City of Toledo Bid Sheet



Similar documents
MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT

How to Estimate the Cost of Interior Building Finishes from Schematic Drawings. CPE Candidate No December 2014

Advanced_O&M_Task_List_Example_Tool_06_02_16: O&M Example

GENERAL REQUIREMENTS:

IFB Alarm Monitoring ADDENDUM NUMBER ONE

Estimated Cost of Repair

General Equipment Preventive Maintenance Guidelines Preventive Maintenance services at 201 Granby Street for NRHA.

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE APPLICATION REVIEW

UNIVERSITY OF TOLEDO

REQUEST FOR QUOTATION

CITY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING STANDARD FEE LIST (updated 10/3/2015)

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE

SEWER BACKUP PREVENTION PROGRAM

CCU Engineering Specifications. Section PRECAST CONCRETE PRODUCTS

How To Install An Overhead Sewer

How To Calculate Cost Of An Eco-Friendly Building

Department of Public Utilities Facilities Maintenance Operations

COUNTY OF EL PASO, TX REQUEST FOR BIDS Bus and Fleet Vehicle Maintenance and Repair Services (Supplement)

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION PAGE 1

CSC-DIVISION 1-MASTER SECTIONS Description

Solicitation Addendum One (1) RFQ CARPET CLEANING SERVICES

POSITION DESCRIPTION

AGENDA ITEM EXECUTIVE SUMMARY

Ice Rink Application For General Liability Insurance

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

CONSTRUCTION CONTRACT TERMINOLOGY

Appendix S Pump Station Evaluation

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

Wisconsin Expo, Inc.

Commercial Construction Permit Application

City of South Haven Water Plant Projects. Monthly Status Report

BMIC S APPETITE GUIDE EFFECTIVE JUNE 2013

NORMI Professional Guidance for DIY Projects

Hurricane Hotwash. Presented by: David W. Mock, P.E. Director S.E. Region, Ports and Maritime Group CH2M HILL. AAPA Cruise Committee

In Partnership with. TDIndustries Diplomat Drive Dallas, Texas Phone: Fax: Website: TDIndustries.

LITTLETON / ENGLEWOOD WASTEWATER TREATMENT PLANT. L/E WWTP Lighting Improvement 2015 Project Manual S Platte River Drive Englewood CO 80110

Overview of the Four Year Financial Plan (FY 2016 FY 2019) Presentation to the Financial Review Commission March 23, 2015

Disaster Prevention and Protection Checklist

SIOR GREATER KANSAS CITY MUNICIPAL DEVELOPMENT REPORT CARD

BOARD OF EDUCATION The School District of South Orange and Maplewood 525 Academy Street, Maplewood, NJ 07040

Engineering Major Service Actual Budget Projected Request Executive Adopted

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

AMERICAN BOTTOMS REGIONAL WASTWATER TREATMENT FACILITY BID AB SLUDGE LOADING, HAULING & DISPOSAL TECHNICAL SPECIFICATIONS

UNIVERSITY OF WISCONSIN MADISON

Rutgers Environmental Health and Safety

2. Have five years of experience at processing maintenance work orders in a multi-property facility in the ranger of 2,000,000 sq ft.

Repair and Remodeling Estimating Methods. 4th Edition. RSMeans

Facility Support Services

Drinking Water Sector - Damage Assessment Report

HEATING, VENTILATION & AIR CONDITIONING PREVENTATIVE MAINTENANCE & REPAIR WORK (NO WIN PROJECT) MAINEDOT 66 INDUSTRIAL DRIVE FACILITY AUGUSTA

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

MARKET SCOUT CONTRACTORS QUESTIONNAIRE (complete in addition to an Acord application) 1. Applicant:

SECTION 1 GENERAL REQUIREMENTS

2. Division 05 Structural Steel Framing for steel framework requirements

Exhibit C: Scope of Work and Schedule of Deliverables

ITEM QUANTITY UNIT UNIT AMOUNT UNIT AMOUNT AMOUNT

City facilities that are currently part of the System are listed below. Other City facilities may be added in the future.

Please Refer to Attached Sample Form

Jefferson Parish Department of Water Emergency Plan

ABC CIRCUITS 10 Circuit Drive Circuit Town, IN SLUG CONTROL PLAN

FREEMAN ELECTRICAL SERVICES FAQ s

Update on Maintenance and Service Costs of Commercial Building Ground-Source Heat Pump Systems

MEMORANDUM West Swann Avenue, Suite 225 Tampa, Florida Phone (813) Fax (813)

Safety, Health and Accessibility Design Guidelines For Architects, Engineers and Design Firms

The Comprehensive Coatings Service Provider to Industry

Maricopa Association of Governments. Technical Memorandum No. 1 INFRASTRUCTURE DEVELOPMENT COSTS. August 2001

University of Iowa Main Power Plant 2008 Flood Preparations, Event, & Recovery

POSITION DESCRIPTION NORTHFIELD PUBLIC SCHOOLS September 2007

CHAPTER 7: SUBDIVISION CONSTRUCTION, INSPECTION AND BONDING Subdivision Improvement Performance Bond Requirements

REQUEST FOR QUALIFICATIONS/PROPOSALS (RFQ/P) FOR COMMERCIAL PROPERTY MANGEMENT SERVICES FOR 3737 MAIN STREET GROUND FLOOR COMMERCIAL

Commission Districts Affected Facilities and Transportation Services Department

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

8.0 Construction Cost Estimates

Supermarket / Retail Safety Solutions

Department Store Storage Areas

How to Estimate the Cost of a Clean Room and Data Center Equipment Electrical Work. Section 2 Types of Methods of Measurements page 4

Cover Page page 1. Table of Contents page 2. Section 1 Introduction page 3. Section 2 Variable Air Volume System Components page 4

Introduction to Process Engineering Economics. based on size of major equipment items allow to decide whether to invest in a detailed study

ACTIVITY NAME. Training Requirements for Spill Prevention Control and Countermeasures (SPCC) 40 CFR Part 112 Naval Air Station Corpus Christi Texas

Routine Maintenance and Inspection

SUBSTANTIAL IMPROVEMENT/DAMAGE NOTICE TO PROPERTY OWNERS

Electrical. This section applies to the design and installation of building power distribution systems.

Historic Flood Impact on the Nashville Drinking Water System. Scott Potter, Director Metro Water Services, Nashville, TN

CITY OF LOS ANGELES PERSONNEL DEPARTMENT CAREER OPPORTUNITIES FOR MECHANICAL HELPER

AVAILABLE WORLD CLASS AIRCRAFT MANUFACTURING & MAINTENANCE COMPLEX. 46,000 + to 1,200,000 + SF Available

PLANT OPERATIONS STRATEGY & FEE UPDATE MARCH 26, 2010

Lower Level (Level L) Exhibit Halls A, B & C

NATIONAL REACH LOCAL TOUCH

TRAINING SPCC/SWPP Training UGA. Automotive Center. Campus Transit

FACILITIES PLANT OPERATIONS SERVICES

SUPPLEMENTAL SPECIFICATIONS CROSS SLOPE VERIFICATION:

WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE

BUILDING PERMITS. Santa Rosa County Building Inspection

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION

Upper Occoquan Service Authority Centreville, Virginia A Case Study

INVITATION TO BID. Contractor Services Associated with:

Design Criteria & Service Goals

LAKES REGION SANITARY DISTRICT COST REIMBURSEMENT PROGRAM FOR THE INSTALLATION OF OVERHEAD SEWERS OR BACKFLOW PREVENT DEVICES

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water

Services outsourced in 2013 to a third-party firm (not including parts, equipment purchased). Type of Service

Transcription:

FOR: DEPT: DPU/Water Reclamation DATE: 6/10/14 Article 2.3 Final Design Elements 2.3. A, HVAC System 2.3. B, Blower Intake 2.3. C, Filter System 2.3. D, Bridge Crane 2.3. E, Final Cost Estimate 2.3. Design Memorandum 2.4. Bidding Services Total Design Cost Final Design City of Toledo Bid Sheet BLOWER BUILDING AND VENTILATION IMPROVEMENT NO. 55B Material Number Article 2.2 Preliminary Design Report 2.2. A, HVAC System 2.2. B, Blower Intake 2.2. C, Filter System 2.2. D, Bridge Crane 2.2. E, Preliminary Cost Estimate Total Preliminary Design Cost Article 2.7 Office Engineering during Construction A. Contract Management B. Submittal Review and Approval C. Change Orders D. Project Start-up G. As-built Drawings Total for Office Engineering Visison Design Group, LLC $ N/A Estimated Hours Total Cost Estimated Hours Total Cost Estimated Hours Total Cost Estimated Hours Total Cost Estimated Hours Total Cost 1 328 $ 36,801.60 440 $ 49,368.00 256 $ 28,723.20 2 3 4 5 Total Project Cost* Multiplier; Indirect labor Multiplier; Profit & Overhead Total Multiplier $ 137,871.36 3.0

No Bidders City of Toledo Bid Sheet FOR: SEVERN TRENT CHLORINE SYSTEM PARTS AND SERVICES DEPT: DPU/WATER RECLAMATION DATE: 6/10/14 Material Description Supply Severn Trent parts, components and services for the Chlorine System. Material Mark-up % over cost Labor Rate $ per hour Other Charges Material Mark-up % over cost Labor Rate $ per hour 1 2 Other Charges Material Mark-up % over cost Labor Rate $ per hour 3 Other Charges

CITY OF TOLEDO BID SHEET FOR: JANITORIAL SERVICES FOR DOWNTOWN BUILDINGS DEPT: DPS/FACILITY AND FLEET DATE: 6/10/14 S & R Cleaning and Recovery Job1USA Extreme Detail Cleaning and Construction Service $ N/A $ N/A $ N/A $ N/A $ N/A GDI Omni Kynard Enterprises Item Number Detailed Description 1 2 3 4 5 6 SAFETY BUILDING 1 Housekeeping Task Total Monthly Hours: 480 563 490 Flat Rate for Monthly 550 Janitorial N/A (Rate is based on Labor Hourly Rate for tasking: $ 20.00 $ 16.92 $ 17.50 $ 19.70 $19.00 per hour) Total Monthly Cost: $ 9,600.00 $ 9,525.96 $ 8,575.00 $ 10,835.00 $8,600.00 Fixed Flat Rate 2 Hourly labor costs for emergency non-scheduled services or for additional work with tasking of light bulb changing, sidewalk snow removal and salting near buildings. Extra labor for flood clean-up. City will honor labor laws for overtime and any material expenses. This is not a substitute for major flood/fire restoration work by licensed contractors. Straight time hourly rate: $ 25.00 $ 16.92 $ 25.00 $ 19.70 $ 20.00 3 Submit square foot cost to clean carpeting per specifications and general guidelines. Carpet Cleaning (per square foot): N/A $ 16.92 $0.22 per sq ft $ 0.07 $ 4 Submit square foot cost to strip/wax hard floor surfaces per specifications and general guidelines. (OT $21.26)

Hard Surface Flooring (per square foot): N/A N/A $0.22 per sq ft $ 0.35 $ 5 Submit cost of emergency cleaning needs of body fluid, including cost of required sanitizing kit for each occurrence. Emergency Cleaning of Body Fluids: $ $16.92 + $15.75 for kit $25.00 per hour + $25.00 kit $ 25.95 $ REGIONAL CRIMINAL JUSTICE CENTER 1 Housekeeping Task Total Monthly Hours: $ 490.00 606 747.5 Flat Rate for Monthly 575 Janitorial N/A (Rate is based on Labor Hourly Rate for tasking: $ 20.00 $ 16.92 $ 17.50 $ 19.70 $19.00 per hour) Total Monthly Cost: $ 9,800.00 $ 10,253.52 $ 13,081.25 $ 11,327.50 $8,200.00 Fixed Flat Rate 2 Hourly labor costs for emergency non-scheduled services or for additional work with tasking of light bulb changing, sidewalk snow removal and salting near buildings. Extra labor for flood clean-up. City will honor labor laws for overtime and any material expenses. This is not a substitute for major flood/fire restoration work by licensed contractors. Straight time hourly rate: $ 25.00 $ 16.92 $ 25.00 $ 19.70 $ 20.00 3 Submit square foot cost to clean carpeting per specifications and general guidelines. Carpet Cleaning (per square foot): N/A N/A $0.22 per sq ft $ 0.07 $ 4 Submit square foot cost to strip/wax hard floor surfaces per specifications and general guidelines. Hard Surface Flooring (per square foot): N/A $ 0.24 $0.22 per sq ft $ 0.35 $ 5 Submit cost of emergency cleaning needs of body fluid, including cost of required sanitizing kit for each occurrence.

Emergency Cleaning of Body Fluids: $ $16.92 + $15.75 for kit $25.00 per hour + $25.00 kit $ 25.95 $ 1 Housekeeping Task ALARMS BUILDING Total Monthly Hours: 86 130 53.5 Flat Rate for Monthly 160 Janitorial N/A (Rate is based on Labor Hourly Rate for tasking: $ 20.00 $ 16.92 $ 17.50 $ 19.70 $19.00 per hour) Total Monthly Cost: $ 1,720.00 $ 2,199.60 $ 936.25 $ 3,152.00 $2,000.00 Fixed Flat Rate 2 Hourly labor costs for emergency non-scheduled services or for additional work with tasking of light bulb changing, sidewalk snow removal and salting near buildings. Extra labor for flood clean-up. City will honor labor laws for overtime and any material expenses. This is not a substitute for major flood/fire restoration work by licensed contractors. Straight time hourly rate: $ 25.00 $ 16.92 $ 25.00 $ 19.70 $ 20.00 3 Submit square foot cost to clean carpeting per specifications and general guidelines. Carpet Cleaning (per square foot): N/A N/A $0.22 per sq ft $ 0.07 $ 4 Submit square foot cost to strip/wax hard floor surfaces per specifications and general guidelines. Hard Surface Flooring (per square foot): N/A $ 0.24 $0.22 per sq ft $ 0.35 $ 5 Submit cost of emergency cleaning needs of body fluid, including cost of required sanitizing kit for each occurrence. Emergency Cleaning of Body Fluids: $ $16.92 + $15.75 for kit $25.00 per hour + $25.00 kit $ 25.95 $ RIVERSIDE CONCOURSES 1 Housekeeping Task

Total Monthly Hours: No Bid 34 280 Flat Rate for Monthly 40 Janitorial N/A (Rate is based on Labor Hourly Rate for tasking: No Bid $ 16.92 $ 17.50 $ 19.70 $19.00 per hour) Total Monthly Cost: No Bid $ 575.28 $ 4,900.00 $ 788.00 $750.00 Fixed Flat Rate 2 Hourly labor costs for emergency non-scheduled services or for additional work with tasking of light bulb changing, sidewalk snow removal and salting near buildings. Extra labor for flood clean-up. City will honor labor laws for overtime and any material expenses. This is not a substitute for major flood/fire restoration work by licensed contractors. Straight time hourly rate: No Bid $ 16.92 $ 25.00 $ 19.70 $ 20.00 3 Submit square foot cost to clean carpeting per specifications and general guidelines. Carpet Cleaning (per square foot): No Bid N/A $0.22 per sq ft $ 0.07 $ 4 Submit square foot cost to strip/wax hard floor surfaces per specifications and general guidelines. Hard Surface Flooring (per square foot): No Bid $ 0.24 $0.22 per sq ft $ 0.35 $ 5 Submit cost of emergency cleaning needs of body fluid, including cost of required sanitizing kit for each occurrence. Emergency Cleaning of Body Fluids: No Bid $16.92 + $15.75 for kit $25.00 per hour + $25.00 kit $ 25.95 $

City of Toledo Bid Sheet Carus Corporation FOR: 135 TONS (MORE OR LESS) BULK POTASSIUM PERMANGANATE DEPT: DPU/Water Treatment DATE: 6/10/14 $ 5% Price per Unit to Minimum Order Qty Include Delivery Price per Unit to Minimum Order Qty Include Delivery Price per Unit to Minimum Order Qty Include Delivery Price per Unit to Minimum Order Qty Include Delivery Price per Unit to Minimum Order Qty Include Delivery Material Number NSF/ANSI 60 certified chemical used in the treatment of drinking water. 1 45,000 lbs $5,000.00/ton 2 3 4 5 Delivery of each load will be made in calendar days fropm date of notice to ship 7 Trade Name of Materials CAIROX Potassium Permanganate Guarnateed Analysis of KMn04 Discount for prompt payment % 30 days 97% 0

CITY OF TOLEDO BID SHEET FOR: RESERVOIR AND CONDUIT IMPROVEMENTS DEPT: DPU/WATER TREATMENT DATE: 6/10/14 A.A. Boos & Sons $ 5% Price per Unit to Inlcude Price per Unit to Inlcude Price per Unit to Inlcude Price per Unit to Inlcude Price per Unit to Inlcude Price per Unit to Inlcude Delivery as noted Delivery as noted Delivery as noted Delivery as noted Delivery as noted Delivery as noted Item Number Detailed Description 1 2 3 4 5 6 1 Dive Inspections & Report $ 30,000.00 2 Transfer Conduit Repair $ 20,000.00 3 Conduit Repairs Near Gate #5 $ 12,000.00 4 Conduit Construction Joint Repair North of East Reservoir Weir $ 12,000.00 5 Conduit Construction Joint Repair North of East Reservoir Gate $ 21,126.00 6 Reservoir Top Slab Repairs $ 100,000.00 7 Column Repair $ 10,000.00 8 Access Hatch Repairs $ 296,000.00 9 Elevated Tank Concrete Pier Repair $ 10,000.00 10 Peripheral Drain Pumping Station Repair $ 100,000.00 11 Contingency Allowance (per Section 01019) $ 40,000.00 12 Grand Total $ 651,126.00

FOR: CITY OF TOLEDO BID SHEET WATER TREATMENT PLANT THM ANALYZER DEPT: DPU/WATER TREATMENT DATE: 6/10/14 Bissnuss, Inc. $ 2,550.00 Unit Price to Include Delivery Unit Price to Include Delivery Unit Price to Include Delivery Unit Price to Include Delivery Unit Price to Include Delivery Item Number Detailed Description 1 2 3 4 5 6 10026808 THM Analyzer $51,000.00 Unit Price to Include Delivery