SCAFFOLDING PRODUCT TECHNICAL GUIDE. Scaffold Couplers General Technical and Application Manual. Genuine Safety. Outstanding Service.



Similar documents
SCAFFOLDING AUGUST making a difference ERECTING, ALTERING AND DISMANTLING PART 1: PREFABRICATED STEEL MODULAR SCAFFOLDING

MultiPost-AP anchorage device

Connection Solutions

Since it was established in 1989, with a small manufacturing base in Qwa Qwa and a hire yard in Botswana, Uni-Span

PUMP JACK SYSTEM AND ACCESSORIES

WorkSafe Guidance Document FALL PROTECTION IN RESIDENTIAL CONSTRUCTION

STANDARDS FOR TESTING AND RATING SCAFFOLD ASSEMBLIES AND COMPONENTS

Chapter 10 - Scaffolding Systems

Structural Holding System

FRACASSO SCAFFOLDING PS 720

Formwork Direct International Ltd Phone No +44 (0151) Fax no +44 (0151)

Trouble shooting guide

HORIZONTAL INSTALLATION

INSTRUCTIONS FOR USE

Residential Deck Safety, Construction, and Repair

SCAFFOLDING RUNWAY SYSTEM

Operations and Instruction Manual Might Swivel - Part # Concrete and Steel Anchorage Connector ANSI Z ,000 lbs / 44kn

One-third of all fatalities in the U.S. construction

Wall braces with a swivel head are included to accommodate all roof pitches.

PITCHED ROOF STRUCTURES

Scaffold Industry Association of Canada

3M Mobile SkyWalk Series Horizontal Lifeline Product Return Form

CUPLOK SCAFFOLD SYSTEM

MAXIMO The panel formwork with the MX Tie which is installed from one side only

BRIO Modular scaffolding

Timber Decks. Technical Note. March 2007

LEGACY REPORT ER ICC Evaluation Service, Inc. Reissued November 1, Legacy report on the 1997 Uniform Building Code

Sports and High Mast Lighting Poles Phone: (866) Fax: (817)

KIRÁLY TRADING KFT H-1151 Budapest Mogyoród útja tel: Clamps Clamping devices

Installation guide for the SafeLine type anchorage device. Tested in compliance with EN 795: No.: SE-...

Removable Aluminium posts

TRIO 330 The framed panel formwork for heights of up to 3.30 m

BUILD A CARPORT. 2 - Planning the carport. 3 - Designing the carport

OSHA GUIDANCE DOCUMENT FALL PROTECTION IN RESIDENTIAL CONSTRUCTION

Conceptual Design of Buildings (Course unit code 1C2)

PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta

Interim Guidance on Collective Fall Prevention Systems in Scaffolding

ASSEMBLY INSTRUCTIONS Residential Roof solutions

RZ Guardrail System Installation Manual

AA Solar and Sun Power Plus

OSHA Scaffold Standard for Construction. 29 CFR 1926 Subpart L

SERIES NG 1800 STRUCTURAL STEELWORK

SAFE ERECTION AND USE OF SCAFFOLDING

Dismantling and Reassembly Guide

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

Small Flat Panel Lift Arm FSA-1004 and KSA-1004

Drive shaft, servicing

CABLE SUPPORT SYSTEMS

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

Key Features. Product Overview. Threaded Joint Rate Simulator

MAT 75 STRUCTURAL SUPPORT SYSTEM

SECTION 4: Cable Ladder Stainless Steel & Aluminium

Layher. Protective Systems. More Possibilities. The Scaffolding System. Layher Keder Roof and Keder Hall Instructions for Assembly and Use

POWERS Controls No. 4 Pneumatic Damper Actuator

Linear modules Lifting units Rotary modules Grip modules Inductive proximity switches Plug connectors

FLAT ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL

March 14, Installation of Bay, Bow and Garden Windows

Volkswagen B3 Passat Manual Transmission 02A 34 Manual Transmission - Controls, Assembly (Page GR-34) 02A 5-speed. Gearshift cable/lever installing

OUTDOOR DISCONNECTORS A division of ACTOM (Pty) Ltd

Owner s Manual Gantry Cranes

Contractor s Safe Working Agreement

Les Produits MURPHCO Ltée

VALVES FOR REFRIGERATING SYSTEMS

Work at Height. John Frontczak Construction Manager Facilities Engineering Chevron Corporation. All rights reserved.

SG4:10 Preventing Falls from Scaffolding Collective Fall Prevention.

Fall Protection System: A system put in place to protect workers from falling. (i.e. installation of guardrails, fall arrest, fall restraint, etc.

11 Guardrail. W-Beam Guardrail Pre-Installation Inspection During Installation Basis for Use. Modified Guardrail. End Treatments and Transitions

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

Installation Instructions:

European Technical Approval ETA-10/0153

SECTION GUARDRAILS

HALF COUPLER HALF COUPLER

Davcron Concrete Agitator - Operations Manual

CODE OF PRACTICE FOR METAL SCAFFOLDING SAFETY

INSTALLATION. General. Important Note. Design. Transport

Wisconsin Building Products Evaluation

EXPLORE 4-Leg Teaming Table with Screen Share Assembly Instructions

FLAT ROOF BOX SPAN CARPORTS

Table of Contents. Overview 1. Pump Disassembly 2. Control Disassembly / Reassembly 7. Pump Reassembly 13. Adjustment Procedures DR Control 19

USER INSTRUCTIONS AND SPECIFICATIONS for use of SAFE APPROACH STANDING SEAM ANCHOR & SAFE APPROACH METAL ROOF SCREW-DOWN ANCHOR

The Guide to Safer Scaffolds

Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors

DIVISION: EARTHWORK SECTION: BORED PILES REPORT HOLDER: HUBBELL POWER SYSTEMS, INC.

Installation and Operating Instructions Installation Instructions for SS EPE-316L Series

I BEAM TRACK INSTALLATION

Fixtures - Parts - Accessories to shampoo bowls

Steering column, steering column tube and steering wheel, servicing

Original instructions Protective tube for Orion1B and Orion2 Orion WET-xxx and Orion WET-Kxxx

SD. Flat roof. Rack Mounting. Installation instructions (2010/11) AU

Check for deteriorated, shifting or missing tie-down pads. Replace if needed.

RINGFEDER. Automatic Hook Couplings for Road and Cross Country Vehicles. TYPE RUwg. Prospect

Repairing storm damaged roofs

RESIDENTIAL ROOF TRUSS INSTALLATION PROCEDURES

2740 Whitten Rd Bldg 103 Memphis, TN Telephone

INSTALLATION AND OPERATING INSTRUCTIONS For Model GL1 Gate Locks

Owner s Manual Read and keep this manual. Patents World Wide

Accessories for GF and RA machines

Nuffield and Middleweight Leyland Tractor - 11 inch - Double Clutch Overhaul Part 1 - Clutch Removal and Dismantling

Resharpening Companion

CETAC Z-Drive Assembly

Transcription:

SCAFFOLDING PRODUCT TECHNICAL GUIDE Scaffold Couplers Genuine Safety. Outstanding Service.

Introduction Scaffold couplers are essentially the fundamental component that is used to assemble tube-and-coupler scaffolding as encompassed by AS1576. Tube-and-coupler scaffolding is defi ned in AS1576.3 as 'a scaffold in which individual circular tubes serving as standards, ledgers, braces or ties are joined together by means of purpose designed couplers'. This basic fi tting that is designed to join two scaffold tubes can be used to create a diverse range of scaffolding structures or used as an accessory to prefabricated scaffolding systems. This manual includes basic types of scaffold couplers which join two tubes together as well as special couplers used to connect scaffold tube to other components, equipment or structures. Working Load Limits Working Load Limits (WLL s) are given for couplers that are covered by AS1576.2 and comply to that standard. WLL s for couplers shown may be limited by components to which they are attached. Hence, load capacity of such components must be checked for suitability to support resultant loads. Important The technical and application guidelines contained in this booklet are recommended methods to be used with scaffold couplers supplied by Acrow Formwork & Scaffolding Pty Ltd. Recommendations and technical details must be accurately followed to obtain the correct performance of the product. Deviation from the recommended usage will require a separate engineering design and/or verifi cation by Acrow Formwork & Scaffolding Pty Ltd. The use and application of scaffold couplers must be in compliance with the requirements of Statutory Regulations and Australian Standards for Scaffolding (AS/NZS1576 'Scaffolding' and AS/NZS 4576 'Guidelines for Scaffolding') as applicable. The illustrations of the assembly confi gurations are guidelines only. Site specifi c Hazard and Risk assessments may need to be generated for specifi c projects. As part of the risk management processes, we draw your attention to the requirement that scaffolders must, as part of their competency, be competent in manual lifting techniques. Therefore, scaffolders erecting, altering or dismantling scaffolding must follow the manual handling guidelines published by Regulatory Authorities or other guidelines and codes of practice recognised as being acceptable by such Regulatory Authorities. Personnel who erect, alter or dismantle scaffolding over 4m in height must hold a current National, State or Territory Certifi cate in Scaffolding to the appropriate class. Double Coupler Joins two scaffold tubes having outside diameter of 48.3mm at right angles. Tightening nuts suit standard Scaffold Spanner Replaceable 'T' bolts, nuts and washers. Robust design made from drop forged steel for durability and reliability. Typical working load limit of 6.25kN against slip at tightening torque of 54 Nm. Can be used to resist tension or compression loads. Swivel Coupler Joins scaffold tube having outside diameter of 48.3mm at any angle. Each half of the Coupler is interconnected with a swivel pin. Typically used for connecting bracing members. Also used for tension splicing of scaffold tubes. Tightening nuts suit standard Scaffold Spanner Replaceable 'T' bolts, nuts and washers. Robust design made from drop forged steel for durability and reliability. 6.25 kn against slip at tightening torque of 54 Nm. Can be used to resist tension or compression loads in bracing. Should not be used to support primary members. (Refer Clause 3.2.2 of AS1576.2-1991) DC 1.1 SC 1.2 Reduction Double Coupler Similar to Double Coupler except that it connects tube to 60 O.D. RDC 1.80 Reduction Swivel Coupler Similar to Swivel Coupler except that it connects tube to 60 O.D. RSC 2.20 Disclaimer 1 Photographs/illustrations shown within this brochure are intended as expressing the diversity and possible applications of the product and as such must not be used as assembly instructions. 2 In line with Acrow Formwork & Scaffolding Pty Ltd's commitment to continuous product development and improvement, the information contained in this brochure may be changed without notice. 3 Every effort has been made to give appropriate guidelines for the use of this product, however, Acrow Formwork & Scaffolding Pty Ltd accepts no responsibility for any loss or damage suffered by any person acting or refraining from action as a result of this information. Should the users require any further information or guidance, they are encouraged to contact their local Acrow Formwork & Scaffolding Pty Ltd outlet.

Expanding Joint Pin Joins scaffold tube standards end to end internally. Fits inside scaffold tubes. Expands to fi t internal diameter of scaffold tube when bolt tightened. Tightening bolt suits standard Scaffold Spanner Made from forged steel. Hot dip galvanised fi nish. Under compression loading this Joint Pin is capable of taking the full capacity of the scaffold tube. Not to be used for tension loads. Under tension loading, it is necessary to splice the joint with another scaffold tube and Swivel Couplers (tension load check required). Not to be used for end to end joining of tube ledgers. (Refer Clause 3.2.2 of AS/NZS1576.6-2000). This Joint Pin must only be used to join scaffold tube with the same internal diameter, ie, the same wall thickness. Typical scaffold tube sizes are: 48.3mm O.D. x 40.3mm I.D. (4.00mm wall thickness tube) or 48.3mm O.D. x 38.5mm I.D. (4.88mm wall thickness tube). External Sleeve Coupler Joins scaffold tubes end to end externally. Used for end to end joining of scaffold tube standards. Locates on outside diameter of scaffold tube members. Tightening bolt suits standard Scaffold Spanner. Made from high quality pressed steel. Hot dip galvanised fi nish. Under compression loading this Coupler is capable of taking the full capacity of the scaffold tube. Not to be used for tension loads. Under tension loading, it is necessary to splice the joint with another scaffold tube and Swivel Couplers (tension load check required). Can be used for end to end joining of tube ledgers. (Refer Clause 3.2.2 of AS/NZS1576.6-2000). This Coupler must only be used to join scaffold tube with the same external diameter. Typical scaffold tube sizes are: 48.3mm O.D. x 40.3mm I.D. (4.00mm wall thickness tube) or 48.3mm O.D. x 38.5mm I.D. (4.88mm wall thickness tube). EJCP 1.4 ESCG 1.20 Putlog Coupler Putlog Coupler (Standard Double Flap Type) Joins scaffold tubes at right angles. Used for fi xing putlog tubes onto ledger tubes. Tightening nut suits standard Scaffold Spanner Replaceable 'T' bolt, nut and washer. Pressed steel fl aps and drop forged steel cap. Typically used for securing guardrails and midrails at right angles to standards. Other uses can distort the coupler so that tube retention is not effective and WLL does not apply. Not to be used for connecting ledger tube in tubeand-coupler Only use Right Angle Couplers for this purpose. Refer AS/NZS1576.6 for guidance on tube-andcoupler 0.62 kn against slip of tube through fl aps of coupler at tightening torque of 54 Nm. (Standard Wrapover single type) Joins scaffold tubes at right angles. Used for positioning putlog tubes onto ledger tubes. Tightening nut suits standard Scaffold Spanner Replaceable 'T' bolt, nut and washer. Pressed steel body and drop forged steel cap. Typically used for securing guardrails and midrails to standards at right angles. Other uses can distort the Coupler so that tube retention is not effective and WLL does not apply. Not to be used for connecting ledger tube. Only use Right Angle Couplers for such purpose. Refer AS/NZS1576.6 for guidance on tube-andcoupler 0.62 kn against slip of tube through fl aps of coupler at tightening torque of 54 Nm. Putlog Coupler - Hook Type Joins scaffold tubes at right angles. Not recommended for fi xing of putlog tubes to ledger tubes for working decks. PC 1.0 PCSW 0.7 PCHT 0.4

Putlog Head Used for single pole putlog Fits scaffold tube. 6.25 kn (resistance to tube slip where nuts tightened to 54 Nm torque). 2.25 kn (bending of blade). PH 1.3 Board Clamp Retains timber scaffold planks to putlog/ transom tubes. Suitable for plank thickness range of 35 to 38mm. SBCP 0.60 Putlog Head RSJ Clamps Joins scaffold tube to Tapered or Parallel Flange steel beams at 90. Size 1 suitable for RSJ fl ange thickness up to 19mm. Size 2 suitable for RSJ fl ange thickness of 19-38mm. Size 3 suitable for RSJ fl ange thickness of 38-57mm. RSJ Girder Clamp scaffold tube RSJ Clamp N 1 RSJC1 RSJ Clamp N 2 RSJC2 1.1 1.1 Rafter Coupler Used for clamping scaffold tube to timber runners. Suitable for timbers 50mm wide. RC 1.5 15.0 kn scaffold tube RSJ Clamps must be used in pairs each side of the fl ange. Minimum tightening torque = 54 Nm. Gravlock Girder Clamp Joins scaffold tube to Tapered or Parallel Flange steel beams at 90. Suitable for girder fl ange thickness up to 44mm. Gravlock Girder Clamp 15.0 kn scaffold tube Gravlock Girder Clamps must be used in pairs each side of the fl ange. Minimum tightening torque = 54 Nm. RSJ Swivel Clamp Joins scaffold tube to Tapered or Parallel Flange steel beams at various angles. Suitable for girder fl ange thickness up to 44mm. scaffold tube RSJ Clamp N 3 1.20 RSJC3 GGC 1.50 RSJSC 1.5 Suitable anchor to structure Wall Tie Bracket Wall Tie Brackets are an alternative tying method and they are used where it is not possible or convenient to tie through windows or around columns. Wall Tie Brackets supplied by Acrow Formwork & Scaffolding comprise a half Swivel Coupler attached to an angle section with a pin allowing it to rotate. The angle section contains an 18mm dia hole for a 16mm dia fastener or anchor for securing the bracket to the face of a building wall or similar structure. The swivel pin attachment enables the Half Coupler to rotate through 360. Notes: The load capacity of the selected anchor and the structure to which the bracket is attached must be verifi ed as having suitable capacity to sustain the Working Load Limit of the bracket. When determining anchor forces, prying forces must be considered where they may occur. Stated WLL is applicable where the following types of Swivel Coupler is used: - Acrow/Euro - Acrow/Burton s - Acrow/SGB - Acrow. Australian Standards for Scaffolding provide guidance on Anchorage and Tie Assemblies. In particular refer to Clause 2.8 of AS1576.1 and Clause 8.5 of AS4576. WTB 2.0 RSJ Swivel Clamp scaffold tube 15.0 kn scaffold tube RSJ Swivel Clamps must be used in pairs each side of the fl ange. Minimum tightening torque = 54 Nm. DO NOT EXCESSIVELY OVER TIGHTEN.