PRMF Implementation Review



Similar documents
SECTOR ASSESSMENT (SUMMARY): PUBLIC RESOURCE MANAGEMENT. 1. Public Resource Management Sector Issues and Opportunities

ATTACHED TECHNICAL ASSISTANCE

DBM-DILG-DOF-NEDA Joint Memorandum Circular No." February 24,2015

Annex II: Terms of Reference for Management and Implementation Support Consultant (Firm)

SEAL OF DISASTER PREPAREDNESS IN LOCAL GOVERNMENTS

Section 7. Terms of Reference

Performance Management Development System (PMDS) for all Staff at NUI Galway

1.0 BACKGROUND 2.0 OBJECTIVE OF ASSIGNMENT

Human resource management strategy

INVESTORS IN PEOPLE REVIEW REPORT

APPENDIX 3 TO SCHEDULE 8.1

OUTPUT: RURAL ROAD ASSET MANAGEMENT

Kingdom of Thailand: Strengthening Integrated Water and Flood Management Implementation

POSITION DESCRIPTION. Role Purpose. Key Challenges. Key Result Areas

Timor- Leste. United Nations Development Programme. Vacancy Announcement

Running Head: HEARTSHARE S MANAGEMENT TRAINING PROGRAM

URBACT III Programme Manual

Guide on Developing a HRM Plan

Department of Finance. Strategic Plan California s Fiscal Policy Experts

MINISTRY OF EDUCATION AND SPORTS THE DEPARTMENT OF SECONDARY EDUCATION THE SECONDARY SUB-SECTOR

CONTRACT MANAGEMENT FRAMEWORK

Atlantic Provinces Community College Consortium Business Plan

Conducting BPLS Automation Training Workshops

udget and Business Plans for

Learning & Development Framework for the Civil Service

Plymouth Council & Asset Management

HR/OD Intervention Design Specification

Internal Audit of the Georgia Country Office

PEOPLE AND ORGANISATION DEVELOPMENT STRATEGIC FRAMEWORK FOR LOCAL GOVERNMENT IN NORTHERN IRELAND

How To Help The Republic Of The Maldives

Commonwealth Secretariat Response. to the DFID Multilateral Aid Review Update

Review of the Affordable Health Choices Act (Kennedy Bill)

2.0 OBJECTIVES OF THE CONSULTANCY SERVICE

4 Adoption of Asset Management Policy and Strategy

Papua New Guinea: Supporting Public Financial Management, Phase 2

WORKERS COMPENSATION DIVISION INDUSTRY REFERENCE GROUP REPORT

ESM Management Comments on Board of Auditors Annual Report to the Board of Governors for the period ended 31 December 2014

Professional Engineers Using Software-Based Engineering Tools

MINISTRY OF TRANSPORT AND COMMUNICATIONS OF KYRGYZ REPUBLIC. CAREC Transport Corridor 1 (Bishkek-Torugart Road) Project 3

EXECUTIVE SUMMARY...5

Contest. Gobernarte: The Art of Good Government. Eduardo Campos Award Third Edition

CGAM022.1/12/10. Asset Management Improvement Strategy 2010

The City of Calgary, 2009 PSC Operational Review Final Report

URBACT III OPERATIONAL PROGRAMME ( ) CALL FOR PROPOSALS FOR THE CREATION OF 20 ACTION-PLANNING NETWORKS

AUDIT OF USAID/LEBANON S DEVELOPING REHABILITATION ASSISTANCE TO SCHOOLS AND TEACHER IMPROVEMENT PROGRAM

Office of the Chief Information Officer. Annual Report

ANNEX I TO REQUEST FOR PROPOSALS N PTD/09/032 TERMS OF REFERENCE FOR A

Concept Paper for Affected Population Forums

ADVERTISEMENT. Project Coordinator, Ending Violence Against Women / EVAW (SOI covering Vanuatu) (SC SB-4)

Human Capital and Talent Management Support Services:: Ref:

Efficiency Scrutiny Committee 16 th September 2014 IT - Scrutiny of the Service Review process and viability of options for change

FORMULATING HUMAN RESOURCE DEVELOPMENT POLICY FOR THE PUBLIC SERVICE (KENYAN CASE)

Implementation strategies for increasing the impact of tax administration reforms

Service Improvement Plan. DRAFT v.0.1. Harrow IT Services

Rwanda Governance Board Ikigo cy Igihugu Gishinzwe Imiyoborere Office Rwandais de la Gouvernance JOB ANNOUNCEMENT

SUPPLEMENTARY DOCUMENT 5: FINANCIAL MANAGEMENT ASSESSMENT I. INTRODUCTION

Delivering progress towards meeting HMG targets on the SME growth agenda

Sustaining Progress Fourth Progress Report

REPORT OF THE ACTING MUNICIPAL MANAGER 1. INTRODUCTION / BACKGROUND TO REPORT

SEQUENCE OF PRESENTATION

Certificate IV in Frontline Management

GOVERNMENT RESPONSE TO THE CHILD INTERVENTION SYSTEM REVIEW

SBBC: JJ-002 FL: 28 THE SCHOOL BOARD OF BROWARD COUNTY, FLORIDA JOB DESCRIPTION. Approved School-based Administrators Salary Schedule

STRATEGIC REVIEW OF HUMAN RESOURCE MANAGEMENT IN UNICEF. Terms of Reference July

Business Plan

A Homeless Prevention System for London Ontario

Virtual Human Resource Management Program

GOVERNANCE RISK ASSESSMENT AND MANAGEMENT PLAN

ASSAM POWER GENERATION CORPORATION LIMITED

AUSTRALIAN GOVERNMENT INFORMATION MANAGEMENT OFFICE CYBER SECURITY CAPABILITY FRAMEWORK & MAPPING OF ISM ROLES

Structure of the Administration (political and administrative system)

Governance Guideline SEPTEMBER 2013 BC CREDIT UNIONS.

MASENO UNIVERSITY OFFICE OF THE DEPUTY VICE-CHANCELLOR, PARTNERSHIPS, RESEARCH & INNOVATIONS

M ANAGEMENT I NTEGRATION G OAL. Achieve organizational and management excellence

Public Service Commission Statement of Mandate

JOB DESCRIPTION. Job Purpose To provide overall leadership and strategic direction to the ACORD country programme.

Building Disaster Risk Management capacity: key principles

PROJECT PROCUREMENT PROCEDURES AND GUIDELINES

INTEGRATION OF COMMUNITY WATER POINTS MANAGEMENT WITHIN THE CONTEXT OF OVERALL PLANNING IN MVOMERO DISTRICT COUNCIL

Department of Public Service Management

PROJECT AGREEMENT FOR INDEPENDENT PUBLIC SCHOOLS INITIATIVE

AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP)

R000. Revision Summary Revision Number Date Description of Revisions R000 Feb. 18, 2011 Initial issue of the document.

NATIONAL HEALTH INSURANCE CONDITIONAL GRANT DISTRICT BUSINESS PLAN TEMPLATE

Philippines: ECO-TOWN FRAMEWORK

ACTION PLAN FOR LITHUANIAN PARTICIPATION IN THE INTERNATIONAL INITIATIVE OPEN GOVERNMENT PARTNERSHIP

Business Plan-Human Resource Component

TERMS OF REFERENCE For the Provision of Long Term Advisor Services To the Government Technical Advisory Centre

REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTANT SERVICES)

ESB Guide to the NOS 2015

Building Schools for the Future. Communications and Engagement Plan

Transcription:

Department of the Interior and Local Government PRMF Implementation Review Project Steering Committee Meeting 25 November 2010 1 Managed by:

Outline 1. What are PRMF s achievements in Capacity Development and Physical Works? 2. How is PRMF tracking in terms of expenditure? 3. What are the emerging issues and lessons? 2

Summary of Achievements Wide appreciation amongst stakeholders of the PRMF Leadership more engaged in the program and understanding of the demands and benefits Enabling environment established and over 200 capacity development activities completed Procurement streamlined and counterparts involved Development of the vision, reform strategy and graduation strategy underway for each key result area in each Province First year roads nearing completion, second year designs underway. Managing Change Creating a sense of urgency Creating a transition management team Generating short term wins Developing a vision and strategy Building a broad based approach through empowerment 3

Provincial Achievements PRMF AWARENESS Departments have supported and embraced PRMF as an institutional reform and governance program ROAD SECTOR PLANNING Provincial Road Sector Planning and Management Reviews completed as a baseline to determine capacity development requirements PPDO and PEO understand the importance and progress of integrated transport planning Provincial Road Network Development Plans approved

Provincial Achievements ROAD SERVICES DELIVERY PEO capacitated in the areas of traffic surveys, road conditions surveys, construction supervision, materials testing and quality control PEO hold regular meetings with stakeholders to assess physical works progress and address implementation issues PEO appreciates the importance of road maintenance and has gained appreciation of various maintenance options 5

Provincial Summary BUDGET & EXPENDITURE MANAGEMENT INTERNAL CONTROL AND INTERNAL AUDIT PROCUREMENT Public Financial Management Assessment Report, draft Strategic Public Financial Management Plan produced including Revenue Generation and Resource Mobilization Plan, Capacity Development Plan, Monitoring and Evaluation Plan, and Integrity Development Plan Internal Audit Units/Offices have been established Increased understanding of the NGICS among provincial departments Departments are preparing risk registries BAC members more knowledgeable on GPRA/IRR 9184 and participated in bidding and rebidding of year 1 roads Increased understanding on procurement of consulting services 6

Provincial Summary HUMAN RESOURCE DEVELOPMENT ENVIRONMENTAL MANAGEMENT AND CCT M & E SYSTEMS Staff and Skills inventory undertaken as part of HRMD Plan development and incentive targets Enhanced understanding of the national policies and processes on the 4 R s recruitment, rewards and recognition, retention and retirement HRMD Plans being developed or updated PRNDP planning resulted in increased awareness on key gender, social inclusion, environmental and cultural issues to be considered in road network development plans PEO more familiar with the EMP preparation processes M&E systems developed as part of PRNDP 7

Provincial Summary INFORMATION SYSTEMS MANAGEMENT ICT & GIS assessment undertaken GPS training undertaken etracs implementation commenced Hardware & software procured Road and bridge asset management system development commenced 8

CD Foundation Activities Key deliverables: PRNDP, Incentives Program for FY 1 PRMF orientation and awareness raising for stakeholders PRNDP Introduction of technical and participatory processes to generate critical information and priorities to prepare the plans (January to March) Review of planning experience and surfacing of lessons (August) Provision of guidelines for the review and update process (November) HRMD Orientation on SCALOG (January to March) Conduct of skills inventory (January to March) Responsive HRMD Orientation for all HRM units (September) Development and dissemination of HRMD Planning Resource Pack (November) Orientation on procurement of consulting services in PRMF (October) 9

Internal Control CD Foundation Activities Orientation on internal control and internal audit for IA units (August to September) Orientation on risk management in the public sector and preparation of risk registries (November) Revenue Generation Identification of revenue generation strategies (February to March in the context of the PRNDP and in September in relation to the SFMP) Financial Management Leadership Seminar (October) General observations: Strong relationships between the CD Foundation Activities WP and the other WPs (e.g., Public Financial Management) CD Foundation Activities WP served as a good base to prepare LGUs for the implementation of the CD Program for FY 2010-11 See schedule on PSC PPT 2 10

Draft Design Guidelines for Local Roads Guidelines to address local context and guide road design and construction from second year Draft Policy document for legal issuance developed in August 2010 Draft Capacity Development Program developed in August 2010 Draft guidelines completed September 2010 Presented to DILG and PEAP Presented to PEOs during the Maintenance and Design Seminar Task force established by DILG to review the document. Review commences early December. See schedule on PSC PPT 2 11

GIS and ICT Implementation GIS & ICT assessment of DILG and provinces completed May 2010 Training program in GPS and information systems support Information Systems Plans and ICT units created in all provinces Procurement of hardware and software to build GIS & ICT systems in DILG and provinces completed delivery ongoing Application development commenced for road and bridge asset management system Training and implementation of etracs in Bohol and Misamis Oriental and 10 municipalities See schedule on PSC PPT 2 12

Public Financial Management and Assessment Financial Management Framework developed and validated Assessment and validation of PFM practices and analyses Provincial coaching on PFM tools and techniques Provincial coaching on Financial Management Planning PFM Assessment Report and draft Strategic Financial Management Plan developed for all provinces Orientation on NGICS Integration of information services to enhance revenue collection by improvements in tax assessment and collection system. Held workshop on Public Financial Leadership held with Local Chief Executives and key decision makers See schedule on PSC PPT 2 13

Construction Supervision Consultancy Capacity development on Construction Supervision and Contract Management PEOs finalizing the CS Manuals for local application Supervision services on Physical Works on 1 st Year Roads Baseline traffic surveys completed New teams deployed in November to continue remaining supervision works and address outstanding issues Required time extension for selected physical works to January 2011 See schedule on PSC PPT 2 14

Construction Supervision Capacity Development Evaluation Report on PEO s ability to supervise physical works in Year 2 Pre and Post Tests Administered Self assessment and independent assessments Re-entry action plans (REAPs) followed through after each training session 15

Construction Supervision Capacity Development Province Initial Self Assessment Final Self Assessment Agusan del Sur 2.70 4.00 5.00 Bohol 2.79 3.26 4.60 Bukidnon 2.76 3.90 4.80 Guimaras 2.93 3.25 3.67 Misamis Occidental 2.73 3.12 3.80 Misamis Oriental 2.77 3.64 4.00 Surigao del Norte 2.81 4.12 4.87 Confidence for Year 2 1 Low competence; 2 Fair; 3 Average; 4 High; 5 Very High Competence 16

Construction Supervision Capacity Development Conclusions Overall improvement in capacity and confidence to supervise year 2 roads Combination of on-site coaching, lecturing and re-entry action planning gave positive results but highly dependent on the assigned resident engineers Still a need to strengthen health and safety, risk, environmental management, contract performance evaluation and specific technical skills It is recommended that Resident Engineers and Supervising Engineers be used for Year 2 Roads with a strategy to transition the PEO to full supervision services by completion 17

Agusan del Sur Provincial Internal Audit Services Office established Road Policy Workshop advanced concept of integrated transport planning Capacity Development Plan developed for PHRMO, PPDO, PBO, PEO and PENRO Provincial M&E Technical Working Group established PPDO reviewing 20% Development Fund Plans for 2011 AIP to ensure that it contains priorities from both PRNDP and PDIP Provincial M&E Team has been established 18

Bohol Project Management Team now institutionalised as Road Sector Committee as part of Management Executive Board PPDO undertaking review to consolidate 20% Development Fund Plans for 2011 AIP Internal Audit Service established Multi-departmental Provincial M&E Team established Bohol ICT Office established working with 5 Municipal ICT teams New BAC appointed by Governor Increased coordination with COA 19

Bohol Inventory of ODA and other development projects undertaken in barangays affected by PRMF activity Provincial M&E Team has been established Audit Plan for 2011 in preparation Provincial Summit on Climate Change Adaptation and Disaster Risk Management for roads and other infrastructure held Provincial Gender Code and Gender and Development Framework developed Bohol Environmental Code reviewed to include road sector PENRO developed Environmental Plan for Year 1 roads Transparency Reporting Workshop for Civil Society and Media Practitioners held 20

2011 AIP approved by PDC Bukidnon PEO engineers conducting road condition survey using GPS GIS maps of road networks and geographic features produced For cultural sensitivity local village chieftains (Datus) conducting ritual rites before road construction Provincial ICT Unit established including budget allocation Over 10% of 2011 budget using GOP procurement guidelines has been contracted out Training Needs Analysis undertaken with HRMO for Provincial Government departments and offices Community involvement in monitoring and reporting of vehicles 21

Guimaras PEO updated information for 25 road sections using acquired skills in road condition and traffic surveys Re-Entry Action Plans as venue for passing on new skills and techniques to other staff PENRO has developed an Environmental Management Plan for year 1 roads Public Financial Management Forum held to validate financial assessment tools, techniques and indicators Staff training on GPS has resulted in production of GPS road inventory for a GIS-based road and bridge inventory system 100% coverage of provincial road sections achieved August 2010 22

Guimaras Intention to reorganise PPMC to include private sector and civil society and use to monitor road projects Staff and skill inventory being undertaken to inform HRMD Plan Provincial Road Summit held to engage communities 23

Misamis Occidental Road Sector Vision Workshop held with stakeholders to investigate best practice techniques Integrated M&E system being developed as part of PRNDP 2011 Annual Investment Program approved containing projects and activities from PRNDP 24

Misamis Oriental MOA Signed with National Government Agencies and Provincial Governments in the region on supporting the PRMF Road inventory and condition training has improved skills of Resident Engineer PENRO developed Environmental Management Plan for year 1 roads A Technical Working Group composed of Treasurer, PIAD, PEO, HRMDO and PBO will undertake M&E for PRNDP Capacity Building Plan has been finalised For road condition survey a partnership with Xavier University Engineering Resource Centre, a Road Watch Regional partner has been established Increased coordination with Procurement Watch Team 25

Surigao del Norte PEO coordinating with municipal governments, Barangay Development Council and local communities to assess physical works progress PEO engineers trained in GPS Partnership with Siargao Partnership for Economic and Environmental Development to address issues of illegal quarrying in Protected Areas Management Board controlled island Creation of first M&E team for Surigao del Norte 26

Capacity Development Year 2 Progress Facility-Wide Activities Completed Orientation Session for DILG Officials and Staff Industry Forum for PRMF Road Construction Integrated Transport Planning Workshop Road Maintenance Forum Commenced Community Engagement Forum and Workshop program 27

Physical Works Program Overall Status Report by Project Planned Accomplishment as as of of 1727 Nov Aug 2010 Actual Accomplishment 100% 90% 80% Perecentage Percentage Accomplishment 70% 60% 50% 40% 30% 20% 10% 0% ADS-01 ADS-02 BOH-01 BOH-02 BOH-03 BUK-02 GUI-01 GUI-03 GUI-04 MOC-01MOC-02MOC-03MOR-01 SDN-01 SDN-02 Contract Package Per Province Contract Package per Province See photos and other details on PSC PPT 2 28

Expenditure Disbursement of funds delayed by extended procurement process and delays in Physical Works Procurement will be improved in Year 2 addressing weaknesses in bidding such as the bid ceiling Quality of contractors can be improved by evaluating contract size and improved post-qualification criteria to address known weaknesses Quality of design and construction can be improved by involving key stakeholders, addressing RROW issues early, and improving quality of survey data

FY 2009-2010 Imprest Expenditure 30

Lessons Clearer reform strategy required by each Province to demonstrate a cohesive and systematic approach to capacity development Capacity development initially adopted a gap-based approach evaluation of gaps in relation to immediate past and current performance It now needs to transition to a target-based approach focus on future targets and end-state institutional change The development of the graduation strategy and reform program will be a major milestone for each Province to demonstrate a comprehensive understanding of the requirements and future goals 31

Transitioning to a Target-Based CD Planning Model Gaps-Focused Targets-Focused What do we need to change in terms of: Structure/Organization Systems over time (annually from 2011-13) to address gaps in our performance in 2010 and the immediate past (and hopefully help us achieve our targets for 2014)? What do we need to change in terms of: Structure/Organization Personnel Systems over time (annually from 2011-2013) to be able to do what we said we would do fully by 2014? 32

Lessons Adaptive management techniques and developing alternative strategies are required to achieve a balance between meeting expenditure targets and putting in effective and efficient reforms. Improved topographic mapping is needed for developing drainage schemes. Political intervention is viewed as a significant barrier to reform by government and private sector stakeholders, but it can be harnessed to drive the reform agenda. PRMF reporting needs to be streamlined and customised to the needs of decision makers (AusAID, DILG and the Provincial Governments). 33

Lessons Local contractors need capacity development across a wide range of areas to meet quality expectations Problematic designs and lack stakeholder input Poor documentation and quality control Succumb to patronage politics Poor planning and scheduling Poor cost estimation Lack of skills in basic computer technology Lack of skills in surveying Lack of planning in sourcing materials and getting permits One suggestion is to strengthen the accreditation and licensing system 34

Physical Works Policy Issues Inclusion of slope stabilisation in the base program as a component of road rehabilitation Approach to sealing of steep slopes - now resolved as part of design guidelines Stronger focus on access issues for local residents - embankment issues Stronger compliance and adherence to procedures with RROW clearance prior to commencement 35

Thank You 36