006 Edition COPYRIGHT All rights are reserved. Applications to copy all or any part of this publication should be made to the Buildings Department, Hong Kong Special Administrative Region (HKSAR) Government.
4
5 CONTENT PREFACE Page CEPAS BUILDING DATA SHEET (CONSTRUCTION/DEMOLITION WORKS) 1 INDOOR ENVIRONMENTAL QUALITY (IE) 2 IE 1 Health & Hygiene 2 IE 2 Indoor Air Quality 4 IE 3 Lighting Environment 6 BUILDING AMENITIES (BA) 8 BA 1 Safety 8 BA 2 Management 9 RESOURCES USE (RE) 13 RE 1 Energy Efficiency 13 RE 2 Water Conservation 15 RE 3 Timber Use 17 RE 4 Material Use 21 LOADINGS (LD) 29 LD 1 Pollution 29 LD 2 Waste Management 37 SITE AMENITIES (SA) 41 SA 1 Landscape 41 SA 2 Security 43 NEIGHBOURHOOD AMENITIES (NA) 45 NA 1 Sustainability Economics 45 SITE IMPACTS (SI) 47 SI 1 Nature Conservation 47 SI 2 Heritage Conservation 49 SI 3 Buildability 51 NEIGHBOURHOOD IMPACTS (NI) 53 NI 1 Environmental Impact Assessment 53 NI 2 Environmental Interactions 54 NI 3 Impacts to Communities 56 APPENDIX 1. LIST OF ABBREVIATIONS 58 APPENDIX 2. SUMMARY OF CEPAS INDICATORS 60 APPENDIX 3A. CEPAS SCORING & WEIGHTING TABLES FOR CONSTRUCTION STAGE (CONSTRUCTION WORKS) 66 APPENDIX 3B. CEPAS SCORING & WEIGHTING TABLES FOR CONSTRUCTION STAGE (DEMOLITION WORKS) 70
6 PREFACE Thank you for reading this CEPAS Construction Stage Assessment Manual. This assessment manual for Construction Stage forms one part of the holistic life-cycle considered comprehensive environmental performance assessment scheme (CEPAS) for buildings in Hong Kong. It is for use during the building construction period. The target users for these publications are building developers, owners, designers and building environmental specialists, i.e. all parties of the building industry. The general public is also encouraged to use this scheme to understand more about building environmental issues. It is expected that the building performance will be improved when all the users are involved. The entire CEPAS assessment scheme consists of the following publications: CEPAS Application Guidelines CEPAS Pre-design Stage Assessment Manual CEPAS Design Stage Assessment Manual CEPAS Construction Stage Assessment Manual CEPAS Operation Stage Assessment Manual The CEPAS manuals are prepared to provide a measure to evaluate sustainability performance for all building types in Hong Kong. It is expected that this assessment scheme (2006 edition) will continue to develop by sharing research supports and implementation experience with other local and international assessment scheme. In order to maximise the flexibility of building planning, design, construction and operation, there is flexibility in a number of the indicators within this assessment scheme. It is recommended that this assessment scheme be used with reference to related technical guidelines from local and international academia, professional organisations and the Government. These CEPAS manuals were written by Ove Arup & Partners Hong Kong Limited and the associated subconsultants. The scheme has incorporated advices from local experts and the Steering Group members, issues raised in the Discussion Forum and Expert Panels, as well as findings of Questionnaire Survey to the stakeholders. The CEPAS assessment schemes, application guidelines and other codes, handbooks and information published by the Buildings Department can be downloaded at December 2006
7 CEPAS Building Data Sheet (Construction/Demolition Works) BD Ref. No. Building Name Building Address Building Type RESIDENTIAL NON RESIDENTIAL Usages Usages Building Dimensions Total site area (m²) Total floor area (m²) (AC-R) Occupancy (Person) Building Height (m) No. of floor (include basement) Open space area (m²) Total site area (m²) Total floor area (m²) (AC-NR) Occupancy (Person) Building Height (m) No. of floor (include basement) Open space area (m²) Non residential building (Office & public place floor area, i.e. area assigned for use by the tenant / landlord / public, such as office, common area, shop, within the total enclosed space) (m²) Non residential building (Other than office & public place floor area) (m²) Building Type RESIDENTIAL NON RESIDENTIAL Pre-design STAGE This submission (Tick one) Building stage assessed (Tick relevant) This submission (Tick one) Building stage assessed (Tick relevant) Design Construction (Construction works) Construction (Demolition works) Operation Operation Stage (Re-assessment) Construction Stage Assessment Manual Page Edition
8 INDOOR ENVIRONMENTAL QUALITY (IE) IE 1 IE 1.1 Health & Hygiene Health & Hygiene Intent To enhance of health and hygiene in construction / demolition site Strategy Indicators Sub-criteria Performance Scale Non-residential / Residential buildings 0 0 P C < P C < P C < P C 1 IE 1.1 Score Item Stage Strategy 1 C D Space provision for cleansing facilities and storage of cleansing equipment Non-residential / Residential No Yes N/A 2 C D Regular cleansing and good housekeeping in toilets and site office 3 C D Hygiene management plan for construction / demolition site 4 C D Designated person to inspect the site regularly to identify health and hygienic problem areas 5 C D Provide training and information on health and hygiene issues to construction site staff 6 C D Use of no / low emission cleaning products (A) Total maximum score (applicable items only) in this Sub-criteria (B) Total score (applicable items only) obtained in this Sub-criteria NON-RESIDENTIAL + RESIDENTIAL Sub-criteria performance score (P C ) (B)/(A) = P C Explanation Item 1: This indicator is assigned to encourage contractors to provide designated space within the construction / demolition site, including the site office, toilets and the constructed portions within the site. The designated space / room(s) shall be in the form of a room / protected space with sufficient storage area and washing basin, to Construction Stage Assessment Manual Page Edition
9 allow washing of cleansing equipment and storage of cleansing commodities. Item 2: Many construction / demolition sites are notorious for dirty toilets. This indicator aims to encourage the contractors to provide a better and more hygienic environment for site workers. The cleansing frequency of a site office will depend on the actual situation but daily cleansing of toilet is required. A cleansing logbook shall be provided to record the cleansing works. Item 3: The indicator aims to encourage the contractors to formulate a hygiene management plan for the construction / demolition site. The management strategies can be in form of educational basis, instructions or guidelines for site staff and both long-term and short-term workers. In addition, the management plan shall include the identification of hygienic problems and their possible locations, methods to maintain the hygiene performance and an emergency action plan. Item 4: This indicator is assigned to encourage the contractors to designate a member of site staff to inspect the construction / demolition site regularly, and to identify health and hygiene problem areas. A minimum inspection frequency of once a week is expected, for instance, stagnant water offers a breeding ground for mosquitoes, which may bite site workers and cause transmission of diseases. This indicator aims to eliminate health risks, such as mosquito growth within the construction / demolition site. A designated person is required to inform the project site staff for the requirement of health risk remedial works, such as stagnant water removal. Item 5: This indicator is assigned to maintain and improve health and hygiene knowledge and technique to site staff through education and training that provided by the contractors. Good health and hygienic environment is best achieved by staff good habits and practice. Item 6: Large quantity of cleaning products is consumed during construction and demolition works. Some of the cleaning products are toxic and non-biodegradable, which will cause adverse impact to the environment. This indicator is assigned to encourage the use of environmentally-friendly cleaning materials and products. Submittal The following information shall be provided to demonstrate the compliance of the Strategy Indicators: Hygiene management plan. Management plan implementation records. Layout drawing and relevant evidence, such as photos. Training records / materials on environmental health. Documentation on using environmentally friendly cleaning products. Construction Stage Assessment Manual Page Edition
10 IE 2 IE 2.1 Indoor Air Quality Indoor Air Quality Strategies Intent To provide and implement IAQ strategies for the construction / demolition site Strategy Indicators Sub-criteria Performance Scale Non-residential / Residential buildings 0 0 P C < P C < P C < P C 1 Innovation 0 or 1 IE 2.1 Score Item Stage Strategy 1 C D Design with sufficient quantity of fresh air supply for the site office and show room on site 2 C - Design of commercial kitchen ventilation system within construction site with effective oily fume and odour removal in canteens and food business 3 C - Implement IAQ management strategies for occupied buildings under construction Non-residential / Residential No Yes N/A 4 C - Use of no/low emitting building and furnishing materials (A) Total maximum score (applicable items only) in this Sub-criteria (B) Total score (applicable items only) obtained in this Sub-criteria NON-RESIDENTIAL + RESIDENTIAL Sub-criteria performance score (P C ) (B)/(A) = P C Explanation Item 1: This indicator is assigned to encourage the provision of good quality fresh air to the construction / demolition site office and show room / sale office. The minimum fresh air rate for the office area as described in the ASHRAE Standard : Ventilation for Acceptable Indoor Air Quality, shall be referred as the minimum compliance requirement for this indicator. Item 2: This indicator is assigned to encourage appropriate design of the commercial kitchen ventilation system within the construction site. The ventilation system should be equipped with effective oily fume and odour removal for canteens and food Construction Stage Assessment Manual Page Edition
11 business. The EPD A Guide to Control of Oily Fume and Cooking Odour from Restaurants and Food Business shall be referred. Item 3: This indicator is assigned to encourage IAQ control due to construction works in occupied buildings. The IAQ Guidelines for Occupied Buildings Under Construction (1995), published by the Sheet Metal and Air Conditioning, Contractors National Association (SMACNA) or other relevant publication shall be referred. In addition, if spatially feasible, a temporary exhaust air duct is recommended to extract air directly from the construction area to the ambient. Air in the construction area should be prevented from getting into the occupied space, this can be achieved by maintaining negative air pressure in the A&A areas. In addition, all air filters used in the construction site and its surrounding areas shall be replaced prior to occupancy of the A&A portions. Item 4: This indicator is assigned to control indoor air pollution at source, which is one of the effective indoor air pollution control strategies. Building and furnishing materials without or with low pollutant emission, particularly on VOC, is acceptable for this indicator. Innovation Item: Innovative method to further improve IAQ in construction / demolition site This is a bonus score for innovative IAQ management in the construction / demolition site Submittal The following information shall be provided to demonstrate compliance with the Strategy Indicators: Relevant strategy report. Strategy implementation records. Relevant photographic evidence. Other relevant supporting documentation for improved and innovative ideas. Material Safety Data Sheet (MSDS) or manufacturer s data sheet highlighting the slated VOC emissions on building / furnishing materials Construction Stage Assessment Manual Page Edition
12 IE 3 IE 3.1 Lighting Environment Visual Quality & Comfort Intent To design and maintain good visual comfort in site office and enhance energy efficiency for electric lighting installations Strategy Indicators Sub-criteria Performance Scale Non-residential / Residential buildings 0 0 P C < P C < P C < P C 1 Innovation 0 or 1 IE 3.1 Score Item Stage Strategy 1 C D Design of lighting with optimum illuminance and glare control in site office. 2 C D Design with daylight and electric lighting integration in site office and allow more daylight access to the interior Non-residential / Residential No Yes N/A 3 C D Use of T5 fluorescent lamps in site office (A) Total maximum score (applicable items only) in this Sub-criteria (B) Total score (applicable items only) obtained in this Sub-criteria NON-RESIDENTIAL + RESIDENTIAL Sub-criteria performance score (P C ) (B)/(A) = P C Explanation Item 1: Optimum illuminance level can reduce energy consumption as it avoids the over-provision of lighting and produces a good indoor visual environment. Glare control for electric lighting can be achieved by means of selecting proper designed luminaries to limit the glare within site office. Lighting installations in various areas and space shall achieve and maintain the optimum standard of illuminance and limit the glare index, as recommended by the CIBSE Code for Interior Lighting (1997). Item 2: This indicator is assigned to encourage use of daylight instead of electric lighting, and use of automatic lighting control system for integrated daylight and electric lighting operation. Appropriate control and sensor facilities shall be provided to allow coordinated operation of the natural and artificial light sources, in response to the interior requirements and outdoor daylight conditions. The integrated control shall be able to minimize the operating period of electric lighting and to allow more use of Construction Stage Assessment Manual Page Edition
13 daylight. Also, a more pleasant indoor environment can be created through daylight access. However, daylight may bring along radiation to the interior and so the use of optimum external solar shading devices and the collection of reflected daylight are encouraged. Item 3: Technical details for energy efficient lighting installations, as referred in the EMSD Guidelines on Energy Efficiency Equipment: T5 Fluorescent Lamps. The T5 fluorescent lamp is recommended for all construction site office areas, where feasible. Innovation Item: Innovative method to further improve the indoor visual comfort and lighting energy efficiency within construction site This is a bonus score for innovative method to improve the visual quality and comfort in construction / demolition site. Submittal The following information shall be provided to demonstrate compliance with the Strategy Indicators: Relevant strategy report, calculation, equipment specification. Relevant photographic evidence. Other relevant supporting documentation for improved and innovative ideas. The maintained illuminance shall be calculated using lumen method as described in the CIBSE code. Construction Stage Assessment Manual Page Edition
14 BUILDING AMENITIES (BA) BA 1 Safety Pre-requisite Criteria Intent To provide a safe working environment in and around a construction / demolition site Stage C D Requirements This indicator is assigned to reassert the importance of Safety in the overall building environmental performance through the current statutory requirements. Compliance Statutory requirements, no assessment in CEPAS is required. Maintaining a safe environment for workers in and around a construction / demolition site is essential for a sustainable community. The government is endeavours in protecting and promoting health and safety for the community. Compliance with safety related statutory requirements are considered as minimum requirements in this assessment scheme. Meanwhile, additional safety measures provided by the building Developer / Owner / Contractor are recommended. The followings are some common safety related statutory requirements in Hong Kong. Code of Practice for Safety and Health at Work in Confined Spaces Code of Practice for Site Safety Supervision Code of Practice on the Design and Construction of Builders Lifts This indicator is applicable for both Construction and Demolition Stages. Construction Stage Assessment Manual Page Edition
15 BA 2 BA 2.1 Intent Management Building Management To provide effective and environmental conscious construction management Strategy Indicators Sub-criteria Performance Scale Non-residential / Residential buildings 0 0 P C < P C < P C < P C 1 Innovation 0 or 1 BA 2.1 Score Item Stage Strategy (A) 1 C D Major contractors for the construction / demolition projects are accredited with ISO 9000 quality management system 2 C D Major contractors for the construction / demolition projects are accredited with ISO environmental management system 3 C D Major contractors for the construction / demolition projects are accredited with OHSAS occupational health and safety management system 4 C D Environmental training provided for the major contractors management and supervisory staff at the early stage of construction / demolition process 5 C D Environmental training provided for the construction workers at the early stage of construction / demolition process 6 C - Comprehensive building records provided and conveyed to building operator and designer with satisfaction 7 C - Comprehensive and effective testing and commissioning works provided and satisfy the designer s requirements 8 C - Appropriate trainings of various building facilities and services installations provided by the contractors and suppliers to the building operators Total maximum score (applicable items only) in this Sub-criteria (B) Total score (applicable items only) obtained in this Sub-criteria Non-residential / Residential No Yes N/A Construction Stage Assessment Manual Page Edition
16 NON-RESIDENTIAL + RESIDENTIAL Sub-criteria performance score (P C ) (B)/(A) = P C Explanation Item 1: A quality management system is fundamental for effective construction activities and essential in providing their clients with the quality of services they require. The services provided by contractors shall be carried out in a suitably coordinated, efficient and cost effective manner, with the guidance and restriction of an appropriate quality management system adopted. The widely recognised ISO 9000 standard shall be referred. Major contractors include the main builder and main building services contractors. Item 2: An Environmental Management System is an overall management system, which includes organizational structure, planning activities, responsibilities, practices, procedures, processes and resources for developing, implementing, achieving, reviewing and maintaining the environmental policy. It provides a framework for systematic presentation of environmental information for decision making as well as improving the environmental performance of the contractors, and enhancing their creditability with financial institutions, insurance companies, regulators and building Developers / Owners. The widely recognised ISO standard shall be referred. Major contractors include the main builder and main building services contractors. Item 3: An Occupational Health and Safety Management System is a part of the overall management system which includes organization structure, planning activities, responsibilities, practices, procedures, processes and resources for developing, implementing, achieving, reviewing and maintaining the occupational health and safety policy, and so managing the occupational health and safety risks associated with the business of the organization. The technical specification of OHSAS takes a structured approach to occupational health and safety management. The elements of successfully OH&S management are depicted as a process model consisting OH&S Policy, Planning, Implementation and Operation, Checking and Corrective Action, Management Review and ultimately Continual improvement. All of these processes are considerably important to building construction and contractors should develop plan to implement. Items 4 & 5: The indicators are assigned to encourage effective environmental training to raise environmental awareness and knowledge of the construction project team and workers. All staff involved in the construction project shall be included in this training, from site management level to worker level. The guidelines as described in the Annex 3.4: Environmental Training of the Best Practice Guide: Environment Best Practice Guide for Environmental Protection on Construction Sites, published by the Hong Kong Construction Association, shall be referred. In addition, other environmental precautions such as training of workers to avoid material breakage or left-over during material delivery, handling and storage shall be included. An inhouse environmental trainer or external trainer can carry out the training. The training materials shall cover general and site-specific precaution, mitigation, remedial measures for the construction project and good working practices. Coordination between the trainer and design team is encouraged, to enable the environmental design concept to be fully conveyed to the contractors staff. Item 6: A complete set of building records is essential for effective operation, maintenance and management, and should therefore be handed over to the building operator at project completion. The contractor is required to compile and provide the following information and convey to building operator. The score in this indicator is awarded to Contractor if the client s representatives are satisfied with the building records. Construction Stage Assessment Manual Page Edition
17 Building, structural, drainage, site formation, alterations and additions plans approved by the Building Authority (BA); documents associated with the approval such as calculations, undertakings, certificates, permits, etc.; and records on any change of use of certain parts of the building accepted by the BA Building services as-built drawings, including fire services, underground drains, drainage, water supply, electrical, lighting, broadcasting, gas supply, MVAC systems, etc. The plumbing and fire services drawings shall be the approved drawings by the Water Supplies Department and Fire Services Department respectively. Layout plan for hidden utilities such as electricity cables, gas pipes, telephone lines, etc. Testing, commissioning and operation manuals for building services, mechanical components and installations. Maintenance certificate, installation contract, etc. of the building services Testing records and certificates required under Fire Service (Installations and Equipment) Regulations Testing records and certificates required under Building (Ventilating Systems) Regulations Testing and inspection records and certificates required under Lifts & Escalators (Safety) Ordinance Testing records and certificates required under Electricity (Wiring) Regulations Certification for the performance of specific materials and components, as well as warranties from specialist contractors or suppliers (e.g. on waterproofing materials and its installation work) Completed CEPAS Pre-Design, Design and Construction Stages assessment forms, results and submission details (if available). The operation and maintenance (O&M) manual shall be prepared with user-friendlly and well-structured format ASHRAE Guideline 4 (1993), BSRIA Application Guide 1/87 (1990), or equivalent standards can be adopted as reference for manual preparation. Item 7: Building commissioning is a critical part of the building handover procedure and is important for the building s long-term operation, as it determines the expense of building operation and rectification works. It involves testing and balancing of the installed systems to ensure correct and effective compliance with regulations, specifications and design intent. To ensure the Contractor s performance works in testing and commissioning works, the performance testing and commissioning (T&C) works shall cover various building systems. Reference to relevant T&C standards are also required, such as the Testing and Commissioning Procedure for various building systems issued by the Building Services Branch of Architectural Services Department of HKSAR, as well as other recognized international guidelines such as those issued by the CIBSE, BSRIA and ASHRAE. For large building projects or building with complicated building systems, employment of a specialist commissioning agent is recommended. This indicator is assigned to recognize the contractors commitment in carrying out comprehensive and effective T&C works prior to handover to the building operator by means of the above-mentioned standards and guidelines. The score in this indicator is awarded to Contractor if the T&C works are entirely satisfied by the client s representatives. Item 8: Appropriate and effective training shall be arranged by contractors and Construction Stage Assessment Manual Page Edition
18 suppliers to train the operating and maintenance staff, and familiarize them with the building design philosophy, as well as the strategies and methods for the operation of various building facilities and building services systems. The scope of the training depends on the scale of the building, as well as the complexity of building services installations and building facilities. This indicator is assigned to recognise the contractors commitment in carrying out comprehensive and effective technical training to the building operator. The score in this indicator is awarded to Contractor if the training scope and information are entirely satisfied by the client s representatives. Innovation Item: Innovative method to further improve the construction / demolition management effectiveness This is a bonus score for using innovative method to improve the construction / demolition project management process, such as the construction program, environmental management, construction method, construction sequence, etc. Submittal The following information shall be provided to demonstrate the compliance with the Strategy Indicators: Relevant strategy report. Strategy implementation records. Relevant approval letters from the client s representatives and relevant certificates. Other relevant supporting documentation for improved and innovative ideas. Construction Stage Assessment Manual Page Edition
19 RESOURCES USE (RE) RE 1 RE 1.1 Energy Efficiency Energy Efficiency Intent To enhance the energy efficiency performance of construction / demolition site Strategy Indicators Sub-criteria Performance Scale Non-residential / Residential buildings 0 0 P C < P C < P C < P C 1 Innovation 0 or 1 RE 1.1 Score Item Stage Strategy 1 C D Formulation and implementation of an overall energy management strategy for the construction / demolition site 2 C D Formulation and implementation of an overall energy management strategy for the site office 3 C D Formulation and implementation of a lighting operation strategy to minimise unnecessary lighting operation in the construction / demolition site at night 4 C D Minimum 50% of all electrical appliances and equipment used in site offices complied with Grade 2 or better as defined in the EMSD Energy Efficiency Labelling Scheme for Household Appliances and Office Equipment / Multi-function Device for site office & sales areas 5 C D Minimum 50% of all electrical appliances and equipment used in sale office and show room on construction site complied with Grade 2 or better as defined in the EMSD Energy Efficiency Labelling Scheme for Household Appliances and Office Equipment / Multifunction Device for site office & sales areas Non-residential / Residential No Yes N/A 6 C D Use of renewable energy in the construction / demolition site (A) Total maximum score (applicable items only) in this Sub-criteria (B) Total score (applicable items only) obtained in this Sub-criteria Construction Stage Assessment Manual Page Edition
20 NON-RESIDENTIAL + RESIDENTIAL Sub-criteria performance score (P C ) (B)/(A) = P C Explanation Item 1: The indicator is assigned to encourage the major contractor to establish energy management strategies for the construction / demolition site. The strategy shall include energy saving measures, categorised energy consumption records and an education program for site staff. A competent person shall be assigned to supervise the development and implementation of the strategy and to monitor its effectiveness. Also, the use of advanced and efficient construction machineries are encouraged in the strategy. Direct burning of coal, wood, or even rubbish on site shall be prohibited. Item 2: The indicator is assigned to encourage the Client and contractors to establish energy management strategy for the temporary office in construction / demolition site. A competent person shall be assigned to organise an energy saving education program and to supervise and its follow up activities. Also, sufficient thermal insulation for the temporary building fabric and minimisation of infiltration is required. In addition, a sufficient operable window shall be provided to allow natural ventilation during moderate seasons. Item 3: This indicator is assigned to minimise energy wastage through unnecessary electric lighting operation at night. For instance, use of fluorescent lamps instead of incandescent lamp is recommended for site security use. Items 4 & 5: This indicator is assigned to encourage the use of energy efficient electric appliances in the site office and sale office, such as air-conditioners. Item 6: Possible use of renewable energy on site includes wind, solar electricity, solar thermal, etc. Innovation method: Modification of the design and to facilitate construction / demolition methods or sequence that can reduce energy consumption during construction process This is a bonus score for innovation in construction method. This indicator is assigned to encourage the contractor to use advanced and innovative method to further reduce energy consumption during construction. For instance, the contractor may propose an alternative construction method with improved energy consumption, other than the specified method in the design stage, to carry out construction work without a major cost implication. Submittal The following information shall be provided to demonstrate compliance with the Strategy Indicators: Energy management strategy report with time program. Strategy implementation records. Relevant photographic evidence. Construction Stage Assessment Manual Page Edition
21 RE 2 RE 2.1 Water Conservation Water Conservation Strategies Intent Encourage the implementation of water conservation strategies and provide effective facilities Strategy Indicators Sub-criteria Performance Scale Non-residential / Residential buildings 0 0 P C < P C < P C < P C 1 Innovation 0 or 1 RE 2.1 Score Item Stage Strategy Non-residential / Residential No Yes N/A 1 C D Use of low flow water closet in construction site office 2 C D Use of automatic / manual flow control faucet and control valve for urinal in site office 3 C - Use of low flow water closet in sale office & show room on construction site 4 C - Use of automatic / manual flow control faucet and control valve for urinal in sale office & show room on construction site 5 C D Collection of rainwater for reuse within construction / demolition site (A) Total maximum score (applicable items only) in this Sub-criteria (B) Total score (applicable items only) obtained in this Sub-criteria NON-RESIDENTIAL + RESIDENTIAL Sub-criteria performance score (P C ) (B)/(A) = P C Explanation This indicator aims to encourage the reduction of consumption, for both potable & flushing water. The water wastage habits of some contractors can be improved in actively by means of education, or passively by means of manual / automatic flow control devices for controlling water supply. Both are feasible and will achieve the aims effectively. Reduction in water use will not only reduce the environmental loading on both water supply and waste treatment facilities, but also to lessen the demand for energy use, Construction Stage Assessment Manual Page Edition
22 pumping power in the utility network, chemical treatment and the environmental impacts in water treatment process. A variety of water saving facilities is commercially available in Hong Kong. Automatic devices can provide a better service quality, while some manual devices can also provide the same function. Innovation method: Use of other water saving device or innovative idea to reduce water consumption in construction / demolition site This indicator is satisfied if the innovative devices or designs can save water by 15% of the total water consumption. Submittal The following information shall be provided to demonstrate the compliance of the Strategy Indicators: Relevant strategy report. Relevant photographic and other evidence. Other relevant supporting documentation for improved and innovative ideas. Construction Stage Assessment Manual Page Edition
23 RE 3 RE 3.1 Timber Use Timber for Temporary Use Intent To reduce the use of timber for temporary purpose Performance Indicators Stage C D Sub-criteria Performance Scale Non-residential buildings Residential buildings 0 No reused / recycled timber used for temporary works 1 50% of reused / recycled timber used for temporary works (used 2 times) 2 80% of reused / recycled timber used for temporary works (used 5 times) 3 90% of reused / recycled timber used for temporary works (used 10 times) No reused / recycled timber used for temporary works 50% of reused / recycled timber used for temporary works (used 2 times) 80% of reused / recycled timber used for temporary works (used 5 times) 90% of reused / recycled timber used for temporary works (used 10 times) Non-residential Buildings Score (P C-NR ) Residential Buildings Score (P C-R ) RE 3.1 Score Explanation Timber is a global valuable resource. The construction industry in Hong Kong consumes a substantial amount of timber, with much of the timber being disposed to landfill sites after minimal use. Supply of timber is becoming increasingly scarce and there is no forest in Hong Kong that can supply timber for the industry. Reduction in timber consumption and reuse of timber for temporary works, such as hoarding, formwork, site office fabrication and other temporary use at sites is required. The proportion of timber use in a typical construction site is shown as follows, Hoarding 5% Formwork 80% Site Office fabrication 5% Site accommodation 10% Timber used for temporary work (such as formwork) for building construction is the dominant contributing factor on appropriate resource use. The use of reused / recycled timber for formwork could be conducted through the Contractor s own initiative or specified in the Design Stage. As far as global environmental sustainability is concerned, the source of timber rather than the type of timber is more emphasized in this indicator. Construction Stage Assessment Manual Page Edition
24 Submittal The following information shall be provided to demonstrate the compliance of the Performance Indicators: Confirmation from the Contractor with relevant material use records. Relevant photographic evidence. Construction planning / method statement(s) in relation with temporary works to illustrate the effort in reducing the use of timber and to be verified at the later stage of the construction programme. Construction Stage Assessment Manual Page Edition
25 RE 3.2 Minimization of Timber Use Intent To minimize the use of timber during construction Performance Indicators Stage C - Sub-criteria Performance Scale Non-residential buildings Residential buildings 0 Minimization < 50% of the timber use Minimization < 50% of the timber use 1 Minimization 50% of the timber use Minimization 50% of the timber use 2 Minimization 70% of the timber use Minimization 70% of the timber use 3 Minimization 90% of the timber use Minimization 90% of the timber use Non-residential Buildings Score (P C-NR ) Residential Buildings Score (P C-R ) RE 3.2 Score Explanation Timber is a global valuable resource and saving of timber is our priority in conserving our environment. The construction industry in Hong Kong consumes a substantial amount of timber, with many of them disposed to landfill sites after minimal use. Supply of timber becomes increasingly scarce and there is no forest in Hong Kong that can supply timber for the industry. Timber demand can be minimized by a number of measures during construction including: Use of large metal formwork Use of metal hoarding Use of precast façade and staircase using metal formwork Use of semi-precast slab to replace timber slab formwork. It is estimated that more than 90% of timber consumed in construction with traditional method can be saved 1. 1 Pang N.W. etal Green building the housing authority experience, Seminar on Green Building 2003 Construction Stage Assessment Manual Page Edition
26 Submittal The following information shall be provided to demonstrate the compliance of the Performance Indicators: Confirmation from the Contractor with relevant material use records. Relevant photographic evidence. Construction planning / method statement(s) in relation with temporary works to illustrate the effort on reducing the use of timber and to be verified at the later stage of the construction programme. Construction Stage Assessment Manual Page Edition
27 RE 4 RE 4.1 Material Use Recycled Material Use Intent Reduce material consumption and reduce demands on limited natural resources by using recycled materials. Performance Indicators Stage C - Sub-criteria Performance Scale Non-residential buildings Residential buildings 0 < 5% of materials & components used with recycled content 1 5% of materials & components used with recycled content 2 10% of materials & components used with recycled content 3 15% of materials & components used with recycled content < 5% of materials & components used with recycled content 5% of materials & components used with recycled content 10% of materials & components used with recycled content 15% of materials & components used with recycled content Non-residential Buildings Score (P C-NR ) Residential Buildings Score (P C-R ) RE 4.1 Score Explanation This indicator is assigned to encourage contractors to follow the material reuse requirements as stipulated in the Designer s specification, or to establish and implement material use strategy by their own initiative. The material use strategy shall include categorization of materials used for building construction and refurbishment, and to determine which building parts / components can be constructed from reused materials. In general, this performance indicator assesses a wide range of items. Major items of applicable recycled materials that correspond to a significant proportion of building structure are recycled steel rebar, recycled aggregates and recycled brick and blocks. Miscellaneous materials of plastic, packing board of paper, wood chips arid etc. As concrete is one of the most commonly used building materials, use of PFA or recycled aggregate in concrete are also encouraged. For large sections, PFA grading should be specified and complied with Work Branch Technical Circular (WBTC) 14/90. Crushed concrete aggregate should also compile with the British Standard BS 882. The use of materials that are recycled or consisted of recycled content is also encouraged. However, it must ensure that the reuse or recycled materials have no adverse impact to the environment. This indicator is applicable for materials to be used in major permanent building Construction Stage Assessment Manual Page Edition
28 components and materials, such as building structure, false ceiling, partition wall, paint, door, window, etc. Since a contractor has a better capability to determine the possible amount of materials with recycled content that can be used in each specific project, the score in the construction stage is awarded to the Contractor for increasing the percentage of materials used with recycled content. The percentage of material used as described in the performance indicators shall not less than the percentage of materials and components used with recycled content specified in the Design Stage. Submittal The following information shall be provided to demonstrate the compliance of the Performance Indicators: Material use strategy report. Reused / recycled material use record. Other relevant evidence, such as photos. Evidence to demonstrate that the recycled /reused materials will not cause adverse health impact to the future building users and occupants. The information is as required shall be able to demonstrate the recycled material source, categorization of material used, reused locations and amount of reused / recycled materials for building construction / refurbishment. The exact material content in purchased recycled materials should be verified from the supplier and submitted for review. The quantities of reused or recycled material should be determined on the basis of either the weight or volume of the total amount of material used. Reuse of material could be the material/ components salvaged from the existing structure during the demolition process and/or recycled materials from other sources and demolition sites. The recycled content of material shall be determined by dividing the weight/volume of recycled content in the item by the total weight/volume of all material in the item. The percentage of materials and components reused with recycled content relative to the total permanent materials used for building construction in the shell and core areas, as well as the materials provided by the landlord in rental and sellable areas shall be calculated. Construction Stage Assessment Manual Page Edition
29 RE 4.2 Construction Waste Recycling Intent To recycle construction waste generated in building construction process Performance Indicators Stage C - Sub-criteria Performance Scale Non-residential buildings / Residential buildings 0 < 3% of salvageable waste recycled and reused on or off site 1 3% of salvageable waste recycled and reused on or off site 2 5% of salvageable waste recycled and reused on or off site 3 10% of salvageable waste recycled and reused on or off site RE 4.2 Score Explanation When a building is constructed or refurbished, there are often substantial quantities of materials that are salvageable. The salvageable materials can be recycled and recovered for use in the construction process at the same site or other sites. Before commencement of any construction and refurbishment work, the Contractor is expected to carry out an estimation survey and to identify and categorize various types of salvageable materials from the building construction process in order to maximize the scale of salvageable waste recovery. The construction waste shall be categorized into inert and non-inert waste. Salvageable materials, including inert waste, such as metals, bricks and tiles, as well as non-inert waste such as timber, paper and plastic, should be removed from the buildings before being discarded to landfill. Selective sequential demolition in refurbishment work should be adopted to remove one type of material at one time to avoid mixing. If the building services equipment inside the A&A site can be reused or the metallic parts of the equipment are recyclable, hand dismantle is also recommended. The collected construction waste shall be recovered on site and transferred to a recovery factory or public filling area for reclamation. A certain essential items and their corresponding percentage of recovery are suggested as follows: 100% recovery of inert portion of excavated material and demolition debris from construction and refurbishment works, 100% recovery of metallic waste, 100% recovery of non-contaminated paper and cardboard Construction Stage Assessment Manual Page Edition
30 Submittal The following information shall be provided to demonstrate compliance with the Performance Indicators: Construction waste management plan. Waste management records for all construction waste for reuse in the same site or other sites, recycled and recovered in a factory, and inert material for government reclamation. Other relevant evidence, such as photos, drawings. Trip-ticket record with verifications by project engineer / architect representative, the record should record the amount of waste conveyed to landfill or public filling area. Receipts from recycle vendors on confirmation of recycled material received Relevant information are required to demonstrate the recycled material sources in the building construction work, categorization of material used, amount of reusable / recyclable materials collected with proper handling. The quantities of salvaged material should be determined based on either the weight or volume of the total amount of material produced and collected. The percentage of materials actually salvaged relative to the total amount of potentially salvageable materials produced during the construction and refurbishment process shall be calculated. Construction Stage Assessment Manual Page Edition
31 RE 4.3 Demolition Waste Recycling Intent To recycle demolished materials generated in building demolition process Performance Indicators Stage - D Sub-criteria Performance Scale Non-residential buildings / Residential buildings 0 < 20% of salvageable waste transfer to other site / recovery plant or on-site for recycle and reuse 1 20% of salvageable waste transfer to other site / recovery plant or on-site for recycle and reuse 2 40% of salvageable waste transfer to other site / recovery plant or on-site for recycle and reuse 3 60% of salvageable waste transfer to other site / recovery plant or on-site for recycle and reuse RE 4.3 Score Explanation When a building is demolished (exclude destruction work in A&A works), there are often substantial quantities of materials are salvageable. The salvageable materials can be recycled and recovered for use in the construction process in the same site or other sites or recycled in recovery plant. Before commencement of demolition work, contractor is encouraged to carry out a field survey and to identify and categorize various types of salvageable materials of the building in order to maximize the scale of salvageable waste recovery. Also, hand demolition and dismantling should be considered prior to demolition using point breaker, bulldozer, crane ball and chain, and explosives. The demolition waste shall be categorized into inert and non-inert waste. Salvageable materials, including inert waste, such as metals, bricks, masonry, excavated spoil and tiles, as well as non-inert waste such as timber, paper, plastic, should be removed from the buildings before demolition. Selective sequential demolition should be adopted to remove one type of material at one time to avoid mixing. If the building services equipment inside the building can be reused or the metallic parts of the equipment are recyclable, hand dismantle is also recommended. The collected demolition waste shall be recovered on site, transfer to recovery plant or public filling areas for reclamation. Since a contractor has a better capability to determine the possible amount of salvageable materials and to identify the possible recycling and reusable materials, field survey together with drawings to indicate the locations of various types of salvageable materials and a strategy plan to categorize the demolished materials for recover and disposal are essential to reduce waste in a demolition site. Presumably, recyclable waste salvaged for export in lieu of local consumption will also be credited in this performance indicator. In addition, a designated area to sort the waste material on-site before delivery to Construction Stage Assessment Manual Page Edition
32 recovery factory and other sites, or to store the reusable materials on site for new building construction, shall be assigned by the Contractor Submittal The following information shall be provided to demonstrate the compliance of the Performance Indicators: Demolition waste management plan. Waste management records for all salvageable materials demolished and for reuse in the same site or other site, recycled and recovered in factory, inert material for government reclamation. Other relevant evidence, such as photos and drawings. Trip-ticket record with verifications by project engineer / architect representative, the record should record the amount of waste conveyed to landfill or public filling area. Receipts from recycle vendors on confirmation of recycled material received Relevant information are required to demonstrate the recycled material sources in the building, categorization of material used, amount of reusable / recyclable materials for the future / other building refurbishment. The quantities of salvaged material should be determined based on either the weight or volume of the total amount of material demolished. The percentage of salvageable materials salvaged relative to the total amount of salvaged materials demolished and dismantled during the demolition process shall be calculated. Construction Stage Assessment Manual Page Edition
33 RE 4.4 Environmentally-Friendly Materials Intent Encourage use of environmentally friendly building materials to reduce environmental impacts. Performance Indicators Stage C - Sub-criteria Performance Scale Non-residential buildings 0 < 25% of environmentally friendly materials used 1 25% of environmentally friendly materials used 2 50% of environmentally-friendly materials used 3 75% of environmentally friendly materials used Residential buildings < 25% of environmentally friendly materials used 25% of environmentally- friendly materials used 50% of environmentally friendly materials used 90% of environmentally friendly materials used Non-residential Buildings Score (P C-NR ) Residential Buildings Score (P C-R ) RE 4.4 Score Explanation Use of environmentally-friendly material helps to minimize the life-cycle environmental impacts. Adoption of green building materials is encouraged and should be awarded. Meanwhile, environmentally-friendly construction methods, such as the use of system formwork aiming to cut down wastage on site, are encouraged. This indicator is applicable for major building materials, such as external walls, permanent partition walls, cladding, flat roof, floor finishes, windows, curtain walls, doors and paint, which are constructed in the shell and core area, as well as materials provided by the landlord in rental and sellable areas. Environmental-friendly material is defined as meeting (1) Compliance with the Hong Kong Green Label Scheme, Product Environmental Indicator for Construction Materials, produced by the Green Council and Hong Kong Productivity Council, or (2) Summary Rating `A in The Green Guide to Specification An Environmental Profiling System for Building Materials and Components, BRE, or (3) `Good in Environmental Resource Guide, The American Institute of Architects. The designer and contractor are capable to determine the possible amount of environmentally friendly materials used, the score for the construction stage is awarded to the Contractor for increasing the use of environmentally friendly materials in the building construction process. The percentage of material used, as described in the performance indicators, includes the percentage of environmentally friendly materials and components specified in the Design Stage. Construction Stage Assessment Manual Page Edition
34 Submittal The following information shall be provided to demonstrate compliance with the Performance Indicators: Environmentally friendly material use strategy report. Material use record and validation on the actual consumption compared with the designed amount as written in the strategy report Other evidence, such as photos. The information is required to demonstrate the type of environmentally friendly materials used, locations of applications and amount of environmentally friendly materials used for building construction / refurbishment. Construction Stage Assessment Manual Page Edition
35 LOADINGS (LD) LD 1 Pollution Pre-requisite Criteria Intent To minimise and mitigate outdoor pollution and the subsequent health and environmental impacts under global and local considerations Stage C D Requirements This indicator is assigned to reassert the importance of pollution reduction issues in the overall building environmental performance through the current statutory requirements. Compliance Statutory requirements, no assessment is required in CEPAS. Construction and demolition works should be carried out in full compliance with the Air Pollution Control Ordinance, Noise Control Ordinance, Water Pollution Control Ordinance, Ozone Layer Protection Ordinance and all relevant regulations, as well as statutory Code of Practice and Technical Memorandum from various government departments such as EPD, FEHD, AFCD, etc. Heavy construction machineries and vehicles shall minimise effluent discharge and satisfy statutory requirements. Construction Stage Assessment Manual Page Edition
36 LD 1.1 Air Pollution Intent To minimise and mitigate outdoors air pollution and the subsequent local and global health and environmental impacts. Strategy Indicators Sub-criteria Performance Scale Non-residential / Residential buildings 0 0 P C < P C < P C < P C 1 Innovation 0 or 1 LD 1.1 Score Item Stage Strategy (A) 1 C D Construction / demolition site air pollution and dust control management plan formulated and implemented by Contractor 2 C D Site personnel(s) are designated to carry out regular inspections on the effectiveness of air pollution control measures, and to carry out dust control in construction / demolition site 3 C D Construction / demolition works that leads to significant amount of dust generation shall be provided with proper sheltering to minimise dust spread 4 C - To store dusty materials in enclosed area, to carry out dusty material mixing works within sufficient sheltering, and to perform dust suppression measures to minimise dust spread 5 C D All refrigerants used for air-conditioning systems in site office are zero ozone depleting potential Total maximum score (applicable items only) in this Sub-criteria (B) Total score (applicable items only) obtained in this Sub-criteria Non-residential / Residential No Yes N/A NON-RESIDENTIAL + RESIDENTIAL Sub-criteria performance score (P C ) (B)/(A) = P C Explanation Dust, odour and incompletely combusted substances are the most common pollutant source in construction sites, due to various construction and demolition activities. Effective and comprehensive air pollutant control is required to minimise the spread of Construction Stage Assessment Manual Page Edition
37 pollutants within the site and to the surrounding area. Good management and implementation strategy will reduce the health risk to the personnel within a site. Item 1: This indicator is assigned to encourage the establishment of an air pollutant management strategy and to implement the strategy effectively. The `Air aspect as described in the checklist for site planning, Annex 3.3 of the Best Practice Guide: Environment Best Practice Guide for Environmental Protection on Construction Sites, published by the Hong Kong Construction Association, shall be referred. Item 2: This indicator is assigned to encourage effective implementation of dust control measures in a construction / demolition site. The checklist as described in Annex 4.4 of the Best Practice Guide: Environment Best Practice Guide for Environmental Protection on Construction Sites, published by the Hong Kong Construction Association, shall be referred. The designated person is required to carry out regular inspections of the construction site, according to the guideline. Items 3 to 4: The indicators described are the most common air pollutant issues in construction / demolition site. The indicators are assigned to encourage effective dust control during the construction and demolition process. Any plan formulation or dust control measures shall also be in line with the requirements as stipulated in the Air Pollution Control (Construction Dust) Regulation. Item 5: Reduction of ozone-depleting substances will benefit the global and local environment. The aim of this indicator is to reduce the release of ozone depleting substances such as chlorofluorocarbons (CFCs) and hydrochlorofluorocarbons (HCFCs) into the atmosphere from building materials and service systems. CFC and HCFC heavily implicates in the depletion of the ozone layer. The majority of CFC and HCFC related substances come from heating, ventilation, air conditioning and refrigeration equipment. This indicator is assigned to award the use of environmentally-friendly refrigerant in air conditioning equipment. Innovation Item: Other innovative method to further reduce air pollution generated from construction / demolition process This is a bonus score for innovation in reducing air pollution generated on site. Submittal The following information shall be provided to demonstrate the effectiveness of the implementation and compliance with the Strategy Indicators: Air pollution management strategy. Strategy implementation records. Relevant evidence such as photos, checklists, equipment specification and drawings. Other relevant supporting document for improved and innovative ideas. Construction Stage Assessment Manual Page Edition
38 LD 1.2 Water Pollution Intent To minimise and mitigate water pollution and the subsequent health and environmental impacts in global and local considerations Strategy Indicators Sub-criteria Performance Scale Non-residential / Residential buildings 0 0 P C < P C < P C < P C 1 Innovation 0 or 1 LD 1.2 Score Item Stage Strategy 1 C D Construction / demolition site water pollution management plan formulated and implemented by Contractor 2 C D Site personnel(s) designated to carry out regular inspection and on the effectiveness of water pollution control measures 3 C D Separate rainwater drainage path is provided such that contaminated waste water discharge to rainwater system can be avoided 4 C D Minimisation and treatment of wastewater from building construction / demolition 5 C D Reuse of washing water and providing silt removal facilities before discharged to drain 6 C D Soil and waste water from construction site toilets discharged to government sewer Non-residential / Residential No Yes N/A 7 C - Effective grease trap is provided for each site canteen (A) Total maximum score (applicable items only) in this Sub-criteria (B) Total score (applicable items only) obtained in this Sub-criteria NON-RESIDENTIAL + RESIDENTIAL Sub-criteria performance score (P C ) (B)/(A) = P C Explanation Wastewater from construction / demolition site mainly comes from rainwater stream, site toilets, site canteens, water effluent from construction process and cleansing. Construction Stage Assessment Manual Page Edition
39 Effective water pollution control methods shall be provided to minimise adverse environmental impact. All wastewater pollution control strategies shall be implemented together with routine inspection and maintenance is required. Item 1: This indicator is assigned to encourage establishment of water pollutant management strategy and to implement the strategies effectively. The `Water Quality aspect as described in the checklist for site planning, Annex 3.3 of the Best Practice Guide: Environment Best Practice Guide for Environmental Protection on Construction Sites, published by the Hong Kong Construction Association, shall be referred. Item 2: This indicator is assigned to encourage effective implementation of water pollution control measures in construction site. The checklist as described in Annex 6.2 of the Best Practice Guide: Environment Best Practice Guide for Environmental Protection on Construction Sites, published by the Hong Kong Construction Association, shall be referred. The designated person is required to carry out regular inspections on the construction site according to the guidelines. Item 3: In construction / demolition site, rainwater usually mix with soil and sand and creates a sand stream. Solid barrier or sand bags are possible means to filter the rainwater collection path, and to minimize soil and sand discharge into rainwater drain. Surface run-off from construction / demolition site are discharged into storm drains via adequately designed sand / silt removal facilities such as sand traps, silt traps and sediment basins. The sections for `Surface Run-off and Ground Water in the EPD ProPECC PN1/94 shall be referred. Item 4: Wastewater generated from general building construction / demolition activities, such as concreting, plastering, cleansing, are discharged into foul sewers with sufficient silt removal facility and ph adjustment. The section for `Wastewater from Building Construction in the EPD ProPECC PN1/94 shall be referred. Item 5: Boring and drilling water, wheel washing water and the water for testing & sterilization of water retaining structures and water pipes, are reused after sedimentation. Discharge of the waste water into storm drains shall be filtered via silt removal facilities. For discharging of Bentonite slurries, acid cleaning, etching and pickling wastewater shall be treated properly before discharging to foul sewers. Relevant sections in the EPD ProPECC PN1/94 shall be referred. Item 6: Wastewater discharged from toilet shall be discharged to government sewer as far as possible. For remote site, small sewage treatment plant can be constructed in accordance with the EPD ProPECC PN1/94. Item 7: Grease trap shall be sufficiently large to separate grease and wastewater effectively. Cleansing and inspection openings shall also be provided. The guidelines as described in the EPD ProPECC PN1/94 shall be referred. Innovation Item: Other innovative method to further reduce water pollution generated from construction / demolition process This is a bonus score for innovation in reducing water pollution generated on site. Construction Stage Assessment Manual Page Edition
40 Submittal The following information shall be provided to demonstrate the implementation effectiveness and compliance of the Strategy Indicators: Water pollution management strategy. Strategy implementation records. Relevant evidence such as photos, checklists, equipment specification and drawings. Other relevant supporting document for improved and innovative ideas. Construction Stage Assessment Manual Page Edition
41 LD 1.3 Noise Pollution Intent To minimise and mitigate noise pollution and the subsequent health and environmental impacts in global and local considerations Strategy Indicators Sub-criteria Performance Scale Non-residential / Residential buildings 0 0 P C < P C < P C < P C 1 Innovation 0 or 1 LD 1.3 Score Item Stage Strategy (A) 1 C D Formulation and implementation of a good management plan for the control of noise pollution at the construction / demolition site. 2 C D Designation of site personnel(s) for conducting regular inspection on the effectiveness of noise control measures. 3 C - Reduce noise from construction activities based on EPD nonstatutory requirements Total maximum score (applicable items only) in this Sub-criteria (B) Total score (applicable items only) obtained in this Sub-criteria Non-residential / Residential No Yes N/A NON-RESIDENTIAL + RESIDENTIAL Sub-criteria performance score (P C ) (B)/(A) = P C Explanation Noise from construction / demolition site mainly generated from work process and machineries. Effective noise pollution control methods shall be provided to minimise adverse environmental impact. All noise pollution control strategies shall be implemented together with routine inspection and maintenance. Item 1: This indicator is assigned to encourage establishment of noise management strategy and to implement the strategies effectively. The `Noise aspect as described in the checklist for site planning, Annex 3.3 of the Best Practice Guide: Environment Best Practice Guide for Environmental Protection on Construction Sites, published by the Hong Kong Construction Association, shall be referred. Item 2: This indicator is assigned to encourage effective implementation of noise Construction Stage Assessment Manual Page Edition
42 pollution control measures in construction site. The checklist as described in the Annex 5.2 of the Best Practice Guide: Environment Best Practice Guide for Environmental Protection on Construction Sites, published by the Hong Kong Construction Association, shall be referred. The designated person is required to carry out regular inspection on the construction site according to the guidelines. Item 3: The EPD ProPECC PN 2/93: Noise from Construction Activities Nonstatutory Controls shall be referred. Innovation Item: Other innovative method to further reduce noise pollution generated from construction process This is a bonus score for innovation in reducing noise pollution generated on site. Submittal The following information shall be provided to demonstrate the implementation effectiveness and compliance of the Strategy Indicators: Noise pollution control strategy. Strategy operation records. Relevant evidence such as photos, checklists, equipment specification and drawings. Other relevant supporting document for improved and innovative ideas. Construction Stage Assessment Manual Page Edition
43 LD 2 Waste Management Pre-requisite Criteria Intent To reduce waste generation, disposal and the associated environmental impacts Stage C D Requirements This indicator is assigned to reassert the importance of waste reduction issues in the overall building environmental performance. Carry out construction and demolition works with full compliance to the Waste Disposal Ordinance and all relevant regulations from various government departments such as EPD, FEHD, AFCD, etc. Compliance Statutory requirements, no assessment in CEPAS is required. Some buildings with hazardous waste disposal (e.g. Chemical and Asbestos) during construction / demolition should also abide by the corresponding Ordinances, Guidelines and Codes of Practice from EPD (e.g. Waste Disposal (Chemical Waste) (General) Regulation). Construction Stage Assessment Manual Page Edition
44 LD 2.1 C&D Waste Management Intent To encourage the implementation of effective construction and demolition waste management plan to reduce, recycle and reuse C&D waste Strategy Indicators Sub-criteria Performance Scale Non-residential / Residential buildings 0 0 P C < P C < P C < P C 1 Innovation 0 or 1 LD 2.1 Score Item Stage Strategy (A) 1 C D Contractor established and implemented a construction, demolition & municipal waste management plan in construction / demolition site 2 C D Designated person(s) to inspect the implementation effectiveness on various waste management strategies regularly 3 C D Designated centralised space(s) and facilities for sorting and storage of recyclable and non-recyclable waste specified 4 C D Provision of air tight system to store organic waste that may leads to bad smell and hygienic problem Total maximum score (applicable items only) in this Sub-criteria (B) Total score (applicable items only) obtained in this Sub-criteria Non-residential / Residential No Yes N/A NON-RESIDENTIAL + RESIDENTIAL Sub-criteria performance score (P C ) (B)/(A) = P C Explanation This indicator aims to assess the establishment of waste management strategies and provision of facilities for sorting and storage of municipal, construction and demolition waste. Specific area shall be assigned for different waste types, such as organic, nonrecyclable and recyclable wastes. The sorting of waste type can be carried out manually or automatically in the designated area(s). Hong Kong is facing serious long-term problems with poor management of construction and demolition (C&D) waste materials in the current practices. Relying on reclamation projects as the major outlets in reusing the inert C&D materials is Construction Stage Assessment Manual Page Edition
45 extremely unstable and would not be sustainable in the long run. Meanwhile, many salvageable materials discarded, demolished and dismantled in demolition and construction site are usually disposed into public landfill that leads to a serious land burden for this city. Item 1: This indicator is assigned to encourage contractors to implement effective construction and demolition waste management to reduce, recycle and reuse C&D waste. To comply with this indicator, the main contractor is required to formulate a comprehensive waste management plan and carry out weekly implementation records. The main contractor and developer s / owner s representative shall monitor contractor s performance and implementation records on C&D waste management. To comply with this indicator, the C&D waste management on construction and demolition site shall follow the methodologies and criteria as stipulated in the ETWB Technical Circular (Works) No. 19/2005: Environmental Management on Construction Sites. Reduction, Reuse and Recycling of C&D materials are the principles of the waste management plan. C&D waste is categorized into inert and non-inert wastes. The salvageable C&D waste can be reused on the same site or in other sites, or recycled and recovered in factory. Salvageable materials, including inert waste, such as metals, bricks and tiles, as well as non-inert waste such as timber, paper, plastic, should be addressed in the waste management plan. For inert waste, the Waste Flow Table as described in the ETWB Technical Circular (Works) No. 15/2003 shall be used. In addition, the main contractor shall formulate relevant weekly record tables to record the salvageable inert and non-inert C&D waste being generated, C&D waste that have been reused for the same site or other sites, disposal as public fill and transferred to factory for recovery. For inert C&D wastes, the record tables and their waste categorisation as described in the CEDD Technical Circular No. 42/2004 shall be used as reference for contractor s management plan formulation. For non-inert waste, the record format shall be similar to that of inert waste, but the categorisation shall include, but not limited to timber, paper, plastics, etc. The waste management plan shall be formulated specifically for the site construction and demolition activities. The waste management plan shall include, but not limited to the key types of waste to be reduced, waste reduction targets, waste reduction programmes, packaging waste management and waste disposal procedures. Apart from that, effective implementation is required to ensure the strategies are applicable to all site workers and cover the entire site area, including site office. The strategies can be in form of educational basis, instructions or guidelines. Besides, the EPD guidelines on Site Practice for Waste Reduction in Construction Industry shall also be referred. Item 2: Designated person(s) are required to inspect the implementation effectiveness of various waste management strategies on site every week. The designated person(s) should ensure the strategies are implemented according to the guidelines as stipulated in the waste management plan and keep up-to-date with the waste management records. The designated person(s) shall arrange guiding and warning materials, such as information sheet and poster, to ensure all workers and staff on site acknowledge the target and method of the C&D waste management plan. Also, the designated person(s) shall look for improvement strategies to enhance the effectiveness of waste management and maximising the recyclable waste collection and reuse. Item 3: Centralised space(s) could be allocated in form of open space or enclosed area, but enclosed area is recommended. However, for open space storage, sufficient distance away from the working space shall be maintained so as to Construction Stage Assessment Manual Page Edition
46 minimize both odour and health risks. The centralised space shall be located with convenient waste delivery access and with minimal environmental impact due to waste transportation within the site. The waste shall be at least classified to inert and non-inert, organic (e.g. from site kitchen), paper, masonry, timber, metals, plastics, concrete and excavated spoil categories. The checklist as described in the Annex 7.3 & 7.4 of the Best Practice Guide: Environment Best Practice Guide for Environmental Protection on Construction Sites, published by the Hong Kong Construction Association, shall be referred. Item 4: Exposed waste storage, particularly for organic waste, leads to unwanted odour and health risks to the surroundings. Provision of self-closing air tight system could be in automatic or manual operations. Innovation method: Innovative method to reduce waste generation or effective waste management in construction / demolition site This is a bonus score for innovation in construction and demolition waste management. Submittal The following information shall be provided to demonstrate the implementation effectiveness and compliance of the Strategy Indicators: Waste management plan. Strategy implementation records. Relevant evidence such as photos, checklists, equipment specification and drawings. Other relevant supporting document for improved and innovative ideas. Construction Stage Assessment Manual Page Edition
47 SITE AMENITIES (SA) SA 1 SA 1.1 Intent Landscape Tree Preservation To preserve and protect existing trees within the construction / demolition site Performance Indicators Stage C D Sub-criteria Performance Scale Non-residential buildings / Residential buildings 0 Without effective tree preservation and protection measures in site 1-2 Effective tree preservation and protection measures provided by Contractor in site (for all designated trees retain on the original locations or other places) 3 Effective tree preservation and protection measures provided by Contractor in site (for all designated trees including old & valuable trees (if any) retain on the original locations) SA 1.1 Score Explanation This indicator is assigned to encourage effective tree preservation and protection measures provided and implemented by the Contractor, with the support of Developer and Designers. The existing trees with good amenity value shall be incorporated in the landscape design of the new development, to form part of the landscape area. Survey to existing trees is required at the Design Stage. To comply with this indicator, all identified and designated healthy trees within the site shall be retained, preserved and protected by the Contractor within the site or transferred to other site for reuse. Implementation and monitoring of the tree protection measures on site to minimize the adverse impact to the preserved trees due to construction activities shall be included. Specific tree preservation of transplantation measures shall be formulated for large trees with high amenity value. The pre-requisite requirements for this indicator are field survey, and preservation and reuse of all existing healthy trees within the site that have been designated by the designer / client at the Design Stage. Damaging of any designated healthy existing trees due to improper protection and preservation is not eligible to obtain score in this indicator. The definition of old and valuable trees shall refer to the ETWB Technical Circular (Works) No. 29/2004: Registration of Old and Valuable Trees, and Guidelines for their Preservation. Retaining all existing old & valuable trees at the original locations is required due to lesser potential damage to the trees. Retaining of other old trees at the original locations is also encouraged. Therefore, additional score is awarded if all designated trees as identified in the design stage are retained at the original Construction Stage Assessment Manual Page Edition
48 locations. Submittal The following information shall be provided to demonstrate the compliance of the Performance Indicators: Tree protection and re-planting strategy. Tree survey and delivery records. Drawings showing the existing and new tree locations and numbers. Specific method statement for tree preservation and transplantation and monitoring reports for tree preservation works. Construction Stage Assessment Manual Page Edition
49 SA 2 SA 2.1 Intent Security Security To provide effective security measures in construction / demolition site Strategy Indicators Sub-criteria Performance Scale Non-residential / Residential buildings 0 0 P C < P C < P C < P C 1 SA 2.1 Score Item Stage Strategy (A) 1 C D Effective passive security facilities provided in construction / demolition site 2 C D Effective active security measures provided in construction / demolition site 3 C D No construction materials / demolished salvageable materials lose reported to police throughout the entire construction period Total maximum score (applicable items only) in this Sub-criteria (B) Total score (applicable items only) obtained in this Sub-criteria Non-residential / Residential No Yes N/A NON-RESIDENTIAL + RESIDENTIAL Sub-criteria performance score (P C ) (B)/(A) = P C Explanation Item 1: This indicator is assigned to encourage implementation of effective passive security facilities in construction / demolition site, such as security guard stand, access barrier / gate, security fence. Reasonable quantities of facilities and provisions shall be provided in according with the scale and complexity of the site. Item 2: This indicator is assigned to encourage implementation of effective active security facilities in the construction / demolition site, such as closed circuit television (CCTV), door alarm, electronic access control and security guards, etc. Sufficient facilities and provisions shall be provided in order to reflect the scale and complexity of the site. Item 3: Lose of construction materials may lead to delay of construction program and additional construction cost. Lose of demolished salvageable materials also reflect Construction Stage Assessment Manual Page Edition
50 inadequacy of security measures on site. Police s record on construction site lose case report is a good indicator in determining the effectiveness of site security. In order to comply this indicator, contractor should declare that they have no construction materials / demolished salvageable materials lose case reported to police throughout the construction / demolition period. Submittal The following information shall be provided to demonstrate the implementation effectiveness and compliance of the Strategy Indicators: Security strategy report. Strategy implementation records. Drawings showing security measures. Construction Stage Assessment Manual Page Edition
51 NEIGHBOURHOOD AMENITIES (NA) NA 1 NA 1.1 Sustainability Economics Sustainability Economics Intent To recognise the effort of the additional expenditure on improving environmental performance in construction / demolition site and its surroundings Performance Indicators Stage C D Sub-criteria Performance Scale Non-residential buildings / Residential buildings 0 Financial contribution on improving environmental performance: <0.1% final construction / demolition cost 1 Financial contribution on improving environmental performance: 0.1% expenditure <1.5% final construction / demolition cost 2 Financial contribution on improving environmental performance: 1.5% expenditure <1% final construction / demolition cost 3 Financial contribution on improving environmental performance: 1% final construction / demolition cost NA 1.1 Score Explanation Sustainability economics relates to the estimated additional investment provided by the developer/client (include the cost contributed by contractor on improving environmental performance within CEPAS context) to pay for the building construction and demolition that are beneficial to improve the environmental and social performance. Expenditure on improving environmental performance is essential as a driving force of performance enhancement in the entire construction / demolition process. The actual cost expenditure to provide facilities and carry out environmental improvement measures shall be calculated and compared with the final construction / demolition cost. The expenditure shall include construction / demolition cost spend on facilities, equipment and installations, as well as the professional service cost of various building environmental survey, study and analysis works, during construction / demolition work period. Construction Stage Assessment Manual Page Edition
52 Submittal The following information shall be provided to demonstrate the compliance of the Performance Indicators: Cost calculation and relevant evidence. Construction Stage Assessment Manual Page Edition
53 SITE IMPACTS (SI) SI 1 SI 1.1 Intent Nature Conservation Nature Conservation To conserve and enhance the natural environment by protecting the ecological value of the site in terms of habitat and biodiversity Strategy Indicators Sub-criteria Performance Scale Non-residential / Residential buildings 0 0 P C < P C < P C < P C 1 SI 1.1 Score Item Stage Strategy (A) 1 C D If habitat ecological value was identified on site in the Design / Pre- Design Stage and designed to conserve, sufficient protection measures are provided by Contractor 2 C D If biodiversity ecological value was identified on site in the Design / Pre-Design Stage and designed to conserve, sufficient protection measures are provided by Contractor 3 C D Contractor established a site ecological value protection strategy in the early stage of construction / demolition work Total maximum score (applicable items only) in this Sub-criteria (B) Total score (applicable items only) obtained in this Sub-criteria Non-residential / Residential No Yes N/A NON-RESIDENTIAL + RESIDENTIAL Sub-criteria performance score (P C ) (B)/(A) = P C Explanation Hong Kong contains large area of natural landscapes, which support a diverse assemblage of plant and animal species. However, the expanding building development, connecting roads and parking areas, are endangering the wildlife corridors and leave lesser room for the survival of species. Therefore, at site level, CEPAS encouraged creating or retaining habitats for the use of indigenous species to maintain / increase the local biodiversity. The natural environment is a valuable asset belonging to the people in Hong Kong and their future generations. New Construction Stage Assessment Manual Page Edition
54 developments could lead to non-recreatable nature environment for the habitats. A survey on the site-wide ecological value is encouraged in the Design / Planning Stage. If habitat and biodiversity ecological value are identified on a construction / demolition site, this indicator is assigned to encourage proper and effective protection of biodiversity and habitat ecological value on the site. The indicators can be scored only if the ecological value can be well protected and maintained until the handover to next building stage. Submittal The following information shall be provided to demonstrate the implementation effectiveness and compliance of the Strategy Indicators: Site ecological value protection strategy report. Relevant drawings and photo evidence. Construction Stage Assessment Manual Page Edition
55 SI 2 SI 2.1 Intent Heritage Conservation Heritage Conservation To conserve and protect archaeological and historic buildings, monuments, components and artefacts Strategy Indicators Sub-criteria Performance Scale Non-residential / Residential buildings 0 0 P C < P C < P C < P C 1 SI 2.1 Score Item Stage Strategy 1 C D Contractor established a site cultural heritage protection strategy in the early stage of construction / demolition work 2 C D If buildings, monuments, components and artefacts with cultural heritage value were identified on site in the Design / Planning Stage and designed / planned to conserve, sufficient protective measures are implemented by contractor 3 C D Contractor established preventive measures to minimize adverse structural and environmental impacts towards the immediate adjacent building(s) with cultural heritage value Non-residential / Residential No Yes N/A (A) Total maximum score (applicable items only) in this Sub-criteria (B) Total score (applicable items only) obtained in this Sub-criteria NON-RESIDENTIAL + RESIDENTIAL Sub-criteria performance score (P C ) (B)/(A) = P C Explanation If the existing building on site has a cultural heritage value, reuse of the building is encouraged. This practice is common in many European countries, Mainland China and other some countries. Unfortunately, many developers or building owners in Hong Kong are unwilling to reuse the existing building but prefer to rebuild a building with more sellable floor area. Hence, this indicator is assigned to encourage reuse of existing building with heritage value. Reuse of the entire building, or a large portion of existing building, such as building envelope, courtyard, are acceptable in this indicator. A survey on the site-wide cultural heritage value is encouraged in the Design / Pre- Construction Stage Assessment Manual Page Edition
56 design Stage. If the existing building, monuments or their components and artefacts on site are identified with cultural heritage value in the site survey during Design / Pre-design Stage, the designated building or portions for reuse or transfer to other site shall be well protected and maintained. Submittal The following information shall be provided to demonstrate the implementation effectiveness and compliance of the Strategy Indicators: Site cultural heritage protection strategy report. Relevant drawings and photo evidence. Construction Stage Assessment Manual Page Edition
57 SI 3 SI 3.1 Intent Buildability Buildability To construct the building and its facilities ease of construction and less materials used, and encourage the use of innovative construction technology to enhance buildability Strategy Indicators Sub-criteria Performance Scale Non-residential buildings Residential buildings 0 0 P C < P C < P C < P C < P C < P C < P C P C 1 Innovation 0 or 1 0 or 1 Non-residential Buildings Score (P C-NR ) Residential Buildings Score (P C-R ) SI 3.1 Score Item Stage Strategy (A) 1 C - Widely use of precast structure other than that specified in the Design Stage 2 C - Widely use of full precast module and / or integrated services module other than that specified in the Design Stage 3 C - Use of other precast components in building other than that specified in the Design Stage Total maximum score (applicable items only) in this Sub-criteria (B) Non-residential Residential No Yes N/A No Yes N/A Total score (applicable items only) obtained in this Sub-criteria NON-RESIDENTIAL Sub-criteria performance score (P C ) (B)/(A) = P C (A) Total maximum score (applicable items only) in this Sub-criteria (B) Total score (applicable items only) obtained in this Sub-criteria RESIDENTIAL Sub-criteria performance score (P C ) (B)/(A) = P C Explanation Standardised building components, simple installation details and building services systems, pre-fabricated building elements, shortest services routes, integrated building components, simple site fabrication works, storage management of construction site materials, are possible methods to enhance buildability. These components usually have relatively lower energy content compared with the in-situ ones and provide material wastage. Wider use of prefabrication is one of the solutions Construction Stage Assessment Manual Page Edition
58 that help to overcome many of these problems inherent in in-situ construction. Shorter construction period and lesser material consumed could be the benefits by better buildability. Construction process usually requires heavy demand on technologies, logistic management, site supervision and quality assurance. Also, construction works give rise to considerable environmental problems, such as dust nuisance from on-site concrete mixing, noise from the use of metal formwork, excessive waste from the use of timber formwork, and muddy site run-off. The contractor is encouraged to adopt innovative method, and to create project-specific construction technologies to satisfy the high quality requirements of various construction activities as well as the buildability. The developer will be benefited by the new technology to gain a better profit, whilst the Contractor is benefited by sound technical competitiveness. In addition, simple building services installation details, shorter services routes and simple site fabrication methods are also encouraged to improve buildability. To further minimise the cost and energy consumption for transportation of precast structure as well as to maintain the local labour activities, the indicators encourage pre-fabrication structures, modules and components manufactured in Hong Kong. Item 1: This indicator is assigned to encourage widely adoption of other precast structure such as precast slab, staircase, column, beam, etc. This indicator is awarded if precast structure is proposed and provided by the Contractor other than the precast structure specified in the Design Stage. Item 2: This indicator is assigned to encourage widely adoption of full precast module, such as residential flat, modular office, and the adoption of integrated services module, such as prefabricated toilet unit, plant room unit, bathroom unit, which completed with full building services equipment, pipes, ducts and cable containments. This indicator is awarded if full precast module and / or integrated services module is proposed and provided by the Contractor other than the full precast module / integrated service module specified in the Design Stage. Item 3: This indicator is assigned to encourage the use of other precast component in building, such as meter chamber, services riser, refuse chute, standardized door leaf opening, window, etc. This indicator is awarded if precast component is proposed and provided by the Contractor other than the precast components specified in the Design Stage. Innovation Item: Use of other improved and innovative building technology to enhance the buildability and minimise environmental impacts This indicator is assigned to encourage improved and innovative building technology to enhance buildability and minimise environmental impacts. This is a bonus point for buildability. Submittal The following information shall be provided to demonstrate the implementation effectiveness and compliance of the Strategy Indicators: Relevant technical proposals, drawings, implementation records and photo evidence. Other relevant supporting document for improved and innovative ideas. Construction Stage Assessment Manual Page Edition
59 NEIGHBOURHOOD IMPACTS (NI) NI 1 Environmental Impact Assessment Pre-requisite Criteria Intent To avoid environmental impacts and to minimise and control the adverse effects due to environmental impacts during construction / demolition process Stage C D Requirements This indicator is assigned to reassert the importance of environmental impact assessment in the context of building environmental performance. Environmental Impact Assessment (EIA) as stipulated in the Environmental Impact Assessment Ordinance and the Technical Memorandum on Environmental Impact Assessment Process not only is a strategic process, but also is an active planning tool for building development. It aims to achieve a balance between environmental management and development decision. Compliance The Contractor is required to expedite all required measures to minimise the potential environmental impacts. The Developer is required to monitor the effectiveness of the impact minimisation measures provided by the Contractor. Construction Stage Assessment Manual Page Edition
60 NI 2 NI 2.1 Environmental Interactions Environmental Nuisance Intent To minimise adverse environmental nuisance towards the surrounding buildings and streets due to construction / demolition process Strategy Indicators Sub-criteria Performance Scale Non-residential / Residential buildings 0 0 P C < P C < P C < P C 1 NI 2.1 Score Item Stage Strategy (A) 1 C D Designate a proper site material storage area to minimise nuisance to the surroundings 2 C D Designate a proper hoisting facilities locations to minimise the risk to the surroundings 3 C D Implement other environmental nuisance control measure in construction / demolition site Total maximum score (applicable items only) in this Sub-criteria (B) Total score (applicable items only) obtained in this Sub-criteria Non-residential / Residential No Yes N/A NON-RESIDENTIAL + RESIDENTIAL Sub-criteria performance score (P C ) (B)/(A) = P C Explanation Item 1: This indicator is assigned to encourage contractors to designate a proper area to store site materials in order to reduce nuisance to the surroundings. For instance, cutting machine shall be located in the site far away from site boundary and nearby buildings. Sand or similar materials shall be located away from windy locations within the site such that blowing of sand to the surroundings can be minimized. Item 2: This indicator is assigned to encourage contractors to designate a proper area to locate hoisting facilities in order to reduce the risk to the surroundings. The hoisting locations and materials hanging path shall avoid locating directly above the worker circulation area in the site and site surrounding pavements. If this is inevitable, movable barrier and / or warning signs shall be provided and installed to separate the material hanging paths and human circulation paths. Construction Stage Assessment Manual Page Edition
61 Item 3: Apart from the environmental nuisance control measures as described in Items 1 and 2, other nuisance control measures are encouraged to consider. The BD PNRC 17: Control of Environmental Nuisance from Construction Sites shall be referred for this indicator. Common environmental nuisance are identified in the practice note, and some of them are statutory requirements and some are not. The checklist can be used as reference to minimise environmental nuisance. This indicator is assigned to award the contractor who has implemented all environmental nuisance control measures (where relevant to the construction / demolition site) as described in the BD PNRC 17. Meanwhile, the Contractor is encouraged to minimize site activities that cause nuisance to the surrounding road, utilities and pass-by, such as long-term road evacuation near heavy traffic streets, long-term utility services suspension, loading / unloading of building materials at the site entrance that forms a barrier to the surrounding pavements and streets, etc. Submittal The following information shall be provided to demonstrate the implementation effectiveness and compliance of the Strategy Indicators: Relevant technical proposals, drawings, implementation records and photo evidence. Other relevant supporting document for improved and innovative ideas. Construction Stage Assessment Manual Page Edition
62 NI 3 NI 3.1 Impacts to Communities Impacts to Communities Intent To encourage public participatory considered construction / demolition activities, and to minimize nuisance generated from the site that cause adverse impacts to the community and surroundings Strategy Indicators Sub-criteria Performance Scale Non-residential / Residential buildings 0 0 P C < P C < P C < P C 1 NI 3.1 Score Item Stage Strategy (A) 1 C D Contractor to identify the potential sensitive receivers nearby the site due to construction / demolition activities. 2 C D Establish a continuous communication channel among the Developer / Owner, Contractor and the surrounding residents and building users. 3 C D Contractor to designate a person to record and review the opinion, complaints and advices provided by the surrounding residents and building users, and to coordinate with the project staff to improve the site activities. Total maximum score (applicable items only) in this Sub-criteria (B) Total score (applicable items only) obtained in this Sub-criteria Non-residential / Residential No Yes N/A NON-RESIDENTIAL + RESIDENTIAL Sub-criteria performance score (P C ) (B)/(A) = P C Explanation Item 1: This indicator is assigned to encourage contractors to identify potential sensitive receivers near the construction / demolition site due to site activities. The Contractor shall avoid site activities with severe nuisance to the identified sensitive receivers (e.g. school, hospital, residential flats) where possible, and to provide protective and remedial measures. Item 2: This indicator is assigned to encourage a continuous communication between the building Developer / Owner, Contractor and the surrounding residents and building users. A communication channel for the surrounding residents and building Construction Stage Assessment Manual Page Edition
63 users to convey their opinions, complaints and advices shall be established such that the building Developer / Owner / Contractor is able to adjust the new building construction / demolition method and remedial works to minimize the environmental and safety impacts to the communities. Item 3: This indicator is assigned to encourage the Contractor to designate a person to record and review the opinion, complaints and advices raised by the surrounding residents and building users. The personnel can be a site-based staff or office-based staff, who coordinates with the project site staff to improve the construction / demolition activities where feasible. Submittal The following information shall be provided to demonstrate the implementation effectiveness and compliance of the Strategy Indicators: Relevant technical proposals, drawings, implementation records and photo evidence. Construction Stage Assessment Manual Page Edition
64 APPENDIX 1. LIST OF ABBREVIATIONS The following abbreviations shall be referred in this assessment scheme: A&A Addition and Alternation ACH Air Change per Hour AFCD Agriculture, Fisher and Conservation Department, HKSAR Government AP Authorized Person ArchSD Architectural Service Department, HKSAR Government ASHRAE American Society of Heating, Refrigerating and Air-conditioning Engineers, USA BA Building Authority, HKSAR Government BD Buildings Department, HKSAR Government BRE Building Research Establishment, UK BREEAM Building Research Establishment Environmental Assessment Method, UK BS British Standard BSRIA Building Services Research and Information Association, UK C&D Construction and Demolition CASBEE Comprehensive Assessment System of Building Environmental Efficiency for Japan CCMS Central Control and Monitoring System CEDD Civil Engineering and Development Department, HKSAR Government CEPAS Comprehensive Environmental Performance Assessment Scheme CIBSE Chartered Institution of Building Services Engineers, UK CIE Commission Internationale de Eclairage CIRIA Construction Industry Research and Information Association, UK COP Code of Practice DSD Drainage Services Department, HKSAR Government EIA Environmental Impact Assessment EMGB-Taiwan Evaluation Manual for Green Buildings in Taiwan 綠 建 築 標 章 EMO Energy Management Opportunity EMSD Electrical and Mechanical Services Department, HKSAR Government EPD Environmental Protection Department, HKSAR Government ETWB Environmental, Transport and Works Bureau, HKSAR Government EUI Energy Utilisation Index FEHD Food and Environmental Hygiene Department FSD Fire Services Department, HKSAR Government GBC Green Building Challenge GBTool Green Building Tool GFA Gross Floor Area GHEM - PRC Green House Evaluation Manual China Assessment Handbook for Ecological Residential Building 中 國 生 態 住 宅 技 術 評 估 手 册 HK-BEAM Hong Kong Building Environmental Assessment Method HKHA Hong Kong Housing Authority, HKSAR Government HKHD Hong Kong Housing Department, HKSAR Government HKIA The Hong Kong Institute of Architects HKIE The Hong Kong Institution of Engineers HKIP Hong Kong Institute of Planners HKIS The Hong Kong Institute of Surveyors Construction Stage Assessment Manual Page Edition
65 HKPolyU HKSAR HVAC HVACR HVCA IAQ IBI IEQ IESNA ISO LA LandsD LEED LCA LCC NABERS N/A O&M ODS OTTV PlanD PGBC PNAP PNRC ProPECC PN SC SDU SPeAR SUSDEV21 WSD The Hong Kong Polytechnic University Hong Kong Special Administrative Region of the People s Republic of China Heating, Ventilation and Air-Conditioning Heating, Ventilation, Air-Conditioning and Refrigeration Heating and Ventilating Contractors Association, UK Indoor Air Quality Intelligent Building Index, Hong Kong Indoor Environmental Quality Illumination Engineering Society of North America International Organization for Standardization Land Authority, HKSAR Government Lands Department, HKSAR Government Leadership in Energy and Environmental Design, USA Life Cycle Analysis Life Cycle Costing The National Australian Building Environmental Rating System of Australia Not Applicable Operation and Maintenance Ozone-depleting substances Overall Thermal Transfer Value Planning Department, HKSAR Government Professional Green Building Council, Hong Kong Practice Notes for Authorised Persons and Registered Structural Engineers, issued by BD, HKSAR Government Practice Notes for Registered Contractors, issued by BD, HKSAR Government Professional Persons Environmental Consultative Committee Practice Notes, issued by EPD, HKSAR Government Site Coverage Sustainable Development Unit, HKSAR Government Sustainable Project Appraisal Routine Sustainable Development for the 21 st Century, HKSAR Government Water Supplies Department, HKSAR Government Construction Stage Assessment Manual Page Edition
66 APPENDIX 2. SUMMARY OF CEPAS INDICATORS CONSTRUCTION STAGE Categories Sub-criteria Indicators C D N R Indoor Environmental Quality (IE) IE 1.1 Health& Hygiene Space provision for cleansing facilities and storage of cleansing equipment Regular cleansing and good housekeeping in toilets and site office IE 1 Health & Hygiene Hygiene management plan for construction / demolition site Designated person to inspect the site regularly to identify health and hygienic problem areas Strategy Provide training and information on health and hygiene issues to construction site staff Use of no / low emission cleaning products IE 2 IE 2.1 IAQ Strategies Design with sufficient quantity of fresh air supply for the site office and show room on site Design of commercial kitchen ventilation system within construction site with effective oily fume and odour removal in canteens and food business IAQ Implement IAQ management strategies for occupied buildings under construction Strategy Use of no/low emitting building and furnishing materials C Applicable for Construction Works N Applicable for Non-residential Building D Applicable for Demolition Works R Applicable for Residential Building IE 3 Lighting Environment IE 3.1 Building Amenities (BA) BA1 BA2 Safety Management Visual Quality & Comfort Innovative method to further improve IAQ in construction / demolition site Design of lighting with optimum illuminance and glare control for in site office. Design with daylight and electric lighting integration in site office and allow more daylight access to the interior Use of T5 fluorescent lamps in site office Innovative method to further improve the indoor visual comfort and lighting energy efficiency within construction site Provide a safe habitation and working environment in and around a construction / demolition site BA 2.1 Building Management Major contractors for the construction / demolition projects are accredited with ISO 9000 quality management system Major contractors for the construction / demolition projects are accredited with ISO environmental management system Major contractors for the construction / demolition projects are accredited with OHSAS occupational health and safety management system Strategy Pre-requisite Strategy Construction Stage Assessment Manual Page Edition
67 Categories Sub-criteria Indicators C D N R Environmental training provided for the major contractors management and supervisory staff at the early stage of construction / demolition process Environmental training provided for the construction workers at the early stage of construction / demolition process Comprehensive building records provided and conveyed to building operator and designer with satisfaction Comprehensive and effective testing and commissioning works provided and satisfy the designer s requirements Strategy Scheduled trainings of various building facilities and services installations provided by the contractors and suppliers to the building operators Innovative method to further improve the construction / demolition management effectiveness Resources Use (RE) RE 1.1 Energy Efficiency Formulation and implementation of an overall energy management strategy for the construction / demolition site Formulation and implementation of an overall energy management strategy for the site office Formulation and implementation of a lighting operation strategy to minimise unnecessary lighting operation in the construction / demolition site at night RE1 Energy Efficiency Minimum 50% of all electrical appliances and equipment used in site offices complied with Grade 2 or better as defined in the EMSD Energy Efficiency Labelling Scheme for Household Appliances and Office Equipment / Multi-function Device for site office & sales areas Minimum 50% of all electrical appliances and equipment used in sale office and show room on construction site complied with Grade 2 or better as defined in the EMSD Energy Efficiency Labelling Scheme for Household Appliances and Office Equipment / Multi-function Device for site office & sales areas Strategy Use of renewable energy in the construction / demolition site Modification of the design and to facilitate construction / demolition methods or sequence that can reduce energy consumption during construction process RE 2.1 Water Conservation Strategies Use of low flow water closet in construction site office Use of automatic / manual flow control faucet and control valve for urinal in site office RE2 Water Conservation Use of low flow water closet in sale office & show room on construction site Use of automatic / manual flow control faucet and control valve for urinal in sale office & show room on construction site Strategy Collection of rainwater for reuse within construction / demolition site Use of other water saving device or innovative idea to reduce water consumption in construction / demolition site Construction Stage Assessment Manual Page Edition
68 Categories Sub-criteria Indicators C D N R RE3 Timber Use RE 3.1 Timber for Temporary Use Reduce the use of timber for temporary use Performance RE 3.2 Minimization of Timber Use Minimize the use of timber during construction Performance RE 4.1 Recycled Material Use Reduce material consumption and reduce demands on limited reserves of natural resources by the use of recycled materials. Performance RE4 Material Use RE 4.2 Construction Waste Recycling RE 4.3 Demolition Waste Recycling To recycle construction waste generated in building construction process To recycle demolished materials generated in building demolition process Performance Performance RE 4.4 Environmentally-Friendly Materials Use of environmentally -friendly building materials to reduce environmental impacts. Performance Loadings (LD) Minimise outdoor pollution and the subsequent health and environmental impacts under global and local considerations Pre-requisite LD 1.1 Construction / demolition site air pollution and dust control management plan formulated and implemented by Contractor Pollution Air Pollution Site personnel(s) are designated to carry out regular inspections on the effectiveness of air pollution control measures, and to carry out dust control in construction / demolition site LD1 Construction / demolition works that leads to significant amount of dust generation shall be provided with proper sheltering to minimise dust spread To store dusty materials in enclosed area, to carry out dusty material mixing works within sufficient sheltering, and to perform dust suppression measures to minimise dust spread Strategy All refrigerants used for air-conditioning systems in site office are zero ozone depleting potential Other innovative method to further reduce air pollution generated from construction / demolition process Construction Stage Assessment Manual Page Edition
69 Categories Sub-criteria Indicators C D N R LD 1.2 Water Pollution Construction / demolition site water pollution management plan formulated and implemented by Contractor Site personnel(s) designated to carry out regular inspection and on the effectiveness of water pollution control measures Separate rainwater drainage path is provided such that contaminated waste water discharge to rainwater system can be avoided Minimisation and treatment of wastewater from building construction / demolition Reuse of washing water and providing silt removal facilities before discharged to drain Strategy Soil and waste water from construction site toilets discharged to government sewer Effective grease trap is provided for each site canteen Other innovative method to further reduce water pollution generated from construction / demolition process LD 1.3 Noise Pollution Formulation and implementation of a good management plan for the control of noise pollution at the construction / demolition site. Designation of site personnel(s) for conducting regular inspection on the effectiveness of noise control measures. Reduce noise from construction activities based on EPD nonstatutory requirements Strategy Other innovative method to further reduce noise pollution generated from construction process Reduce waste generation, disposal and associated environmental impacts Pre-requisite LD2 Waste Management LD 2.1 C&D Waste Management Contractor established and implemented a construction, demolition & municipal waste management plan in construction / demolition site Designated person(s) to inspect the implementation effectiveness on various waste management strategies regularly Designated centralised space(s) and facilities for sorting and storage of recyclable and non-recyclable waste specified Strategy Provision of air tight system to store organic waste that may leads to bad smell and hygienic problem Innovative method to reduce waste generation or effective waste management in construction / demolition site Site Amenities (SA) SA1 Landscape SA 1.1 Tree Preservation Effectiveness of tree preservation and protection measures provide by Contractor in site (for all designated trees retain on the original locations or other places) Performance SA2 Security SA 2.1 Security Effective passive security facilities provided in construction / demolition site Strategy Construction Stage Assessment Manual Page Edition
70 Categories Sub-criteria Indicators C D N R Effective active security measures provided in construction / demolition site No construction materials / demolished salvageable materials lose reported to police throughout the entire construction period Neighbourhood Amenities (NA) NA 1.1 Environmental Economics Financial contribution percentage on improving environmental & Social related construction site performance NA1 Environmental Economics Performance Site Impacts (SI) SI 1.1 Natural Conservation If habitat ecological value was identified on site in the Design / Pre-design Stage and designed to conserve, sufficient protection measures are provided by Contractor SI 1 Nature Conservation If biodiversity ecological value was identified on site in the Design / Pre-design Stage and designed to conserve, sufficient protection measures are provided by Contractor Strategy Contractor established a site ecological value protection strategy in the early stage of construction / demolition work SI 2.1 Heritage Conservation Contractor established a site cultural heritage protection strategy in the early stage of construction / demolition work SI 2 Heritage Conservation If buildings, monuments, components and artefacts with cultural heritage value were identified on site in the Design / Planning Stage and designed / planned to conserve, sufficient protective measures are implemented by Contractor Strategy Contractor established preventive measures to minimize adverse structural and environmental impacts towards the immediate adjacent building(s) with natural heritage value SI 3.1 Buildability Widely use of precast structure other than that specified in the Design Stage SI 3 Buildability Widely use of full precast module and / or integrated services module other than that specified in the Design Stage Use of other precast components in building other than that specified in the Design Stage Strategy Use of other improved and innovative building technology to enhance the buildability and minimise environmental impacts Neighbourhood Impacts (NI) NI 1 Environment Impact Assessment Avoid environmental impacts and to minimise and control the adverse effects due to environmental impacts during the construction / demolition process Pre-requisite NI 2 Environmental Interactions NI 2.1 Environmental Nuisance Designate a proper site material storage area to minimise nuisance to the surroundings Designate a proper hoisting facilities locations to minimise the risk to the surroundings Strategy Construction Stage Assessment Manual Page Edition
71 Categories Sub-criteria Indicators C D N R Implement other environmental nuisance control measures in construction / demolition site NI 3.1 Impact to communities Contractor to identify the potential sensitive receivers nearby the site due to construction / demolition activities. NI 3 Impact to communities Establish a continuous communication channel among the Developer / Owner, Contractor and the surrounding residents and building users. Contractor to designate a person to record and review the opinion complains and advices provided by the surrounding residents and building users, and to coordinate with the project staff to improve the site activities. Strategy Construction Stage Assessment Manual Page Edition
72 APPENDIX 3A. CEPAS SCORING & WEIGHTING TABLES FOR CONSTRUCTION STAGE (CONSTRUCTION WORKS) Indoor Environmental Quality (IE) Criteria W c S c Sub-Criteria S sc IE1 Health & Hygiene 0.86 IE1.1 Health & Hygiene IE2 IAQ 0.73 IE2.1 IAQ Strategies IE3 Lighting Environment 0.62 IE3.1 Visual Quality & Comfort CONSTRUCTION (Strategy) Building Amenities (BA) Criteria W c S c Sub-Criteria S sc BA2 Management 0.78 BA2.1 Building Management CONSTRUCTION (Strategy) Resources Use (RE) Criteria W c S c Sub-Criteria S sc RE1 Energy Efficiency 0.58 RE1.1 Energy Efficiency RE2 Water Conservation 0.70 RE2.1 Water Conservation Strategies CONSTRUCTION (Strategy) Construction Stage Assessment Manual Page Edition
73 Loadings (LD) Criteria W c S c Sub-Criteria S sc LD1.1 Air Pollution LD1 Pollution 0.78 LD1.2 Water Pollution LD1.3 Noise Pollution LD2 Waste Management 0.84 LD2.1 C & D Waste Management CONSTRUCTION (Strategy) Site Amenities (SA) Criteria W c S c Sub-Criteria S sc SA2 Security 0.52 SA2.1 Security CONSTRUCTION (Strategy) Site Impacts (SI) Criteria W c S c Sub-Criteria S sc SI SI2 Nature Conservation Heritage Conservation 0.67 SI1.1 Nature Conservation 0.52 SI2.1 Heritage Conservation SI3 Buildability 0.93 SI3.1 Buildability CONSTRUCTION (Strategy) Construction Stage Assessment Manual Page Edition
74 Neighbourhood Impacts (NI) Criteria W c S c Sub-Criteria S sc NI1 Impact Assessment Pre-requisite NI2 NI3 Environmental Interactions Impacts to Communities 0.65 NI2.1 Environmental Nuisance 0.93 NI3.1 Impacts to Communities CONSTRUCTION (Strategy) Resources Use (RE) Criteria W c S c Sub-Criteria S sc RE3 Timber Use 0.92 RE3.1 RE3.2 RE4.1 Timber for Temporary Use Minimization of Timber Use Recycled Material Use RE4 Material Use 0.69 RE4.2 RE4.4 Construction Waste Recycling Environmentally-Friendly Materials CONSTRUCTION (Performance) Construction Stage Assessment Manual Page Edition
75 Site Amenities (SA) Criteria W c S c Sub-Criteria S sc SA1 Landscape 0.73 SA1.1 Tree Preservation CONSTRUCTION (Performance) Neighbourhood Amenities (NA) Criteria W c S c Sub-Criteria S sc NA1 Sustainability Economics 0.93 NA1.1 Sustainability Economics CONSTRUCTION (Performance) Total Performance Score Performance Weighting (Wp) Total Strategy Score Strategy Weighting (Ws) Total CEPAS Score (Construction) Construction Stage Assessment Manual Page Edition
76 APPENDIX 3B. CEPAS SCORING & WEIGHTING TABLES FOR CONSTRUCTION STAGE (DEMOLITION WORKS) Indoor Environmental Quality (IE) Criteria W c S c Sub-Criteria S sc IE1 Health & Hygiene 0.86 IE1.1 Health & Hygiene IE2 IAQ 0.73 IE2.1 IAQ Strategies IE3 Lighting Environment 0.62 IE3.1 Visual Quality & Comfort DEMOLITION (Strategy) Building Amenities (BA) Criteria W c S c Sub-Criteria S sc BA2 Management 0.78 BA2.1 Building Management DEMOLITION (Strategy) Resources Use (RE) Criteria W c S c Sub-Criteria S sc RE1 Energy Efficiency 0.58 RE1.1 Energy Efficiency RE2 Water Conservation 0.70 RE2.1 Water Conservation Strategies DEMOLITION (Strategy) Construction Stage Assessment Manual Page Edition
77 Loadings (LD) Criteria W c S c Sub-Criteria S sc LD1.1 Air Pollution LD1 Pollution 0.78 LD1.2 Water Pollution LD1.3 Noise Pollution LD2 Waste Management 0.84 LD2.1 C & D Waste Management DEMOLITION (Strategy) Site Amenities (SA) Criteria W c S c Sub-Criteria S sc SA2 Security 0.52 SA2.1 Security DEMOLITION (Strategy) Site Impacts (SI) Criteria W c S c Sub-Criteria S sc SI1 SI2 Nature Conservation Heritage Conservation 0.67 SI1.1 Nature Conservation 0.52 SI2.1 Heritage Conservation DEMOLITION (Strategy) Construction Stage Assessment Manual Page Edition
78 Neighbourhood Impacts (NI) Criteria W c S c Sub-Criteria S sc NI1 Environmental Impact Assessment Pre-requisite NI2 NI3 Environmental Interactions Impacts to Communities 0.65 NI2.1 Environmental Nuisance 0.93 NI3.1 Impacts to Communities DEMOLITION (Strategy) Resources Use (RE) Criteria W c S c Sub-Criteria S sc RE3 Timber Use 0.92 RE3.1 Timber for Temporary Use RE4 Material Use 0.69 RE4.3 Demolition Waste Recycling DEMOLITION (Performance) Site Amenities (SA) Criteria W c S c Sub-Criteria S sc SA1 Landscape 0.73 SA1.1 Tree Preservation DEMOLITION (Performance) Construction Stage Assessment Manual Page Edition
79 Neighbourhood Amenities (NA) Criteria W c S c Sub-Criteria S sc NA1 Sustainability Economics 0.93 NA1.1 Sustainability Economics DEMOLITION (Performance) Total Performance Score Performance Weighting (Wp) Total Strategy Score Strategy Weighting (Ws) Total CEPAS Score (Demolition) Construction Stage Assessment Manual Page Edition
Construction and Demolition Waste
Re-issued under new categorization in August 2009 as Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers ADV-19 Buildings Department Practice Note
Exhibit B. Property Acquisition and Disposition Division Residential Design & Performance Standards
Exhibit B Property Acquisition and Disposition Division Residential Design & Performance Standards I. Introduction The Property Acquisition and Disposition Division ( PADD ) has developed design standards
Modular Accommodation Solutions. Flexibility, efficiency and quality in one complete package
Modular Accommodation Solutions Flexibility, efficiency and quality in one complete package Welcome Our Services Providing Your Solutions The clients who work with SEDAC Accommodation Solutions are extremely
Sustainable Features. High-performance HVAC. High-performance Envelope Green Roof Day-Lighting Bicycle Infrastructure
Sustainable Features High-performance HVAC High-performance Envelope Green Roof Day-Lighting Bicycle Infrastructure Sustainable Landscaping Recycled and Regional Materials Storm-water Management District
BOMA BESt Assessment Overview
BOMA BESt Assessment Overview BOMA Building Environmental Standards OFFICE Module August 2013 The Voice of the Commercial Real Estate Industry in Canada The Building Owners and Managers Association of
POMONA COLLEGE Sustainability Integration Office Facilities and Campus Services
POMONA COLLEGE Sustainability Integration Office Facilities and Campus Services May 200 Table of Contents NEW CONSTRUCTION/MAJOR RENOVATION Process... Design... 3 MINOR RENOVATIONS/PROJECTS Process...
Los Angeles Mission College Facilities Master Plan Draft Program Environmental Impact Report 3.5 ENERGY CONSERVATION AND SUSTAINABILITY.
3.5 ENERGY CONSERVATION AND SUSTAINABILITY As a result of the analysis undertaken in the Initial Study 1 for the Los Angeles Mission College Facilities Master Plan, the LACCD determined that the proposed
Green and Sustainable Buildings
Green and Sustainable Buildings Design Criteria and Application in Hong Kong Green building is the practice of increasing the efficiency with which buildings use resources energy, water and materials.
Design and Build of Passenger Terminal Building North Extension At Macau International Airport (RFQ-198) Section 6 Bill of Quantities
At Macau International Airport (RFQ-198) Section 6 Bill of Quantities Bill Nr. 1 Preliminaries Bill Nr. 1 PRELIMINARIES NOTES : (1) The work shall be done during day time and night time according to CAM/ADA
Sustainability in construction at Creighton
Sustainability in construction at Creighton Like many other higher education campuses and companies Creighton is striving to draft their own policies, procedures and guidelines. Through the support of
LEED GOLD CERTIFIED OFFICE DESIGN AND CONSTRUCTION
LEED GOLD CERTIFIED OFFICE DESIGN AND CONSTRUCTION Setting a Precedent for Sustainable Interior Commercial Design FLEXIBLE INNOVATIVE CREATIVE R E S P O N S I B L E We transformed our lower Manhattan office
FEDERAL LEADERSHIP IN HIGH PERFORMANCE and SUSTAINABLE BUILDINGS MEMORANDUM OF UNDERSTANDING
FEDERAL LEADERSHIP IN HIGH PERFORMANCE and SUSTAINABLE BUILDINGS MEMORANDUM OF UNDERSTANDING PURPOSE: With this Memorandum of Understanding (MOU), signatory agencies commit to federal leadership in the
http://www.bca.gov.sg/greenmark/others/gm_nreb_v2.1.pdf
Green Mark Criteria for Non-residential Existing Building (Version 2.1) GM for Non-residential Existing Buildings Criteria (Ver. 2.1) can be downloaded from : http://www.bca.gov.sg/greenmark/others/gm_nreb_v2.1.pdf
MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS
Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT
BREEAM Refurbishment and Fit-out 2014 Briefings. Part of the BRE Trust
BREEAM Refurbishment and Fit-out 2014 Briefings Part of the BRE Trust BREEAM for Refurbishment and Fit-out Follows 2 years of development Draft scheme published and consultation from 19 th July 2014 Launched
Sika Sarnafil World Class Roofing and Waterproofing
The following is a brief summary of the Leadership in Energy and Environmental Design program (LEED, Version 3) and the sections Sika Sarnafil s roofing systems can help contribute to obtaining LEED points.
Holistic Approach in Delivering Government Buildings The Low Carbon Concept
International Conference on Planning for Low Carbon Cities 22 May 2009 Holistic Approach in Delivering Government Buildings The Low Carbon Concept Ir. HO Sai-king, Assistant Director (Building Services),
Demolition Works Measures for Public Safety
Re-issued under new categorization in August 2009 as Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-21 Buildings Department Practice Note
Green House, Hungary
Further information Skanska AB www.skanska.com Contact Noel Morrin, SVP Sustainability & Green Support [email protected] Green House, Hungary Case Study 109 Aspects of Sustainability This project
Green Globes for New Construction Pre-Assessment Checklist for Project Managers
1 Green Globes for New Construction Pre-Assessment Checklist for Project Managers What is Stage I assessment? As the design phase draws to a close, and your Green Globes questionnaire is completed through
HHHHH Outstanding 85%
Provinciehuis_Assessment_2040204_74,32%Final Score and Rating BREEAM Scheme: Europe 2009: Offices H Pass 30% Building Name: Provinciehuis Antwerpen HH Good 45% BREEAM Registration No.: BREEAM-0048-4626
Facility Support Services
Facility Support Services The Precision Group has a breadth of experience delivering innovative, first class facility support service solutions to clients across the public and private sectors. Our expert
SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request
SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table
GOOD LANDLORD CODE OF PRACTICE FOR PRIVATE RENTED SECTOR MANAGEMENT
GOOD LANDLORD CODE OF PRACTICE FOR PRIVATE RENTED SECTOR MANAGEMENT GUIDANCE DOCUMENT Each section contains general information on why the standard was set (Yellow text boxes). In many cases, the standards
CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES
CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES INTRODUCTION What is a Construction Management Plan? The City of Vincent requires careful management of construction involving excavation and retention
IEQ Management Plan. Denver Museum of Nature and Science ECF Addition
IEQ Management Plan GH Phipps Construction Companies 5995 Greenwood Plaza Blvd., Suite 100 Greenwood Village, Colorado 80111-4710 303.571.5377 PHONE www.ghphipps.com Denver Museum of Nature and Science
Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study
Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study Robert C. Burns, AIA, LEED AP Principal Director of Historic Architecture 804. 648. 5040, ext. 1107
Life Cycle Assessment (LCA) and Life Cycle Cost (LCC) Tool. for Commercial Building Developments in Hong Kong
Life Cycle Assessment (LCA) and Life Cycle Cost (LCC) Tool for Commercial Building Developments in Hong Kong FORWARD Forward 2002, the Electrical and Mechanical Services Department In (EMSD) of the HKSAR
34% 81% 84% 19% GOLD PROJECT HIGHLIGHTS. LEED Facts. Stubbs Laboratory
HARVARD UNIVERSITY FACULTY OF ARTS AND SCIENCES LEED-CI V3.0 STUBBS LABORATORY GORDON MCKAY LABS BUILDING Gordon McKay Building, 9 Oxford Street, Cambridge, MA 02138 GOLD The Stubbs Laboratory is a 2,035
This report presents the findings and recommendations of the assessment of energy use and
This report presents the findings and recommendations of the assessment of energy use and environmental stewardship of Arlington Street Church, Boston, MA. As stewards of the earth it is important that
ST. MONICA FOOD PANTRY HOUSTON, TEXAS
PROJECT MANUAL FOR ST. MONICA FOOD PANTRY HOUSTON, TEXAS OWNER: ST. MONICA CATHOLIC CHURCH 8421 W. MONTGOMERY ROAD HOUSTON, TEXAS 77088 ARCHITECT: C SIX ARCHITECTURE, LLC 4606 F.M. 1960 WEST, STE 400 HOUSTON,
B-1 Buildings & Service Maintenance
B-1 Buildings & Service Maintenance B-1 Buildings & Service Maintenance SAFETY, HEALTH AND ENVIRONMENTAL POLICY: B-1 DATE OF ISSUE: AUGUST 1994. BUILDINGS AND SERVICES MAINTENANCE 1. Introduction It is
Asbestos Management Policy
Asbestos Management Policy Originator: Approval date: Policy and Strategy Team Sovini Board PCHA Board OVH Board/EMT 3 rd December 2012 22 nd November 2012 25 th September 2012 Review date: December 2013
Code of Practice for Building Energy Audit
Code of Practice for Building Energy Audit 2012 Code of Practice for Building Energy Audit Table of Contents Page No. 1. Introduction 1 2. Interpretations 1 3. Application 4 4. Technical Compliance with
RHODE ISLAND. Downloaded 01.15.11
Housekeeping/Laundry/Maintenance Section 35.0 Housekeeping RHODE ISLAND Downloaded 01.15.11 35.1 A full time employee of the facility shall be designated responsible for housekeeping services, supervision
Current Statistics Northern Tier Pennsylvania. Number of Jobs 5,700 94,600 Average Earnings Average industry earnings per worker includes benefits
Agriculture & Resource Conservation FAST FACTS Current Statistics Northern Tier Pennsylvania Number of Employers 80 2,900 Number of Jobs 5,700 94,600 Average Earnings Average industry earnings per worker
Policy for the Management of Asbestos in Buildings
in Buildings Health and Safety Services 1 A1. Introduction If asbestos fibres enter the lungs they can cause cancer or incurable disease. Consequently the University is committed to ensure that all reasonably
GREEN SCHOOL DESIGN (Revision no.1, Dated 07/14/2010)
I. Introduction: GREEN SCHOOL DESIGN (Revision no.1, Dated 07/14/2010) Public school facilities must be designed and constructed to be efficient, effective, and sustainable for their expected building
GREEN FACTS. Marina Bay Sands
Marina Bay Sands GREEN FACTS Marina Bay Sands is committed to integrating sustainability into the core business strategy. We drive sustainability through our Sands ECO360 Sustainability programme, a global
ASBESTOS CONTAINING MATERIALS POLICY
ASBESTOS CONTAINING MATERIALS POLICY Document Control Version 3 Ratified by Risk Management Sub Group Date Ratified 19 December 2012 Name of Originator/Author Head of Estates and Facilities Name of Responsible
LEED PRESENTATION OUTLINE
16902 BOLSA CHICA STREET, SUITE 101 HUNTINGTON BEACH, CA 92649 TELEPHONE (714) 840-8230 FACSIMILE (714) 840-2490 LEED PRESENTATION OUTLINE I. Overview of Green Building and Risks Involved with Sustainability
Office of the Government Chief Information Officer. Green Data Centre Practices
Office of the Government Chief Information Officer Green Data Centre Practices Version : 2.0 April 2013 The Government of the Hong Kong Special Administrative Region The contents of this document remain
Archant London Environmental Awards
Archant London Environmental Awards Environmental Business of the Year Big Yellow Self Storage PLC Barking Central, Hertford Road, Barking, IG11 8BL Introduction Big Yellow is a local business that has
WHEN IS A PERMIT REQUIRED?
WHEN IS A PERMIT REQUIRED? Any owner, builder, contractor, or other authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure,
Policy on the Management of Asbestos
WISHAW AND DISTRICT HOUSING ASSOCIATION Policy on the Management of Asbestos As with all the Association s policies and procedures, this document, where required, may be able to be translated into other
Fire Safety Requirements for Child Care Centre
Fire Safety Requirements for Child Care Centre A. Restrictions on Location Child care centre shall not be located : - (a) (b) in any premises designed for residential use; in any industrial building, warehouses,
BCA Green Mark for Restaurants
BCA Green Mark for Restaurants Updated: 10/5/2011 1 Point Allocations - BCA Green Mark for Restaurants (I) Energy Related Requirements Part 1 : Energy Efficiency Category Point Allocations Minimum 20 points
Exhibit C: Scope of Work and Schedule of Deliverables
Exhibit C: Scope of Work and Schedule of Deliverables Project Scope of Work Phases: A City Hall Envelope Renovations B City Hall Skylight Replacement C City Hall Chiller Replacement D City Hall Annex Plaza
LONDON BOROUGH OF BROMLEY STANDARDS FOR HOUSES IN MULTIPLE OCCUPATION (HMO) INTRODUCTION
LONDON BOROUGH OF BROMLEY STANDARDS FOR HOUSES IN MULTIPLE OCCUPATION (HMO) INTRODUCTION 1. Minimum Standards: This document sets out the minimum standards required in HMOs located within the London Borough
Achieve increasing levels of energy performance beyond the prerequisite standard to
Certification Contribution The Leadership in Energy and Environmental Design () Green Building Rating System is the nationally accepted benchmark for the design construction, and operation of high performance
Construction Technologies Career Field Pathways and Course Structure
Courses in Structural Systems (DD) Construction Technologies Career Field Pathways and Course Structure PATHWAY COURSES SUBJECT CODE Construction Technology-Core and Sustainable Construction 1 178000 Carpentry
Whistler Green: Project Checklist
Whistler Green: Project Checklist (Detached and duplex dwellings) Whistler Green is our community standard for healthy homes that use energy and resources efficiently in a mountain setting. Considered
Home Inspection Report
4949 Brownsboro Rd Suite 293 Louisville, KY 40223 (502) 414-1440 [email protected] Inspected By: William Carter, HI-1956 Home Inspection Report Prepared For: Edward Cullen Property Address:
CITY OF YORBA LINDA P.O. BOX 87014 CALIFORNIA 92885-8714
CITY OF YORBA LINDA P.O. BOX 87014 CALIFORNIA 92885-8714 BUILDING DIVISION (714) 961-7120 Single Family Residential New Construction, Additions & Alterations Submittal Requirements Required agency approvals
Contents. Who is Premier Guarantee? Your Structural Warranty. What to look out for in your New Home. Running in your New Home. DIY and Maintenance
Homeowners Handbook Contents Who is Premier Guarantee? Your Structural Warranty What to look out for in your New Home Running in your New Home DIY and Maintenance Structural Warranty Cover This booklet
SECTION 807 PUMP STATION REHABILITATION
SECTION 807 PUMP STATION REHABILITATION 807-1 DESCRIPTION: Rehabilitation of pump stations shall be defined as the cleaning, removal, repair and/or replacement of any and/or all components including but
A clean energy solution from cradle to grave
Environmental Product Declaration A clean energy solution from cradle to grave Offshore wind power plant employing SWT-6.0-154 siemens.com / wind 2 Assessing the performance of a wind power plant The environmental
Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities
Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)
G. Common Defects in Buildings - Leakage
F. Common Defects in Buildings - Structural 32. Recently, some concrete chips have fallen from the ceiling in my kitchen. There are rusty steel bars and the area in question measures about 300 x 400mm.
A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES
A Residential Owner s Guide to PERMITS CITY OF Elgin PLANNING & NEIGHBORHOOD SERVICES CITY OF Elgin A Residential Owner s Guide Welcome! This booklet has been prepared to provide residential property owners
6 Schedule quarterly communications to keep employees involved in environmental improvements. WASTE REDUCTION REQUIRED MEASURES
GREEN BUSINESS CERTIFICATION (GBC) Business Name: Business Address: Plano, TX ZIP: Commercial Recycling 4200 W. Plano Parkway Plano, TX 75093 972-769-4393 OFFICE/RETAIL CHECKLIST General Education Waste
Undercover storage requirements for waste/recycling depots
Waste Information Sheet Undercover storage requirements for waste/recycling depots Update September 2010 EPA 845/10: This information sheet has been prepared for waste management and resource recovery
Environmental Policy. JRI Orthopaedics Limited
JRI Orthopaedics Limited October 2014 Contents Clause 1. Policy Statement 1 2. Who is covered by the policy? 2 3. Organisation and Responsibilities 2 4. Training and Communication 3 5. Suppliers and Customers
BCA EXTENDS ITS GREEN MARK CERTIFICATION TO RESTAURANTS - BCA Green Mark certification for Asia s first green McDonald s restaurants
MEDIA RELEASE BCA EXTENDS ITS GREEN MARK CERTIFICATION TO RESTAURANTS - BCA Green Mark certification for Asia s first green McDonald s restaurants - McDonald s Jurong Central Park outlet first to clinch
100% 50% 92% 99% LEED Facts PROJECT HIGHLIGHTS. Multi-occupant spaces have adjustable thermostats and lighting. Reduced water usage for landscaping
UNIVERSITY OF RICHMOND CAROLE WEINSTEIN INTERNATIONAL CENTER 28 Westhampton Way, Richmond VA 23173 LEED NC v2.2 GOLD 2015 Completed in 2010, the Carole Weinstein International Center showcases the University
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 MINORITY AND WOMEN S BUSINESS ENTERPRISE PARTICIPATION
Repair and Remodeling Estimating Methods. 4th Edition. RSMeans
Brochure More information from http://www.researchandmarkets.com/reports/2214808/ Repair and Remodeling Estimating Methods. 4th Edition. RSMeans Description: This estimating guide for repair and remodeling
Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders
INTRODUCTORY INFORMATION TABLE OF CONTENTS 00 0101 PROJECT TITLE PAGE PROCUREMENT REQUIREMENTS (PROJECT MANUAL) Tab A - Invitation for Bids Tab B - Instructions to Bidders Tab C Bid Form for General Bids
BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES
Department of Health and Human Services, Division of Public Health Occupational and Environmental Epidemiology Branch 1912 Mail Service Center, Raleigh, North Carolina 27699-1912 BUILDING ASSESSMENT QUESTIONNAIRE
125 Mount Auburn Second Floor Office Renovation LEED-CI Silver, September 2008
125 Mount Auburn Second Floor Office Renovation LEED-CI Silver, September 2008 The Harvard Law School s 125 Mount Auburn office renovation project team was committed to sustainable design and construction,
energy in education promoting energy efficiency in schools
The DART Energy Research Programme Recognising that the programme should be as much about people and changing cultures while delivering service the approach was developed initially through the four different
Department of Public Works. Recycling policy for buildings and civil infrastructure
Department of Public Works Recycling policy for buildings and civil infrastructure A whole-of-government recycling policy for buildings and civil infrastructure Policy statement The Queensland Government
ASEAN GREEN HOTEL. Audit Checklist
_ --- / ASEAN GREEN HOTEL Audit Checklist Nominee for Green Hotel Scope AuditTeam 1. 2. 3. Date of audit Requirement ndicators Criteria of audit Audit Guidance Rating Score Audit Findings Major Criteria
guidance notes Form C
guidance notes Form C These guidance notes are designed to help you complete Form C Application for new water infrastructure and plot(s) connection for industrial/commercial development(s) Important: Form
Schematic Design: Quality Management Phase Checklist Project Phase Checklist Series
Best Practices : Project Phase Series Contributed by Micheal J. Lough, AIA, Principal, Integral Consulting The AIA collects and disseminates Best Practices as a service to AIA members without endorsement
Planning Guidance for Food and Drink Establishments
Planning Guidance for Food and Drink Establishments ENVIRONMENT DIRECTORATE, CIVIC CENTRE, 44 YORK STREET, TWICKENHAM TW1 3BZ Planning Guidance for Food and Drink Establishments Introduction This guidance
MASTER BUILDERS ASSOCIATION
MASTER BUILDERS ASSOCIATION New South Wales 2015 EXCELLENCE IN HOUSING AWARDS ENTRY FORM Closing Date: Friday 20 March 2015 2015 EXCELLENCE IN HOUSING AWARDS AN ELECTRONIC VERSION OF THIS ENTRY FORM IS
ELIGIBLE REPAIR PROJECT PARAMETERS
THE DISTRICT MUNICIPALITY OF MUSKOKA ONTARIO RENOVATES PROGRAM FOR HOMEOWNERS ELIGIBLE REPAIR PROJECT PARAMETERS 1. To have your project considered and payment processed, all projects requiring a Building
C I T Y O F P E A R S A L L
The Largest City Between San Antonio and Laredo COMMUNITY DEVELOPMENT C I T Y O F P E A R S A L L A Business-Friendly, Family-Oriented Community Building Department Application Information (Please read
BCA-IDA Green Mark for Existing Data Centres Version EDC/1.0
BCA-IDA Green Mark for Existing Data Centres Version EDC/1.0 To achieve GREEN MARK Award Pre-requisite Requirement All relevant pre-requisite requirements for the specific Green Mark Rating are to be complied
Asbestos Policy & Procedure
Asbestos Policy & Procedure 1. Purpose & Introduction This policy and procedure sets out Octavia s commitment and approach to ensuring, so far as reasonably practicable, that residents, contractors and
Systems Selection Enclosure Systems Material Selection Assessment and Mitigation
Return to Curriculum Home CES Home Find an AIA/CES Registered Course Self Report a Learning Activity MATERIALS AND METHODS To develop professionally in Practice with a focus on sustainable design, you
DUTIES and GUIDANCE. for. BOARDS of MANAGEMENT. DEALING with ASBESTOS CONTAINING MATERIALS. before, during & after
DUTIES and GUIDANCE for BOARDS of MANAGEMENT on DEALING with ASBESTOS CONTAINING MATERIALS before, during & after SCHOOL REFURBISHMENT WORKS, DEMOLITIONS AND BUILDING WORKS PROJECTS CONTENTS CONTENTS...2
Operating Sustainable Facilities
Operating Sustainable Facilities Introduction... 1 Chapter 1: Energy Topic 1: Energy and Sustainable Facilities... 8 Topic 2: Energy Metrics... 11 Topic 3: Sustainable Facility Energy Initiatives... 20
Guide to the (Non-Residential) California Green Building Standards Code. Including changes effective July 1, 2012
Guide to the (Non-Residential) California Green Building Standards Code An educational publication by the California Building Standards Commission Third Edition January 2012 CALGreen Section: 5.710.6.2
BES 6001 Issue 3 Guidance Document
BES 6001 Issue 3 Guidance Document This guide is intended to give an understanding of BES6001:2014 Framework Standard for Responsible Sourcing. It is not a controlled document. 3.2.1 Responsible Sourcing
Sample Company SECTION 019113 GENERAL COMMISSIONING REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY AND CONTRACT RESPONSIBILITIES
SECTION 019113 GENERAL COMMISSIONING REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY AND CONTRACT RESPONSIBILITIES A. The Owner will contract separately and directly for the majority of the commissioning work
Klosterenga, Oslo, Norway, 1998-2000 page - 1
Klosterenga, Oslo, Norway, 1998-2000 page - 1 Introduction Klosterenga is an urban revitalisation project close to the city centre of Oslo. The 3 apartments were built with a focus on energy saving. Next
Application for electricity connections Business premises. Electricity. Send your completed application form with supporting documentation to:
Electricity Thank you for considering for your electricity connections. We have put together these notes to help you fill out your and to ensure we receive all the correct information for your application
How To Calculate Cost Of An Eco-Friendly Building
THE ECONOMICS OF LEED FOR EXISTING BUILDINGS FOR INDIVIDUAL BUILDINGS 2008 EDITION A WHITE PAPER BY LEONARDO ACADEMY INC. Revised February 2, 2009 APRIL 21, 2008 THIS WHITE PAPER SPONSORED BY JOHNSON CONTROLS
Contract No. CV / 2007 / 06 Kwai Chung Incineration Plant Demolition and Decontamination Works Site Management Plan for TRIP TICKET SYSTEM
Site Management Plan for TRIP TICKET SYSTEM (Version 1.3) CONTENT Item Description(s) Page No. 1. Introduction 2-3 2. Disposal of C & D Materials to Designated Disposal Ground 4 3. Site Management Plan
Restoring your Property: How to be prepared for Rapid Response to Flood Damage
Restoring your Property: How to be prepared for Rapid Response to Flood Damage After a flood, the restoration process can be long and complex, particularly for large commercial properties. Failure to apply
Millennium Hall, Philadelphia, Pennsylvania is a Residence Hall/Dormitory building of approximately 102,680 ft². The client is Drexel University.
Page 1 of 6 INTRODUCTION Millennium Hall, Philadelphia, Pennsylvania is a Residence Hall/Dormitory building of approximately 102,680 ft². The client is Drexel University. Millennium Hall is described as
Landlord/Agent Code of Conduct
Landlord/Agent Code of Conduct Commitment to this is a requirement of the Home Stamp accreditation scheme The Home Stamp Code of Conduct aims to provide guidance and advice regarding the management of
Acceptance on the Approved List of contractors cannot however guarantee that any work orders will be issued to that contractor.
PROPERTY MANAGEMENT INTRODUCTORY GUIDANCE NOTES FOR THE APPLICATION TO THE APPROVED LIST OF CONTRACTORS CONTRACTORS GUIDANCE NOTES APPLICATION FORM ISSUED BY: PROPERTY MANAGEMENT UNIT WEST YORKSHIRE FIRE
DEMOLITION PERMIT CHECKLIST* B.H.M.C. Section 10-3-4201
GEORGE CHAVEZ, City Building Official DAVID YELTON, Building Inspection Manager NESTOR OTAZU, Community Preservation Manager BUILDING & SAFETY DIVISION 455 North Rexford Drive, 1 st Floor Beverly Hills,
Building Design to Foster a Quality and Sustainable Built Environment
Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-151 Building Design to Foster a Quality and Sustainable Built Environment