MAXIMO SCHEDULER 7.5.1 Bouke Spoelstra



Similar documents
Maximo Scheduler Update

Configuring the Optimization Server

Mastering Microsoft Project 2013

NE-50413B Mastering Microsoft Project 2010

Mastering Microsoft Project 2013 Course: 55054A Course Length: 3 Days

Mastering Microsoft Project 2010

Project Management: Intermediate Microsoft Project 2010

Administration. Welcome to the Eastwood Harris Pty Ltd MICROSOFT PROJECT 2010 AND PMBOK GUIDE FOURTH EDITION training course presented by

Infor LN Service User Guide for Service Scheduler Workbench

Improving Offshore Supply Chain by Predictive Asset Management Making Smarter Business Decisions

Scheduling Document Creation

FIELDAWARE PRO. Cloud-based, made for mobile field service automation solution for small and medium-sized businesses. KEY FEATURES

OVERVIEW. Microsoft Project terms and definitions

The Art of the Possible Scheduling Options in SAP. Mark W. Scott Vesta Partners, LLC

Mastering Microsoft Project B; 3 days, Instructor-led

Getting Started With Mortgage MarketSmart

IBM Tivoli Software. Document Version 8. Maximo Asset Management Version 7.5 Releases. QBR (Ad Hoc) Reporting and Report Object Structures

Oracle Utilities Work and Asset Management

Mastering Microsoft Project 2013

ViryaNet Service Scheduler

Dare to be one step ahead

IBM Tivoli Software. Maximo Business Intelligence Work Packs. Workorder, Asset Failure, Asset and Inventory Management

MAXIMO Project Manager User s Guide

Penn State University (PSU)

IBM Tivoli and Maximo Asset Management Development Update & Maximo 7.1 Preview

Smarter Infrastructure Instrumented, Interconnected, Intelligent... Patterns of Innovation

SAP Multiresource Scheduling Solution Brief. Aug / 2015

Software Development & Education Center. Microsoft Office (Microsoft Project 2010)

Module A2 Item Activities, Gantt Chart and Utilization Sheet

PSA 2015 Step by Step Guide is published by Assistance Software. All rights reserved. No part of this publication may be Projects reproduced.

Project Management within ManagePro

Dispatch Board Maintenance. User Guide

Microsoft Project 2007 Level 2: Working with Resources and Managing a Project

QAD Usability Customization Demo

LONG INTERNATIONAL. Long International, Inc Whistling Elk Drive Littleton, CO (303) Fax: (303)

Beginning Microsoft Project

Table of Contents. Part I Welcome. Part II Introduction. Part III Getting Started. Part IV The User Interface. Part V Quick Start Tutorials

Non-Profit Solution for Microsoft Dynamics CRM

Microsoft Project 2010 builds on the Microsoft Project 2007 foundation with flexible work management solutions and the right collaboration tools for

FieldEZ for Oil and Gas

USER CONVERSION P3, SURETRAK AND MICROSOFT PROJECT ASTA POWERPROJECT PAUL E HARRIS EASTWOOD HARRIS

User Guide for TASKE Desktop

Sun Bear Marketing Automation Software

CREATING EXCEL PIVOT TABLES AND PIVOT CHARTS FOR LIBRARY QUESTIONNAIRE RESULTS

QAD Field Service Scheduler Demonstration Guide. May 2015 EE2015

At the top of the page there are links and sub-links which allow you to perform tasks or view information in different display options.

PEOPLESOFT MAINTENANCE MANAGEMENT

The Rehab Documentation Company, Inc. 12/8/11. ReDoc Scheduler. User Guide

MAXIMO 7 TRAINING GUIDE INVENTORY MANAGEMENT FLORIDA INTERNATIONAL UNIVERSITY NE 1 st Ave M1008 Miami, FL 33137

Project Creation and Gantt Chart Design Using Microsoft Project. R. Baker. The University of Tampa

Module 1 Concept & Navigation

WEBTIME CLEARING HOUSE Version 7.1.4

Access to a unified real-time solution enables your company to make informed decisions and maximize profitability.

Microsoft Access 2010 handout

Advanced Planning and Scheduling

Tracking Project Progress

OmniPlan for Mac Reviewer s Guide

Add Feedback Workflow

ELECTRO-MECHANICAL PROJECT MANAGEMENT

Sage CRM 7.3 Release Preview

Artemis project management tools for SW development project managers

Penn State University (PSU)

Resource Scheduler 2.0 Using VARCHART XGantt

Planning and Managing Projects with Microsoft Project Professional 2013

Search help. More on Office.com: images templates

ORACLE MANUFACTURING EXECUTION SYSTEM FOR DISCRETE MANUFACTURING

Getting Started Guide

MICROSOFT OFFICE ACCESS NEW FEATURES

Microsoft Visio 2010 Top 10 Benefits

Realizing the Benefits of Finite Capacity Scheduling to Manage Batch Production Systems

Microsoft Project Server 2013

Plugin for Microsoft Dynamics CRM For On Premise and Online Deployments. User Guide v. 2.3 April 2015

ACS Version Accounts Payable

Welcome to ComputerEase 10.0

IBM Maximo for Service Providers:

Zoho CRM. Getting Started. Guidelines for Beginners

Excel 2010: Create your first spreadsheet

CMMS/EAM. Maintenance Solutions

User Guide QAD Field Service Scheduler

PROJECT MANAGEMENT HANDBOOK, PART 1 - ISSUES COMMON TO ALL PROJECT MANAGERS. Table of Contents. Introduction Why Do We Need Schedules?...

PERCEPTION PERT-PAC Using Microsoft Project 2000

The power to transform your business

SAS BI Dashboard 4.4. User's Guide Second Edition. SAS Documentation

NEW FEATURE OVERVIEW SPRINGCM S APPROVAL WORKFLOW TOOL (AKA ROUTING AND APPROVAL WORKFLOW)

Get more from Microsoft Dynamics AX with Maintenance Management from HSO

MAXPANDA CMMS Simple yet Perfect

Pastel Evolution BIC. Getting Started Guide

Technisoft Service Manager

Model Simulation in Rational Software Architect: Business Process Simulation

NICE BACK OFFICE SOLUTIONS. Improve the Efficiency and Effectiveness of Your Back Office Operations. Insight from Interactions

Release Notes DAISY 4.0

Oracle Primavera P6 Reporting & Analytics. Stefano Lentini Oracle Primavera Senior Sales Consultant

QUICK START GUIDE RESOURCE MANAGERS. Last Updated: 04/27/2012

Transcription:

MAXIMO SCHEDULER 7.5.1 Bouke Spoelstra 1

Topics To Be Covered Scheduler - Our revised view of Work Management Licensing & Pricing Target Markets & Differentiators Detailed Functionality by Role Key Contacts 2

Scheduler Revised Approach to Work Management Scheduler is now not just a planning & scheduling tool! It is a means for simple labor assignments to be made It is a Dispatching application where the location of Crews and Labor, and the progress of work can all be monitored It is Maximo Everyplace templates designed to make the job of the field technician all that much easier 3

4 Roles That We Now Accommodate in Managing the Schedule Scheduler/Planner Defines and adjusts labor/crew availability along with resource leveling Capacity Planning Assigns work orders to resources Continuously optimizes the schedule as the operational environment changes Sequence and route work assignments based on geography Dispatcher Monitor field resources and work order progress and status Monitor the location of field resources compared to open orders Enter status and complete work orders on behalf of technicians who don't have mobile devices Sequence and route ongoing work assignments based on geography and optimization Field Technician Supervisor approves and assigns work on mobile devices Receive work orders in the field and provide real time status updates to dispatch Complete, edit and approve work orders on mobile devices along with viewing work on a map with optimal driving directions Notify dispatch of potentially dangerous situations, incomplete work

Maximo Scheduler Target Markets Maximo s strength has always been in organizations seeking a single product to maintain their assets across all asset classes! Utilities Manufacturing Facilities Federal, State, & Municipal gov ts Oil & Gas Service Providers These same organizations desire a single product to create: an optimal schedule that is meaningful and achievable Quick, easy to perform, and reliable labor assignments Be aware of Crew and Labor location, sequenced dispatched work, and be able to effectively deal with new incoming work Provide field technicians with a dynamic route of daily work, directions to work locations, a view of nearby work and co-workers, and a means to manage their work, all on a mobile device 5

What Makes Up Scheduler 7.5.1 IBM is investing in the natural evolution of products in a direction desired by our customers Enhancements to Scheduler Graphical Assignment/Dispatching Provision of standard Work Order actions Additional Resources Assets/Locations Labor Tools Materials Schedule Compliance Enhancements to Maximo Service Addresses Public Map UI Control Crews Maximo Everyplace role based templates All included as Maximo Scheduler 7.5.1 6

7 What is Maximo Scheduler? Maximo Scheduler is an add-on product to Maximo Is installed when Maximo 7.5 is installed Maximo Scheduler Enabled by the Scheduler license key

8 Our Work Management Focus Areas Capacity Planning Resource Optimization Assignment Dispatching Real-time Communication Forecast Work Identify Resource Gaps Availability: Assets Location Material Tools Labor/Crews Resource Leveling Graphical UI Labor and Crews Graphical UI Public Map Control Route Optimization Labor and Crews Assign Emergency Work Communication To Field Technicians Schedule Compliance

9 Time Phased Functional Utilization PM Application Scheduler and Graphical Assignment Graphical Assignment Everyplace Applications Forecast Schedule Dispatch Mobile PM Forecasting Capacity Planning Resource Optimization Dispatching Field Technician Years to Months Months 1-7 Days 1-3 Days

10 Logical Work Management Hand Off Scheduler Create Schedule Forecast Work, Resource Demand / Availability Graphical Assignment Make Assignments View availability (incl. breaks, vacation), Validate Craft/Skill, Dispatching Assigned Routes visible &editable in a map Assign new work based on crew proximity Communication Field tech can view assigned route & work Update work status & progress

Maximo Scheduler s Roots Are Deep 11

12 Maximo Scheduler s Pedigree Gantt View to visualize work orders and tasks - Drag & drop work orders & tasks - Manage dependencies - Perform CPM - View resource load and availability Scheduler 7.1 Work Orders - Date constraints - Task dependencies Scheduler 7.1.1 Gantt View to visualize PM forecasts - View and manage future PMs and Work Orders - View resource load and availability for both future PMs and Work Orders Work Orders - Bulk Reschedule - Assignment Manager tab in Work Order application

Precedence Logic and Activity Constraints Precedence logic added between work orders/tasks that have the same parent SNE/FNL date constraints calculated automatically from JP/PM offsets 13

PM Forecasting Generate a forecast based on the PM details. Allow a means to modify forecasted dates and have Maximo use the dates when generating PM based work orders. PM Forecast dates are graphically displayed in the Maximo Scheduler Gantt chart. 14

15 Maximo Scheduler 7.5.1 Focus Detailed Functional Features by Role

The Planner & Scheduler 16

Schedule Compliance The ability to show Target, Scheduled and Actual Dates on the Gantt chart Allows Planners & Schedulers to get a view of how work is progressing, and the affect of the progress on related work 17

Load and Availability Additional resource types Provides the Planner & Scheduler with the view of factors critical to achieving a realistic schedule Craft, Labour, Crew Types, Tool Items Availability automatically derived for craft and crew in plan 18

Location and Asset Availability New actions added to Locations and Assets applications Define and manage Maintenance/Operational Schedules (single or sets of schedules) Eliminates the chance of a Planner & Scheduler setting work to be done when the Asset/Location is not available (i.e. Asset in a production run, or Maintenance not available) 19

Asset & Location Availability 20

21 Material Availability Other Resource Availability tab shows: Maintenance/Operational/Calendar availability of Asset and Location Material Availability for planned materials Shows required quantity vs available quantity Green bar shows materials are available, red bar shows materials are unavailable Planners & Schedulers know when not to schedule work based on material availability

Group by Work Property Group By Asset, Job Plan, Location, PM, Priority or Work Type Allows the logical grouping of work to recognize trends, ensure schedule suitability 22

Work Order Actions Additional Actions and Buttons Allow status changes on multiple work orders/tasks Additional Toolbar Buttons Zoom to Week Go To Day Constrain horizontal scrolling to the date range containing work Filter resources based on selected work orders Show/Hide Compliance Full Screen 23

Work Cost Tab Calculate costs within schedule by week, month and year Illustrate Committed and Saved Estimated Labor, Materials, Services and Tools, as well as Actual Labor, Materials, Service and Tools Allows budget adherence 24

Compliance Tab Measure Planned Hours against Actual Hours for a period Illustrates a Compliance Factor Cron task(s) automatically calculate plan/actual hours at specified frequency 25

Making Labor Assignments With Graphical Assignment 26

Graphical Assignment New application aimed at the process of assigning work to people Similar UI to Scheduler Gantt view for consistency Helps the Planner & Scheduler see non work time for a resource, as well as assignments made by other Foremen beyond the bounds of their schedule eliminates duplicate labour assignments 27

Allows the Foreman to: Making an Assignment Split Work According to Shifts, might be used if extending duration of the assignment across an end of shift Split Work, once split can drag second assignment to add a time gap Split Work into Three Records, creates two additional assignments Create Assignment Delete Assignment 28

The Dispatcher 29

Dispatch View Dispatcher views the map with applicable Crew or Resource routes as defined by assignments. View each Crew or Resource calendar Calendar View Map View 30

Dispatch Calendar View Assist the Dispatcher by allowing to: Highlight resources to focus upon View travel time between work locations Know when scheduled work breaks are set to occur 31

Dispatch Map View Show each sequence of assignments and relative location for ach Labor or Crew View nearby Crews and Resources, unassigned work, prioritized work, 32

33 Labor & Crew Geolocation Tracking Browser geolocation API tracks the user Allows Dispatcher to know the location of all resources and/or Crews allows for making better dispatching decisions Red last update accuracy is over the limit Blue when last update was within 60 mins Yellow last update outside 60 mins

Map Tools Provide Visibility Provide Dispatchers with visibility to allows supreme decision control Full screen, My location, layers, symbology selection, route directions, refresh, unassigned work orders and nearby labor & crews New tools specific to customers business requirements can be added by customization Nearby Labors & Crews Unassigned Work Orders 34

35 Map Symbology Selection Layers are added depending on what is on the map Each layer has its own symbology configuration

The Mobile Field Technician 36

37 Revise the Technicians View A new mobile application for the field technician New Maximo Everyplace applications created for the field technician View current and sequenced assignments on map as sent by the Dispatcher Designed for Crew or single resource use Obtain directions to work locations View and feedback on Work Order details See location of nearby Crews or resources Pick up unassigned work from the map when opportunity presents itself Leverage the existing Maximo Everyplace product Application Designer provides ability to tailor existing templates or create your own Automatic updates of sequenced work reflecting newer higher priority work, reassignments, emergencies Applications for Supervisor, and Technician (Lite, Phone and Tablet versions)

38 Field Technician Application Field Technician s Work Order Route

39 Field Technician Application My Work Field Technician s Street Level Route Field Technician s Material Requirements Field Technician s Tool Requirements

40 Field Technician Application Details Toolbar Actions: Query Tools New / Follow-up Work Order Status Change Stop / Start Timers Attach Documents View work order details

41 Field Technician Application Resources Planned Materials, Tools and Labor/Crews

42 Field Technician Application Results Reporting of Work Order Results

Field Technician Application Time Reporting 43

The Summarized Work Management Vision Use Maximo Scheduler to: Find the optimal time to schedule upcoming work by balancing: Work order and Task relationships and constraints Labor, Asset, Location, Craft, and Material availability Drag and drop labor assignments (or automate) Increase the visibility of resources and crews by: Leverage map UI control for dispatching of incoming work Monitor progress of existing work Manipulate crew and resource routes Improve efficiency of field technicians Leveraging map UI control for viewing of route stops Dynamic work list based on dispatched work and automated optimization Communication with neighboring resources Intuitive feedback from mobile applications 44

Where Maximo lead: Differentiators Maximo Scheduler provides access to world class EAM application without integration. Other products require costly and complex integration which must be maintained over time. Clear visibility of critical factors influencing the creation of a good schedule Asset and Location availability Material availability Tool availability Labor vacation and other non work time Simple integration to Production schedules Maximo Scheduler is an add-on product to Maximo, so customers can obtain desired enhancements at a much lower price point. Maximo customers indicated that they do not want the complexity of true Field Service Management vendor products 45

Licensing Licensing Maximo Asset Management Scheduler 7.5.1 is a Maximo add-on Sold as Authorized User only User must have license entitlement to Maximo as well (i.e. Authorized User or Limited Use Authorized User) A Scheduler license is required for anyone occupying any of the roles Any user occupying more than one role (i.e. Planner and Dispatcher) requires only one Scheduler license Maximo Everyplace Users do not need a Scheduler license to leverage the Everyplace field technician templates (i.e. if the customer has purchased any number of Scheduler licenses, then any licensed Everyplace user does not require a Scheduler license to use the new templates) 46

Questions 47