KEN NEWMAN, P.E. 9630 Rancho Drive Willis, Texas 77318-6625



Similar documents
An Introduction to Oil and Gas Well Servicing

Setting a Global Standard. SingleBore Subsea Completion System

powered by ingenuity Corrosion Logging Well Integrity Measurement

We build products that extract oil and gas

High Data Rate MWD Mud Pulse Telemetry

DecisionSpace Well Engineering Software

Main areas of services are:

Tax Executives Institute

Effect of Temperature on Wireline Cables Technical Bulletin Ten

Total Subsea Solutions

15823 N. Barkers Landing Houston, TX /

Society of Petroleum Engineers Drilling Systems Automation Technical Section (DSATS) Drillbotics. International University Competition

10 Wireline operations

Send your directly to

Plug and Abandonment Forum

Society of Petroleum Engineers SPE Global Training Committee Training Course Review Process

PRESS KIT IVAR AASEN DET NORSKE OLJESELSKAP ASA

BS PROGRAM IN PETROLEUM ENGINEERING (VERSION 2010) Course Descriptions

Texas Oil Tools Subsea Well Intervention Equipment

DEPARTMENT OF PETROLEUM ENGINEERING Graduate Program (Version 2002)

FIBER-OPTIC SENSING TECHNOLOGIES

Our Aim. Our Vision. NIGT works towards ameliorating its vision to be amongst the leading innovative and proactive suppliers in the Oil & Gas sector.

The United States. United States FACILITIES & PROFILES

SPE Distinguished Lecturer Program

New Generation of Deepwater BOP Stacks. Dominique Allegre CAMERON Paris, October 23rd 2013

SPECIALTY FIBER OPTIC CABLE. Downhole Sensing Subsea

Dávid Szabó*, Ján Pinka*, ¼uboš Fedorko** UGS WELLS IN DEPLETED FIELDS

Ken Ross. Professional Experience. Insurance Claims Consulting

PAKISTANI PROFESSIONAL DEGREE B.E. (PETROLEUM & Natural GAS) with 1 st Class-1 st Position, 1991 Ph.D in PETROLEUM ENGINEERING, 2008 INSTITUTE:

Maersk Resilient. Maximised drilling efficiency and uptime. Optimised for concurrent activities

HPHT CAPPING STACKS AND NEW TECHNOLOGY FOR SUBSEA WELL CONTROL. December 3, 2014 Presenter: Mike Cargol

API Std 53 - Blowout Prevention Equipment Systems for Drilling Wells Last update: August 12, 2015

creating a global advantage a history of energy alloys

Qualifications and Experience of Jatinder Kumar. B.S., Petroleum Technology, 1963, Indian School of Mines, Dhanbad, India

Drilling Rigs and Well Technology. RAPID RIGS AND WELL TECHNOLOGY Cairn India Limited.

THE DELTON GROUP MANPOWER TRAINING CONSULTANCY SHORT COURSE PROGRAMME TOPICS LISTING

State-of-the-art oilfield service

TULLOW OIL SUPPLY CHAIN

Training for Operations and Maintenance

Introduction. The following is an outline of the contents of this paper: Definition of Artificial Lift Page 2. How an Oil Well is Produced Page 2

Fiber Optics in a Bakken Multi-Stage Fractured Well. Montana Tech 2011 SPE Drilling Symposium Presented by: Chelsea Kadler

Subsea School The training program

WELL LOGGING TECHNIQUES WELL LOGGING DEPARTMENT OIL INDIA LIMITED

Subsea Market Review. Subsea 2011 February 9 10, Quest Offshore Resources, Inc. 1

Estimation of shear force for blind shear ram blowout preventers

Rogaland på Børs August 30 th 2010

Competitive Edge through System Engineering

Completion Assembly Services. Critical preparation services whenever they are needed

American Petroleum Institute Purchasing Guidelines Purchase API Spec 7K online at

W. Kent Muhlbauer. P.E. WKM Consultancy, LLC 704 Wickford Circle, Austin, TX Tel:

Solving challenges. Drill out solutions Package

OFFSHORE FIELD DEVELOPMENT

South Central Service Center

SEA SOLAR POWER INTERNATIONAL LLC OTEC BRIEFING

RSS Proves Valuable In Vertical Wells

Construction Services. Furnishing Energy Solutions

NATIONAL OILWELL VARCO, INC. (Exact name of registrant as specified in its charter)

Handbook. Purchasing Guidelines. API Monogram Equipment. Purchase API Specs online at

Paradigm High Tech and Innovative Software Solutions for the Oil and Gas Industry

LINKING SEABED TO SURFACE

Certificate Programs in. Program Requirements

Schlumberger and Cameron Conference Call August 26, 2015

How To Build A Kingkong Production System

Master thesis WELL INTEGRITY OF SUBSEA WELLS DURING LIGHT WELL INTERVENTIONS. Stud.techn. Sigbjørn Tornes Birkeland. June 2005

Resume. Adeyemi Gbadegesin Abiodun , & adeyemig@yahoo.com, gbadegesin.adeyemi@covenantuniversity.edu.

Subsea Drilling Systems

MEK4450. Templates & Manifolds. 29 August Templates and Manifolds. This module will cover:

Degree/ Higher Education Jobs:

The advice. The expertise. Wherever you are.

Grassroots Drilling. A History and Look Ahead. David Wennerstrom. ICOTA Roundtable October 2005 Canadian Chapter

Monitoring and Managing Coiled Tubing Integrity

The Advance of New ROV Conveyed Geotechnical Acquisition Tools - Going Where No Man Has Gone Before. Subsea UK Expo February 2014

GE Oil & Gas. Industrial modules. Turnkey power-generation and compression solutions to increase efficiency, reliability & power in restrictive areas

Description. ACTIVITY GROUP Advertising A Air- Conditioning related services A Architecture A Aviation

Industrial Technology

Passive Wireless Sensor Applications for the Oil and Gas Industry

DELIVERY THROUGH TECHNOLOGY Parque das Conchas Project

Excellence in energy services for over 100 years. OCTG Managed Service Provision

The SPE Foundation through member donations and a contribution from Offshore Europe

RISER SYSTEMS. Our world class innovation solving your riser challenges

APPLICATIONS OF REAL-TIME WELL MONITORING SYSTEMS

Introduction to Drilling- Basic Operations & Tools

2016 TRAINING PLAN MANAGEMENT TECHNICAL UPSTREAM & DOWNSTREAM TRAINING & CONSULTANCY SERVICES

Bill Maloney. EVP Development and Production North America Statoil

Superior Energy Services, Inc.

Your Service Partner Avonmouth and Bristol Service Centres

GE Oil & Gas Subsea Systems. 1 GE 2012 All Rights Reserved Unauthorised Reproduction Prohibited

MEXICO ENERGY REFORM Opportunities in Exploration & Production and Electricity. Executive summary. Antonio Prince

University of Cyprus

SPE/IADC WELL CONTROL ASIA PACIFIC 2009 Velocity string installation in deep live gas wells.

Kodiak Deepwater Project Challenges and Solutions

DOE Award Number: TITLE PAGE. Phase I Topical Report. Don L. Hanosh

JUBILEE TECHNICAL TRAINING CENTRE TAKORADI POLYTECHNIC 2015 TRAINING PROGRAMMES

Total Subsea Services

Supplier of Oil Country Tubular Goods, Associated Products & Services

INSITU TESTS! Shear Vanes! Shear Vanes! Shear Vane Test! Sensitive Soils! Insitu testing is used for two reasons:!

GAS WELL/WATER WELL SUBSURFACE CONTAMINATION

The Blocks and Drilling Line

Vallourec Global Solutions. Tubular Solutions FROM CONCEPTION TO COMPLETION

F.I.R.S.T. Gas Turbine End of Life Presentation

Transcription:

EDUCATION & LICENSE PROFESSIONAL ENGINEER #83977, STATE OF TEXAS 7/98 Massachusetts Institute of Technology M.S. Mechanical Engineering, 9/81 6/83 GENERAL ELECTRIC EDISON ENGINEERING PROGRAM Part-time internal training program 9/80 6/83 UNIVERSITY OF MARYLAND B.S. Mechanical Engineering, 9/80 6/83 HARFORD COMMUNITY COLLEGE A. A. Engineering, 9/80 6/83 WORK EXPERIENCE AUGUST 2010 PRESENT KNEWMAN ENGINEERING Ken founded KNewman Engineering (KNE), a DBA of KNewman Holdings, LLC. KNE which draws upon Ken s background in Coiled Tubing (CT), tubing forces and limits and CT fatigue to provide technical consulting and modeling tools to the oil and gas industry, in these areas of expertise. See www.knewman.com for more information. JUNE 2009 PRESENT Ken founded Cormorant Engineering which is developing hydraulically operated gas well dewatering systems. See www.cormorant.us.com for more information. CORMORANT ENGINEERING Jan 2008 Present Pecan Grove In January 2008 Ken bought a pecan orchard with 1,000 pecan trees, and built an assisted living center on the farm. The assisted living center now has 11 residents. There are 4 rental homes on the farm. The Pecan Grove DBA of KNewman Holdings has 3 businesses, the assisted living center, the rental houses and the pecan orchard. See www.pecangrove.net. AUGUST 2007 JUNE 2010 Technical Advisor NOV CTES CONROE, TX The portion of CTES equity owned by Ken Newman was sold to National Oilwell-Varco (NOV) in August 2007. Ken continued to be responsible for the technical content of the CTES products. June 1993 August 2007 President, CTES, L.P. Founder of CTES, L.C. (partially owned by National Oilwell-Varco) and CTES, Ltd (UKbased company) which develop specialized products and perform research, consulting and contract engineering services for the Coiled Tubing industry. In 2007 the combined companies have 31 employees and in excess of $9.5 million in annual revenue. Selected major accomplishments of CTES include: Developed the Cerberus software suite that performs fatigue, downhole forces and well hydraulics models for job design calculations. Developed the Orion data acquisition systems and specialized sensors (diameter and depth sensors) for real time acquisition of data on CT units, pumping units, and wireline units. Over 100 of these units have been sold. Patented and developed a system to install wireline cable inside of CT while the CT is spooled on the reel. 18 of these systems have been sold. 23 March 2012 Resume of Ken Newman Page 1

Performed research regarding the fatigue, buckling, lockup, elongation, rotation and catastrophic buckling of CT. Performed research to prove that cement pulsation would improve the integrity of casing cementing. Developed CT Engineering and Operations manuals and training materials used by several large companies. Developed and operated a data warehouse to store drilling data transmitted via satellite from rigs, and make this data available to customers over the internet. Chairman of the Board, SmarTract, Inc. Invented and patented a downhole tractor system within CTES, L.C. This system was developed in conjunction with SensorWise, Inc. and then was placed in a separate company, SmarTract, Inc. The tractor system has been commercial since March of 2000. SmarTract currently has 7 employees in offices in Houston and Aberdeen Scotland. JANUARY 1985 JUNE 1993 SCHLUMBERGER August 1990 June 1993, CT Business Line Manager DS, France Responsible for Dowell-Schlumberger worldwide CT business. Major accomplishments include: Developed CT business strategy and annual plans Managed the 300% growth of this business from 1990 to 1992 Coordinated R&D, training, manufacturing, marketing and operations activities Started and managed the CT drilling task force - becoming a new business Wrote many SPE papers, magazine articles, brochures and ads Performed many CT seminars, SPE distinguished lecture series etc. April 1988 September 1990, CT Engineering Manager DS, Texas Started the CT engineering efforts in DS with 10 engineers. Major developments were: CT fatigue life prediction model CT tubing forces model - developed the concept of lockup Selective treatment downhole tool system CT logging system Real time tubing integrity monitor Safe deployment system U.S. Patent 4,940,095 plus many internal patent memos Jan 1988 September 1990, Director Schlumberger Employee Credit Union (SECU) Served on SECU board of directors - elected, part time position Chairman of the marketing committee Performed marketing survey for checking accounts Developed business plan to implement checking account system Jan 1985 April 1988, Computer Systems Department Manager SPT, Texas Managed department with up to 25 people and a $10M budget responsible for: Accounting (MIS) systems serving many engineering and manufacturing locations Manufacturing (MRP) systems serving 4 manufacturing plants CAE/CAD and general purpose computer systems serving over 100 engineers CAM systems for numerical control machines Coordinating the Engineering - Manufacturing interface DEC 1979 JAN 1985 GENERAL ELECTRIC COMPANY MASSACHUSETTS JUNE 1982 JAN 1985, COMPRESSOR APPLICATIONS ENGINEER Designed centrifugal compressors and presented proposed designs to customers. Dec 1979 Jun 1982, Computer Systems Engineer Developed CAE/CAD software to design steam turbines and centrifugal compressors. DEC 1979 JAN 1985 TEACHER MASSACHUSETTS 23 March 2012 Resume of Ken Newman Page 2

TAUGHT FORTRAN PROGRAMMING IN THE EVENINGS AT FITCHBURG STATE COLLEGE WHILE AT GE. SEPT 1977 DEC 1979 OCT 1975 SEPT 1977 NASA, SCIENTIFIC PROGRAMMER BATA SHOE, COMPUTER OPERATOR PATENTS PUBLICATIONS 1) US 4,940,095- Deployment/Retrieval Method and Apparatus for Well Tools used with Coiled Tubing 2) US 5,599,004 Apparatus for the Injection of Cable into Coiled Tubing 3) US 5,503,370 Method and apparatus for the Injection of Cable into Coiled Tubing 4) US 5,794,703 Wellbore Tractor and Method of Moving an Item Through A Wellbore 5) US 6,082,461 Bore Tractor System 6) US 6,089,323 Tractor System 7) US 6,142,406 Method and System for Controlling a Coiled Tubing Arch 8) US 6,247,534 Wellbore Cable System 9) US 6,321,596 System and Method for Measuring and Controlling Rotation of Coiled Tubing 10) US 6,443,242 Method for Wellbore Operations Using Calculated Wellbore Parameters in Real Time 11) Europe 0951611 Wellbore Tractor 12) US 6,527,056 Variable OD Coiled Tubing Strings 13) US 6,782,751 Pipe Inspection Systems and Methods 1. Ackert, D., Beardsell, M., Corrigan, M., Newman, K.: "The Coiled Tubing Revolution," The Oilfield Review, October 1989, pp. 4-16 2. Newman, K., Corrigan, M. and Cheatham, J.: "Safely Exceeding the Critical Buckling Load in Highly Deviated Holes," SPE paper 19229, Offshore Europe, Aberdeen, September 1989. 3. Newman, K., Corrigan, M., Hehoe, G., Douglas, A., Torre, A.: "Assisted Lift Production Logging with Coiled Tubing," SPE paper 90142, Eighth Offshore South East Asia Conference, Singapore, December 1990 4. Newman, K.: "Coiled Tubing Pressure and Tension Limits," SPE paper 23131, Proceedings from Offshore Europe 91, Aberdeen, September 1991 5. Newman, K. and Newburn, D.: "Coiled Tubing Life Modelling," SPE paper 22820, 66th Annual Technical Conference and Exhibition, Dallas, October 1991 6. Thomeer, H. and Newman, K.: "Safe Coiled-Tubing Operations," SPE paper 23266, The First International Conference on Healty, Safety and Environment, The Hague, November 1991 7. Newman, K.: "Determining the Working Life of a Coiled Tubing String," Offshore Magazine, December 1991 8. Traonmilin and K. Newman: "Slim Hole Drilling Experiment with Coiled Tubing," Oil & Gas Journal, February 1992 9. Newman, K. and Allcorn, M.: "Coiled Tubing in High Pressure Wells," SPE paper 24793, 67th Annual Conference and Exhibition, Washington D.C., October 1992 10. Leising, L. and Newman, K.: "Coiled Tubing Drilling," SPE paper 24594, 67th Annual Conference and Exhibition, Washington D.C., October 1992 11. Adrichem, W. and Newman, K.: "Validation of Coiled-Tubing Penetration Predictions in Horizontal Wells," SPE paper 24765, 67th Annual Conference and Exhibition, Washington D.C., October 1992 12. Newman, K.: "Collapse Pressure of Oval Coiled Tubing," SPE paper 24988, European Petroleum Conference, Cannes France, November 1992 13. Ackers, M., Doremus, D., Newman, K.: "An Early Look at Coiled-Tubing Drilling," Oilfield Review, July 1992, pp. 45-51 14. Adam, B., Newman, K., O'Brien, D.: "Coiled Tubing: Versatile Tool for the 1990s," Petroleum Engineer International Magazine Supplement, November 1992 15. Newman, K.R., Brown, P.A.: "Development of a Standard Coiled-Tubing Fatigue Test," SPE paper 26539, SPE Annual Technical Conference and Exhibition, Houston, October 1993 16. Gu, H., Newman, K.R., Hauglund, L.: "Analysis of Slack-off Force Transmitted Downhole in Coiled Tubing Operations," SPE paper 26511, SPE Annual Technical Conference and Exhibition, 23 March 2012 Resume of Ken Newman Page 3

Houston, October 1993 17. Simmons, J., Adam, B.: "Evolution of Coiled Tubing Drilling Technology Accelerates," Petroleum Engineer International, September 1993 18. Leising, L., Newman, K.: "Coiled-Tubing Drilling," SPE Drilling and Completion, December 1993, 227-232 19. Newman, K., Drake, P., Palmer, R.: "Increased CT Activity Leads to Development of New Coiled Tubing Equipment," American Oil and Gas Reporter Magazine, February 1994 20. Newman, K., Doremus, D.: "Hybrid Coiled Tubing / Snubbing Drilling and Completion System," SPE paper 28300, 69th Annual Technical Conference and Exhibition, September 1994 21. Newman, K.: "Where is the Coiled Tubing Wave Headed," Petroleum Engineer International, September 1994 22. Knowles, D., Newman, K.: Slimhole and Coiled Tubing Standards, Phase I, GRI Topical Report number GRI-95/0179, March 1995 23. Palmer, R., Newman, K., Reaper, A.: "Developments in Coiled Tubing BOP Ram Design," OTC Paper 7876, Offshore Technology Conference, Houston, May 1995 24. Newman, K., Haver, N., Stone, L., Tong, D: Development of a Coiled Tubing Cable Injection System, SPE Paper 30679, SPE Annual Technical Conference and Exhibition, Dallas, October 1995 25. Newman, K.: Coiled Tubing Forces and Stresses Modeling Improvements, 2 nd ICoTA/SPE European CT Roundtable, October 1995 26. Newman, K. Stone, Lyndon: Electric Drilling Motor for CT Drilling - Feasibility Study, GRI Final Report number GRI-95/0428, October 1995 27. Newman, K., Brown, P., Van Arnam, D.: Slimhole and Coiled Tubing Standards, Phase I - Weld Technology, GRI Final Report number GRI-95/0500, December 1995 28. Newman, L., Brown, P., Van Arnam, D., Wolhart, S.: Analysis of Coiled Tubing Welding Techniques, SPE 36346, SPE/ICoTA 1 st North American Coiled Tubing Roundtable, Montgomery, TX, February 1996 29. Newman, K., Stone, L., Wolhart, S.: The Feasibility of Using an Electric Downhole Motor to Drill with Coiled Tubing, SPE 36343, SPE/ICoTA 1 st North American Coiled Tubing Roundtable, Montgomery, TX, February 1996 30. Newman, K.; Well Service Coiled Tubing Units Vs. Drilling Rigs, Petroleum Engineer International, February 1996, pp 71-72 31. Newman, K., Sathuvalli, U., Wolhart, S.: Defining Coiled Tubing Limits - A New Approach, OTC 8221, 28 th Annual OTC, Houston, May 1996 32. Newman, K., Sathuvalli, U., Wolhart, S.: Elongation of Coiled Tubing During its Life, SPE 38408, 2 nd Annual SPE/ICoTA North American Coiled Tubing Roundtable, April 1-3, 1997 33. Newman, K., Coiled Tubing Technology Continues its Rapid Growth, World Oil Magazine, January 1998, pp 64-71 34. Newman, K., Aasen, Jan, Catastrophic Buckling of Coiled Tubing in the Injector SPE 46007, 3 rd Annual SPE/ICoTA North American Coiled Tubing Roundtable, April 15-16, 1998 35. Newman, K., Coiled-Tubing Stretch and Stuck-Point Calculations SPE 54458, 1999 SPE/ICoTA Coiled Tubing Roundtable, May 1999 36. Newman, K., Stein, D., Ackers, M., Rotation of Coiled-Tubing SPE 60737, 2000 SPE/IcoTA Coiled Tubing Roundtable, April 2000 37. Newman, K., Wojtanowicz, A., Gahan, B., Cement Pulsation Improves Gas Well Cementing World Oil Magazine, July 2001 38. McSpadden, A., Newman, K., Development of a Stiff-String Forces Model for Coiled Tubing SPE 74831, 2002 SPE/ICoTA Coiled Tubing Roundtable, April 2002 39. Newman, K., Variable OD Coiled Tubing, SPE 74829, 2002 SPE/ICoTA Coiled Tubing Roundtable, April 2002 40. McSpadden, A., Newman, K., Modified CT Limits Analysis for Practical Well Intervention Design, SPE paper 74828, 2002 SPE/ICoTA Coiled Tubing Roundtable, April 2002 41. Newman, K., Lovell, J., A New Approach to Ultrasonic CT Inspection, SPE paper 81722, SPE/ICoTA Coiled Tubing Conference and Exhibition, April 2003 42. Smalley, E., Newman, K., Stephens, R., Modeling and Measuring Dynamic Well Intervention Stack Stress, SPE paper 94233, SPE/ICoTA Coiled Tubing Conference and Exhibition, April 2005 43. Newman, K., Dynamic FEA Models for Snubbing Buckling and Riserless Subsea Wireline 23 March 2012 Resume of Ken Newman Page 4

Intervention, SPE paper 99749, SPE/ICoTA Coiled Tubing and Well Intervention Conference and Exhibition, April 2006 44. Newman, K., Vibration and Rotation Considerations in Extending Coiled-Tubing Reach, SPE paper 106979, SPE/ICoTA Coiled Tubing and Well Intervention Conference and Exhibition, March 2007. 45. Newman, K., Smalley, E., Linares, L., Kelleher, P., Field Experience Using an Intervention Wellhead Structure Modeling and Monitoring System, SPE paper 113808, SPE/IcoTA Coiled Tubing and Well Intervention Conference and Exhibition, April 2008 46. Newman, K., Burnett, T., Pursell, J., Gouasmia, O., Modeling the Affect of a Downhole Vibrator, SPE 121752, SPE/ICoTA Coiled Tubine and Well Intervention Conference and Exhibition, March 2009 47. Newman, K., Dynamic Well Intervention Modeling, SPE 153180, SPE/ICoTA Coiled Tubine and Well Intervention Conference and Exhibition, March 2012 23 March 2012 Resume of Ken Newman Page 5