PCIS On-going Support Meeting. Presented by Mark Benton 19 th January 2012



Similar documents
Pavement Condition Information Systems support contract

Highway Asset Management Strategy

Highways asset management. Our European capabilities and experience

Pavement Engineering & Asset Management. Meeting the requirements of our existing & future diverse road networks

Highway Asset Management Strategy

Performance Monitoring

Roads for All. The Trunk Road Network. Disability Equality Scheme. and. Action Plan

Transport Asset Management Plan. 2nd Edition

Highway Infrastructure Asset Management Strategy

Highway Asset Management Strategy

TRANSPORT ASSET MANAGEMENT PLAN STRATEGIC VERSION. Residents & Visitor Services

Slough Borough Council. Highway Asset Management Strategy

Birmingham Highways Maintenance and Management Service CIHT Northern Ireland

HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT

11. Managing our Transport Assets

Shropshire Highways Draft Asset Management and Communications Strategy and Implications of Department for Transport Incentivised funding

AIQS STRATEGIC AND BUSINESS PLAN

Introduction to the online training materials

Guidance document for EMIS Web EPS Release 2 deployment

External Audit BV Performance Report: Delivering Change Management and Financial Sustainability

ASSET MANAGEMENT STRATEGY

Back to Basics. Managing the Audit Department: Resource Management

Honours Degree (top-up) Computing Abbreviated Programme Specification Containing Both Core + Supplementary Information

CALIFORNIA GIS COUNCIL CHARTER

Major Project Governance Assessment Toolkit

MANAGING THE ROADS AND THE ROLE OF THE ROAD MANAGEMENT OFFICE (RMO) John McCarthy Senior Advisor Department of Transport, Tourism and Sport

THE FEDERATION

Learning Spaces will be allocated by the automated timetable system based on suitability and rooms will be utilised appropriately based on capacity.

Road asset management project Data template guidance notes

HIGHWAY ASSET MANAGEMENT STRATEGY 2015

Office of the President Annual Plan 2012/2013

New Learning Provider Joiner Pack

Appendix B: SWMP Contact List

Hampshire s Highway Asset Management Strategy. 1 Implementing Effective Asset Management

Gateway review guidebook. for project owners and review teams

Presented by Vuyelwa Toni Penxa, Samuel Isaacs, Joe Samuels and Mark Albertyn

Manchester City Council

Nexteer Automotive Group Limited

EXPLANATORY MEMORANDUM TO THE CONTRACTS FOR DIFFERENCE (ELECTRICITY SUPPLIER OBLIGATIONS) REGULATIONS No. [XXXX]

Research and information management strategy Using research and managing information to ensure delivery of the Commission s objectives

Guidelines for Carrying out a Survey

JOB DESCRIPTION. Service Desk Technician

Highway Asset Management Strategy

Report of the Student Feedback Project Steering Group

INVITATION TO BECOME AN ASSOCIATE OF THE EDUCATION AND TRAINING FOUNDATION

INTERNAL AUDIT FINAL REPORT CNES FINANCE AND CORPORATE RESOURCES DEPARTMENT CLOUD IT SYSTEMS AND THE CRM SYSTEM OFFICIAL OFFICIAL

Enterprise Risk Management & Information Technology

January Brand and Campaigns Executive: Information for Candidates

THE ROAD SAFETY AUDIT TOOKIT

Using Cloud-Computing to Promote Asset Management Best Practices A Ministry of Transportation Ontario Case Study

DIPLOMA IN BUSINESS RISK MANAGEMENT

SMS0045 Construction Health and Safety Policy and Procedures

The Annual Audit Letter for West Mercia Police and Crime Commissioner and Chief Constable

City of Cardiff Council Improving Scrutiny Project: Project Brief, January 2015

Aberdeen City Council

APPENDIX K: HIGHWAY MAINTENANCE STRATEGY

Plymouth Council & Asset Management

PEOPLE AND ORGANISATION DEVELOPMENT STRATEGIC FRAMEWORK FOR LOCAL GOVERNMENT IN NORTHERN IRELAND

Position Description. Department: Quantitative Research Direct Reports: Project Manager/Researcher Senior Researcher

The overall aim for this project is To improve the way that the University currently manages its research publications data

Draft TMH 22 ROAD ASSET MANAGEMENT MANUAL

Technology Operations NI, BBC Northern Ireland Technology Operations Support Manager

BRIEFING PAPER UNIVERSITY GREY USER IDENTITY MANAGEMENT

Technical Note: Road Condition and Maintenance data. Contents

South East Water Corporation Finance Audit and Risk Management Committee Charter. October 2012

CITB CITB. Grants Scheme CONSTRUCTION INDUSTRY TRAINING BOARD NI CONSTRUCTION INDUSTRY TRAINING BOARD NI

Customer Guide Helpdesk & Product Support. [Customer Name] Page 1 of 13

School or service safety advisor (SSA) role

Job Information Pack. Facilities Assistant Tower Hill, London. March 2014 ALZHEIMER S SOCIETY

A flexible structure and global reach means that we can quickly respond to our partners' needs, while offering the benefits of economies of scale.

FRAMEWORK FOR IMPLEMENTING PERFORMANCE MANAGEMENT

The role is Practice Manager for MDY Legal. You will report to the Partners of the Firm.

FOOD LAW ENFORCEMENT IN SCOTLAND

EVALUATION Actions Activities Results Evidence of Activities & Quality

18 November 2015 At a meeting of the Select Committee held at a.m. at County Hall, Chichester.

JOB DESCRIPTION. TITLE: Corporate Property Manager SALARY RANGE: 55,000-70,000

Transcription:

PCIS On-going Support Meeting Presented by Mark Benton 19 th January 2012

Welcome Fire Safety Smoking Mobile phones Facilities TRL Internet t Wifi Password Refreshments

Agenda Introduction and purpose day Background PCIS Contract What it delivered. Future Challenges Elements in need of coordination Owners Forum Support arrangements Governance Structure Final Thoughts

PCIS Ongoing Support 1 2 3 4 Project Overview Liaison and Project Steering Product Development Accreditation, QA and Audit 5 Technology Promotion

PCIS Ongoing Support 6 7 8 HAMFIG Support Unclassified Roads Reporting Technical Documents 9 Use of Resources

PROJECT OVERVIEW

Objectives Support for Local Authority Pavement Condition Information Systems..to support local highways authorities in their use of information technology to deliver their road service. Help all stakeholders to perceive stability, consistency and commitment in the development of UKPMS and SCANNER

UK Roads Board requirements - Appoint a team to: Promote the use of PMS and SCANNER in local authorities Support commercial suppliers in the implementation of future UKPMS and SCANNER specifications Support industry in the development of other data sources and their interface with PMS

UK Roads Board objectives Appoint a team to: Promote the use of transport asset condition data through pavement information technologies within local highway authorities and their contractors Oversee the accreditation, quality assurance and audit of pavement information technologies Develop and implement the UKPMS and SCANNER core specifications

Our overall approach (work streams) Inputs Liaison & Project Steering Barry Cleave Product Development Andrew Gallagher Feedback Accreditation Quality Assurance & Audit Tom Buckland Management Technology Promotion Stuart McRobbie Outputs Page 10

Overall approach - phases We identified three phases in the project Short term transition - Ensuring continuity and a smooth transition Medium term evolutionary improvement - Aiming to improve the reputation and usefulness of the existing systems - Encouraging the take up and effective use of existing products - Making improvements, amendments and changes where needed Longer term transformation - Leadership to transform UKPMS, on the basis of the further research and development tasks - New acceptance testing, accreditation, QA and audit arrangements - Creating widespread support for any changes Page Pavement 11 Condition Information Systems

Overall project plan 2008 2009 2010 2011 PCIS support contract Transition Evolution Transformation SCANNER & UKPMS SCANNER Extend QA Review TRL Specification New QA UKPMS Func Review Specification Develop QA New QA Visual surveys Inspector QA DCD QA Technology Promotion Seminars Workshops Training

LIAISON AND PROJECT STEERING

Deliverables Liaison and project steering 1 2 3 4 Project inception meeting Project steering meetings (PCMG) Implementation ti advisory group meetings (RBAG) Visual surveys subgroup

Deliverables Liaison and project steering 5 6 7 Project closedown meeting PMS developers meetings SCANNER contractors t meetings

Our achievements All specified requirements delivered: - Project overview meeting Chris Capps ( ) - Project initiation meeting and workshop( ) - PCMG set up & Nine PCMG meetings ( ) - RBAG formed & Five RBAG meetings ( ) - Three visual survey contractors meetings ( ) - Two PMS developers meetings ( ) - Five SCANNER contractors meeting ( ) - Drafted PCMG reports to UKRB ( ) - Drafted PCMG business plans for UKRB/UKRLG ( )

Our achievements Considerable effort was made to reach out to other groups, especially in the first year, to build the bridges for the transformation task ( ) The results of the UKPMS Core Functionality Review were well communicated - Accepted by the PCMG - Accepted by the UKRB - Accepted by DfT

Liaison and project steering CSS Engineering Committee UK Roads Board Highways Management Group (CSS) Asset Management Group (CSS/TAG) PCMG FCMG Highway Condition Assessment Group HAMFIG Roads Board Advisory Group

Our achievements Effective liaison and project steering ( )

PRODUCT DEVELOPMENT

Deliverables Product development 8 9 10 11 12 Update UKPMS core specification (annually) Update SCANNER core specification (annually) Detailed plan to implement UKPMS core specification Ensure PMS suppliers deliver core functionality Ensure PMS suppliers deliver desirable functionality

Product development Visual surveys and methods Treatment selection Scheme building Pavement management systems UKPMS functionality review Deterioration modelling Condition projection SCANNER surveys GPS and GIS data referencing Whole life costing Other machine PCS Specifications Training

Three phases Transition - Gather reference material - Establish reference library Evolution - Identify requirements for improving UKPMS, SCANNER and other machine surveys Transformation - Develop and implement a fully defined and priced plan to drive through the changes identified from the UKPMS functionality review

Our achievements All specified requirements delivered: - Update UKPMS core specification annually ( ) - Update SCANNER specification annually ( ) - Detailed plan to implement UKPMS core specification ( ) - Ensure UKPMS developers deliver core functionality ( ) - Ensure UKPMS developers deliver desired functionality ( )

Our achievements Amendments to UKPMS core specification ( ) (HAMFIG, FNS, etc.) UKPMS core functionality review delivered on time and budget (separately funded) ( ) BUT unable to implement recommendations

Product development Visual surveys and methods ( ) Treatment selection Scheme building Pavement management systems ( ) UKPMS functionality review ( ) Deterioration modelling Condition projection SCANNER surveys ( ) GPS and GIS data referencing Whole life costing Other machine PCS Specifications ( ) Training

Our achievements Product Development successfully delivered ( ) (But limited by UKPMS CFR not being implemented)

ACCREDITATION, QA AND AUDIT

Deliverables Accreditation, QA and Audit 13 14 15 16 17 Conduct Annual Health Checks on UKPMS (annually) Devise new UKPMS accreditation and audit mechanism (following functional review) Establish a new, independent accreditation and audit process (following functional review) Review TRL s performance of SCANNER QA Re-tender SCANNER QA contract 18 Establish new SCANNER QA contract

Three phases Transition - Ensure established mechanisms are continued (where appropriate) or reinstated (where necessary) Evolution - Maintain and support existing arrangements - Extend TRL s SCANNER QA contract for one year - Review performance of TRL s SCANNER QA contract Transformation - Introduce new UKPMS requirements following functional review - Develop specifications for new contracts for UKPMS and SCANNER acceptance testing and QA

Our achievements Specified requirements delivered: - Conduct annual health checks on UKPMS 3 x 5( ) - Devise new UKPMS accreditation and audit mechanism (following functional review) (?) - Establish a new, independent accreditation and audit process (following functional review) (?) - Review TRL s performance of SCANNER QA ( ) - Re-tender SCANNER QA contract ( ) - Establish new SCANNER QA contract ( )

Our achievements Visual Survey Accreditation ( ) - New accredited test site at Leamington Spa - FNS accreditation developed - Test sites accredited for FNS Inspector Accreditation ( ) - CVI, 48 tests, 44 passes, 4 fails - DVI, 42 tests, 39 passes, 3 fails - FNS, 29 tests, 28 passes, 1 fail - Auditor, 3 tests, 3 passes

Our achievements SCANNER QA developed as a commercial service ( ) BUT no funding to implement recommendations of the UKPMS core functionality review

Accreditation, QA and Audit Visual Survey Inspector Accreditation DCD software accreditation UKPMS Accreditation and QA Machine Survey Accreditation Survey contractors Local authorities Scott Wilson Sheffield City WDM Exor Pitney Bowes Symology Jacobs WDM Service providers Yotta NotaVia Highway Surv. WDM Yotta MARCH Yotta DCL

Our achievements Accreditation, QA & Audit function successfully delivered ( )

TECHNOLOGY PROMOTION

Deliverables Technology promotion 19 20 21 22 23 One stop shop helpdesk Contact reference database Re-establish UKPMS website Upgrade UKPMS website Issue electronic newsletters

Deliverables Technology promotion 24 25 26 27 Regional seminars UKPMS Owners Forum meetings Conference presentations ti Journal papers

Three phases Transition - Re-establish basic support for UKPMS - Ensure continuity and a smooth transition Evolution - Develop communication with local authorities - Identify best practice use of UKPMS and SCANNER, - Promoting such approaches across the local authority community - Investigate how best to involve other stakeholders Transformation - Communicating the changes in UKPMS and SCANNER

Our achievements All specified requirements delivered: - One stop shop helpdesk ( ) - Contact reference database ( ) - Re-establish UKPMS website ( ) (short term expedient) - Upgrade UKPMS website ( ) (total replacement was necessary) - Website hosting & maintenance for future 2 years ( ) - RBAG established (replaced Owners Forum) ( ) - Issue electronic newsletters ( ) - Regional seminars ( ) - Conference presentations ( ) - Journal papers ( )

Our achievements All specified requirements delivered: - One stop shop helpdesk ( ) - Contact reference database ( ) - Re-establish UKPMS website ( ) (short term expedient) - Upgrade UKPMS website ( ) (total replacement was necessary) - Website hosting & maintenance for future 2 years ( ) - Issue electronic PCIS newsletters x 24 ( ) - Regional seminars x 6 ( ) - Conference presentations x 6( ) - Journal papers x 8 ( )

Technology promotion Technology promotion Conferences and journals ( ) Universities and colleges UKPMS Owners forum Technical training Survey contractors Regional seminars ( ) Newsletter ( ) PCIS website ( ) UKPMS suppliers Local authorities and their service providers

Our achievements Technology Promotion successfully delivered ( ) (but without transformation phase)

HAMFIG SUPPORT

PCIS Contract support to HAMFIG Additional to original contract Attendance at meetings (Ro Cartwright) Technical Input (Ro Cartwright) Attendance at meetings (Andrew Gallagher & TRL) Review of Carriageway Depreciation model Papers and presentation

UNCLASSIFIED ROADS REPORTING

PCIS Contract - UCR reporting Additional to original contract Collection of data from Authorities Analysis Reports prepared

TECHNICAL DOCUMENTS

PCIS Contract Technical Documents Technical Note 46 (Provisional) (09/10) Technical Note 46 - Part 1 - Financial Information to support Asset Management (Carriageways) Technical Note 46 - Part 2 - Financial Information to support Asset Management (Footways and Cycletracks) Technical Note 47 - Footway Network Survey: Network Performance Report (Provisional) (09/10) Advice Note 9 - Part 1 - Carriageway Depreciation Calculations in UKPMS Advice Note 9 - Part 2 - Footway & Cycletrack Depreciation Calculations in UKPMS

PCIS Contract Technical Documents Rule Set Changes from RP8.01 to RP9.01 - Summary for UKPMS Users Rules and Parameters 9.01 Rules and Parameters 10.01 2010/2011 - SCANNER QA Review by Atkins Weighting sets: 2009/10: Introduced new SCANNER CCI weighting sets: - WSCCIv0102.zip Package for UKPMS Annual Health Check: 2008, 2009, 2010 Package for DCD Accreditation test

PCIS Contract Technical Documents Revised Documents: UKPMS User Manual, Volume 2 (8 chapters revised, 1 new added) Technical Note 03 - HMDIF File Structures and Content Technical Note 41 - PI Guidance Notes (Scottish) 08/09 Technical Note 42 - PI Guidance Notes (Northern Ireland) 08/09 Technical Note 43 - PI Guidance Notes (Welsh) 08/09 Technical Note 44 - NI168 Guidance Notes (English) -- principal roads (2008/09) Technical Note 45 - NI169 Guidance Notes (English) -- non-principal roads (2008/09)

PCIS Contract Technical Documents Revised Documents: Technical Note 41 - PI Guidance Notes (Scottish) 09/10 Technical Note 42 - PI Guidance Notes (Northern Ireland) 09/10 Technical Note 43 - PI Guidance Notes (Welsh) 09/10 Technical Note 44 - NI168 Guidance Notes (English) -- principal roads (2009/10) Technical Note 45 - NI169 Guidance Notes (English) -- non-principal roads (2009/10)

PCIS Contract Technical Documents Revised Documents: Technical Note 41 - PI Guidance Notes (Scottish) 10/11 Technical Note 42 - PI Guidance Notes (Northern Ireland) 10/11 Technical Note 43 - PI Guidance Notes (Welsh) 10/11 Technical Note 44 - NI168 Guidance Notes (English) -- principal roads (2010/11) Technical Note 45 - NI169 Guidance Notes (English) -- non-principal roads (2010/11) Technical Note 47 - Footway Network Survey: Network Performance Report (10/11)

PCIS Contract Technical Documents Revised Documents: SCANNER Specification 2009 SCANNER Specification 2011 SCANNER HMDIF Specification General guidance for SCANNER Road Condition Indicator Technical guidance for SCANNER Road Condition Indicator

PCIS Contract Technical Documents Revised Documents: Weighting sets: Revised 2008/09: Original SCANNER RCI: - WS223v0101 became WSPrinv0101 - WS224av0102 became WSBCv0101 Revised 2008/09: Revised SCANNER RCI: - WS223v0202 became WSPrinv0201 - WS224av0202 became WSBCv0201 Revised 2009/10: Revised SCANNER RCI - WSBCv0201 became WSBCv0202

Our overall achievement We believe we have done a good job, overall, and delivered the specified outputs where possible BUT the project was prevented from delivering the transformational change that was really wanted BECAUSE the funding for further development work was not provided through other projects or contracts as had been planned - therefore: Everything was in place to deliver transformational change for UKPMS had funding for the further development work been made available

ONGOING SUPPORT FOR PCIS

TRL Offer to UKRLG to Help Support PCIS for 2 years Project Management PCIS Helpdesk UKPMS AHC Accreditation Visual Survey PCIS Newsletter PCIS Website Unclassified Roads Data PCIS Forum PCIS Liaison Manage Income sources

Project Management To efficiently management the project at minimum cost To attend up to 3 meetings per year of the PCMG or other nominated steering group To prepare progress reports for these meetings To prepare accounts for these meetings To manage finances as above

PCIS Helpdesk To monitor and manage the PCIS Helpdesk To reply to all calls To provide support on minor queries To liaise with PCMG on more major support issues To seek funding from user for local l support issues Maintain contacts database Maintain call and issues log database

Visual Survey To continue management of the visual survey accreditation process with the visual survey companies To manage the DCD accreditation process To manage any very minor changes to DCD requirements and accreditation To manage any minor changes to visual survey test sites To deliver any minor Visual Survey Manual updates

PCIS Newsletter Seek contributions for newsletters Provide some content Edit and publish newsletters (up to 4 per year)

PCIS Website Maintain the PCIS website Update Accreditation information Upload technical documents Upload presentations and reports to PCMG (or nominated group) Upload newsletters

Unclassified Roads Data To collect data from local authorities on unclassified roads To work with Andrew Gallagher Associates to deliver analysed data

PCIS Forum To set up and manage a new subscription based PCIS forum To use web based technologies to disseminate information (Technical promotion) Maintain PCIS Website Forum Only area Provide Web Video Conferencing with user participation

PCIS Liaison Attend PCMG Attend RBAG Attend UKPMS Developer groups Attend Visual Survey groups

Manage Income sources Work with the UKRLG/UKRB/PCMG and National Governments to identify potential income sources to maximise available funding for the work. To prepare business plans and work with the sources of the income to secure funding To manage all financial requirements for the collection and accounting of monies. To manage all financial requirements for the distribution and accounting of monies on a fair and equitable basis for the funding achieved

Thank you PCIS Ongoing Support Presented by Mark Benton Team Leader 19 th January 2012 Tel: 01344 770743 Email: mbenton@trl.co.uk