Application of Time Management Tools and Techniques by Construction Industry Players: A Comparative Study between Kedah and Kelantan



Similar documents
Relationship between Factors of Construction Resources Affecting Project Cost

IJSRD - International Journal for Scientific Research & Development Vol. 3, Issue 10, 2015 ISSN (online):

ALGORITHM FOR DETERMINING CONTROLLING PATH CONSIDERING RESOURCE CONTINUITY

Chapter 9 Computer Scheduling Projects should be scheduled one byte at a time

Use project management tools

Time Management. Part 5 Schedule Development. Richard Boser

The management of the projects with MS Project

Operational Research. Project Menagement Method by CPM/ PERT

Goals of the Unit. spm adolfo villafiorita - introduction to software project management

Amajor benefit of Monte-Carlo schedule analysis is to

Programmes. Unit 3: P lanning construction work processes and efficient use of resources in construction and the built environment.

Project Planning and Scheduling

Graphical Project Planning Techniques: An Overview of Gantt, PERT, and CPM Charts Prepared for groups in ECE480 1/6/02, D. Grover

Schedule Risk Analysis Simulator using Beta Distribution

Engineering and Construction

PROGRAMMING TECHNIQUES. Chapter 5(Part 2)

LONG INTERNATIONAL. Long International, Inc Whistling Elk Drive Littleton, CO (303) Fax: (303)

Project Time Management

Project Scheduling and Gantt Charts

VisPMIS: A VISUAL PROJECT MANAGEMENT INFORMATION SYSTEM

5. Creating a Gantt Chart

Microsoft Project 2010

A CONSTRUCTION SCHEDULE CONTROLLING SYSTEM USING WEB-BASED KNOWLEDGE TECHNOLOGY. Will Y. Lin(a) and H. Ping Tserng(b)

8. COMPUTER TOOLS FOR PROJECT MANAGEMENT

Review on Using Packages to Enhance the Teaching of Critical Path Networks

Keywords: Programming, planning, linear work, civil engineering, time chainage, 4D, virtual reality.

Project Planning. Lecture Objectives. Basic Reasons for Planning. Planning. Project Planning and Control System. Planning Steps

CDR.07. CPM Scheduling and How the Industry Views Its Use

DEVELOPMENT OF A DISTRIBUTED CONSTRUCTION PROJECT MANAGEMENT GAME WITH COTS IN THE LOOP

SE351a: Software Project & Process Management

A SYSTEMATIC APPROACH FOR MONITORING AND EVALUATING THE CONSTRUCTION PROJECT PROGRESS

ANT COLONY OPTIMIZATION ALGORITHM FOR RESOURCE LEVELING PROBLEM OF CONSTRUCTION PROJECT

Project Management Tools

CRASHING-RISK-MODELING SOFTWARE (CRMS)

Mastering Microsoft Project 2010

Chapter 2: Project Time Management

Software Application: Information System Elements. Project Management in Information Technology (IT) Projects. Project Scheduling basics

Mastering Microsoft Project B; 3 days, Instructor-led

Microsoft Project Activity

Oracle Primavera P6 Enterprise Project Portfolio management Overview Programme Reference # 201A

Demonstrate and apply knowledge of project management in

Comparative Resource Scheduling Using Various Software Packages

The Project In the beginning was The Project, and then arose the Assumptions.! And The Project was without form and the Assumptions were void.

CISC 322 Software Architecture. Project Scheduling (PERT/CPM) Ahmed E. Hassan

OVERVIEW. Microsoft Project terms and definitions

USER CONVERSION P3, SURETRAK AND MICROSOFT PROJECT ASTA POWERPROJECT PAUL E HARRIS EASTWOOD HARRIS

STUDY ON APPLICATION OF GENETIC ALGORITHM IN CONSTRUCTION RESOURCE LEVELLING

Appendix A of Project Management. Appendix Table of Contents REFERENCES...761

A Comparison Study Between Event Chain Methodology And Critical Path Method In The Construction Industry

Chapter 6: Project Time Management. King Fahd University of Petroleum & Minerals SWE 417: Software Project Management Semester: 072

Chapter 6: Project Time Management

Activity Networks And Gantt Charts

NE-50413B Mastering Microsoft Project 2010

Pearson Education Limited 2003

A Proposal for Constructing Relational Database from Class Diagram

INTRODUCTION TO PROJECT MANAGEMENT AND MS PROJECT

Scheduling Resources and Costs

Chapter 1.7 Project Management. 1. Project financing is one of the step of project management- State True or False

Introduction to IT Project Management

Table of Contents Author s Preface... 3 Table of Contents... 5 Introduction... 6 Step 1: Define Activities... 7 Identify deliverables and decompose

Project Management Using Earned Value

TABLE OF CONTENTS CHAPTER DESCRIPTION PAGE

MSP How to guide session 2 (Resources & Cost)

Technology A Risk Prevention / Mitigation Tool

Linear Schedules for Tunnel Projects

CSC 443: IT Project Management Midterm 1 exam - Spring semester March 21 st, 2012

Project and Production Management Prof. Arun Kanda Department of Mechanical Engineering Indian Institute of Technology, Delhi

Importance of Project Schedules. matter what happens on a project. projects, especially during the second half of projects

Module 11. Software Project Planning. Version 2 CSE IIT, Kharagpur

MECH 896 Professional Development for MEng Students. Homework Discussion. Scheduling Overview. Winter 2015: Lecture #5 Project Time Management

ELECTRO-MECHANICAL PROJECT MANAGEMENT

Basic Concepts. Project Scheduling and Tracking. Why are Projects Late? Relationship between People and Effort

Technique (LOBST) for a Real estate sector

Location Based Scheduling In The Form Of Flow Line and Its Comparison to Cpm/Bar Chart Scheduling - doi: / IAU.IJEMME

PROJECT TIME MANAGEMENT. 1 Powered by POeT Solvers Limited

Software Development & Education Center. Microsoft Office (Microsoft Project 2010)

Intelligent Resource Scheduling for Reduced Turnaround Durations. Rob Richards, Ph.D.

Introduction to Project Management ECE 480. Erik Goodman

PLAYING GAMES: EVALUATING THE IMPACT OF LEAN PRODUCTION STRATEGIES ON PROJECT COST AND SCHEDULE

APPLICATION OF PROJECT MONITORING TOOLS FROM OWNER S PERSPECTIVE

Introduction. Project Management in New Zealand

Project Management Glossary

A. O. Odior Department of Production Engineering University of Benin, Edo State.

Tracking Project Progress

Major Characteristics and Functions of New Scheduling Software Beeliner Based on the Beeline Diagramming Method (BDM)

PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT)

Mastering Microsoft Project 2013

Guidance on Critical Path Analysis

COST AND TIME CONTROL OF CONSTRUCTION PROJECTS: INHIBITING FACTORS AND MITIGATING MEASURES IN PRACTICE

Scheduling Glossary Activity. A component of work performed during the course of a project.

Construction Planning, Equipment and Methods ENGI 8749 Fall Semester, 2008 Tutorial #2 Resource Leveling using MS Project

Research Article ISSN: PROJECT MANAGEMENT SOFTWARE- AN OVERVIEW

Module 3: The Project Planning Stage

Critical Path Analysis & PERT Charts (taken from

Laboratory 1 Initiating a Project

added to the task, using Project, it will automatically calculate the schedule each time a new resource is added.

Work Breakdown Structure (WBS)

PROJECT EVALUATION REVIEW TECHNIQUE (PERT) AND CRITICAL PATH METHOD (CPM)

PN /16/ CRITICAL PATH METHOD PROGRESS SCHEDULE

MS Project Tutorial for Senior Design Using Microsoft Project to manage projects

Transcription:

Application of Time Management Tools and Techniques by Construction Industry Players: A Comparative Study between Kedah and Kelantan Ismaaini Ismail 1, Ismail Abdul Rahman 2, Aftab Hameed Memon 3, Ahmad Tarmizi Abd Karim 4 1,2,3,4 Faculty of Civil and Environmental Engineering, Universiti Tun Hussein Malaysia 86400 Parit Raja, Batu Pahat, Johor, Malaysia 1 is_mujahidah@yahoo.com 2 ismailar@uthm.edu.my 3 aftabm78@hotmail.com 4 tarmizi@uthm.edu.my Abstract - Effective time management is very important in determining a success of any project. Thus, without proper controlling of time will cause project delay and consequently budget overrun. There are various techniques and software which can be adopted for controlling time in construction projects. Hence, this study is to assess the mostly applied of various techniques of time managements and software packages applied in Malaysia s construction industry. Data collection was carried out quantitatively using structured questionnaire survey amongst the practitioners involved in construction projects. Average index calculation was employed to assess the level of mostly applied of time management techniques and software packages adopted in construction project. It was found that two mostly applied techniques adopted in Kedah and Kelantan are the same for CPM and Gantt Bar Chart. While the three mostly applied software packages used for time management for both states are Microsoft Project, Microsoft Excel and Primavera. Hence, it is recommended that time management practices need to be investigated in detail to uncover any activity or action which may contribute to time overrun. Keywords: Time management, Time management techniques, Time control Software, Construction Projects. I. INTRODUCTION Time management is an important criterion to ensure the successful completion of projects. Unfortunately, construction industry is experiencing poor time management practices which have resulted in significant amounts of time overrun. These overruns in time have become a global phenomenon. Like other countries, Malaysia is also facing the same problem of time overrun [1], [2] and [3]. Reference [4] also reported that 90% large MARA construction projects are facing time overrun problem since 1980. This time overrun is the result of poor and ineffective time management. Therefore, effective time management is very important as it can help in overcoming this problem of time overrun and achieved completion of construction projects within estimated time. Although there are various methods and software packages developed for time management, however, very rare studies have focused on assessing the effectiveness of these method and packages. Hence, this study focused on the most effective methods used by the respondents. It will help the practitioners in construction to select appropriate technique and software for achieving effective time management and to ensure completion of construction projects on time. However, the scope of this study is limited to Kedah and Kelantan state. II. RELATED WORKS Time management is the application of various methods and techniques to ensure the completion of projects within stipulated time. Without a proper time management, many problems will occur such as extension of time or time overrun which is a common problem in today s construction industry worldwide [1]- [3], [5]-[9]. Time overrun occur when the actual progress of a construction project is slower than the planned schedule [10]. This problem of time overrun can be reduced by effective use of available time management techniques and software packages as discussed in followings sections. A. Time Management Techniques There are several techniques commonly used in construction projects. These techniques have difference 14

function and aim to manage the time in completion of project. It includes: 1) Gantt Bar Chart 2) Critical Path Networks/Method 3) Milestone Date Programming Techniques 4) Program Evaluation and Review Technique (PERT) 5) Elementary Trend Analysis/Line of Balance Method (LOB) 6) Precedence Network Diagram 7) Simulation 1) Gantt Bar Chart Gantt bar chart or Gantt charts are one of the basic scheduling techniques. The chart was developed by Henry L [9]. The technique is widely used for project scheduling and control because of its simplicity, ease of preparation and graphical method. Each activity is shown in its schedule position to give an efficient use of resources, the logic and float are presents by dotted line and important constraints or key dates are clearly marked [11]. 2) Critical Path Networks/Method The critical path method (CPM) emerged in the late 1950s and used to analyze the network to identify critical path(s) and project duration. It was developed as a project management tool to improve scheduling and project administration tasks, supporting project managers to ensure project is completed on time and on budget [12]. 3) Milestone Date Programming Techniques Milestone is a special event that needs an attention in the framework of project management. Milestones do not have durations or resources, but should be considered zero duration activities because that is how they are handled when placed in a schedule and computed with CPM. Besides that, most of the progress shown in the milestone is only on the critical path and ignore noncritical activities. This is to ensure that the milestones of the project are met even when actually some activities are being ignored. 4) Program Evaluation and Review Technique (PERT) PERT was originated by the U.S. Navy in 1958 as a tool for scheduling the development of a complete weapon system [13]. PERT was originally oriented to time elements of a project and it used probabilistic time estimates to aid in determining probability that a project could be completed by a given date [14]. PERT provides a basis to estimate time performance. It also provides an assessment of probability of reaching certain milestones by specified dates or of achieving overall project completion within a specified time period [15]. 5) Elementary Trend Analysis/Line of Balance Method (LOB) According to [16] the line-of balance (LOB) technique is a linear scheduling method that allows the balancing of the operations such as that each activity is continuously and efficiently performed in each consecutive unit. In addition, the method can be used to evaluate interrelationships among a few select activities from a larger group of construction activities included in a network schedule [9]. 6) Precedence Network Diagram Precedence Network Diagram is quite similar with CPM and it also widely used in the construction industry. The technique as first was called circle and connecting line, later the term was changed into activity on node. The arrows used to connecting the nodes where it became a network to define the relationships between the activities [9]. The advantages of this technique are easier to draw and modify, and additional activities can be inserted without changing node reference numbers. 7) Simulation Simulation techniques have been used to predict activity duration and improve planning [17]-[19]. However, the building up of simulation models requires planners to have a good knowledge of simulation. The main strategies in simulation system for modelling construction process are Process Interaction and Activity Scanning [14]. Activity scanning strategy is the focus on identifying the activities and the conditions under which the activities take place [14]. B. Software for Time Management One of the primary advantages of using computers for construction scheduling is that the mathematical computations are instantaneous and errors free. Of these, commonly adopted software packages in construction industry for time control are as follows: 1) Primavera Project Planner 2) Microsoft Project 3) Asta Power Project 4) Microsoft Excel 5) Project Commandar 6) Deltek Open Plan 1) Primavera Project Planner Primavera software products are designed to support the project management needs of organizations that 15

manage large numbers of projects at one time. In generally, their functions are give us detailed overview for projects, help us to control and manage projects time, control and manage projects budget, manage resources and to control risks. The reports generated from Primavera Project Planner can be presented as numbers, PERT, Gantt charts, bar chart and diagrams. 2) Microsoft Project Microsoft Project software is an internal tool to help manage the huge number of projects. The main purpose of this software is to equip project managers with the right set of robust project management techniques and tools required to effectively and efficiently manage projects. Microsoft Project has various features to support project management such as manual scheduling where this features can be used to set task durations and, starts and finish dates with point and click. 3) Asta Power Project Asta Power Project is a professional project management software tool that is specifically designed to plan and deliver projects on time and within budget. In purpose of time planning Asta Power Project provide comprehensive features such as: i) Plan tasks in units from hours, days, weeks, months, years etc. ii) Use sophisticated calendaring to schedule tasks and resources. iii) Use hammocks, multiple links, link types, link categories, task splitting and joining, task positioning etc. to finely tune a plan. 4) Microsoft Excel Microsoft Excel is most popular project management software which is used widely for common information organization and tracking like a list of sales leads, project status reports, contact lists, and invoicing. The function is more to calculation, graphing tools, pivot tables and a macro programming language called visual basic for applications. In Microsoft Excel there various kind of templates that can be use for the project planning such as Excel project management templates, Gantt Chart and project planning, project reporting, Microsoft Excel formulas for project managers and etc. 5) Project Commandar Project Commandar Software is ideal for project and resource planning, job scheduling or departmental. For construction project, this software has claimed as a low cost standard tool for many major companies in UK. This application has combine simplicity of use with advanced features and so it can be use by anyone even people with no experience in project planning. 6) Deltek Open Plan Deltek open plan is an enterprise project management system that substantially improves an organization s ability to complete multiple projects on time and on budget. Deltek open plan also helps to: i) Analyze performance across a program of projects ii) Define project priorities iii) Allocate resource efficiently across the organization iv) Model resource tools and skills III. METHODOLOGY In this study, two methods will be focus which is on the literature review and the questionnaire survey targeted to construction project in Kelantan and Kedah. Besides that statistical methods would be used to analyze the data collection from the questionnaire survey. A total of 100 questionnaire sets were distributed randomly amongst the personnel involved in construction industry who are registered in top 3 classes i.e. G5 to G7 under CIDB and PKK in the Kedah and Kelantan state. As a result 59 responses were received back. The survey was conducted by post, via mail delivery and also by hand method. The questions divided into two parts. The first part is about the demographics that include the information and projects undertaken by the company. Subsequently in part two, respondents were asked about time management tools and techniques. In this section, respondents must be states the technique and also the software package that they use for time control in their project. A 3-point likert scale was used to understand the perception of practitioners as 1 for not effective, 2 for moderately effective, 3 for very effective. Gathered data was analysed using statistical software SPSS and was calculated using average index method (AI). AI will be calculated with following expression: Average Index = (1x 1 + 2x 2 + 3x 3 ) N where, X 1 = Number of respondents for Not Effective X 2 = Number of respondents for Moderately Effective X 3 = Number of respondents for Very Effective N = Number of respondents 16

IV. RESULTS AND DISCUSSIONS The respondents organization characteristic investigated in this study is presented in Table 1. State Table 1: Respondents Organization Category Frequency Percent (%) Kedah 24 41 Kelantan 35 59 Type of organization Consultant 15 25 Contractor 40 68 Client 4 7 Category of organization Private 50 85 Government 5 8 Joint venture 2 3 Others 2 3 Project undertaken Building 30 51 Infrastructure 16 27 Building and Infrastructure 6 10 Others 7 12 Procurement strategy Design and Build 33 56 Turnkey 3 5 Project management 15 25 Others 8 14 Size of project < 1 million 7 12 1-5 million 16 27 6-10 million 10 17 10-50 million 21 36 > 50 million 5 8 Table 1 show that respondents from Kelantan are the majority in this survey with 59% of the total respondents. While, 41% of respondents involved are from Kedah. In term of their organizational type, the respondents in contracting organization are in the majority (68%), followed by those in consulting organizations (25%) and then those in client organizations (7%). The respondents were involved in handling both type of project i.e. building and infrastructure and most of them were from private organization with 85% of respondents. Further, majority (36%) of respondents participating in the survey had experience of handling large projects i.e. projects with contract amount between RM 10-50 Million. The respondents involved in the survey have had several years of experience in handling various types of projects. The characteristics of the respondents participated in survey as summarized in Table 2. Table 2: Respondents Qualification and Experience Category Frequency Percent (%) Experience 0-10 years 46 78 11-20 years 8 14 21-30 years 4 7 > 31 years 1 2 Position Project manager 14 24 Director 13 22 Engineer 19 32 Others 13 22 Qualification Diploma 5 8 Degree 31 53 Master 20 34 Others 3 5 As indicated in table 2, majority (78%) of the respondents have less than 10 years professional experience in construction industry, about 14% had between 11-20 years professional experience and only a few respondents (7%) have experience between 21-30 years and more than 31 years experience only 2% respondents. The table also indicates that 32% of respondents are engineer, 24% are project manager and the position of director and others are 22% respectively. A. Time Management Techniques The survey results on the most time management techniques applied by the respondents are as shown in table 3. Table 3: Effectiveness of time management techniques Time Management Techniques Kedah Kelantan AI Rank AI Rank Gantt Bar Chart 2.00 2 2.43 2 CPM 2.63 1 2.71 1 Milestone 1.79 3 1.86 4 PERT 1.42 4 1.97 3 LOB 1.21 6 1.23 7 Precedence Network Diagram 1.29 5 1.51 5 Simulation 1.13 7 1.43 6 17

According to table 3, the respondents rated Critical Path Method (CPM) is the most effective time management method in Kedah and Kelantan. This indicates that respondents believe that this technique is very effective in controlling and monitoring the progress of construction projects. Coincidently, second most effective method of time management for Kedah and also Kelantan is Gantt Bar Chart. However, third effective technique for Kedah is Milestone while for Kelantan is PERT. The least effective technique of time management is Simulation for the Kedah. However, LOB technique is the least effective technique for Kelantan. B. Software Packages In order to achieve effective time management, there are various software packages available which can facilitate time management effectively. Table 4, shows the survey results on the most time management software applied by the respondents. Table 4: Effectiveness of Time Management Software Software Packages Kedah Kelantan AI Rank AI Rank Primavera Project Planner 1.46 3 1.43 3 Microsoft Project 2.54 1 2.49 1 Asta Power Project 0.71 4 0.63 4 Microsoft Excel 1.88 2 2.34 2 Project Commandar 0.71 4 0.51 6 Deltek Open Plan 0.63 5 0.54 5 Top three software packages used in both states are Microsoft project, Microsoft Excel and Primavera Project Planner. Among these, Microsoft Project is rated as most effective software in time management and control for both Kedah and Kelantan. This may be due to easy and friendly application of the Microsoft project software. The least effective method adopted in Kedah is Deltek Open Plan while Project Commandar is for Kelantan. V. CONCLUSION Selecting suitable and effective time management techniques and software is very helpful in controlling project time. This study assessed the level effectiveness of techniques and software packages for time management applied in construction industry in the Kedah and Kelantan. Two major findings from this study are as follows: a) CPM, Gantt Bar Chart, PERT and Milestone are most commonly adopted and considered very effective in managing construction time. b) Microsoft Project, Microsoft Excel and Primavera are the most common and effective software packages used in construction industry for both states. REFERENCES [1] Hussin, J. M, Abdul Rahman, I and Memon, A. H (2012). The Way Forward in Sustainable Construction: Issues and Challenges.International Journal of Advances in Applied Sciences (IJAAS), Vol. 2 (1), ISSN: 22528814 http://iaesjournal.com/online/index.php/ijaas/arti cle/view/1321 [2] Memon, A.H, Abdul Rahman, I, Abdullah, M.R and Abdul Azis, A.A (2011). Time Overrun in Malaysian Construction Projects: Perspective of Project Management Consultant. Journal of Surveying, Construction and Property, Vol. 2 (1), pages: 54-66. ISSN: 1985-7527. [3] Sambasivan M, Soon Y.W, (2007), Causes and Effects of Delays in Malaysian Construction Industry. International Journal of Project Management 25 (2007) 517 526 [4] Abdullah, M.R, A.H, Rahman, I.A, & Azis, A.A.A (2009). Causes of Delay and Its Effect in Large Mara Construction Project. International Journal of Integrated Engineering. [5] Fugar. F D K and Agyakwah Baah. A B, (2010), Delays in Building Construction Projects in Ghana. Australasian Journal of Construction Economics and Building,pp.103 116. [6] Endut IR, Akintoye A & Kelly J, (2009). Cost and Time Overruns Of Projects in Malaysia. Proceedings of the 2nd Scottish Conference for Postgraduate Researchers of the Built and Natural Environment (PRoBE), Glasgow Caledonian University. Rotterdam (Netherlands) Pp. 243-252 [7] Enshassi A, Al-Najjar J, Kumaraswamy M,(2009). Delays And Cost Overruns In The Construction Projects In The Gaza Strip. Journal of Financial Management of Property and Construction Vol. 14 No. 2, pp. 126-151. [8] Le-Hoai,L, Lee,Y.D., and Lee,J.Y., (2008), Delay and Cost Overruns in Vietnam Large Construction Projects: A Comparison with Other Selected Countries. KSCE Journal of Civil Engineering (2008) 12(6), pp. 367-377 [9] Olawale Y.A & Sun M, (2010), Cost And Time Control Of Construction Projects: Inhibiting Factors and Mitigating Measures in Practice. Construction Management and Economics, vol. 28, pp. 509 526 18

[10] Mahamid I, (2011), Risk Matrix for Factors Affecting Time Delay in Road Construction Projects: Owners Perspective. Engineering, Construction and Architectural Management, Emerald Group Publishing Limited. Pp. 609-617 [11] Smith,N.J. (2002), Engineering Project Management, Second Edition, United Kingdom, Blackwell Science Ltd. [12] Kim, K. Garza, M.J. (2003), Phantom Float, Journal of Construction Engineering and Management, Vol.129, No. 5: 507-517. [13] Cottrell, D.W. (1999). Simplified Program Evaluation and Review Technique (PERT) Journal of Construction Engineering and Management, Vol.125 No. 1: 16-22. [14] Lu, M. and Abourizk, M.S. (2000) Simplified CPM / PERT Simulation Model Journal of Construction Engineering and Management, Vol.126, No. 3: 219 226 [15] Callahan, T.M., Quackenbush, G.D. and Rowings, E.J. (1992), Construction Project Scheduling. New York: McGraw Hill, Inc. [16] Yang I-T and Ioannou, P.G (July 2004), Scheduling system with focus on practical concerns in repetitive projects, Construction Management and Economics, 22, 619 630. [17] Halpin, D.W., and Riggs, L. S. (1992), Planning And Analysis Of Construction Operations, John Wiley & Sons, Inc., New York, N. Y.,245 [18] Shi J. J., Activity-based construction (ABC) modelling and simulation method, J. Constr. Engrg Mgmt, ASCE, 1999, 125(5), 354 360. [19] Zhang H., Shi J. J., Tam C. M., Iconic animation for activity-based construction simulation, J. Comp. Civil Engrg, ASCE, 2002, 16(3), 157 164. 19