TruexCullins Architecture Fairfield Center School Bid Documents Kitchen and Bathroom Renovation March 1, 2015



Similar documents
SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

INVITATION FOR BIDS CCK PROJECT PEDIATRIC CRITICAL CARE RENOVATION PHASE 3 ADDENDUM #

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

ADDENDUM NO. 1. DATE: February 10, 2015 INVITATION FOR BID: IFB K Commerce Road Renovations Project DATED: February 9, 2015

Invitation to Bid and Instructions to Bidders (This is Phase I of the project please note on any Bid that it Applies to Phase I only) May 1, 2015

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

All bidders shall indicate in their bid/proposal that this Addendum has been received and considered in their bid proposal.

REQUEST FOR BIDS. Project Management Technical Services

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

NOTICE TO CONTRACTORS

SECTION NOTICE TO BIDDERS IVY TECH COLLEGE OF INDIANA NMC INFRASTRUCTURE IMPROVEMENTS INDIANAPOLIS, INDIANA

PROJECT MANUAL MBA SUITE CONVERSION OF ROOMS 435, 436 AND 437. University of Rhode Island Providence Campus. July 8, 2014

FABENS INDEPENDENT SCHOOL DISTRICT FABENS, TEXAS. REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES Risk) FOR

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

CONTRACTOR REGISTRATION

Gramercy Place Condo Association, Inc.

INSTRUCTIONS TO BIDDERS

SECTION INSTRUCTIONS TO BIDDERS

Repair and Remodeling Estimating Methods. 4th Edition. RSMeans

KNOW ALL MEN BY THESE PRESENTS, that we, the undersigned,

From the Office of: MAHLUM ARCHITECTS 71 Columbia Street Floor 4 Seattle, WA 98104

REQUEST FOR PROPOSAL: STRUCTURED CABLING, LAN SWITCHES, LONG DISTANCE SERVICE, ELECTRONIC FAXING, AND HOSTED VOIP SPECIFICATIONS

S E C T I O N P R O P O S A L (CONTINUED)

Warner Robins Housing Authority

THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM SHALL BECOME A PART OF THIS SOLICITATION. Amend Invitation to Bid 14-MC-2194 as follows:

STATE OF DELAWARE DEPARTMENT OF FACILITIES MANAGEMENT CONTRACT # MC

INSTRUCTIONS TO BIDDERS

PROJECT NO. 2733, RFP NO /02. Peralta Community College District. 333 East 8th Street, Oakland, CA Questions

MICHIGAN STATE HOUSING DEVELOPMENT AUTHORITY LOW INCOME HOUSING TAX CREDIT PROGRAM COST CERTIFICATION GUIDELINES TABLE OF CONTENTS

College of the Siskiyous Insurance Requirements

ADVERTISEMENT FOR PREQUALIFICATION FOR THE FOLLOWING BID PACKAGES *RE-ADVERTISED*

City Of Portsmouth, New Hampshire REQUEST FOR QUALIFICATIONS # For. Construction Management Services for the

INVITATION TO BID. Web and Application Development Services. Monday, February 23, 2015 at 10:00 AM

REQUEST FOR QUOTES SAFETY TRAINING - OVERHEAD CRANES / HOISTS RFP # 16S0325

INSTRUCTIONS FOR COMPLETING THE CITY OF GILLETTE CONTRACTOR LICENSE APPLICATION (RENEWAL)

STATE OF DELAWARE DEPARTMENT OF FACILITIES MANAGEMENT CONTRACT # MJ

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

a. Proposals shall be submitted in a sealed envelope and addressed as follows:

CLOSING LOCATION Island Hwy Nanaimo BC, V9T 6N4

C A S T L E G A R & D I S T R I C T R E C R E A T I O N C E N T R E K I T C H E N F L O O R I N G + W A S H R O O M U P G R A D E S

Region 7 Education Service Center Request for Proposal (RFP) For Generator Installation

BETHEL SCHOOL DISTRICT 52 REQUEST FOR PROPOSALS FOR ARCHITECTURAL AND ENGINEERING SERVICES Issue Date: January 8, 2013

REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT AND GENERAL CONTRACTOR SERVICES SPRINGVILLE CITY NEW AQUATICS AND ACTIVITIES CENTER

AIA Document A141 TM Standard From of Agreement Between Owner and Design- Builder

IN071 Engineering & Technology 109/109A Renovate for Office Indiana University Purdue University Indianapolis

Request For Proposal. Furnish Schneider Business Park Signs Design Build Services. For the Cibolo Economic Development Corporation Cibolo, Texas

Request for Quote Number: PRC Baseball Diamond Backstop Re-Fence

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

RE: REQUEST FOR PROPOSAL RFP FLEET MANAGEMENT CONSULTING SERVICES

N.I.C.E. COMMUNITY SCHOOL DISTRICT PRELIMINARY ARCHITECTURAL SERVICES REQUEST FOR PROPOSALS ("RFP")

PASADENA AREA COMMUNITY COLLEGE DISTRICT (PACCD) 2015 California Uniform Public Construction Cost Accounting Act (CUPCCAA) Informal Bid List

HOMER TOWNSHIP HIGHWAY DEPARTMENT ADDENDUM #1. June 13, 2014 VARIOUS (2014 ROAD PROGRAM) SECTION NO.: GM

Borough of Jamesburg

Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum

INVITATION TO BID EOE

REQUEST FOR PROPOSAL FOR: IT CONSULTANT

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

How To Bid On A Building Project In San Jose

Specifications For Roof Repairs. Greenfield Middle School 195 Federal Street Greenfield, MA. City of Greenfield 14 Court Square Greenfield, MA

Construction Technologies Career Field Pathways and Course Structure

Construction Management Services Delmar School District RFP No. DSD16001-CONSTR_MAN

Belgrade School District No Invitation to Submit Bids For School Accounting, Payroll, and Human Resources Software

CSTM 102 Spring Construction Documents to Contract Documents

YORK COUNTY COMMUNITY COLLEGE MAINE BGS PROJECT #2410 C WING HVAC UNITS

ADDENDUM No. 3 May 25, 2016

REQUEST FOR PROPOSALS (RFP) - Construction Management Services. Germantown School District Office

1. PROJECT DESCRIPTIONS.

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK (CMAR)

SECTION ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

CHARLOTTE COUNTY Community Development Department

Carmel Unified School District. Prequalification Application For Bleacher and Pressbox Replacement Project at Carmel High School

Actuarial Study on Post Employment Benefits Ref #12115RFPLC

REQUEST FOR PROPOSALS FOR LANDSCAPE ARCHITECTURAL SERVICES TOWN OF AVON, CONNECTICUT

CHAPTER PUBLIC IMPROVEMENT BIDS AND CONTRACTS

RHODE ISLAND TURNPIKE AND BRIDGE AUTHORITY INVITATION TO BID

REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT

Mechanical Contractor Pre-Qualification Packet. SPSC N180 Computer Data Room Phase II. Project No. CP Notice No. Notice

CITY OF COMMERCE CITY BID BOND

REQUEST FOR PROPOSALS

New York's Real Estate Law - Requirements For the District

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES

ÉCOLE TACHÉ DAYCARE and ADDITION Winnipeg, MB Division Scolaire Franco-Manitobaine

INVITATION TO BID CITY OF HOPKINSVILLE

Applications for building permits will not be reviewed until all of the required information has been submitted.

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

Warner Robins Housing Authority

REQUEST FOR QUOTES FOR. On-Call Plumbing Contractor

How To Get Construction Procurement Services

Request for Proposal S P R I N G F I E L D U T I L I T Y B O A R D MAIN OFFICE

TENDER FOR ROOF REPAIR FOR THE NSLC S METEGHAN RETAIL STORE NOVA SCOTIA LIQUOR CORPORATION 93 CHAIN LAKE DRIVE HALIFAX, NOVA SCOTIA B3S 1A3

Policy Number: Policy Name: Professional Services and Construction Services Procurement

Hunt Construction Group, Inc. LEVEL 1 DESIGN BUILD SPECIALTY CONTRACTOR PREQUALIFICATION DOCUMENTS FOR:

GORDON COUNTY BOARD OF COMMISSIONERS REQUEST FOR QUALIFICATIONS FOR AN ARCHITECT FAMILIAR WITH COMMUNITY DEVELOPMENT BLOCK GRANT APPLICATIONS

SARPY COUNTY, NEBRASKA REQUEST FOR PROPOSALS. Jail Boiler Replacement Project For the. Facilities Management Department

Eanes Independent School District

a. Proposals shall be submitted in a sealed envelope and addressed as follows:

CHAPTER 7 PUBLIC WORKS LAW

TOWN OF LINCOLN INVITATION TO BID EMERGENCY PLANNING, DISASTER RECOVERY AND HAZARD MITIGATION GRANT PROGRAM SERVICES RFP #

Transcription:

Fairfield Center School Kitchen and Bathroom Renovation Project Specifications Owner: Fairfield Center School, 57 Park Street, Fairfield VT 05455 Franklin Central Supervisory Union, 28 Catherine Street, St. Albans VT 05478 Architect: TruexCullins Architecture and Interior Design 209 Battery Street, Burlington VT 05401 Bid Documents Date: March 1, 2015

00 01 02 Project Information 1. Owner: Fairfield Center School, 57 Park Street, Fairfield, VT 05455, (Franklin Central Supervisory Union FCSU, 28 Catherine Street, St, Albans, VT 05478) a. Superintendent of Schools: Dr. Kevin Dirth b. School Principal: Jennifer Wood (Project Contact) c. Custodian: John Baxter d. School telephone: 802 827 6639 e. Owner Office: FCSU, 28 Catherine Street, St, Albans, VT 05478 Tel: 802-524-2600 2. Project Number: A2014045 3. Project Description: a. Renovation of existing Kitchen, Bathrooms and main corridor, including Architectural, Plumbing, Mechanical, Electrical, Structural and Kitchen Equipment scope. 4. Architects: TruexCullins Architecture and Interior Design, 209 Battery Street, Burlington, VT 05401 a. Office Phone 803 658 2775 b. Project Contact: Peter Burns c. Direct telephone : 802 488 8217 d. pburns@truexcullins.com 5. Procurement Schedule a. RFP documents available: Wednesday April 1, 2015 b. Pre- Bid Site Tour: Friday April 10, 2015, 9:00 AM c. Last Request for substitution: 7 days prior to Bid Due date d. Last Request for information: 7 days prior to Bid Due date e. Bid Due date: Wednesday April 22, 2015 Before 3:00 PM Local time f. Bid Opening: Wednesday April 22, 2015 At 3:00 PM Local time g. Notice to Proceed: Issued two weeks after Contractor selection h. Construction Start: Monday June 22, 2015 i. Construction completion: Monday August 17, 2015 j. Owner reserves the right to change this schedule or terminate the procurement process at any time. 6. Procurement Documents a. Available at: BluePrints Etc, 20 Farrell St. South Burlington, VT 05403. Telephone: 802 865 4503, orders@blueprintsetc.com

Specification Table of Contents 00 01 02 Project Information 00 01 10 Table of Contents 00 21 13 Instructions to Bidders 00 31 00 Available Project Information 00 41 00 Bid Form 00 50 00 Contracting Forms and Supplements 00 52 00 Agreement Form 00 72 00 General Conditions 01 10 00 Summary 01 20 00 Price and Payment Procedures 01 23 00 Alternates 01 30 00 Administrative Requirements 01 35 53 Security Procedures 01 40 00 Quality Requirements 01 50 00 Temporary Facilities and Controls 01 57 21 Indoor Air Quality Controls 01 60 00 Product Requirements 01 61 16 VOC Content Restrictions 01 70 00 Execution and Closeout Requirements 01 78 00 Closeout Submittals 01 91 13 General Commissioning Requirements 02 41 00 Demolition 03 30 00 Concrete 04 29 00 Unit Masonry 05 12 00 Structural Steel 05 40 00 Cold Formed Metal Framing 05 50 00 Metal Fabrications 06 10 00 Rough Carpentry 06 82 00 Glass Fiber Reinforced Plastic 07 21 19 Foamed-in- Place Insulation 07 54 00 Membrane Roofing 07 90 05 Joint Sealants 08 11 13 Steel Door and Frames 08 31 00 Access panels 08 71 00 Door Hardware 08 83 00 Mirrors 09 21 16 Gypsum Board Assemblies 09 30 00 Tiling 09 65 00 Resilient Flooring / Floor preparation 09 51 00 Acoustical Ceilings 09 90 00 Painting 10 21 13 Toilet Compartments 10 28 00 Toilet Accessories 10 44 00 Fire extinguishers 11 40 00 Food Service equipment

Plumbing 22 10 01 Summary of Work 22 10 06 Alternates 22 10 07 Definitions and Standards 22 10 10 Basic Requirements 22 10 40 Demolition 22 10 55 Basic Materials and Methods 22 10 84 Fire Stopping for Plumbing Systems 22 11 00 Valves 22 11 35 Meters and Gages 22 11 40 Supports and Anchors 22 11 50 Seismic Restraints 22 11 90 Identification 22 12 50 Insulation 22 14 30 Water Distribution System 22 14 35 Drainage and Vent System 22 14 40 Plumbing Fixtures 22 14 88 Gas Piping Mechanical 23 10 01 Summary of Work 23 10 06 Alternates 23 10 10 Basic Requirements 23 10 40 Demolition 23 10 55 Basic Materials and Methods 23 11 25 Expansion Compensation 23 12 50 Insulation 23 15 10 Hydronic Piping 23 16 20 Gas Fired Heaters 23 18 30 Terminal Units 23 18 49 Kitchen Hoods and Fire Suppression 23 18 50 Fans 23 18 70 Gravity Ventilators 23 18 90 Metal Ductwork and Accessories 23 19 72 Electronic Controls 23 19 73 Pneumatic Controls 23 19 85 Sequence of Operation 23 19 90 Testing, Adjusting and Balancing Electrical - See Drawings

Section 00 21 13 - Instructions to Bidders Invitation 1 Bid submission A. Bids signed and under seal, executed, and dated will be received at the office of the owner before 3:00 PM Local standard time on the 22nd day of April 2015. B. Office of the Owner Address: Franklin Central Supervisory Union FCSU, 28 Catherine Street, St. Albans, VT 05478 Telephone: 802-524-2600 C. Offers submitted after the above time shall be returned to the bidder unopened. D. Offers will be opened publicly immediately after the time for receipt of bids. Bid Documents and Contract Documents 1 Definitions A. Bid documents: contract documents supplemented with invitation to bid, instructions to bidders, information available to bidders, bid form supplements to bid forms and appendices identified. B. Contract documents: defined in AIA A201 including issued addenda. C. Bid, offer, or bidding: act of submitting an offer under seal. D. Bid amount: monetary sum identified by the bidder in the bid form. 2 Contract Documents Identification A. The contract documents are identified as project number A2014045, as prepared by TruexCullins Architecture who is located at 209 Battery Street, Burlington, VT 05401, and with contents as identified in the table of contents. 3 Inquiries/Addenda A. Direct questions to Peter Burns, email: pburns@truexcullins.com. All questions must be in writing. B. Addenda may be issued during the bidding period. All addenda become part of the contract documents. Include resultant costs in the bid amount. C. Verbal answers are not binding on any party. D. Clarifications requested by the bidders must be submitted in writing 7 days prior to bid due date. The reply will be in the form of an addendum, a copy of which will be available from blueprints etc. It is the responsibility of the bidders to establish and maintain proper business contact with blueprints etc. For the transmission of information. 4 Product/Assembly/System Substitutions A. Where the bid documents stipulate a particular product, substitutions will be considered up to 7 days before receipt of bids. B. When a request to substitute a product is made, architect may approve the substitution and will issue an addendum to known bidders. C. In submission of substitutions to products specified, bidders shall include in their bid all changes required in the work and changes to contract time and contract sum to accommodate such substitutions. A later claim by the bidder for an addition to the contract time or contract sum because of changes in work necessitated by use of substitutions shall not be considered. D. The submission shall provide sufficient information to determine acceptability of such products.

E. Provide complete information on required revisions to other work to accommodate each proposed substitution. F. Provide products as specified unless substitutions are submitted in this manner and accepted. G. See section 01 60 00 - product requirements for additional requirements. Qualifications Bid Submission 1 Submission Procedure A. Bidders shall be solely responsible for the delivery of their bids in the manner and time prescribed. B. Submit one copy of the executed offer on the bid forms provided, signed and sealed with the required security in a closed opaque envelope, clearly identified with bidder's name, project name and owner's name on the outside. C. Improperly completed information, irregularities in security deposit, may be cause not to open the bid form envelope and declare the bid invalid or informal. 2 Qualifications Package A. Contractor shall submit together with their bids a qualifications package. This package shall include the following: 1. Evidence of Bonding: Provide documentation from a surety operating in Vermont indicating willingness to provide 100% payment and performance bond for the value of the project. Claim history for payment and performance bonds. 2. List of completed school projects. List may also include commercial type construction similar or relevant to school projects. 3. List of references with telephone numbers, including owners of above requested projects. 4. Resumes of key personnel for Project Manager and job- site Superintendent. 5. List of court cases, arbitrations, actions, and mediations arising from construction contracts in which the firm has been involved over the past 10 years. 6. Proof of Commercial General Liability Insurance, including Automotive Liability Insurance. 7. Proof of Worker s Compensation Insurance. 8. List of any serious health or safety regulation violations in the last 5 years. 3 Bid Ineligibility A. Bids that are unsigned, improperly signed or sealed, conditional, illegible, obscure, contain arithmetical errors, erasures, alterations, or irregularities of any kind, may at the discretion of the owner, be declared unacceptable. B. Bids from contractors with unacceptable qualifications will not be accepted. Bid Enclosures/Requirements 1 Security Deposit A. Bids shall be accompanied by a security deposit as follows: 1. Bid bond of a sum no less than 5 percent of the bid amount on AIA A310 bid bond form. B. Endorse the bid bond in the name of the owner as obligee, signed and sealed by the principal (contractor) and surety.

C. The security deposit will be returned after delivery to the owner of the required performance and payment bond(s) by the accepted bidder. D. Include the cost of bid security in the bid amount. E. After a bid has been accepted, all securities will be returned to the respective bidders and other requested enclosures. F. If no contract is awarded, all security deposits will be returned. 2 Performance Assurance A. Accepted bidder: provide a performance and payment bond as described in document AIA A101-2007 Standard form of Agreement between Owner and Contractor B. Include the cost of performance assurance bonds in the bid amount. 3 Bid Form Requirements A. Complete all requested information in the bid form and appendices. 4 Sales And Use Taxes A. Fairfield center school is sales tax exempt. The tax exempt number will be made available to the successful bidder. 5 Fees For Changes In The Work A. Include in the bid form, the overhead and profit fees on own work and work by subcontractors, applicable for changes in the work, whether additions to or deductions from the work on which the bid amount is based. 6 Bid Form Signature A. The bid form shall be signed by the bidder, as follows: 1. Sole proprietorship: signature of sole proprietor in the presence of a witness who will also sign. Insert the words "sole proprietor" under the signature. Affix seal. 2. Partnership: signature of all partners in the presence of a witness who will also sign. Insert the word "partner" under each signature. Affix seal to each signature. 3. Corporation: signature of a duly authorized signing officer(s) in their normal signatures. Insert the officer's capacity in which the signing officer acts, under each signature. Affix the corporate seal. If the bid is signed by officials other than the president and secretary of the company, or the president/secretary/treasurer of the company, a copy of the by-law resolution of their board of directors authorizing them to do so, must also be submitted with the bid form in the bid envelope. 7 Selection And Award Of Alternatives A. Indicate variation of bid price for alternatives listed on the bid form. Unless otherwise indicated, indicate alternatives as a difference in bid price by adding to or deducting from the base bid price. B. Bids will be evaluated on the total of the base bid price and all of the alternatives. After determination of the successful bidder, consideration will be given to which alternatives will be included in the work. Offer Acceptance/Rejection 1 Duration Of Offer A. Bids shall remain open to acceptance and shall be irrevocable for a period of 45 days after the bid closing date.

2 Acceptance Of Offer A. The owner reserves the right to reject all offers. In accordance with Vermont State law, the owner shall select the lowest bidder unless the two lowest offers are with 1% of each other, in which case, the owner can select either of the bidders. B. Bids from contractors with unacceptable qualifications will not be accepted. C. Should all offers be rejected, the owner reserves the right to revise the contract documents and rebid the project to any or all of the original bidders or to new bidders. Section 00 31 00 - Available Project Information General 1 Existing conditions a. Certain information relating to existing structures is available to bidders but will not be part of the Contract Documents, as follows: 1. Partial electronic.pdf set of blueprint reproductions from the 1965 and 1988 building wing construction, including plumbing and mechanical drawings, roof overbuild and septic systems. a. This set of drawings is not complete and probably does not reflect as- built conditions. b. Image quality varies. c. Contractors shall use information in these drawings at their own risk d. Electronic.pdf files are available from Architect upon request. b. Hazardous Material Survey - Original copy is available at Owner's office.

Section 00 41 00 - Bid Form The Project And The Parties 1 To: 2 For: a. Owner a. Renovation of existing Kitchen, Bathrooms and main corridor, including Architectural, Plumbing, Mechanical, Electrical, Structural and Kitchen Equipment scope. 3 Date: (Bidder To Enter Date) 4 Submitted By: (Bidder To Enter Name And Address) a. Bidder's Full Name 1. Address 2. City, State, Zip 5 Offer a. Having examined the Place of The Work and all matters referred to in the Instructions to Bidders and the Contract Documents prepared by TruexCullins for the above mentioned project, we, the undersigned, hereby offer to enter into a Contract to perform the Base bid Work for the Sum of: 1. dollars 2. ($ ), in lawful money of the United States of America. b. The sum of all the add alternates is: 1. dollars 2. ($ ), in lawful money of the United States of America. c. The basis of the bid award is the sum of the base bid plus the sum of all the add alternates. This amount is: 1. dollars 2. ($ ), in lawful money of the United States of America. d. We have included the required security deposit as required by the Instruction to Bidders. e. All applicable federal taxes are included and State of Vermont taxes are included in the Bid Sum. f. We have included the cost of the required Performance and Payment Bond. 6 Acceptance a. This offer shall be open to acceptance and is irrevocable for 45 days from the bid closing date. b. If this bid is accepted by Owner within the time period stated above, we will: 1. Execute a Letter of Intent to Proceed within seven days of receipt of acceptance of this bid. 2. Furnish the required bonds within seven days of receipt of acceptance of this bid. 3. Commence work on c. If this bid is accepted within the time stated, and we fail to commence the Work or we fail to provide the required Bond(s), the security deposit shall be forfeited as damages to Owner by reason of our failure. d. In the event our bid is not accepted within the time stated above, the required security deposit shall be returned to the undersigned, in accordance with the provisions of the Instructions to

Bidders; unless a mutually satisfactory arrangement is made for its retention and validity for an extended period of time. 7 Contract Time a. If this Bid is accepted, we will: b. Complete the Work by 17th day of August 2015. 8 Alternatives a. If an alternate is selected by the Owner, the Bidder proposes to do the work required by the Contract Documents by increasing the Base Bid by the following amount: 1. Add Alternate #1 (AA1): Bathroom Renovation: including Architectural, Plumbing, Mechanical, Electrical, and Structural scope. A. Dollars b. ($ ), in lawful money of the United States of America. 2. Add Alternate #2 (AA2): Boiler room improvements a. dollars b. ($ ), in lawful money of the United States of America. 9 Changes To The Work a. When Architect establishes that the method of valuation for Changes in the Work will be net cost plus a percentage fee in accordance with General Conditions, our percentage fee will be: 1. percent overhead and profit on the net cost of our own Work; 2. percent on the cost of work done by any Subcontractor. b. On work deleted from the Contract, our credit to Owner shall be Architect-approved net cost plus of the overhead and profit percentage noted above. 10 Addenda a. The following Addenda have been received. The modifications to the Bid Documents noted below have been considered and all costs are included in the Bid Sum. 1. Addendum # Dated. 11 Bid form signature(s) a. The Corporate Seal of b. c. (Bidder - print the full name of your firm) d. was hereunto affixed in the presence of: e. f. (Authorized signing officer, Title) g. (Seal)

Section 00 50 00 - Contracting Forms And Supplements General 1 Agreement And Conditions Of The Contract a. See Section 00 52 00 for the Agreement form to be executed. b. See Section 00 72 00 for the General Conditions. c. See Section 00 72 00 for the General Conditions as modified by Owner to include Supplementary Conditions. d. The Agreement is based on AIA A101 as modified by the Owner. e. The General Conditions are based on AIA A201 as modified by the Owner. 2 Forms a. Use the following forms for the specified purposes unless otherwise indicated elsewhere in the Contract Documents. b. Bond Forms: 1. Performance and Payment Bond Form: AIA A312. c. Post-Award Certificates and Other Forms: 1. Schedule of Values Form: AIA G703. 2. Application for Payment Form: AIA G702 and G703. d. Clarification and Modification Forms: 1. Supplemental Instruction Form: AIA G710. 2. Construction Change Directive Form: AIA G714. 3. Change Order Form: AIA G701. e. Closeout Forms: 1. Certificate of Substantial Completion Form: AIA G704. 3 Reference Standards a. AIA A101 - Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum; 2007. b. AIA A201 - General Conditions of the Contract for Construction; 2007. c. AIA A312 - Performance Bond and Payment Bond; 2010. d. AIA G701 - Change Order; 2001. e. AIA G702 - Application and Certificate for Payment; 1992. f. AIA G703 - Continuation Sheet; 1992. g. AIA G704 - Certificate of Substantial Completion; 2000. h. AIA G710 - Architect's Supplemental Instructions; 1992. i. AIA G714 - Construction Change Directive; 2007.