CABLE MEDIAN BARRIER



Similar documents
Safety Performance of the Median Cable Barrier. Deerfoot Trail, Calgary, Alberta UPDATE

High Tension Cable Median Barrier: A Scanning Tour Report

DESIGN OF A TL-4 MEDIAN CABLE BARRIER FOR DEERFOOT TRAIL, CALGARY

Superseded. The average time for a normal repair after a crash is approximately 1.5 to 2 hours for a 3- person crew.

Washington State Cable Median Barrier In-Service Study

guidance on barrier selection, guidance on barrier design, guidance on barrier placement, and guidance on general system considerations.

Technical Report Documentation Page 2. Government Accession No. 3. Recipient's Catalog No. 1. Report No. FHWA/TX-09/

Session 3: Guardrail Design and Sitespecific. Considerations

Evaluation of Brifen s Wire Rope Safety Fence. By Dave Ward, PE. Indiana Department Of Transportation. S b 2006

Evaluation of High-Tension Cable Barriers in Wisconsin Final Report FEP-05-01

Evaluation of Wisconsin Cable Median Barrier Systems: Phase 2

1What purpose do guard

62 nd Annual Missouri Traffic and Safety Conference. M.A.S.H.: The New Safety Hardware Crash Testing Criteria

HIGH TENSION CABLE BARRIER

Capital Costs for Roadside/Median Barrier Systems

Malcolm H. Ray, P.E., Ph.D. 186 Staples Hill Road Canton, Maine April 26, 2007

INITIAL SITE INSPECTION OF MOTORCYCLE COLLISIONS WITH ROADSIDE OBJECTS IN NEW JERSEY

Table of Contents (Continued) Warrants (1) Median Barrier Types (1)

Summary of ET Plus Guardrail End Treatment Inspections

CHAPTER 14: GUARDRAIL and BARRIERS

Monitoring Highway Assets with Remote Technology

HEART Product Description Assembly Manual

Transportation Management Plan Template

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.

High-tension Median Cable In-service Performance Evaluation and Cost Effectiveness Analysis

Evaluation of Frequency and Injury Outcomes of Lane Departure Crashes

Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL

Alberta Guidelines for Upgrading Bridgerails and Approach Guardrail Transitions

VDOT 2001 Road and Bridge Standards Section Guardrail, Fences, and Markers

How To Improve Safety

DOT HS October 2001

Maryland Department of Transportation. Guidelines for Traffic Barrier. Placement and End Treatment. Design

11 Guardrail. W-Beam Guardrail Pre-Installation Inspection During Installation Basis for Use. Modified Guardrail. End Treatments and Transitions

Cable Median Barrier Guidelines

The Need for Traffic Incident Management

NUCOR STEEL MARION, INC. HIGHWAY PRODUCTS Saving Money. Saving Lives.

Effect of Barrier Type on Injury Severity in Motorcycle-to-Barrier Collisions in North Carolina, Texas, and New Jersey

Best Practices for Removing Vehicles from Cable Barrier for the NC Guardrail Committee

CABLE GUARDRAIL EVALUATION U.S. ROUTE 1 MEDIAN MOORESFIELD ROAD TO GOVERNMENT CENTER SOUTH KINGSTOWN

Research Digest. Table of Contents. In this Issue: TxDOT Reports

Virginia Department of Transportation Guardrail System Upgrade Guidance

How To Use A Tracc Crash Cushion

How To Reduce Work Zone Related Collisions

Unit Price Averages Reports

Bicycle Railing Heights (Everything you wanted to know about design guidelines but were afraid to ask)

Safe & Sound Bridge Terminology

How To Know How Many People Die In A Car Crash

NUCOR U.S. High Tension Cable Barrier System INSTALLATION MANUAL

Successful performance management serves as

A Review of Serious Casualty Motorcycle Crashes in Tasmania

Update on Oklahoma Bridges and Highways

GUARDRAIL CHECKLIST. (most of this information can be found in the Design Scene)

Daniello, Cristino, and Gabler 1 RELATIONSHIP BETWEEN RIDER TRAJECTORY AND INJURY OUTCOME IN MOTORCYCLE-TO-BARRIER CRASHES

Guidelines. Motorcycle and Bicycle Work Zone Safety

TECHNICAL MEMORANDUM SUMMARY REPORT:

SECTION INLETS INLET LOCATIONS

Road Rehabilitation and Reconstruction Using AutoCAD Civil 3D

GUARDRAIL INNOVATION FLOWS FROM HERE

Rockfall in Ohio An Update of the Rockfall Database Population. Eric Kistner Stantec August 1, 2012 Geohazards Conference

NORTH CAROLINA NUG UPDATES FOR SUCCESSFUL TIM TEAMS. Traffic Incident Management Workshop June 19th, 2012

Development of Guidelines for Anchor Design for High-Tension Cable Guardrails

Nu-Guard 31 Steel Guardrail System

CONCEPTUAL REHABILITATION ALTERNATIVE

Storm Drainage Systems

SKT-SP Tangent Terminal

HIGHWAY PRODUCTS. Revised January 2008 BUILDING TOMORROW S HIGHWAY SAFETY SOLUTIONS TODAY

Executive Summary. In December of 2001, the Region of Durham retained Synectics Transportation Consultants Inc. (Synectics) to prepare a report to:

Highway Safety Evaluation. What Is Out There

Maryland Work Zone Accidents Comparison May 2005

DOT HS December Motor Vehicle Crashes: Overview ,000. Fatality Rate per 100M VMT

ARIZONA DEPARTMENT OF TRANSPORTATION

Incident Management Response Plan Hampton Roads Highway Incident Management Committee

National Transportation Safety Board Washington, D.C

Northwest Region Division of Transportation Bureau of Indian Affairs

DRAINAGE MANUAL CHAPTER VII STORM DRAINAGE SYSTEMS

ANNEX D REVIEW OF INFORMATION RECEIVED FROM HIGHWAYS AGENCY LOCAL AGENTS, BRITPAVE, AND THE VRMA

Talking Points. About Roadway Users

District 6. Business Plan

Roadway Cost Per Centerline Mile Revised June 2014

VI. VEHICLE IMPACT WITH CURB-AND-GUARDRAIL SYSTEMS. high-speed roadways, they are often required because of restricted right-of-way, drainage

SAFE ROAD INFRASTRUCTURE DESIGN FOR HIGHWAYS

Probability Assessment of Traffic Accident

MAJOR FATAL ROAD ACCIDENTS IN BANGLADESH: CHARACTERISTICS, CAUSES AND REMEDIAL MEASURES

PRIORITIZATION PROCESSES

Spot Safety Project Evaluation

Motor Vehicle Fatalities Accepted by the Workers Compensation Board

Traffic Incident Management Where are we focused? Captain Mike Prochko Arizona Department of Public Safety Highway Patrol Division

X-Tension TM Guardrail End Terminal

11 p.m. to. Tuesday, June. will remain open. 14. closed

How To Design A Bicycle Path In California

ASSET MANAGEMENT GUIDE FOR PROJECT DESIGN FORMAT

IH-635 MANAGED LANES PROJECT, SEG. 3.2

Paul Deutsch. NDDOT Office of Project Development Conference November 9, 2010

NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW

Safety Risk Analysis and Proposing Risk Mitigation Strategies for Operations and Maintenance Activities in Highways: A Qualitative Method

BEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project.

DOT HS December Motor Vehicle Crashes: Overview. Fatality Rate per 100M VMT

GEOMETRIC DESIGN CIVL 3161

SECTION STORM DRAINAGE TABLE OF CONTENTS

Transcription:

A Focus Technology of the American Association of State Highway and Transportation Officials (AASHTO) Technology Implementation Group (TIG) CABLE MEDIAN BARRIER

Why Median Barriers 23,139 Road Departure Fatalities 16,214 From Run-Off-The Road (ROR) Crashes 740,000 Road Departure Injury Crashes 2,600,000 Road Departure Crashes 267 Fatalities Involving Crossover Median Head-On Collisions Source: Federal Highway Administration, Median Barriers (2001)

Cable Barrier Safe Effective Cost Efficient Proven Results Replaceable

Share & Sponsor Technology Transfer Promote Transportation Advancements Encourage Implementation

Why Cable Median Barrier? R E S U L T S

Median Crossover Collisions Before & After Cable Barrier Placement North Carolina Washington Ohio Texas Before After Before After Before After Before After All Cross Median Collisions 60 23 42.4 11.2 N/A 1 N/A N/A Fatal Cross Median Collisions 4 2 4.4 0.4 9 0 47 1 Disabling Injury Cross Median Collisions 7 2 5.2 1.5 N/A 0 N/A N/A

Across Median Crashes Avoided Disabling Injuries Reduced Lives Saved Fatal Crash Costs Decreased

Cable Barrier Installations Current Planned North Carolina 550 miles 50 miles Washington 165 miles 20 miles Ohio 121 miles 500 miles Texas 600 miles 200 miles Approximate mileage as of 12/31/2006

Cable Median Barrier Life Saving Injury Reducing Technology Flexible Customizable Solutions

Cable Median Barrier States States without Cable States with Cable installed States with Pending Projects

U.S. Generic Low Tension Barrier Type of Cable Barrier Used Safence North Carolina Low High Tension Tension X X Gibraltar Cable Barrier Brifen Safety Fence Washington Ohio X X X Nucor Marion U.S. High Tension Trinity Cable Safety Systems (CASS) Texas X

Barrier Installation Costs Cable Guardrail Low Tension (1-Line) $84,000 per mile High Tension Cable Barrier (Socketed Post) $230,000 per mile Single Face Guardrail (2-Line) $265,000 per mile Double-Faced Guardrail (Strong Post) $175,000 per mile

Barrier Installation Costs Cable Median Barrier $130,000-300,000 per mile* W-Beam Guardrail $250,000-600,000 per mile* Precast Concrete Barrier $300,000-2,700,000 per mile* *Upper end of cost range reflects costs for extensive grading

Barrier Installation Costs Concrete Barrier $310,000 per mile Earth Mounding $190,000 per mile Barrier W-beam Guardrail $83,000 per mile High Tension Cable $72,000 per mile

Barrier Installation Costs Cable Median Barrier (High Tension, Socket Post) $45,000/mile (Include a Three Foot Mow Strip + $45,000) Precast Concrete Barrier $120,000/mile Precast Single Slope Concrete Barrier $210,000 Cast in Place Concrete Barrier $250,000

Roadway Design: Side Slope & Placement Cable Median Barrier 70 Median Width or Less 500 Miles of Low Tension Barrier 11 6 Designed Deflection 4 Offset from Ditch Line 6:1 Slopes or Flatter Median Barrier Drawings 8 Offset at 60 Median Widths Cable Height Pre-2006: 21 Bottom 27 Middle 33 Top 2006 Forward: 20 ½ Bottom 25 ¼ Middle 30 Top Design Specifications

Roadway Design: Side Slope & Placement Cable Median Barrier Placed on 6:1 Slope or Flatter Placed Within l of Low Point in Median 43 Miles of Low Tension Installed 122 Miles of High Tension (Predominately Socketed System) Or A Minimum of 8 Offset from Low Point Deflection Varies Depending on Post Spacing Generally 9-12 with 16 Post Spacing

Roadway Design: Side Slope & Placement Cable Median Barrier 10 Offset from Ditch Centerline 6:1 Depressed Median Slopes And Wide Paved Shoulders 50-76 Median Widths 10 Paved Inside Shoulder Concrete Sockets 8 Deflection (generally)

Roadway Design: Side Slope & Placement Cable Median Barrier Deflection 8 or Less 6:1 Approach Slope 12 From Travel Lane 20 Post Spacing End Cable Barrier Behind W- Beam Place Cable Barrier on Convex Side of Curves

Maintenance & Repair North Carolina Washington Ohio Texas Maintenance Repairs N/A 219 171 Unknown Average Posts Hit Average Hours to Repair N/A 6-7 5.65 10 N/A 2-14 48-120 Less Than hours from One Hour time of accident Average Repair Cost N/A $800 $631 per location $111 per post Unknown

North Carolina Lessons Learned 80% Decrease in Total Across Median Crashes 86% Decrease in Fatal Across Median Crashes Washington Cable Median Barriers Reduce Frequency and Severity of Median Cross-Over Collisions 95% of Vehicles that Hit the Cable Median Barrier Did Not Cross the Median Cable Median Barrier has Fewer Injuries and Secondary Collisions than Other Barriers Ohio Location of Interchanges Does Not Have Impact on Barrier Plans Recommend Multi-Facet Approach Texas Many Hits Since Cable Barrier Installed but No Penetrations To-Date Initial Negative Reaction from Emergency Services has been Reversed

Cable Median Barrier Resources Available www.aashtotig.org Challenges to Weigh

To Learn More AASHTO TIG http://www.aashtotig.org Federal Highway Administration Brifen U.S.A. Gibraltar Nucor Steel Marion Safence Trinity http://www.safety.fhwa.dot.gov http://www.brifenusa.com http://gibraltartx.com http://nsmarion.com http://www.safence.com http://www.highwayguardrail.com

The Lead States Team North Carolina Shawn Troy (919) 773-2897 stroy@dot.state.nc.us Brian Murphy (919) 773-2898 bgmurphy@dot.state.nc.us Washington Dick Albin (360) 705-7451 albind@wsdot.wa.gov Ohio Texas Dean Focke (614) 466-2847 dean.focke@dot.state.oh.us Rory Meza (512) 416-2678 ameza@dot.state.tx.us Federal Highway Administration Frank Julian (404) 562-3689 frank.julian@fhwa.dot.gov