National Aeronautics and Space Administration (NASA)



Similar documents
ESA s role & activities to support Cr(VI) replacement

SurTec 650 Tri-Chrome Passivation of Aluminum

Cold trichloroethylene degreasing Film Thickness 70± 10 µm 10 minutes at 170 C (PZ 770 alone) 5 minutes 30 sec. at 220 C (maximum curing conditions)

PRODUCT DATA SHEET DESCRIPTION:

DETAIL SPECIFICATION CHEMICAL CONVERSION COATINGS ON ALUMINUM AND ALUMINUM ALLOYS

A thermal cure is then applied to obtain final properties of the paint film.

Hexavalent Chrome Removal in Aircraft Painting Schemes

3 Scotch-Weld TM. Structural Adhesive Films AF 6 AF 10 AF 13. Technical Data July, 2001

3 Scotch-Weld TM. Structural Adhesive Film AF AF Technical Datasheet December 2009

Scotch-Weld TM. DP410 Off-White. Product Data Sheet. Product Description. Key Features Rapid cure at room temperature; cure rate may be accelerated

Precision Leaded Resistors

Alodine EC 2 The Principle of Protection

Evaluating Protective Coatings for Ballast Tanks

Houston Plating & Coatings

Automotive Engineered Attachment Systems

Crystal Clear Sealant

Note: Minor color change may occur in exposed service, but corrosion protection will not be compromised

DEPARTMENT OF DEFENSE ALLIED NATIONS TECHNICAL CORROSION CONFERENCE. November 15-19, 2015 Pittsburgh, PA, USA. Technical Program

PRETREATMENT TECHNICAL DATA SHEET WATER EMULSIFIABLE RUST PREVENTATIVE PRODUCT DESCRIPTION

3 Scotch-Weld TM. Epoxy Adhesive EC-3333 B/A. Technical Data May 2010

PHOENIX Product Data Sheet (Updated on 14-Jan-2012)

Specifications for Programs: 737, 747, 757, 767, 777, 787

Non-Chromate Aluminum Pretreatments Phase I Report Project #PP0025

Scotch-Weld TM. Epoxy Adhesive 1838 B/A Green 1838 B/A Tan 1838-L B/A Translucent. Technical Data February, Product Description

Base and Accelerator are contrasting colors. Good retention of strength after environmental aging.

ZINCROLYTE VS DUPLEX 700

Process Control For Phosphate Coating A new military specification for phosphate coatings...

GRIP-GARD BC BASECOAT CHROME

3M Scotch-Weld Epoxy Adhesive

10P20-44 High Solids Epoxy Primer

Colorado State University. Durrell Center Roof Repair

Treatment of a surface or structure to resist the passage of water in the absence of hydrostatic pressure. presence of hydrostatic pressure.

family of products is really Reichhold s answer to the growing need to meet more stringent regulations and performance requirements.

Technical Data May, 2015

Diamond Grade Conspicuity Markings For School Bus Safety Markings

3 Scotch-Weld TM. Epoxy Adhesive DP110 Translucent and Gray. Technical Data December, 2009

SECTION GUARDA SECURITY WINDOW SCREENS

Wecryl Waterproofing System under surfacing supplied by others

Package Trends for Mobile Device

SIGMACOVER 280. PRODUCT DATA SHEET December 10, 2014 (Revision of March 1, 2014) DESCRIPTION

A. Work on this project shall consist of, but is not limited to, the following:

Alodine. EC 2 ElectroCeramic Coating. Engineered for the Forces of Nature

IMO Approved Tank Cleaning Chemicals

Application Instructions for Avery Dennison Films SF S LTR EZ RS, Conform Chrome

3M Scotchkote Urethane Coating 165HB

You have just purchased the most portable and economical spray chrome system in the world!

AAMA Voluntary Specification, Performance Requirements and Test Procedures for Superior Performing Organic Coatings on Aluminum Extrusions

3 Thermal Transfer Acrylate Label Material 3921

N.V.S.C. INDUSTRIAL PRODUCTS NVSC INDUSTRIAL COATINGS THIS DOCUMENT SHOWS ALL THE N.V.S.C. PRODUCTS SUITABLE FOR INDSUTRIAL PURPOSE

PAINTING OVER HOT DIP GALVANIZED STEEL

Technical Data May, 2015

Citric Acid Passivation of Stainless Steel

Axial and Radial Leaded Multilayer Ceramic Capacitors for Automotive Applications Class 1 and Class 2, 50 V DC, 100 V DC and 200 V DC

WATERPROOFING OF WET ROOMS

INTRODUCTION WHAT ARE TRANSITION METAL COATINGS? WHAT IS THE APPEARANCE OF A TRANSITION METAL COATING PRETREATMENT?

SIGMACOVER 300. PRODUCT DATA SHEET December 12, 2014 (Revision of November 1, 2013) DESCRIPTION

Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

RECOATING AND RENEWING SPF ROOFING SYSTEMS

NDT Procedure for Liquid Penetrant Inspection TRINITY NDT. An ISO 9001:2008 Certified Company

Standard For Lining Ductile Iron Pipe and Fittings For Sewer Service

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted )

NDT Procedure for Liquid Penetrant Inspection

Maintenance & repair Solutions

Anodizing Reference Guide

RBS detergents for laboratories

Technical Data March, 2015

Aircraft Cleanability and Corrosion Issues 26 February Craig Matzdorf NAVAIR

POLYURETHANE LINING AND COATING ON PIPE RAW WATER

3M Dual Lock Reclosable Fastener

3 Laser Toner Printable Polyester Label Material 7840TL

SCREEN PRINTING INSTRUCTIONS

CONTENTS. 1 cooling technology white paper

Test Methods for the Colour Fastness of Leather & Dyes. TFL Leather Technology Ltd. Quality and Environment February 2004 Version 1.

MARTIN TESTING LABORATORIES (MTL) PAINTS AND COATINGS TESTING CAPABILITIES

TECHNICAL DATA SHEET HAMMERITE METAL PAINT. Smooth Hammered Satin Aerosol

Nickel Free Room Temperature Seal: an innovative and ecological process

BRIDGE FIELD PAINTING, REPAINTING, 412 AND PAINT RESIDUE CONTAINMENT. A. Field Painting, Bridge Repainting and Residue Containment:

1.1.2 Polypropylene The polypropylene must be a white opaque film, 1 2 mil thick. Biaxial orientation is preferred.

SPREFIX SPRAY INSULATION _ in the marine market.

Two separate and different methods are used to manufacture the above items:

Quality assurance of flex circuits in the SCT barrel hybrid production

Scotch-Weld. Low-Odor Acrylic Adhesives DP810 DP810 NS. Technical Data June, 2004

TUCSON AIRPORT 374,804 sq.ft. of roofing coated with the SUPER BASE(HS) / SUPER THERM SYSTEM.

Cautionary Information

Passivation of martensitic corrosion resistant steel

PRODUCT DATA SHEET Sika Cable System

EcoCWave. The all-round talent for aqueous part cleaning.

Scotch-Weld TM. Acrylic Adhesives. DP8405NS Green. Product Data Sheet. Date: March 2014 Supersedes: August 2013

3.8 HSP (High Solids Polyurethane)

A PERFORMANCE EVALUATION OF MODERN SURFACE FINISHES FOR ZINC DIE CASTINGS

3M Thermally Conductive Adhesive Transfer Tapes

CLICKBOND FASTENER OVERVIEW:

CERTIFICACIONES Y PRUEBAS DE LABORATORIO

Owner s Manual

COATINGS MANUAL HRSD 9.0 THIRD PARTY INSPECTION GUIDELINES. 9.1 The Value of Third Party Inspection. 9.2 When to Use Third Party Inspection

09990 MOLD REMEDIATION, LEAD-BASED PAINT ABATEMENT AND ENCASEMENT OF ASBESTOS

Intercoastal Paint Company

SSPC-SP 6/NACE NO. 3

Transcription:

Objective Evaluate and test hexavalent-chrome free pretreatments for avionics and electronics applications Benefits Project builds off of previously successful NASA and DoD testing Reduced risk for materials obsolescence of hex-chrome coatings with the discovery of coatings that perform to the requirements for current and future Programs within NASA, the DoD and ESA Continue to collaborate with DoD and industry to identify and test alternatives for various applications within the aerospace community If a qualified technology or product is implemented, it will: Meet environmental and safety regulatory requirements Reduces need to monitor for chromium exposure due to new regulations Decreased risk of environmental, worker and public exposure Reduced maintenance cost and government liability 2

Pretreatments Substrates Alodine 1600 (Control) 6061-T6 Metalast HF 7075-T73 Metalast HFEPA 2024-T3 SurTec 650 SurTec 650 C Alodine T 5900 RTU lridite NCP Limited Screening Tests Alodine EC2 Metalast TCPCC-600P Corrlink 30A NANOMYTE PT-10 Deft RECC NANOMYTE TC-4001 UMR CeCC Alodine 160/161 EonCoat Alodine 5923 Plus PPG X-Bond 4000 lnterlox 5705 3

Testing {NASA KSC Corrosion Technology Lab and Beachside Corrosion Lab} Salt Spray Resistance Patti-Jr. Pull-Off Adhesion Test ASTM 8 117 ASTM D 4541 168 hours Cross-Cut Tape Test To failure ASTM D 3359, Procedure 8 Surface Resistance (ASTM D 257) Wet Tape Paint Adhesion Contact Electrical Resistance (81706) 24 Hour Immersion Cyclic Corrosion 96 Hour Immersion at 120 F ASTM G 85, Annex 5 18-Month Marine Environment KSC Beach Corrosion Test 4

Panel Preparation {NASA KSC Corrosion Technology Lab} The panel preparation procedure was developed as part of the NASA TEERM Hexavalent Chrome Alternatives for Aerospace Project. Stakeholders participating in the Hexavalent Chrome Free Coatings for Electronics Applications Project agreed to the procedure. 1. Solvent Hand Cleaning a. Ethanol {200 proof}. 2. Mild Alkaline Aqueous Degreaser (Non-Silicate) a. Chemetaii-Oakite NST- (5 /o by volume@ 49-54 C for 4 minutes.) 3. Dl water rinse to water break-free. Preceding degreasing steps will be repeated until water break-free is achieved. 4. Deoxidize Bath (Oakite LNC) a. Oakite LNC (10 /o by volume@ ambient temperature for 3-4 minutes.) 5. Rinse thoroughly using clean (5 megaohm or better) Dl ambient temperature water. 6. Take panels directly to pretreatment bath 5

Salt Spray Resistance (ASTM B 117, 168 hours) Pretrea m ent AI Control Alternative 1 Alternative 2 Alternative 3 Alternatives are not listed in the same order as they are listed on Slide 3 6

Hex Chrome Free Coatings for Electronics {NASA-DoD) Salt Spray Resistance {ASTM B 117, to failure) Pretrea ment Pretrea ment Co trol Alternative 4 Alternative 1 2024-T3 Alternative 5 Alternative 2 Alternative 6 Alternative 3 e - AJ I fiv e 6061-TOtest pa efs as e lll as 1of5test panelisfor7075- T73, 20 24-T3 a f or all pretreat nts ere I..ISed f or AS1M 0 257 readings. Test pa eks w ere _ tested at t e sa e t i e ast e ot ers I i:sted i t e t a bl e. Testi g t t ese test pa els w as stopped after 168 rs. Alternatives are not listed in the same order as they are listed on Slide 3 7

Cyclic Corrosion (ASTM G 85, Annex 5, 168 hours) Pretreatment Control Alternative 1 Alternative 2 Alterrnative 3 Alternatives are not listed in the same order as they are listed on Slide 3 8

National Aeronautics and Space Administration {NASA) Combined Data Pretreatment Control Alternative 1 Alternative 2 Alternative 4 Alternative 5 Alternative 6 Alternatives are not listed in the same order as they are listed on Slide 3 9

Cross-Cut Tape Test (ASTM D 3359, Procedure B) Primer (MIL-PRF-2.3377) - PPG Primer (MIL-PRF-852)- Deft 44--GN-G7A Pretreatment Alloy Result Pretreatment Alloy Result Alternative 1 Alternative 2 Alternative J Alternative 4 Alternative 5 Alternative 6 6061-T6 18 6061-T6 18 Alternative 1 18 18 6061-T6 6061-T6 28 Alternative 2 48 6061-T6 6061-T6 6061-T6 6061-T6 6061-T6 Alternative J 18 6061-T6 18 Alternative 4 18 18 28 6061-T6 18 Alternative 5 18 48 18 28 6061-T6 28 Alternative 6 28 28 = 0 /o area removed 48 = less than 5 /o removed 38 = 5-15 /o removed 28 = 15-35 /o removed 1 B = 35-65 /o removed 08 = greater than 65 /o 10

Wet Tape Paint Adhesion {24 hour immersion, ambient temp) Primer (MIL-PRF-23377),- PPG CA7233 Primer (MIL-PRF-852) - Deft 44-GN-o7A Pretreatment Alloy Result Pretreatment Alloy Result - - - 6061-T6 3A Alternative 1 Alternat ive 1 5A 5052- H32 5A ~ 1-- Alt ernative 2 - Alternat ive 2 5052 - H3 ~2 5A 5A - Alternative 3 I ~ Alternative 3 5052-H3 ~2 5A 5A - Alternative 4 6061-1"6 3A 6061-1"6 5A - Alternative 4 3A 5A 1- Alternative 5 6061-1"6 5A Alternative 5 4A 5A 6061-T6 4A Alternative 6 Alternative 6 4A 5A - SA = No peeling or removal 4A =Trace peeling or removal along incisions or at their intersection 3A =Jagged removal along incisions up to 1.6 mm (V16 in.) on either side 2A =Jagged removal along most of incisions up to 3.2 mm (Win.) on either side 1 A = Removal from most of the area of the X under the tape OA = Removal beyond the area of the X 1-11

~ National Aeronautics and Space Administration (NASA) Wet Tape Paint Adhesion (96 Hour Immersion at 120 F) Primer (MI -PRF-23377) - PPG CA7233 Primer (MIL-PRF-852) - Deft 44-GN-07A Pretreatment Alloy Result Pretreat ment Alloy Result 6061-T6 3A -- Alt ernat ive 1 1- Alternat ive 1 3A 5A Alt ernat ive 2 -- Alternative 3 Alternative 4 - AltemaUve 5 Alternative 6 6061-T6 SA Alternat ive 2 5A 5A Alternative 3 5A 5A 6061-T6 3A Alternative 4 3A 5A Alternat ive 5 3A 5A 6061-T6 3A,_, Alternat ive 6 3A 5A - - 5A = No peeling or removal 4A =Trace peeling or removal along incisions or at their intersection 3A =Jagged removal along incisions up to 1.6 mm (V16 in.) on either side 2A =Jagged removal along most of incisions up to 3.2 mm (Win.) on either side 1 A = Removal from most of the area of the X under the tape OA = Removal beyond the area of the X 12

National Aeronautics and Space Administration {NASA) Modified Panel Preparation Procedure Solvent Hand Cleaning Ethanol {200 proof} Chemetaii-Oakite NST- (5% by volume)... Bath temperature - 120 F (49 C).,. Immersion time- 4 minutes Stirred during test panel immersion,... 01 water rinse 1 minute 77 F (25 C) Agitate test panels Dl water rinse 1 minute - - - Dl water spray rinse - 77 F (25 C) 77 F (25 C) Agitate test panels Agitate test panels,, 70% Nitric Acid/DI water = mixed 1:1 Bath temperature- ambient Immersion time- 30 seconds '~ Pretreatment Control Alternative 1 {2024-T3 and 7075-T6} 13

ASTM B 117 Testing Control performed very well on the 2024-T3 and 7075-T6 test panels through 336 hours of testing Control - 2024-T3-336 hours ASTM B 117 Control - 7075-T6-336 hours ASTM B 117 14

ASTM B 117 Testing Alternative 1 performed well on the 7075-T6 test panels through 336 hours of testing. Alternative 1 did not perform well on the 2024-T3 test panels following 168 hours of testing and were removed from test chamber. Alternative 1-7075-T6-336 hours ASTM B 117 Alternative 1-2024-T3-168 hours ASTM B 117 15

Next Phase -Two panel prep procedures per pretreatment Pretreatments Alodine 1600 Metalast HF SurTec 650 lridite NCP. Substrates 2024-T3 (136) 7075-T6 (136) 6061-T6 (80) Primary Test Panel Count {2024 I 7075} 17 panels per alloy 2 alloys 4 pretreatments 2 processes 272 panels Limited Test Panel Count {6061} 1 0 panels per alloy 1 alloys 4 pretreatments 2 processes 80 panels Vendor Applied Pretreatments {2024 I 7075} METALAST TCP-HF I HPA 100 Deft RECC NANOMYTE 16

Hex Chrome Free Coatings for Electronics (NASA-DoD} Next Phase- Process 1 Solvent Hand Cleaning Ethanol {200 proof} Chemetaii-Oakite NST- (5% by volume) t---3... ~ Bath temperature- 120 F (49 C) ' Immersion time - 4 minutes Stirred during test panel immersion Dl water rinse.,., 1 minute 1---3r~ 77 F (25 C} Agitate test panels Dl water rinse... 1 minute ~-~" r 77 F (25 C} Agitate test panels Dl water rinse 1 minute 77 F (25 C) Agitate test panels Dl water rinse.,.~~-------1 1 minute " 77 F (25 C) Agitate test panels 70% Nitric Acid/DI water = mixed 1:1 1011~~--------1 Bath temperature- ambient Immersion time- 30 seconds,, Pretreatment Alodine 1600 Metalast HF SurTec 650 lridite NCP Dl water rinse 1------3"""~ 10 seconds ' Dl water temp 77 F (25 C) Agitate test panels Air dry w/ clean t----~~~ filtered compressed air 17

National Aeronautics and Space Administration {NASA) Next Phase - Process 2 Solvent Hand Cleaning Ethanol {200 proof} Specialty 7 40 (9 oz/gal)... ---3:M Bath temperature- 140 F Immersion time - 5 minutes 1----~ ' 01 water bath... 01 water temperature 77 F (25 C) Agitate test panels Repeat until water bn ak-free,, 01 water bath 01 water temperature 77 F (25 C) Agitate test panels Repeat until water break-free M~E----...,. Specialty 982 (15% by volume) Bath temperature - ambient Immersion time - 2 minutes 01 water spray rinse M""'E----... 01 water temperature 77 F (25 C) "' Agitate test panels Repeat until water break-free 01 water spray rinse 01 water temperature 77 F (25 C) Agitate test panels Repeat until water break-free Pretreatment Alodine 1600 01 water rinse 01 water rinse t--~! Metalast HF 1--~ 30 seconds 1---~! 30 seconds SurTec650 01 water temp 77 F (25 C) 01 water temp 77 F (25 C) lridite NCP 18

Next Phase Testing - Primary {2024 I 7075} Salt Spray Resistance (5 test panels) ASTM 8 117 - To failure with 168 hour inspections Cyclic Corrosion (5 test panels) ASTM G 85, Annex 5- To failure with 168 hour inspections Marine Environment (5 test panels) KSC Beach Corrosion Test - To failure with 168 hour inspections Wet Tape Paint Adhesion (2 test panels {3x5} per test procedure; 1 for each primer) 24 Hour Immersion 96 Hour Immersion at 120 F Testing - Limited {6061} Salt Spray Resistance (5 test panels) ASTM 8 117 - To failure wit 168 hour inspections Electrical contact resistance after salt spray exposure Electrical Contact Resistance Without Salt Spray Exposure (5 test panels) 19

Questions? NASA TEERM Principal Center Kurt Kessel essel@nasa.gov (321) 867-8480 Matt Rothgeb matthew.j. rothgeb@nasa. gov (321) 867-8476 KSC Corrosion Technology Lab Jerry Curran jerome.p.curran@nasa.gov (321) 867-9486