TRAFFIC IMPACT ANALYSIS

Similar documents
Transportation Impact Assessment Guidelines

City of Rockville Regional Development Impacts: Transportation Capacity Analysis. June, 2013

TRAFFIC IMPACT ANALYSIS (TIA)

TRANSPORTATION IMPACT ANALYSIS PROCEDURES MANUAL

TRAFFIC IMPACT ANALYSIS

PROFFER STATEMENT REZONING TLZM LEEGATE November 1, 2013

Guidelines for the Preparation of Transportation Impact Studies 8 th Revision

9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS. April 24, 2015

The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT Revised

TABLE OF CONTENTS TABLES FIGURES

Appendix E Traffic Impact Analysis

Transportation Impact Analysis and Mitigation Plan Procedures Manual

Goals & Objectives. Chapter 9. Transportation

City of Kamloops Notre Dame Corridor Access Plan

TRAFFIC IMPACT ANALYSIS HANDBOOK VOLUME I METHODOLOGIES & REQUIREMENTS

TRANSPORTATION IMPACT ANALYSIS (TIA) Guidelines

INTRODUCTION TO ZONING DISTRICT REGULATIONS

REZONING & PRELIMINARY PLAT

COUNTY OF ALBEMARLE PLANNING STAFF REPORT SUMMARY. Staff: Claudette Grant

May 18, Ms. Courtney O'Neill Associate Planner City of Margate 5790 Margate Blvd. Margate, Florida 33063

TH 23 Access Management Study Richmond to Paynesville

Definitions. For the purposes of this rule chapter the following definitions shall apply unless the context clearly shows otherwise:

FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005

Intersection Cost Comparison Spreadsheet User Manual ROUNDABOUT GUIDANCE VIRGINIA DEPARTMENT OF TRANSPORTATION

Table of Contents B.2 Traffic/Access - Parking

Transportation Policy and Design Strategies. Freight Intensive. Level of Freight Presence

The Need for Traffic Incident Management

Appendix J Santa Monica Travel Demand Forecasting Model Trip Generation Rates

Tier 1 Strategies. WV Route 14 Corridor Management Plan

Orange County Transportation Impact Fee Update FINAL REPORT

TRANSPORTATION IMPACT ASSESSMENT (TIA) GUIDELINES. Section 1 Introduction

Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s.


Traffic Impact Analysis Guidelines

City of Yakima. Home Occupation. Application Packet

Multi Modal Roadway Transportation Impact Fees and Asset Value

CAPACITY AND LEVEL-OF-SERVICE CONCEPTS

How To Design A Crash Investigation Site

Topic 2 11/28/2012 Blocks & Street Network

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, SPP-24 & 1512-ODP-24

1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application):

SECTION 16 TRAFFIC/SAFETY SECTIONS 16.1, 16.2 AND 16.3 ARE UNDER DEVELOPMENT

Texas Case Studies in Access Management. Ed Hard, TTI

Best Practices for Traffic Impact Studies

CHAPTER 4 EXISTING TRANSPORTATION MANAGEMENT

Section 6 Traffic Analysis

CITY OF WEST PALM BEACH PLANNING BOARD Meeting Date: September 24, 2012 Planning Board Case No. 1248Q

Ne w J e r s e y Tr a f f i c Co n g e s t i o n :

Chapter Thirty-five ACCESS CONTROL/ ACCESS MANAGEMENT BUREAU OF DESIGN AND ENVIRONMENT MANUAL

The Fresno COG Travel Demand Forecasting Model How the Pieces Fit Together

D4 - D12 May 8, 2013 Public Hearing

d. Building permits may only be approved if consistent with the approved development plan and land division for all units with common walls.

Presentation to Knox County Commission Monday, February 23, 2015

University Pointe Opportunity Summary. Remaining in Phase I. University Pointe. Hwy. 29 & Brookside Lane Charlotte, NC.

Near Westside Neighborhood and University Avenue Corridor Transportation Study. Public Workshop #2. September 12 and 23, 2013

Draft Transportation Management Plan for Via Verdi Repair Project

3 Tappan Zee Bridge Rehabilitation Options

Chapter 7 ZONING PLAN

Mobile Restaurant Permit Application Checklist

analysis needs be met at the push of a button?

MEMORANDUM. Robert Nichols, Acting Corridor Design Manager Northgate Link Extension

A Case for Real-Time Monitoring of Vehicular Operations at Signalized Intersections

Bond Release Process for New Subdivision Developments in Fairfax County

Mercer County Multi-Modal Transportation Plan Year 2025 Travel Demand Model

The Northwest Arkansas Travel Demand Model

The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan.

SR-18 Corridor Improvements in Wood County

County of San Diego, Planning & Development Services SECOND DWELLING UNIT

Simulating Traffic for Incident Management and ITS Investment Decisions

Light Rail Transit in Phoenix

Highway Capacity and Quality of Service

Traffic Signal Asset Management. Edward Fok USDOT/FHWA Resource Center

PUBLIC SCHOOL FACILITIES ELEMENT

Traffic Impact Study for the North Broadway Mixed-Use Development Chicago, Illinois. Prepared by

Preliminary Plan Application and Checklist

AREA: 0.16 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF

City Code of ANN ARBOR, MICHIGAN Chapter 55 Zoning

Forecasting Demand for Demand Forecasting. Abstract

SECTION 6: TRANSPORTATION

APPENDIX A Dallas-Fort Worth Region Transportation System Management Strategies and Projects

A Short Course on Techniques for Determining Construction Related Road User Costs

Construction Traffic Management Plan

FILE NO.: Z-6915-C. Gamble Road Short-form PCD and Land Alteration Variance Request

PRE APPLICATION CONFERENCE - INTRODUCTION

30 Years of Smart Growth

Brookdale Site. CB6 Update April 1, 2015

Accident Analysis of Sheridan Road between Isabella Street and South Boulevard

Corridor Goals and Objectives

Transcription:

TRAFFIC IMPACT ANALYSIS Presenter Gerry Harter, PE, Area Traffic Engineer Acting Transportation and Land Use Director

Why a TIA? Roads are a critical public resource and a major investment of public funds Traffic impacts from trips generated by development can cause disruption in traffic flow and traffic congestion which can lead to roads becoming less safe. TIAs help to ensure development impacts do not overburden the taxpayer. TIAs can be applied by public officials to balance: o o Property owners right to access the highway to use their land Roadway users right to mobility, safety, and efficient expenditure of public funds. 2

So taxpayers do not have to pay for this. TIA Study to determine how to prevent this 3

Benefit of the TIA Study to the Community Turn lanes and tapers Maintain through traffic flow. 4

Benefit of the TIA Study to the Community Entrances away from intersections and interchange ramps Intersection signal R-O-W for road widening Improve sight distance Interparcel connection Entrance design Subdivision connectivity Consolidate existing entrances. 5

TIA Touch Points During Local Land Use Actions Chapter 527 VDOT Permitting Process Local LUA 527/TIA Permits 6

Local Land Use Approval Process The rezoning of property is the earliest point in the local land review process that offers flexibility in design details By evaluating the proposal Impacts on the transportation network can be identified Measures to address the impacts can be determined Locality can request a TIA at this stage. GREAT TIME FOR VDOT PARTNERING! Conditional zoning - opportunity for applicant to proffer both on-site and off-site transportation improvements to mitigate impacts GREAT TIME FOR VDOT PARTNERING 7

Local Land Use Approval Process Site plan and subdivision plat review Examine details on the design and layout of the development GREAT TIME FOR VDOT PARTNERING! VDOT offers assistance to localities in the review of: The transportation portion of comprehensive plans Rezoning requests, and Site plans and subdivision plats. AT THIS STAGE, VDOT IS ADVISORY ONLY 8

Chapter 527 - Traffic Impact Analysis Land development proposals to be submitted Substantially affect transportation on state controlled highways based on traffic volume 5,000 trips per day (standard threshold) 400 trips per day and at least equals existing traffic on road (for residential development only, low volume road threshold) Dependent upon Submission type Comprehensive Plan or Plan Amendment Rezoning or Special Use Permit Location Within 3,000 ft of connection to VDOT highway (for non-vdot localities) Exception: Rezoning that does not increase trips (daily and peak hour) over those allowed under existing zoning 9

Traffic Impact Analysis Sample Developments That May Meet Thresholds ITE Land Use Low Volume Standard Description Code Variable (400 Trips) (5,000 Trips) Residential Single Family Detached 210 dwelling units 40 du 550 du Apartment 220 dwelling units 60 du 670 du Other Light Industrial 110 square feet not applicable 690,000 sf High School 530 students not applicable 2,900 st Hospital 610 beds not applicable 420 bds General Office Building 710 square feet not applicable 560,000 sf Shopping Center 820 square feet not applicable 40,000 sf Home Improvement Superstore 862 square feet not applicable 170,000 sf These are estimates that have been rounded and are not official thresholds. They are offered as examples only. 10

Chapter 527 TIA Regulations A 527 TIA study prepared per the methodology can still be requested by the locality. VDOT will provide a written response to locality/developer: Summarize key findings of the study Comments on recommended highway improvements Advise on needed compliance with other VDOT regulations Comments on suggested improvements to other travel modes. 11

527 -Traffic Impact Analysis Comp plan submission not required to include TIA; rezoning is required to include a TIA Published local study standards can be used, if certified by District Scope of study dependent upon amount of traffic generated but generally includes: Existing and proposed land use Existing traffic and Level of Service (LOS) Expected future traffic and LOS (without proposed development) Expected future traffic and LOS (with proposed development) Recommendations for traffic impact mitigation measures 12

Traffic Impact Analysis Required elements (cont d) Default assumptions and methodology Data collection (avoid holidays, inclement weather) Trip generation (rates vs. equations based upon ITE methodology) Internal capture rates (residential with others, hotel with office, office with retail) Pass-by trip rates (per ITE Trip Generation Handbook) Allow alternate trip generation for Small Area Plans (EPA-MXD methodology) Level of service calculation (HCM methodology for vehicles, Transit Capacity and Quality of Service Manual for transit) Modal split (bike/ped facilities, proximity to transit service) 24VAC30-155-60 13

VDOT Permitting Process Permits allow users to perform work within our roadways and rights of ways. 1. A permit is required for any type of utility activity occurring within the right-of-way. 2. A permit is required to install any entrance onto a state highway. 3. A permit is required to perform surveying operations within the right-of-way. 4. A permit is required for any agricultural and commercial use and occupancy of the right-of-way. 5. A permit is required for any miscellaneous activity or use of the right-of-way except for mailboxes and newspaper boxes (see 24VAC30-151-560) and public service signs (24VAC30-151-570). 14

TIAs and Entrance Permits What is the relationship between TIAs and commercial entrance permits? VDOT can request a TIA in order to determine impacts of development during the permitting process. 24VAC30-73-70 Commercial Entrance Design At the request of the district, the permit applicant shall furnish a report that documents the impact of expected traffic movements 15

TIAs During Permit Stage If VDOT has not heard about the project until the permit stage, it is more difficult to plan appropriate mitigation measures for transportation impacts. Many times the site plans, rezonings, CUPs, and subdivisions have already been approved by the planning commission and/or the governing body making changes to the site plan difficult. Typically, local governments are disengaged at this stage since they have completed all of their processes. Causes unnecessary delays in commercial entrance permit approval process. More costs and time at end of process when developer was least expecting it. 16

TIAs During Permit Stage Suggestions Engage VDOT as a partner in the process as early as possible. If a TIA is needed to mitigate impacts, have the land development applicant prepare it earlier in the process. Also, ensure that it meets VDOT s expectations as well so that all information is provided avoiding additional delays. VDOT is available in an advisory role and would be happy to assist during the land use action. 17

Conclusion TIAs are vital to the mobility and safety of the travelling public TIAs provide information to help ensure that development mitigates their impacts on the road system. TIAs are required for Chapter 527 rezonings, Should be part of the local land development review process, May be required by VDOT during entrance permit review. Chapter 527 provides a thorough traffic impact analysis methodology for rezonings that fall under 527. Localities can request TIAs for non-527 land use actions. TIA methodology can be different for non-527 developments. The traffic impacts of development should be considered as early in the process as possible. 18

QUESTIONS / COMMENTS For more information on the state law, regulations and traffic impact analysis studies See the VDOT web site, Info Center tab, Transportation and Land Use 19