Arkansas Natural Gas Severance Marketing Costs



Similar documents
Tax Executives Institute

BC-23 APPLICATION FOR GAS COST ALLOWANCE

RAILROAD COMMISSION OF TEXAS APPENDIX C LIST OF E&P WASTES: EXEMPT AND NONEXEMPT

Appendix G. Allowable and Non- Allowable Capital Costs

How To Make A High Co 2 Gas Blend

Recently Completed Projects - Storage Projects

Training for Operations and Maintenance

PIPELINE FUNDAMENTALS. texaspipelines.com

3620 W 11th Streetб Houston, TX Telephone: sales@kellogg-american.com Website:

TECHNICAL INFORMATION ABOUT NATURAL GAS TRANSPORT

Gas Detection for Refining. HA University

Test Code: 8297 / Version 1

COMMERCIAL REPORT / STOCK CONDITION SURVEY. Sydenham Hill Estate Sydenham Hill London SE 23

REGISTRATION OF INTEREST

Introduction. The following is an outline of the contents of this paper: Definition of Artificial Lift Page 2. How an Oil Well is Produced Page 2

Competency Framework for Marine Engineer Class 6. Competency Framework for Marine Engineer Class 6

Main areas of services are:

Eagle Ford Oilfield Services, LLC 150 Port Royal, Aransas Pass, Texas 78336

Tuesday, March 17, 2015 Houston, TX. Energy Exchange 9:20 9:50 a.m. and 9:55 10:25 a.m. OIL AND GAS: ENVIRONMENTAL INSURANCE IS IT NECESSARY?

Facility Support Services

Product Marketing Guide Energy+ Program

Degree/ Higher Education Jobs:

Facilities Maintenance Standards rev

Spill Prevention, Control and Countermeasure (SPCC)

Backup Fuel Oil System Decommissioning & Restoration Plan

COMPRESSION. Bureau of Forestry. Natural Gas Advisory Committee January 15, Presentation to the.

OIL POLLUTION PREVENTION REGULATIONS

FLOWBACK & PRODUCTION TESTING SERVICES

Company Name: City, State, Zip Code: Annual Report Summary

WORKBOOK ON OIL AND GAS ACCOUNTING - Part 2. Prepared by Professor Gary Schugart University of Houston

Characterization of Greenhouse Gas Emissions Involved in Oil and Gas Exploration and Production Operations

Challenges and Opportunities for Small Businesses Engaged in Energy Development and Energy Intensive Manufacturing

Medical Air Systems: Scroll

Gas Marketplace Work? July 9-13, 2007

Topics of the Presentation

HAZARDOUS AND NONHAZARDOUS OIL AND GAS WASTE

National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook

OFFSHORE FIELD DEVELOPMENT

Facility Operations Physical Safety Guidance Document

Chris Clement 701 Bayou Lane Thibodaux, LA

Civil Engineering Sector Labour-Management Health and Safety Committee

123 street Salt Lake City, Utah 84092

Confined Space Entry Procedure Worksheet

Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan

High School Graduation years 2013, 2014, Unit/Standard Number

Safety Manual Title: Spill Prevention & Response Review Date: 6/1/2014

Liquefied Natural Gas (LNG)

APPENDIX O. Spill Prevention and Emergency Response Plan. G3 Terminal Vancouver Port Metro Vancouver Project Permit Application APPENDIX O

Handbook. Purchasing Guidelines. API Monogram Equipment. Purchase API Specs online at

RULE DRY CLEANERS USING SOLVENT OTHER THAN PERCHLOROETHYLENE

Federal Wage System Job Grading Standards for Air Conditioning Equipment Operating, Table of Contents


OIL & GAS PRODUCTION AUDITING

Name Of Occupancy Date. Yes No Describe

48 No Change to Content of Form Permitted

Electric Process Heaters & Engineered Systems

THERMO KING TRUCK & TRAILER UNIT ALARM CODES THIS DOCUMENT SHOWS ALL CURRENT ALARM CODES FOR THERMO KING TRUCK AND TRAILER UNITS.

Understanding the Oil & Gas Exploration & Production Hazardous Waste Definition Exemption. Jeff Bowman, TEEX

Heating, Ventilation, Air Conditioning and Refrigeration (HVACR)

ASME QRO Certification Program

DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY. August 2012

Fiscal Measurement Natural Gas

Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems

Appendix J3 - Outline Fuel Spill Contingency Response Plan. Control room receives call on fuel spill from staff or public

CEILING CASSETTE FAN COIL UNIT

HVAC Claims: Repair vs. Replacement

INVESTMENT OPPORTUNITIES IN THE PETROLEUM SECTOR


EXPERT WITNESS AND DISPUTE SUPPORT Property Damage and Business Interruption Insurance Claims

Oil and Natural Gas Sector: Standards of Performance for Crude Oil and Natural Gas Production, Transmission, and Distribution.

BOAT DEALER/ MARINA OPERATOR This is not a Binder

Perkins Statewide Articulation Agreement. Documentation item: Secondary Competency Task List Coversheet

SWIMMING POOL HEAT PUMP

Current state of plant Functioning as a peak and emergency centre. Statistics Accumulated operating hours:

Optimization of Natural Gas Processing Plants Including Business Aspects

Natural Gas Dehydrator Optimization

Maintenance for Energy Efficiency

Air Conditioner Water Heater - A Product of HotSpot Energy LLC

Centrifugal Water Chillers. Scott Meyerkord

Federal Wage System Job Grading Standard For Mobile Equipment Servicing, Table of Contents

Center for Energy Education Laboratory

PLUMBING, HEATING & AIR CONDITIONING, REFRIGERATION & BOILER INSTALLATION CONTRACTORS QUESTIONNAIRE

Maintaining Fire Protection Systems

Attachment #23 Health Safety Table. Client Education Inform issue and document. How to clean & maintain gutters. How to adjust sprinklers

GRU Purchasing Material Group Codes

COMPETENCY ANALYSIS PROFILE Refrigeration and Air Conditioning Systems Mechanic - Branch 1 313A

SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN

All work shall comply with applicable codes and ordinances. Work shall comply with the BOCA National Plumbing Code, latest edition.

THE DELTON GROUP MANPOWER TRAINING CONSULTANCY SHORT COURSE PROGRAMME TOPICS LISTING

Natural Gas Filtration Applications

HEATING VENTING AND AIR CONDITIONING (HVAC) SUBCONTRACTING SERVICES FOR THE MACON COUNTY HOUSING DEPARTMENT

Drilling Rigs and Well Technology. RAPID RIGS AND WELL TECHNOLOGY Cairn India Limited.

21.1 Functions, Basic Configuration, and Interfaces

A GROUNDWATER PROTECTION PLAN FOR HOME HEATING OIL TANKS

Indirect fired heaters

Transcription:

Arkansas Natural Gas Severance Marketing Costs The following lists present various costs by category as "Allowable" or "Disallowed" as marketing costs. While listing many items, this list may not be all inclusive. Marketing cost must be necessary and essential to marketing the gas. Marketing costs may not reduce the taxable value of gas to less than zero. Marketing costs may not be carried forward from one month to another. WELLHEAD AND DOWNHOLE EQUIPMENT/OPERATIONS Acidizing Casing Cementing Drill Pipe Fishing/fishing tools Fracturing Hot oiling/hot oil treatment Injecting bariod Logging Packers/setting packers Paraffin removal Perforating Swabbing Tubing Well Service Wire line service These items all relate to either the drilling of the well or well servicing activities. None are deductible as marketing costs. Production Equipment/Operations These items are all involved with the production of oil and gas, not marketing the gas. Therefore, none are allowable as marketing costs. Christmas tree Page 1 of 12

Compressors: wellhead/suction/vacuum Corrosion inhibiting chemicals * Downhole separation Electricity to run pumping unit This type of compressor sits on top of the well bore and is used to suction out the oil and gas. *Most of these chemicals are used downhole and are not allowable. If the chemical is used in a pipeline that is part of the marketing function, that portion may be allowed. Lease use gas to run pumping unit Pumping unit Replacement valves/parts for Christmas tree Rods/pulling rods Submersible pumps Tanks Tank and Vessel cleaning Automatic Shut-Down Devices (ASDs) Gas used to run a pumping unit is taxable as lease use gas, and there is not a corresponding marketing deduction for this gas value since the pumping units are used to produce oil and gas. These devices will automatically shut-down the operations of all lease equipment in the event there is a problem with the wellhead or within the lease operations. EQUIPMENT AFTER THE WELLHEAD Air compressors used to start lease equipment Break out of heater and removal; set new heater and start hook-up. Not allowable unless used to start equipment that otherwise qualifies as marketing equipment. Not allowable unless this refers to a qualifying line heater. Page 2 of 12

Cathodic protection These are rods used to prevent corrosion of pipes and vessels. They are allowable if used on the marketing gathering lines or if used on any allowed marketing equipment but not allowed if used downhole. *Depends on if the piping Chrome/stainless piping for handling qualifies as allowable, based on * gas with H2S content. location of the piping and its fuction. The "chrome/stainless steel" element is irrelevant. Clean contacts on coffing See "coffing for compressor" Coffing for compressor building Coffing is used like a crane to lift and move the compressor. Compressor installation charges If the compressor is owned and used in manner related to gas marketing, the installation costs may be included in depreciable base. Compressor/parts and service for compressors - gas lift systems Compressors/parts and service for compressors - to return gas to leases Compressors/parts and service for compressors - to get gas up to required sales pressure. Compressors owned rather than rented. Compressors - rented sales compressors Compressors - at central facility (compressor stations) * *If compressors perform a dual purpose, the costs can be allocated between allowable and not allowable marketing costs. Must be depreciated over useful life. (Cannot take a rental value for owned equipment.) Deducted as a monthly expense. Same as above for all compressors. Compressor - transmission line Not allowable unless it occurs before the sale has been made. *Allowable if not already Compression charge on settlement * deducted from the reported statement price. Page 3 of 12

Compression fuel for gas lift compressors Concrete slab for compressor If compressor is owned, cost of the slab may be included in depreciable base. Concrete pad around compressor to collect oil and drainage, to reduce environmental clean-up in the future. Cost reimbursement from gas purchaser for compression Dehydrators Demulsification chemicals Fence around compressor Should be included in gross taxable value, and actual marketing costs deducted by the producer. Takes the water content out of the gas stream. Used to break down oil emulsions, usually in a heater treater. Filters * *Allowable if used on a piece of equipment that qualifies as a marketing cost deduction. Fin Fans Used to cool the gas after it has been compressed. Flow lines from seperator to purchaser's transmission line Glycol for use in dehydrators See "dehydrators" Heater Treater Used to treat oil, not gas. Hydrogen sulfide (H2S) scavengers Hydrogen sulfide monitoring Insurance on compressor LACT Units Lease chiller Lease separators These measure crude oil being sold. Line heaters * LT Unit *Allowable if the heater is located after the separator. Not allowable if the heater is located before the first separator. Methanol for gas line Condensate storage tanks Painting sales compressor building Used in preventing freeze-ups. Page 4 of 12

Painting dehydrator Painting separators Paint storage tanks to prevent rusting Pig socks used around oil storage tanks & compressor Used to clean oil spills. Pigs and pigging equipment * Pipeline between wellhead and separator Pipeline between wellhead and central separation facility *Allowable if used on gathering lines prior to the sales point. However, most pigs are used on gas transmission lines after the lease sale, in which case they are not allowed as a marketing cost. Pipeline between wellhead and sales line if there is no lease separation and no separation prior to sale (gas is sold full well stream). Pipeline between wellhead and plant if there is no lease separation and gas is going full well stream to the plant for processing Pipeline after first separator Removal of contaminated soil, back-fill new dirt Repair handrails on vessels at tank battery Between separator and sales line. Repair water leg on heater treater Security alarm on compressor Not necessary and essential. Separators at central facility * *Allowed if first separation has already occurred. Shed/cover over sales compressor Skid mounting of sales compressor Stack packs/production units Skid mounting of gas lift compressor not allowable. Basically separators that contain a heat source. There may also be lease use gas comsumed on these. Page 5 of 12

Sweetening chemicals and H2S Sweetening Scavengers Vapor recovery units Drip Stations and the costs of hauling products from drip stations Culverts to protect the pipelines Used to remove hydrogen sulfide from gas. Not allowed if used downhole. Recovering additional vapors is a production function, not marketing. Pipeline drip is generally considered to be condensate, so the costs of handling it are not deductible. Not necessary and essential to market the gas. OTHER LEASE RELATED ITEMS Ad valorem taxes * Building or trailer rental Cattle guards around lease equipment or on lease roads Clean out dumpsters, trash barrels at lease facility Cleaning agents * Construction/installation of lease road Cost to acquire pipeline right of way Fence around the lease facility Fire ant treatment around lease, including compressor Fire extinguishers Heat sensing devices on leases *Allowable on the value of marketing equipment only. If there is no breakdown between marketing equipment vs other equipment, taxes are not allowable. *Deductibility depends on purpose for which they are being used. Costs are allowable if used on allowable marketing equipment. Page 6 of 12

Hydrostatic testing * *Usually refers to testing pressure and amount of water in pipelines. Deductibility depends on which pipelines are being tested. Testing after separation is allowable. Miscellaneous parts, valves, fittings, plugs, duct tape, lubricants, tools, etc. * *Deductibility depends on purpose for which they are being used. Costs are allowable if used on allowable marketing equipment. Motor freight & hauling * Mowing, weeding around lease equipment Mowing, weeding pipeline right of way Repairing fire wall Repair and maintenance on lease roads Salt water disposal expenses, including wells and hauling *Deductibility depends on purpose of freight and hauling. Costs are allowable if for allowable marketing equipment. Water is produced as part of the production operations. Disposing of that water is also a production related expense not related to marketing gas. LABOR EPENSES Cellular phone in pumper's truck, radios, CBs, etc. * *Include in overhead. Allow at 10% rate. Page 7 of 12

Company labor expenses if there is contract labor on the same lease Contract labor * Cost to operate district office building, warehouses, shops, garages, etc. Company labor should not be allowed when the company has hired contractors to work on the marketing equipment. The contract labor expenses can be claimed on marketing equipment. If the contractors work only on specific equipment, i.e., the compressor, then an appropriate percentage of company labor can be allowed for time spent working on other marketing equipment. See "Company labor expenses" Cost of secretary in district office Does not work on equipment which is physically handling gas. Field supervisor cost * *Include in overhead. Allow at 10% rate. *Deductible only if gauger is Gauger salaries/benefits * doing the work of a pumper on marketing equipment. Hand tools used by pumper/gauger * *If the employee's duties are such that his or salary is an allowable marketing expense, the tools the employee uses are then includable as an overhead expense at a 10% rate.. "Break out of heater and removal; set new heater and start hook-up" Meals/food expenses for pumper/gauger Meals/food expenses for other district office personnel * *See line heaters. Page 8 of 12

Pumper salaries/benefits * *The percentage of salary attributable to pumper's time spent working on marketing equipment is allowable. The percentage of salary attributable to other duties, i.e. production, is not allowable. A standard percentage is often used, i.e., 50% of the salary charged to gas wells and 25% charged to oil wells. Each situation should be evaluated indepentently to determine appropriate percentages. If the only meter on the lease is an allowable marketing meter, and no other marketing equipment, only 10% of the salary is deductible. Safety clothing/equipment Required by OSHA or EPA. Supervisors of company and contract * labor *Allowable at 10% overhead rate. *Allowable if the lines being Thawing gas lines * thawed are after the initial separation. Transportation expenses for pumpers/gaugers (trucks) * *Include in overhead at 10% rate, if the transportation expenses are directly related to marketing equipment. METERS Gas analysis expenses To make sure contract requirements are met. Meters - sales Meter on which payment is based. If sales meter is owned by producer, the cost of the meter (depreciation plus monthly maintenance expense) is deductible. Page 9 of 12

Meter - allocation meter Meters - check Meter to measure lease use gas Meter calibration services * Allowable if more than one well or lease is paid from a single purchaser meter. If the sales meter is owned by the purchaser, the producer is allowed to take the cost of lease allocation meters ( since we require lease level reporting). Used to verify sales volumes; usually located next to the purchaser's sales meter. *For sales or allocation meters only. Pens for meters; graphic red pen, graphic green pen, black static pen Allowable if used in an allowable meter only. ELECTRICITY Central separation/compression facility District office building Electronic gate Gas lift compressor Gas sales compressor * Generators * Lease security light Maintenance shop Oil pumps Pumping unit Storage building *Partially allowable. Allocate electricity costs based on how much is used in each function of the facility. *Depends upon use. If used for allowable equipment, it is allowable. PLANTS Compressors - inlet Page 10 of 12

Compressors - tailgate * Control room computers De-methanization expenses Installing breaker in control room *Compressors handling sales gas before the sales meter are allowable. Compressors handling gas being returned to leases for gas lift, injection or lease use, or transmission, are not allowable. Janitorial expenses for office building, storage buildings, and control room Painting of plant piping and other facilities Propane compressors Before the sales meter Scrubbers Water chilling expenses Trucks for intra-plant transportation * *Allowed at the 10% overhead rate. Trucks provided for the transportation of plant managers and supervisors MISCELLANEOUS ISSUES Accounting department salaries Recording revenue from leases and reporting taxes. Carbon dioxide recovery projects * Brokerage or Marketing Fees Tax-Exempt leases and Partially taxexempt leases * *These projects are normally used to enhance production of crude oil. Only an allocation of expenses may be allowed as a marketing cost. The cost of removing CO2 from a gas stream that is being sold is allowable. The cost of returning CO2 to leases and injecting back into the formation is not allowed. The allocation should be based on a study of the schematics for each individual situation. *Marketing cost may only be taken on taxable gas. Page 11 of 12

Insurance premiums on any equipment or facilities Legal Department salaries and expenses Legal department prepares contracts for marketing gas. Production Fees Environmental fees and taxes These fees relate to the amount produced. Sometimes there is a fee for delivering less than the amount called for in the contract. Page 12 of 12