Electric Service Conversion Overhead-to-Underground. Minnesota



Similar documents
REQUEST FOR ELECTRIC SERVICE Commercial

BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE

Please check with your local inspection authority for any additional requirements before installation.

2015 Service Guide XCEL ENERGY. Minnesota North Dakota South Dakota Natural Gas and Electric Installation Information for Residential Contractors

Gas Meter Clearances and Service Installation Requirements

4. REQUEST FOR ELECTRIC SERVICE. 4.1 General Service Information

Section I - General. Page 1 of 5

The City of Basehor, Kansas

NEW SERVICE INSTALLATION STEPS. Common Slow Downs. Other Necessary Steps

SHALLOW UTILITIES JOINT PROVISIONING GUIDELINES SCOPE

Your Responsibilities

2. What building projects are exempted? (permit not required)

Electric Service Guide for Residential Construction

Application for service requiring new burial of service line for DSL or Television

Gas Meter Clearances and Service Installation Requirements

Building Permits: When are they required?

Builder/developer gas service application

ELECTRIC SERVICE HANDBOOK General Information Residential Service Portable/Standby Generators Temporary Service Commercial Service Metering

Electric Service Guide for Commercial Construction

WHEN IS A PERMIT REQUIRED?

new construction departments...

CARROLL COUNTY ELECTRICAL DEPARTMENT SERVICE POLICIES. EFFECTIVE MARCH 1, 1995 Revised 1/01/2013

Physical Address/Intersection: Name of Project: Within a NFIP 100/500yr Floodzone:

Getting the job done: Moving your gas supply. Why would I need to alter my gas supply? What to expect. Working on your property

Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS

REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

GENERAL BUILDING PERMIT INFORMATION FOR: RESIDENTIAL ALTERATIONS & ADDITIONS

NORTHERN LIGHTS, INC. SINGLE PHASE APPLICATION CHECKLIST

For business. Wiring your business for broadband. What happens when copper is required?

your electric service: from overhead to underground

We look forward to serving you!

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

MOBILE HOME SERVICE REQUIREMENTS GAS

A Guide to Detached Residential Garages and Residential Workshops (based on 2006 BCBC)

Single Family Residential Building Permit Questions & Answers

City of Fort Smith Building Permit Process Frequently Asked Questions

Please Refer to Attached Sample Form

Botetourt County, Virginia. Frequently Asked Questions

BGE Service Application Guidelines Commercial & Industrial Projects

HOMEOWNER S PERMIT GUIDE

WINDOW AND DOOR REPLACEMENT REQUIREMENTS

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

LAND USE CODE CHAPTER GENERAL REGULATIONS

Application for. Commercial New Service

City of Milford, Connecticut Information Regarding Permits

Contents General Requirements Location Size Inlet and Outlet Piping Protection Security Electrical Automatic Meter Reading (AMR)

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

Requirement checklist to obtain a building permit for a: NEW SINGLE FAMILY DWELLING RESIDENTIAL ADDITION

Town of Trumbull, Connecticut Information Regarding Permits

A Guide for the Homeowner/Builder

Underground Service Requirements and Instructions

Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements

City of Morro Bay Building Division 955 Shasta Ave., Morro Bay, CA ,

GENERAL INFORMATION AND CHARGES. Buried Service Line Installation Fees: Local Service Monthly Charges Rates

YOU VE BEEN HIRED AS A GENERAL CONTRACTOR

Considering UNDERGROUND. tampaelectric.com

SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT

CITY OF YORBA LINDA P.O. BOX CALIFORNIA

Zoning Department DECK PERMITS. Checklist

Please Refer to Attached Sample Form

INDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

Applying For New or Revised Electric Service

Electricity to your property

Building Code Inspections and Fees

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

How To Get A Power Line Extension

Bond Release Process for New Subdivision Developments in Fairfax County

**ATTENTION** WE DO NOT PROMOTE OR ENCOURAGE YOU TO DO YOUR OWN ELECTRICAL WIRING!!! IT IS BY FAR THE MOST DANGEROUS THING YOU CAN ATTEMPT

Electric Service Guide for Residential Construction

Natural gas and electric service guide

AREA: 2.37 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF. Single-family, Non-conforming machine shop

MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS

Water CIPP What to Do When You re Between a Fence and a Hard Place

Residential Plan Review Emergency Vehicle Access and Water Supply Permit Information Packet

PRIMARY SERVICE LINE: The Company's conductors which connect the supply line with a transformer located on private property.

ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM REQUIREMENTS

NEW HOME CONSTRUCTION

Making changes to your home

ELECTRIC SERVICE GUIDELINES (For Indiana)

Welcome. Xcel Energy. Home. Contact Information. Tear off this portion. Keep for future reference. Customer Service. 24-hour Emergency Hotlines

Site Development Information Worksheet for single family residential development

The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT Revised

CONSTRUCTION PERMIT APPLICATION AND INSTRUCTIONS (Permit Application follows instructions)

Welcome. Xcel Energy HOME. Contact Information. Tear off this portion. Keep for future reference. Customer Service. 24-hour Emergency Hotlines

C I T Y O F P E A R S A L L

Electrical Safety Tips. Help us keep you safe

ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS

#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist

City of St. Charles Basement Finish or Remodel

City of West Chicago Community Development Department 475 Main Street, West Chicago, IL Phone: (630) x 131 / Fax: (630)

Electric Service Requirement Handbook

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

Questions Regarding Proposed Utility Undergrounding in Kensington

Policy and Guidelines for Electric Service

Temporary Electric Service

AT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding

Uncovered Decks & Porches

Residential Building Permit Process

Transcription:

Electric Service Conversion Overhead-to-Underground Xcel Energy Electric Connections Minnesota

Process Please fill out these forms and complete this checklist to begin your application process: 1) Overhead-to-Underground Conversion Bid Sheet. Complete the portion of the enclosed bid sheet marked To Be Completed By Customer to calculate the cost of your service installation. 2) Residential Underground Service Contract. Please read this agreement thoroughly and sign where indicated. Include the Total amount on the bid sheet in the first box under Customer Charges on the service contract at right. 3) Preliminary Site Sketch. This form helps us understand your lot layout and assists us in our planning. 4) Send the following to us at Builders Call Line, 1518 Chestnut Ave., Minneapolis, MN 55403 Signed Residential Service Contract Payment Preliminary Site Sketch form. Plot plan is not accepted as a replacement for the Site Sketch. Bid Sheet 5) Easement. Check your pole location. Is your pole located on your own property? YES continue with checklist NO Do not proceed with electrical work. You may require an easement to proceed with your overheadto-underground conversion. Please contact Builders Call Line at Xcel Energy about how to move forward. 6) Permits. If Xcel Energy has to cross a public road, boulevard or alley to install your service, we will arrange to get the proper permits. Please keep in mind, however, that these permits may delay the process of converting your service by six to eight weeks. 7) Install an Xcel Energy-approved meter socket. Your electrician has or can get Xcel Energy information on which meter sockets are approved. 8) Acknowledgement. That the electrical work has been approved or been completed by a certified electrician. An approval call from state/city certified electrical inspector; or Copy of the affidavit from a licensed electrical contractor. To determine which form of acknowledgement is required for your area, call the Builders Call Line at 1-800-628-2121, between 7a.m. and 4:30 p.m., Monday through Friday. 9) Other utilities. If you want other utilities buried at the same time, it is your responsibility to have your phone and cable TV provider(s) get the wire on site before Xcel Energy starts the installation. If the phone and cable TV wires are not there when Xcel Energy comes to do the conversion, we will bury the electrical wire only. Note: Not available with all utilities. 10) Prepare the work area. Clear an 8-foot-wide path from the utility pole to the new meter location. This includes rocks, brush or trees around the pole, any gardens or flower beds, and any other obstacles that would prevent us from digging a trench in your yard. Xcel Energy will install the underground cable from the first utility pole to the house. We will fill the trench, but will not restore disturbed ground to its original condition. Also remember that the disturbed area will settle over time. We need an open work area at least 4 feet by 4 feet if there is a sidewalk, patio or concrete/hard-scape below or within 4 feet of your meter. You ll need to open an area so the wires can be brought from underground into the new meter and you will be responsible for the restoration.

If the work area is open but enclosed by a fence, you are responsible for providing an opening at least 8 feet wide to get our equipment in and out of the fence. 11) If lot is not to finished grade. Please be within 4 inches of final grade 12) Private underground obstacles. Include this information on site sketch. Expose all private underground obstacles such as sprinkler systems, invisible fencing, drain tiles or old septic or oil tanks. Also expose any other buried lines that do not belong to a utility, such as a private electrical line from your house to a garage or lamp in your yard. Xcel Energy will not be financially responsible for damage to any unexposed facilities. 13) Conduit: future decks, sidewalks or patios Note: NO DISCOUNTS FOR CUSTOMER INSTALLED CONDUIT We don t install conduit as part of an overhead-to-underground installation. However, if you have or plan to build a deck, sidewalk or patio near or abutting the house and above the new service wire, you will need to install a 2-inch gray electrical conduit 24 to 36 inches below finished grade and extending at least 3 feet beyond deck, sidewalk or patio. The conduit should be made of either galvanized rigid steel (meeting the requirements of the ASA Standard C80.1) or OVC (meeting the requirements of Scheduled 40, ASTM-D-1785). Conduit may also need to be installed if the path of installation is not wide enough for our equipment or too steep of a path. If conduit is installed, customer is responsible to fill in trench prior to Xcel Energy electric install. Additional pipes are required for the telephone and cable TV. Please consult these companies for exact requirements. Xcel Energy will not install service wire under any structures, existing or future, e.g. garages or sheds. 14) Scheduling. Xcel Energy will contact you to schedule when: We have received the signed Residential Underground Service Contract with payment. We have received the Preliminary Site Sketch and the Bid Sheet. An Xcel Energy-approved meter socket has been installed and checklist numbers 7 and 8 have been completed and filed. Please inform us at this time if your phone or cable TV utilities will be involved with this installation (see checklist number 9). Xcel Energy has completed a site precheck. bid sheet MiNNesOtA OVeRheAd to UNdeRGROUNd CONVeRsiON bid sheet To calculate the cost of your service installation, please complete the following section. To assist you in this process, we have included an example. Charges include a $340 base charge and a $6.50 per circuit foot charge to convert your service from overhead to underground based on the information you provide. If you are requesting that Xcel Energy also remove a utility pole, an additional $200 will be assessed per pole (if applicable). If actual footage exceeds our estimate, you ll be charged for the actual footage when the job is complete. From Oct. 1 through April 15, an $1,100 (if applicable) Winter Construction deposit is required. 1 Base Charge $340.00 2 Circuit Footage (path must be at least 8 wide with no obstructions along route) 65 ft X $6.50 ft = $422.50 3 Pole Removal (if applicable) 1 ea X $200.00 = $200.00 Total $962.50 1 Base Charge $340.00 2 Circuit Footage (path must be at least 8 wide with no obstructions along route) ft X $6.50 ft = $. 3 Pole Removal (if applicable) ea X $200.00 = $. Total $. PLEASE NOTE: DISCREPANCIES BETWEEN YOUR CALCULATED ESTIMATE AND WHAT IS VERIFIED BY XCEL ENERGY MAY RESULT IN INCREASED COSTS AND SIGNIFICANT INSTALLATION DELAYS. Customer Signature: Date: Address: City State Zip FOR COMPANY USE ONLY DO NOT WRITE BELOW THIS LINE SITE VERIFICATION Xcel Energy or Contractor Foreman: Date: 1 Base Charge $340.00 2 Circuit Footage (path must be at least 8 wide with no obstructions along route) ft X $6.50 ft = $. 3 Pole Removal (if applicable) ea X $200.00 = $. Total TO BE COMPLETED BY CUSTOMER $. Note: All prices are subject to change annually. Call the Builders Call Line at 1-800-628-2121 to confirm. Overhead to Underground Conversion Note: All prices are subject to change annually. Call the Builders Call Line at 1-800-628-2121 to confirm.

Sample Site Sketch Note: All prices are subject to change annually. Call the Builders Call Line at 1-800-628-2121 to confirm. Overhead-To-Underground Preliminary Site Sketch Form Please use these symbols to show us where customer-owned buried facilities or obstructions are located on the property. X ++++++ ####### Closest pole New cable route Meter location Private buried facilities Sidewalk or driveways Trees, shrubs, & flowerbeds Retaining walls Grade changes Use these codes to distinguish the type of customer-owned buried facility E Electric lines to detached buildings L Lighting G Propane gas lines IF Invisible fence T Telephone lines to detached buildings SE Septic system C Cable TV lines to detached buildings ST Satellite TV S Sprinkler system W Water lines An accurate sketch will ensure the installation will occur in a timely manner. PLEASE INDICATE NORTH PROPERTY LINE SIDEWALK 5 6 100 20 IF G PROPANE HOUSE GARAGE PROPERTY LINE IF Is there an alley? Yes No If yes, is pole on your side of the alley? Yes No Utilities to be buried at same time Phone Company Name (CUSTOMER TO COORDINATE WIRE DROPPED OFF AT HOME.) Cable TV Company Name John and Jane Public 5/16/11 20 Main Street Anytown Frank Ave. 612-555-1234 johnandjane@gmail.com Customer or contact name Date submitted Street address & community Cross street Phone Email* FOR INTERNAL USE ONLY Xcel Energy project number: 1-800-481-4700 xcelenergy.com 2011 Xcel Energy Inc. Xcel Energy is a registered trademark of Xcel Energy Inc. Northern States Power Company-Minnesota, an Xcel Energy Company 11-04-406 04/2011

Minimum Clearances for Outside Gas and Electric Meter Installations 17 approx Natural gas meter, clear zone for ignition sources, top view Restoration Xcel Energy will install the underground cable from the first utility pole to the house. We will fill in the trench, but will not restore disturbed ground to its original condition. Also remember that the disturbed area will settle over time. We will be extremely cautious around your trees and shrubs, but Xcel Energy is not financially responsible for any damages that may occur. You will have to put anything moved, such as fencing or swing sets, back in place. 17 approx Natural gas meter, clear zone for ignition sources, front view Ignition sources include outlets, switches and other electric contact points. Electric meters are not considered ignition sources, but for extra safety, Xcel Energy needs a 3-foot separation between the gas meter & vent and the electric meter stand pipe. Electric meter heights, front view Note: All prices are subject to change annually. Call the Builders Call Line at 1-800-628-2121 to confirm. Finished Grade 6 Max. 4 Min. Finished Grade

Converting Residential Overhead Electric Service to Underground (up to 400 amps) Xcel Energy strongly recommends that you hire a licensed electrician to complete any necessary work beyond our wires, which go to the top of the mast. For example, your meter socket, fuse box or internal wiring may need to be upgraded. Your electrician also coordinates with your local inspector when the work is finished. Xcel Energy will not accept customer-installed underground service wire. If you still have questions after reading this brochure, consult the checklist or call the number listed below. We are pleased to be your power provider and we re happy to assist you further. Xcel Energy Conversion Charges Xcel Energy charges to convert your overhead service to underground between April 15 and Oct. 1 are as follows: Base Charge: $340 per service conversion Circuit Footage Charge: $6.50 per trench foot (length of service path) If actual footage exceeds our estimate, you ll be charged for the actual footage when the job is complete. Charges include material and labor for the service installation from Xcel Energy point of service to the customer meter socket regardless of installation method. No discounts for conduit installation. Customer is responsible to ensure an unobstructed 8-foot-wide minimum route for installation. Xcel Energy will determine method of installation. Installation does not include restoration of your yard back to its original condition. Pole Removal: $200 per utility pole if applicable. Winter Construction charges, including a $1,500 deposit, apply to service conversions from Oct. 1 through April 15. Please call the Builders Call Line at 1-800-628-2121 for more information. Please note that the Xcel Energy charge does not include any other costs for work done by your electrician (see Other Costs). Other Costs In most cases it will be necessary to hire a professional electrician to make some changes to your system. For example, the overhead mast may need to be removed from the top of your meter box; or your fuse box or meter socket may need to be upgraded to accept the underground service. Xcel Energy does not recommend that you try to do these things yourself. Also, some communities require permits for this type of work and may charge a fee for the permit application. If you are burying telephone or cable TV, those companies may also charge a fee (see Customer Responsibilities inside.) In Minnesota, North Dakota and South Dakota, once your service is changed, your Xcel Energy account will be placed on the Residential Underground Rate. This will increase your monthly service charge by $2. Note: Xcel Energy reserves the right to refuse conversion from an overhead-to-underground service due to excess costs, impractical field conditions, easement issues, etc. All prices are subject to change annually. Call the Builders Call Line at 1-800-628-2121 to confirm. Questions? If you have additional questions not covered in this brochure, please feel free to call the Xcel Energy Builders Call Line between 7 a.m. and 4:30 p.m., Monday through Friday, at 1-800-628-2121. 2011 Xcel Energy Inc. xcelenergy.com Xcel Energy is a registered trademark of Xcel Energy Inc. Northern States Power Company Minnesota, an Xcel Energy Company 11-03-443