125 Mount Auburn Second Floor Office Renovation LEED-CI Silver, September 2008



Similar documents
34% 81% 84% 19% GOLD PROJECT HIGHLIGHTS. LEED Facts. Stubbs Laboratory

Aldrich Hall. LEED Facts. Silver 34* Case Study. Harvard Business School. Aldrich Hall Boston, MA

Hydro One Office Suite 483 Bay Street, 6th Floor, South Tower, Toronto LEED-CI Case Study

POMONA COLLEGE Sustainability Integration Office Facilities and Campus Services

100% 50% 92% 99% LEED Facts PROJECT HIGHLIGHTS. Multi-occupant spaces have adjustable thermostats and lighting. Reduced water usage for landscaping

Sika Sarnafil World Class Roofing and Waterproofing

FEDERAL LEADERSHIP IN HIGH PERFORMANCE and SUSTAINABLE BUILDINGS MEMORANDUM OF UNDERSTANDING

LEED GOLD CERTIFIED OFFICE DESIGN AND CONSTRUCTION

Rules of Thumb Energy Efficiency in Buildings

The Raleigh Convention Center Raleigh, North Carolina Green Building Education A Self Guided Walking Tour

Key energy-efficient features of your new home

Los Angeles Mission College Facilities Master Plan Draft Program Environmental Impact Report 3.5 ENERGY CONSERVATION AND SUSTAINABILITY.

Siemens Gebze Location FIRST GREEN BUILDING IN TURKEY CERTIFICIED AS LEED GOLD

EarthCents (DSM) Program Summary

Green House, Hungary

TTU Green Standards. TTU Green Standards

Guide to the (Non-Residential) California Green Building Standards Code. Including changes effective July 1, 2012

250 St Georges Tce, Perth, WA (QV1)

LEED PRESENTATION OUTLINE

Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study

FEDERAL LEADERSHIP IN HIGH PERFORMANCE and SUSTAINABLE BUILDINGS MEMORANDUM OF UNDERSTANDING

This report presents the findings and recommendations of the assessment of energy use and

Going for LEED Gold: SUSTAINABLE DESIGN IN THE RICHARD IVEY BUILDING

Exhibit B. Property Acquisition and Disposition Division Residential Design & Performance Standards

Our Triple Bottom Line...

Green Buildings Guidelines for Harvard

Corporate Office Energy Efficiency Initiatives

MSHDA Affordable Green Enterprise Green Communities USGBC LEED

BOMA BESt Assessment Overview

MARQUETTE UNIVERSITY: McCabe Hall

Sustainable Features. High-performance HVAC. High-performance Envelope Green Roof Day-Lighting Bicycle Infrastructure

Saint Cloud Business Center

Total Building Commissioning: Case Study of the U.S. District Courthouse in Salt Lake City, Utah, USA

How To Calculate Cost Of An Eco-Friendly Building

GREEN DEVELOPMENT PLAN Developer Name: Project Name: Address (Street/City/State) Description of Process. Goals. Design & Development Team Members Name

Sample Service Level Agreement

CASE STUDY: The EVERGREEN

SOUTHERN CALIFORNIA EDISON DATA CENTER GREEN BUILDING EDUCATION: A CASE STUDY

Element D Services Heating, Ventilating, and Air Conditioning

Cadillac Fairview s GREEN AT WORK Overview

KEYBANK AT RAINIER TOWER- 24TH & 25TH FLOORS SEATTLE, WA Green Building Education: Case Study. Prepared for KeyBank by Callison LLC 2015 KeyCorp

Deep Energy Savings in Existing Buildings

Sustainability in construction at Creighton

Our footprint. We believe in our people and support them to champion change. Environmental Awareness. Sustainable Design

New York University. Green Lease Guide

COMPASS bos I-A DATA CENTER

LEADERSHIP IN ENERGY AND ENVIRONMENTAL DESIGN

BOMA BESt AND LEED EBOM COMPARISON

Green Built Texas Protocol v3 Project Summary and Checklist, One and Two Family New Construction

HVAC Costs. Reducing Building. Building owners are caught between two powerful forces the need to lower energy costs. By Stephen J.

energy-saving checklist a guide for rental property owners

APHA 2016 Annual Meeting and Expo Hotel Environmental Survey Denver, CO

Industrial Green Building Retrofit 101 Opportunities and Challenges. Light Industrial Green Building Retrofits. Why Green Retrofit?

SouthShore HILLSBOROUGH COMMUNITY COLLEGE

North Carolina Heating and Cooling Equipment Incentive Application

Apollo Group 2012 Sustainability Updated

IEQ Management Plan. Denver Museum of Nature and Science ECF Addition

University Center Texas State Technical College Harlingen

HOW AN ENERGY EFFICIENT HOME CAN HELP THE ENVIRONMENT

Masters Series LEED. Masters Series Contributions to LEED

Massport Sustainability Design Standards and Guidelines (SDG)

EnergyPro Building Energy Analysis. Assisted Living Building

BPC Green Builders. Green building for new and existing homes. Health Comfort Energy

Water Efficiency Obtain EPA WaterSense Certification At Final Inspection. Verifier Verifier confirms presence by visual inspection.

Energy Efficiency for Businesses: An Overview of Best Practices to Help Reduce Energy Costs

PENNSYLVANIA GREEN ENERGY LOAN FUND

Small Guide to BIG Savings: Energy Efficiency for your Small Business. Julia Sander Leidos Engineering, LLC


SAVE ENERGY AT HOME INSULATE AND AIR SEAL

Construction Indoor Air Quality Management Plans for LEED. Matt Gregg, PE, LEED AP

CoreNet Global Las Vegas Summit. LEED Unlocked: Keys to a Successful Sustainability Transformation

Green Globes for New Construction Pre-Assessment Checklist for Project Managers

Haworth s Product to LEED Points. LEED - Commercial Interiors

Schedule B to By-law

Guide Specification SECTION COMMISSIONING OF HVAC PART 1 - GENERAL 1.1 SUMMARY

MECHANICAL SYSTEMS DESIGN. Team

Schematic Design: Quality Management Phase Checklist Project Phase Checklist Series

Current Programs available to Limited Income Customers. Residential and Multifamily

GREEN FACTS. Marina Bay Sands

Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School

2008 City of Chicago Green Pavilion

Home Energy Evaluation Report for Fritz Kreiss and Catherine McQueen

How To Improve A Building

Transcription:

125 Mount Auburn Second Floor Office Renovation LEED-CI Silver, September 2008 The Harvard Law School s 125 Mount Auburn office renovation project team was committed to sustainable design and construction, as well as applying the Harvard Green Building Guidelines, from the onset of design and throughout construction. 125 Mount Auburn is located in the heart of Harvard Square in Cambridge, Massachusetts. The project, a 5620 square foot fit-out and renovation of leased office space on the second floor of the existing building, provides office space for twenty-two staff. The primary objective of the 125 Mount Auburn project was to renovate the second floor to accommodate the Harvard Law School Financial Office and Human Resources, as well as create a remote office for Information Technology Services and a mailroom for the Alumni Relations group. In the Financial Office and Human Resource suites, there is a combination of private offices and workstations. Support areas include a small conference room for Human Resources, a guest waiting area in each suite, copier and storage facilities and centralized files. LEED-CI certification, as well as adherence to the Harvard University Green Building Guidelines, helped the project form and develop sustainability goals. Construction was undertaken in the summer of 2008. The project earned LEED-CI Silver certification in March 2009. PROJECT HIGHLIGHTS > 98.9% of the construction waste was diverted from landfills. > 46.4% of the furniture budget included salvaged furniture > 33.12% of the total value of materials were manufactured regionally within 500 miles > 50% of the wood, by cost, is Forest Stewardship Council certified > 40,040 gallons of water annually estimated to be saved over codeminimum fixtures > Low-VOC materials and comprehensive green cleaning program

L o c a t i o n P r o j e c t T e a m Project Manager Gene O'Connor - HLS Facilities Management Architect Janovsky/Hurley Architects Contractor Kirkland Construction Co. Engineer RDK Engineers Commissioning Authority MAW Consulting, Inc. Waste Management Consultant Institution Recycling Network The project is located in Harvard Square, at the corner of Mount Auburn Street and Story Street, in Cambridge, Massachusetts. Sustainability Consultant Harvard Office for Sustainability Green Building Services N 2

S u s t a i n a b l e S t r a t e g i e s S i t e W a t e r E f f i c i e n c y > 125 Mount Auburn Street is in a densely developed urban area within walking distance to public transportation, campus shuttles, restaurants, banks, churches, retail stores, and other services. > To encourage alternatives to driving, occupants benefit from Harvard s comprehensive Commuter Choice program, which provides carpooling incentives and discounts on public transportation. > Bicycle racks adjacent to the building and close proximity and showers located throughout the building allow the option for commuting via bicycle. > The roof is high-albedo Sarnafil G410 white membrane, which has 82% reflectance and 92% emittance to reduce the heat island effect. > Second floor restrooms and showers were retrofitted to reduce the use of potable water by an estimated 36.51% over Energy Policy Act of 1992 (EPAct) compliant fixtures. EPAct requires that water closets use no more than 1.6 gallons per flush (gpf), lavatories no more than 2.5 gallons per minute (gpm), and showers no more than 2.5 gpm. > The existing 1.6 gpf water closet flushometers were replaced with Sloan dual-flush flushometers, with provide a 1.1 gpf option in addition to the 1.6 gpf option. The 2.5 gpm showerhead was replaced with a 1.6 gpm showerhead. Existing faucet aerators were already 0.5 gpm models. > These measures are estimated to save over 38,600 gallons of water per year compared to EPAct-compliant fixtures. Please print this project profile only if necessary. If printing is required, please print double sided and recycle when finished. Thank you! 3

Energy Efficiency > The existing HVAC VAV air distribution system was modified with a combination of existing and new variable air volume (VAV) terminal boxes and wall-mounted thermostats to provide temperature set point control for the individual zones within the space. The existing base building VAV air handling units and medium pressure duct distribution system provides the heating, ventilating and air conditioning to second floor. All of the VAV terminal units are tied back into the existing house Johnson Controls Building Automation System (BAS). > The project s energy-related systems were commissioned by a thirdparty Commissioning Authority. Commissioning is the process of ensuring that the building s energy related systems are designed, installed, calibrated, and perform according to the owner s project requirements (OPR), basis of design (BOD), and construction documents. The Commissioning scope included: Inspections were conducted during the installation phase to verify the commissioned equipment and systems were installed in accordance with the Contract Documents and are serviceable and maintainable. It also included the observing manufacturer s start-up/check-out sheets, which are executed and submitted by the respective manufacturer or authorized representative. Verification tests were developed and executed to determine the commissioned equipment and systems are installed and operate in accordance with the OPR, BOD, and Contract Documents. Calibration verification was conducted to confirm all measured and recorded data was within specified tolerances. Functional Performance Tests were developed and executed to determine the commissioned equipment and systems, and all related subsystems, are performing in accordance with the OPR and BOD. Each individual piece of equipment and the system, as a whole, was tested. The commissioned equipment and systems were retested until they successfully passed all tests with no deficiencies. > The lighting power density was reduced by 28.97% over an ASHRAE 90.1-2004-compliant lighting design. The interior lighting power allowance for this space was 5,723 watts. 4065 watts were installed, resulting in a reduction of 1658 watts. > This reduction was achieved by installing T5 linear fluorescent and compact fluorescent fixtures to replace the less efficient existing fixtures. > Renewable Energy Certificates (RECs) were purchased from Sterling Planet (wind power) equivalent to 100% of the anticipated electricity use of a typical 5260 square foot office over a two year period. The project purchased RECs for 89,920 kwh. These RECs offset approximately 121,842 pounds of carbon dioxide, a key greenhouse gas. The environmental benefit is equivalent to not driving 12 passenger cars for one year, 7 household s annual electricity use, or 20 tons of waste recycled instead of land filled. For more information, contact: Gene O Connor HLS Facilities Management goconnor@law.harvard.edu Harvard Office for Sustainability, Green Building Services : andrea_trimble@harvard.edu 4

M a t e r i a l s a n d R e s o u r c e s > The construction team recycled 98.95% of the construction waste (31.23 tons) with the assistance of a construction waste recycling consultant to carefully separate each material on-site and identify recycling locations for recyclable material. > The Harvard Law School (HLS) provides collection sites for paper, cardboard, and bottles and cans (glass, metal and plastic) in accordance with Harvard policy and LEED Materials and Resources Prerequisite 1. Recycling containers are located in each private office, as well as at each workstation. They are also located in the kitchen areas, mail rooms, and copy and conference rooms. > The project received a LEED Innovation point for using a Sustainable Carpet Assessment Standard Gold level Environmental Preferable Product for carpet. > 46..47% of the furniture budget included salvaged/used furniture, which reduced the need for virgin materials. > Materials with recycled content and manufactured regionally were used whenever possible. > 33.12% of the materials (by cost) was manufactured locally or regionally within 500 miles of the project site. > Half of all wood in the project (by cost) is Forest Stewardship Council certified. 5

I n d o o r Environmental Q u a l i t y > The interior layout was designed so that most occupants have access to daylight and views out of the perimeter windows. > A comprehensive indoor air quality plan was implemented during construction to ensure healthy indoor air for both the construction staff and other occupants of the building. This included covering HVAC ductwork during installation, high velocity fans to circulate fresh air into the space, local exhaust, and daily housekeeping. > Only low-voc (volatile organic compound) adhesives, sealants, paints, and coatings were used on-site, including Mapei Ultrabond Eco 575 wall adhesive, Heatlthbond 3000 carpet seam sealer, and Benjamin Moore EcoSpec paint. > Bentley Prince Street carpet was used, which is Green Label Plus certified by the Carpet and Rug Institute. > To ensure healthy indoor air quality, HLS prohibits smoking within 25 feet of the building. > Over half of all occupants have access to individual control of an adjustable wall-mounted thermostat. > Occupants will be surveyed once per season about their thermal comfort. Facilities will adjust temperature set points or ventilation if more than 20% of occupants are dissatisfied. > The Harvard Law School uses Harvard s Facilities Maintenance Operations for custodial services, which employs a comprehensive green cleaning program. All photos by Harvard Office for Sustainability 6