NASSCOM ASSESSMENT OF COMPETENCE (NAC) INFORMATION NOTE



Similar documents
Getting Started in the Cambridge LMS - Students

Dragon Medical Practice Edition v2 Best Practices

To ensure you have the appropriate equipment and settings please review the following: Software and Hardware Recommendations.

Soft Call Recorder v3 Manual Version

Magic Control Technology Corporation. Android Mirror KM-C6105. User Manual

System Requirements. SuccessMaker 5 Hosted

Microsoft Office Outlook 2013: Part 1

EUROPEAN TECHNOLOGY. Optimize your computer classroom. Convert it into a real Language Laboratory

The Best RDP One-to-many Computing Solution. Start

Home Agent (HA) Application Process

LOREX CLIENT Remote Software 4.0

3M Occupational Health and Environmental Safety 3M E-A-Rfit Validation System. Version 4.2 Software Installation Guide (Upgrade) 1 P age

ORGANIZER QUICK REFERENCE GUIDE. Install GoToMeeting. Schedule a Meeting. Start a Scheduled Meeting. Start an Instant Meeting.

User Manual V1.0. Remote Software

PVTC Technical Requirements

View Point. Oracle Applications and the economics of Cloud Computing. Abstract

Advanced Certificate in Professional Sales Management Practice

CAMBRIDGE CELTA COURSE ONLINE FAQ SHEET

System Requirements. SuccessMaker 5

Sage Grant Management System Requirements

USB PC Camera User s Guide

Microsoft Office Outlook 2010: Level 1

Professional PC water leak correlator Perfect results thanks to fully digital technology

ASTi PC ver Windows 7 Installation Guide. Document: DOC-01-PCVW7-IG-1

INTELLECT TM Software Package

ELPA21 Field Test Setup and Installation Guide December 2014

Item Minimum Required Recommended Notes

FAQs Frequently Asked Questions

Chord Limited. Mojo Dac Headphone Amplifier OPERATING INSTRUCTIONS

Vodafone Mobile Broadband via the phone

Samsung KIES Online User Update Procedure **

Join & Leave Meetings

ConferenceMe. Release notes. Software version 1.0(1.2) May 2009 D

MEDIA CONTROL SERVER 2.0

Scopia Desktop for Windows Installation and Configuration

Local Playback Software User Manual (V2.0)

1. Desktop Systems: Given below is the clarification and suggested changes.

Digital telephony. Softphone Getting Started Guide. Business Edition TEL-GDA-AFF

Technical Requirements

Stake Holders Perceptions in a Campus Recruitment Process

AT&T Unified Communications Voice. IP Communicator Installation Guide

Project Management Professional (PMP) Certification: PMBOK Guide Fifth Edition

CAM DIPLOMA IN DIGITAL MARKETING (METRICS AND ANALYTICS)

Back Office Recorder Dig04 Installation Guide

CAM DIPLOMA IN DIGITAL MARKETING (MOBILE)

Mobile Eyewear Recorder

IDIS Solution Suite. Backup Service. Software Manual. Powered by

VidyoConferencing Network Administrators Guide

IDIS Solution Suite. Backup Service. Software Manual. Powered by

AXIS AWARDS APPLICATION PREPARATION DOCUMENT

BodyMedia SenseWear Retrieve (V1)

IP Camera Centralization Management. Client Application. (IPCMonitor) Feb, 2013 Version 1.9. User Manual

Manual Version CV

EDIC-mini Tiny model A39

Well, now you have a Language Lab!

Computer Delivered Testing. Test Administrator s Guide

Receptionist-Small Business Administrator guide

USB 3.0 to HDMI External Multi Monitor Graphics Adapter with 3-Port USB Hub HDMI and USB 3.0 Mini Dock 1920x1200 / 1080p

The Case Study highlights how a leading IT company has used SDE to identify and allocate best programmers for critical projects they manage.

Blackwire C510- M/C520-M

Desktop Headphone amplifier with Advanced DAC

DIGICLIENT 8.0 Remote Agent Software

Minimum Software and Hardware Requirements

Acer LCD Monitor Driver Installation Guide

SecureClient Central Installation Guide. September 2014

2 Weeks 1 Week 5 Weeks : Microsoft Exchange Server 2010 Administration 4 Weeks Enterprise Smartphone Administration

Before you start your SKE course:

Dragon Solutions Transcription Workflow

New Inspiron Series (Intel ) All-in- One Desktop

Mobile Video Analysis Software User Guide. Version 2.0.8

PROFESSIONAL DIPLOMA IN MARKETING

EasySuite. User Guide V1.0

A. All equipment and materials used shall be standard components that are regularly manufactured and used in the manufacturer s system.

P420-M TM USB speakerphone

Self-study Course. Risk Communication: building capacity under the IHR

Minimum Computer System Requirements

MySciLEARN System Requirements. For educators and providers using the Fast ForWord and Reading Assistant programs

USB 3.0 to VGA External Multi Monitor Graphics Adapter with 3-Port USB Hub VGA and USB 3.0 Mini Dock 1920x1200 / 1080p

Step 1: Select the Start Menu, then Control Panel.

Blackwire C310-M/ C320-M

MySciLEARN System Requirements. For educators and providers using the Fast ForWord and Reading Assistant programs

Features Reference. About Unified Communication System. Before Using This Machine. Starting a Meeting. What You Can Do During the Meeting

Installation Manual. Table of Contents. System Requirements. PC Console Software. Model no. KX-TDA0300

TELESKILL VIDEO CONFERENCE LIVE

Web Conferencing Version 8.3 Troubleshooting Guide

Monitor Wall 4.0. Installation and Operating Manual

MP3/WMA/REC/USB. 2 Operation instructions. The box: 1. Mp3 player 1pc 2. Stereo earphone. 1pc 3. Manual.. 1pc

Longman English Interactive

BEST HR PRACTICE METRO Cash & Carry India Pvt Ltd

Multi-Profile CMOS Infrared Network Camera

Education & Training Plan. Event Planning Entrepreneur Certificate Program

Copyright JAVS

How To Watch A Live Webcast On A Pc Or Mac Or Ipad (For Pc Or Ipa)

Transcription:

NASSCOM ASSESSMENT OF COMPETENCE (NAC) INFORMATION NOTE An initiative by (in association with the BPM industry)

Table of contents Topic Page No. Introduction 3 Industry endorsement 3 Target audience 3 Key benefits of NAC to various stakeholders 4 NAC test matrix 4 NAC website 5 Key features of NAC 5 Scope of work (for participating College / University) 5 Test centre infrastructure requirements 5 Employment facilitation for NAC test takers 6 Way forward 6 NASSCOM Assessment of Competence (NAC) - 2 -

1. Introduction The Indian BPM industry is growing at a great pace and is contributing heavily to the Indian economy. India has established its leadership position globally in the off-shoring market due to availability of skilled manpower being one of the key strengths that it has. National Association of Software & Service Companies (NASSCOM), the association for IT, BPM & Services Companies in India, has been working with the Indian BPM (Business Process Management) majors to create a national assessment - the NASSCOM Assessment of Competence (NAC). The initiative is aimed at creating a robust and continuous pipeline of talent, which will be done by continuously assessing candidates on key skills, making it easier for firms to screen candidates and also provide them with training-need-analysis. This will then be tied in to training and development efforts to help more candidates become competent to work in the industry. NASSCOM is following a multi-pronged approach to facilitate manpower development for the short and long term. NASSCOM is aiming to build a pool of BPM manpower, which is pre-certified, in tune with the needs of the industry and thereby gear up for the future requirements of the sector. 2. Industry endorsement Following companies helped create NAC and defined the roadmap for it: 1. Genpact (India s largest BPM company) 2. IBM 3. Accenture 4. Convergys 5. EXL 6. HCL 7. Infosys 8. WNS 9. Deloitte As endorsing companies for the NAC, they would give preference to the NAC candidates and will connect directly to those who have performed well in the assessment. NASSCOM to take up this exercise with all its BPM member organizations, who will be roped in as this initiative is taken forward. 3. Target audience NASSCOM will take a gradual approach to run NAC, in which, various States in the country, different Universities/Colleges, other Private Institutes, etc. will be involved. This is, now, supported by the Retail Model, where independent (authorized) test centers, across the country, administer NAC for individual candidates. The target audience will be the final-year students from all non-technical / general streams who will be venturing into the job markets after a year. The intent behind assessing these students is to analyze the level of talent, which is available in various parts of India, especially in tier-2 and tier-3 cities. Gauging this would eventually help identify the various regions in India where the readily available BPM-fit talent pool exists. NASSCOM Assessment of Competence (NAC) - 3 -

4. Key benefits of NAC to various stakeholders Job Aspirants / Test Takers A transparent recruitment process across BPM companies No need to sit through the same tests at the time of recruitment (however, some companies may like to check the same skills at a higher level) Ability to identify self strengths and weaknesses through test scores Ability to do a 'training need analysis', which will help them improve on weak areas through training programs Employment facilitation using the NAC scores Educational Institutes Identifying the training needs of students and analyzing the gaps Aligning the course curricula with industry requirements bridging the education to employability gap Preparing the students on skills that act as pre-requisites to work in the industry Contributing to the industry by preparing the students through a pre-defined approach State Governments Assessment of talent pool available in the region, that is suitable for the industry Employment generation through increased employability of talent Help in attracting serious investors Will help create a concept of education to employability Industry NAC is about moving from a company test to an industry test for entry-level hiring Caters to both voice as well as non voice segment Standardized recruitment test, conducted across the country, leads to greater transparency even amongst the job seekers, hence they can prepare First-level filter for companies, which helps them look only at the deserving / potential lot, resulting in huge cost/time/resource savings Ease of benchmarking for individuals processes 5. NAC Test Matrix Skill Duration (in mins.) Speaking & Listening - Sentence Mastery - Vocabulary - Fluency - Pronunciation Analytical Ability 20 Quantitative Ability 20 Writing - Grammar - Content - Vocabulary - Spelling & Punctuation Keyboard Skills 05 10 20 total duration 75 mins. NASSCOM Assessment of Competence (NAC) - 4 -

6. NAC website NASSCOM s official website for NAC Initiative is www.nac.nasscom.in 7. Key features of NAC Instant results Score card is issued to test taker immediately after the test since the test is 100% automated (online) Eligibility o Any candidate appearing in final year of under-graduation or an equivalent course is eligible to sit for NAC assessment o Each College / University should be able to provide at least 70-80% of their final-year student population to take NAC assessment Commercials o Regular pricing: The fee per test is Rs.360 (plus taxes, if any). It is College s / University s prerogative to charge students 100% or subsidize the fee; however, in the interest of the students and to promote this program, it is recommended for College / University to pay the full amount for the first round. o Retail pricing: NAC will also be conducted at regular intervals at the designated retail centers across the country. The fee per test, in this model, will be Rs.430 (plus taxes, if any) i.e. Rs.360 (test fee) + Rs.70 (centre fee) 8. Scope of work (for participating College / University) - Sensitize / Educate students about the NAC initiative - Facilitate smooth conduct of the test - Provide venue with right infrastructure (see point #9 of this document) for holding the test - Ensure financial compliance w.r.t. payment for the test - Endorse NAC and use it for all subsequent batches 9. Test centre infrastructure requirements Description Client PC (Test Taking PC) (with a Monitor, Mouse & Keyboard) Operating System Windows XP SP3+, Vista, or 7 CPU RAM HDD Web browser: Broadband Internet connection Sound Card with necessary audio and video drivers Headset with Microphone Java Scripts Pentium IV and higher 512 MB RAM and above At least 500 MB free disk space Internet Explorer 7.0 (or higher) (T1, DSL, or cable) with a bandwidth of at least 1 Mbps for 25-30 users (Should support recording & playback capabilities) - Headset with a USB headset is strongly recommended - A room is required that is acoustically appropriate for the Speaking test Enable NASSCOM Assessment of Competence (NAC) - 5 -

UPS (assuming that generator will be used during power failure) Generator (may be used for 8 hours or more if needed) CD-ROM Drive USB Ports Antivirus Screen resolution 1.5 Hour Battery Backup 1024 x 768 pixels Test Environment For Speaking & Listening Test Network security access to allow Cdtclient.exe application to access https://www.ordinate.com (port 443) Disable pop-up blocker Headphone Features: Headphone features Microphone features Sound mode Stereo Ear piece Double Driver Unit Size 32 mm Frequency Response 20-20000 Hz Impedance 32 ohms Frequency response 100-12000 Hz Impedance 3320 10. Employment facilitation for NAC test takers Scores of all NAC test takers are made available to all NASSCOM member companies and are shared, primarily with the endorsing companies, where companies directly connect to those who perform well in the NAC assessment and meet defined job criteria. This ensures great visibility for the test takers and, at the same time, strengthens companies reach to the potential/deserving lot of candidates, leading to a win-win, both for companies and the candidates. 11. Way forward Over time, the intent is that the industry should be hiring only the candidates who come through this assessment. State governments can facilitate the process by trying to make this employment enhancing assessment mandatory to all its final-year students (in the non-technical streams) until it is the preferred choice of the students, recognizing its value-add to their career pathway. The learning from the NAC post assessment and post job interviews will identify other educational interventions required that support a sustainable long-term approach to enhancing employment in the State. NASSCOM will facilitate all such education initiatives working towards a corroborative effort in achieving equity in quality educational and hence enhancing employability. It is strongly recommended that State Governments consider NASSCOM s skill-development training program in the BPM space, called GBFS (Global Business Foundation Skills) that encompasses training for all the foundation / skills that are critical and important from industry s perspective at the entry level. The details of GBFS program can be provided on request. *** NASSCOM Assessment of Competence (NAC) - 6 -