Department of the Interior



Similar documents
Enterprise Records and Document Management System (eerdms) Program Overview

Department of the Interior Privacy Impact Assessment

Enterprise Records and Document Management System (eerdms) Enterprise Form System (EFS) Component System Overview June 27, 2013

Our Hosting Infrastructure. An introduction to our Platform, Data Centres and Data Security.

Chicago 1 (CHI-1) Data Center

Data Center CH1. Elk Grove Village, IL

LDeX Group. Colocation Solutions for High Expectations

X-tier Data Facility. Prepared by X-tier SAE Corporation

Strategic Data Centre Site Profiles Data Centre Co-Location London North

Experience Matters...

Onsite Support: 24/7/365 onsite team. Security: 24/7/365 onsite manned security and CCTV. Monitoring: 24/7/365 Environmental monitoring and management

Global Data Center & Colocation Facilities

INFORMATION MANAGEMENT

AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA)

I. U.S. Government Privacy Laws

LEVEL 3 DATA CENTER SERVICES IN OMAHA, NEBRASKA HIGH AVAILABILITY ENTERPRISE COMPUTING BUSINESS DEMANDS IT. LEVEL 3 DELIVERS IT.

Guide to Information Governance: A Holistic Approach

Location. Central Business District. Ataturk Airport IFC. Sabiha Gökçen Airport

AT&T Internet Data Center Site Specification - Phoenix Area (Mesa, AZ)

DATA CENTERS. VAZATA Headquarters: 6900 Dallas Parkway, Suite 800 Plano, TX VAZATA.COM

August 24, 2012 MEMORANDUM FOR THE HEADS OF EXECUTIVE DEPARTMENTS AND AGENCIES AND INDEPENDENT AGENCIES

About Injazat. Enterprise Cloud Services. Premier Data Center. IT Outsourcing. Learning and Development Services. Enterprise Application Services

How To Visit An Internet Data Center

NORTHERN VIRGINIA ONE (NoVa) DATA CENTER OVERVIEW

INSPECTION CLOUD COMPUTING SECURITY DOCUMENTATION IN THE CYBER SECURITY ASSESSMENT MANAGEMENT SOLUTION

AT&T Internet Data Center Site Specification San Diego Koll (San Diego, CA)

DATA CENTERS. VAZATA Headquarters: 6900 Dallas Parkway, Suite 800 Plano, TX VAZATA.COM

Department of the Interior Privacy Impact Assessment

How To Build A Data Center For Ragingwire

Data Center:Build-to-Suit

September 15, 2014 MEMORANDUM FOR THE HEADS OF EXECUTIVE DEPARTMENTS AND AGENCIES AND INDEPENDENT AGENCIES

File 6: Appendix A, 36 CFR 1234 (formally numbered as 36 CFR 1228 subpart K) Federal Facility Security Standards (version 2.0 issued May 15, 2014)

NY2 21 CRITICAL MEGAWATTS 280,000 SQUARE FEET

Protecting datacenters & mission critical facilities - using IP based systems. Presented by: Jeffrey Lam RCDD Director, Global Accts, Asia ANIXTER

vcloud SERVICE Virtual Tech in partnership with Equinix - vcloud Service

DATA CENTERS. VAZATA Headquarters: 6900 Dallas Parkway, Suite 800 Plano, TX VAZATA.COM

Strategic Data Centre Site Profiles. Data Centre Co-Location London East

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

SWAP EXECUTION FACILITY OPERATIONAL CAPABILITY TECHNOLOGY QUESTIONNAIRE

Contents Error! Bookmark not defined. Error! Bookmark not defined. Error! Bookmark not defined.

AUDIT REPORT. Federal Energy Regulatory Commission s Unclassified Cybersecurity Program 2015

OPERATIONAL CAPABILITY TECHNOLOGY QUESTIONNAIRE

Las Vegas Datacenter Overview. Product Overview and Data Sheet. Created on 6/18/2014 3:49:00 PM

LEVEL 3 DATA CENTER SERVICES IN SAN FRANCISCO HOUSE POWER-INTENSIVE APPLICATIONS AND SUPPORT BUSINESS CONTINUITY

DESIGNATED CONTRACT MARKET OPERATIONAL CAPABILITY TECHNOLOGY QUESTIONNAIRE

Wholesale Data Center Suites Available Now

Appendix G. Security management plan

AT&T Internet Data Center Site Specification New York III (Secaucus, NJ)

Physical Security Assessment Form

NeuStar Ultra Services Physical Security Overview

**MT op» ^chv. Adapted Privacy Impact Assessment. Google Analytics. March 19, Contact

Sovereign. The made to measure data centre

Case Studies: Access Control / CCTV (Security)

AT&T Internet Data Center Site Specification Chicago Area (Lisle, IL)

TONAQUINT DATA CENTER, INC. CLOUD SECURITY POLICY & PROCEDURES. Tonaquint Data Center, Inc Cloud Security Policy & Procedures 1

Site Preparation Management Co., Ltd. March 1st 2013 By Nara Nonnapha, ATD UPTIME

UCS Level 2 Report Issued to

Santa Clara, CA 95054

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Conducting Security System Site Surveys

100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G

Guidance Notes FSR 2014

Ellucian Cloud Services. Joe Street Cloud Services, Sr. Solution Consultant

FACILITY SECURITY CERTIFICATION FORM DOJ SECURITY LEVEL II

Records Management Policy. EPA Classification No.: CIO CIO Approval Date: 02/10/2015. CIO Transmittal No.: Review Date: 02/10/2018

Department of the Interior Privacy Impact Assessment

WEBFIL LIMITED. Your Security Partner

Digital Chicago. 600 south FeDeraL - chicago grand ave - FranKLin ParK 350 east cermak - chicago

Datacentre Studley. Dedicated managed environment for mission critical services. Six Degrees Group

AT&T Internet Data Center Site Specification Dallas Area (Allen, Tx)

Datacentre London 1. Dedicated managed environment for mission critical services. Six Degrees Group

colocation. perfected. Overview

OPERATOR - FACILITY ADDRESS - DATE

Department of the Interior Privacy Impact Assessment Template

MONARCH SECURITY SERVICES, INC.

FROM: Allen Crawley - ~ Assistant Inspector General for Systems Acquisition and IT Security

NY-1 DATACENTER AT A GLANCE. NY-1 is a Tier III-rated, SAS SSAE16 and HIPAA-certified data center

INSPECTION U.S. DEPARTMENT OF THE INTERIOR WEB HOSTING SERVICES

Current as of 11/10/08 1 of 1

KeyLock Solutions Security and Privacy Protection Practices

A. Enhanced Delivery of Information and Services to the Public - Sec. 101, 3602

ISOMEDIA COLOCATION

Supply Chain Security Audit Tool - Warehousing/Distribution

SAP Cloud: Data Center Security SAP Cloud Data Center Strategy and Security Whitepaper

Security Whitepaper: ivvy Products

visit us on the web at:

Nuclear Plant Security Systems

House your data in a building constructed for only one express purpose protect the information inside. Twin Cities East Data

White paper. SAS Solutions OnDemand Hosting Overview

Datacentre South London Data sheet

Transcription:

email, Enterprise Records and Document Management Program Enterprise earchive System Enterprise Content System Enterprise Forms System Enterprise Dashboard System DGI Government U.S. Department Big Data of the Conference Interior 2012 Sensitive but Unclassified For Official Use Only

Program Objective Managing Government Records Directive (OMB M-12-18) Issued August 24, 2012 In support of the November 2011 Presidential Memorandum Managing Government Records, OMB issued Managing Government Records Directive (M-12-18). This Directive requires that to the fullest extent possible, agencies eliminate paper and use electronic recordkeeping and identifies specific actions that will be taken by the National Archives and Records Administration (NARA), the Office of Management and Budget (OMB), and the Office of Personnel Management (OPM) to support agency records management programs. NARA will be issuing further guidance to comply with this directive over the next several months. We are, supporting records for tomorrows workforce 2

Department of the Interior ~90,000 employees 15 main Bureau offices 2,300 office locations ~ 150 Domains One of the largest telework forces 1B IT Budget Diverse mobile workforce $600M IT Transformation & Consolidation Initiative 3

eerdms Program Introduction email, Enterprise Records and Document Management System What is eerdms? An enterprise wide record and document management solution developed to: Centralize departmental records, Provide support for litigation matters, FOIA, and other like functions. Who will benefit from eerdms? Departmental records officers Solicitors Office FOIA Office Office of the Inspector General Other Bureau offices seeking to store and manage official Departmental information 4

eerdms Initiation Why did we invest in eerdms? We invested in eerdms because the Department must have a 21 st century uniform records and information management solution. When will eerdms be available? eerdms went online in 45 days and will be fully integrated in 2012. Who will take advantage of eerdms? eerdms was designed to support the records officers and their respective missions with each Bureau. Users with programs that specifically support records management initiatives can use eerdms and are encouraged to consult their Bureaus records leads. Users or mission leads who may have a need for other supported program functions. 5

Program Capabilities Records Management DoD 5015 v3 Records, Document and Email Archiving/Journaling Records and Document Auto Classification Records and Document Content Management Records and Document Imaging Records and Document Management Records and Document Scanning Records and Document Workflow Records and Document Collaborating Workspaces Records and Document Auditing Records and Document Advanced Early Case Assessment & Review Records and Document Mobility Content Management Section 508 Compliance out of the box Optional: Advanced Legal Review, Social Media Capture, Email Management, National Shredding Program & National Digitization Program, Migration Services and Support Staff Services. 6

How Much Data? Undertaking one of the largest erecords efforts in the Federal Government with Auto Classification Supporting presidential and congressional mandates Exabyte's of other electronic content 7

eerdms Cloud 500,000 Sq Ft of Planned Raised Floor Multiple Distinct Data Center Buildings (Current Basis of Design) Office Space 2 1 3 8

Multi-Layered Security We are committed to provide the highest level of security from the property perimeter to the data center floor Secure Campus 500 foot setback to all buildings K-8 rated fencing (K-12 capable) Hardened, visitor screening facility with ballistic resistant fiberglass panels (Ballistic Level 3) Defense anti-terrorism force protection with focus on TIA 942 and FISMA guideline fulfillment FISMA Low through TS/SCI SCIF Armed security officers Metal detection devices X-ray scanning instruments Truck gate guard house Delta vehicle barriers Internal Security Central command center staffed 24x7x365 with roving guard force Security monitoring with video surveillance and security cameras Pedestrian turnstiles and badge reader systems separate common areas from datacenter space Biometric access through Man-Traps for datacenter areas (card/fingerprint & retina) Badge-in/badge-out security process, Vehicle Inspections 100+ CCTV cameras Secure shipping and receiving docks 9

Facility Infrastructure Summary Robust Infrastructure Fault tolerant site On-site substation Fed from two (2) distinct 230kV transmission lines from two (2) independent Dominion substations Two (2) 55 MVA transformers in completely redundant configurations which distributes power to the site Redundant Power and Cooling Generators with static UPS provide backup power On-site fuel with multiple refueling contracts 25,000 tons of chiller capacity 10

Thank you John Montel erecords Service Manager Service Planning and Management Department of the Interior Office of the Chief Information Officer 1849 C. Street, N.W. Room 7444 Washington, DC. 20040 T. (202) 208-3939 C. (202) 604-1149 F. (202) 501-2360 E. john_montel@ios.doi.gov 11