EXETER TOWNSHIP SKETCH PLAN APPLICATION CHECKLIST



Similar documents
SITE DEVELOPMENT PLAN CHECKLIST. Project Name: Site Plan No.:

REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT

INSTRUCTIONS FOR COMPLETING COMPONENT 1 EXCEPTION TO THE REQUIREMENT TO REVISE THE OFFICIAL PLAN

Hempfield Township LOGGING/HARVESTING PERMIT APPLICATION. Per Section of the Code of the Township of Hempfield

Preliminary Plan Application and Checklist

ADMINISTRATIVE LAND SPLIT APPLICATION

City of Valdosta Land Development Regulations. Table of Contents

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

PLANNED UNIT DEVELOPMENT (P.U.D.), REZONING, and COMPREHENSIVE PLAN AMENDMENT APPLICATION PACKET VILLAGE OF HANOVER PARK DEVELOPMENT COMMISSION

COMMUNITY CERTIFICATIONS

Model Subdivision and Land Development (SALDO) Subdivision/ Land Development Presentation Overview. Why Subdivision and Land Development Regulations?

Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities

Washington City Subdivision Development Application Checklist

PRE APPLICATION CONFERENCE - INTRODUCTION

ZONING HEARING BOARD APPLICATION CHECKLIST

#613 PLANNING BASICS

Planning and Zoning Commission Johnston, Iowa June 29, 2015

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

Electronic Signature and Fee Payment Confirmation

1.7.0 Floodplain Modification Criteria

STATEMENT OF PURPOSE

APPENDIX I DEVELOPMENT PROCESS CHECKLIST

M E M O R A N D U M REVIEW COMMENTS YASGUR SUBDIVISION (12 MAPLE LANE) PRELIMINARY SUBDIVISION PLANS DATED REVISED

Chapter 7 COMMUNITY FACILITIES and SERVICES PLAN

AGENDA LARIMER COUNTY PLANNING COMMISSION Wednesday, April 20, 2016/6:30 P.M./Commissioners' Hearing Room

OWNERS NAME PHONE OWNERS ADDRESS APPLICANTS NAME PHONE APPLICANTS ADDRESS

1. It would create hazardous effects of storm water run-off. 3. It would increase hazardous driving conditions on the public road.

How To Plan For A County Budget

APPLICATION PROCESS FOR LAND DISTURBING PERMIT

Draft ARTICLE 20A "AO" ANTIETAM OVERLAY DISTRICT

Chapter 2 PLAN AND PLAT REVIEW PROCESS

National Association of Home Builders. Land Development Checklist. National Association of Home Builders

Conservation Tax Credit Regulations Chapter A-1 RULES OF GEORGIA DEPARTMENT OF NATURAL RESOURCES CHAPTER

services Imagination. Delivered. Imagination. Delivered. Architecture Automation Bridge Design Electrical Design Environmental

3. Type of lots being registered. If more than one type, so designate with number of each type.

COMP PLAN SUBMITTAL CHECKLIST

5. MAJOR STREET CONSTRUCTION The B-Permit B-Permit Description and Purpose

EASTTOWN TOWNSHIP CHESTER COUNTY, PENNSYLVANIA APPLICATION FOR ZONING PERMIT

5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons)

COMMONWEALTH OF KENTUCKY CITY OF LONDON ORDINANCE NO AN ORDINANCE ESTABLISHING EROSION AND STORM WATER CONTROL

sdci Seattle Permits Tip Tree Protection Regulations in Seattle CATEGORIES OF TREES AFFECTED IDENTIFYING TREE TYPES ON YOUR PROPERTY

NEW CONSTRUCTION FINANCING PROGRAM

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS

TOWN OF JUNO BEACH 340 Ocean Drive Juno Beach, FL Phone: (561) Fax: (561)

The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT Revised

The 2002 Development Regulations. The City of Sugar Hill, Georgia

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS

BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

understanding Sustainable Landscaping & Tree Preservation Standards

Lower Crooked Creek Watershed Conservation Plan EXECUTIVE SUMMARY

Work Breakdown Structure Element Dictionary. Final Design

SPA Annual Report for 2002 September, 2003 Montgomery County Department of Environmental Protection Page 125. Evaluation and Recommendations

COASTAL APPLICATION FOR A MAJOR SITING PERMIT

Property Records Online

PRELIMINARY PROJECT REVIEW PROCESS

Foreign Affairs Security Training Center (FASTC) U.S. General Services Administration U.S. Department of State

JACKSON TOWNSHIP FEE SCHEDULE 2015

Homeowner s Guide to Drainage

THIS PAGE INTENTIONALLY LEFT BLANK

5 Most Common Planning & Management Problems in Ontario County, Canada

Site Plan Review Regulation Amendments draft of 8/31/15

APPLICATION FOR A FILL, EXCAVATION AND SITE GRADING PERMIT

CONFORMITY WITH PLANS; DRAINAGE.

CASS COUNTY COMMISSION POLICY MANUAL ADOPTED DATE: FEBRUARY 2, 1998 PAGE 1 OF 9

PROPERTY LINE ADJUSTMENT APPLICATION

SACRAMENTO COUNTY SUMMARY OF ZONING CLASSIFICATIONS

Harris County Flood Control District. Policy, Criteria, and Procedure Manual

SUBDIVISION REGULATIONS TOWN OF POMFRET, CT

NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014

APPLICATION FOR SPECIAL EXCEPTION USE

Polk Commerce Centre CRA Spine Road Alignment Study

Chapter 7 ZONING PLAN

NOTICE OF A TYPE I DECISION ON A PROPOSAL IN YOUR NEIGHBORHOOD

ACTIVITY REPORT. May 2010

BEFORE YOU BUILD GUIDE

TREE PROTECTION ORDINANCE CITY OF BUFORD, GEORGIA

SECTION EIGHT BONDING REQUIREMENTS

Lincoln County Floodplain Development Permit Application

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

Wildlife Habitat Conservation and Management Program

Warwick Township. Office of Code Compliance. Residential Building Permit Application. Plan Submittal Guide Our Goal is a Safe Environment

Goal 1 To protect the public health, safety and property from the harmful effects of natural disasters.

8.1 APPENDIX A. SUBDIVISION DATA REQUIREMENTS

California Tax Disclosure Report

22.01 SETTLEMENT 24/04/2014 C73

Section 6: Mitigation Strategy

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

CONSTRUCTION PERMIT SUBMITTAL CHECKLIST

ORDINANCE NO

ASSESSOR S CALENDAR. When in session, the board of county commissioners may cancel property taxes which for any lawful reason should not be paid.

CITY OF PITTSBURGH Department of City Planning 200 Ross Street, Pittsburgh, PA (fax)

Building Permits Permit Counter

Official OPP Overall Penn State Stormwater Program Latest Revision/Review: 5/28/2015

PREVENTION. City of Orem FLOOD DAMAGE PREVENTION

Group Home Requirements

Capital Facilities Financial Plan ( ) Supporting document to the 20-year Comprehensive Management Plan

Carlton Fields Memorandum

Sewage Disposal plan

Adopted 9/23/98 CHATTAHOOCHEE CORRIDOR PLAN. The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are:

Transcription:

EXETER TOWNSHIP SKETCH PLAN APPLICATION CHECKLIST Submission Checklist: Items A through G ARE REQUIRED for the first submission of a Sketch Plan. Only Item C is required for the submission of revisions to dully filed Sketch Plan. A. Three (3) completed Applications for Review of Sketch Plan. 330-7.B (1) B. Two completed Department of Fire Codes site/subdivision plan examination permit application 330-7.B (1) C. Four (4) black-on-white prints on paper of the Sketch Plan. 330-7.B (1) D. One (1) completed Site Visit Authorization. 330-7.B (1) E. Submission of three (3) copies of site aerials 330-12.A (13) F. All submissions shall be provided in digital PDF format in a manner approved by the Township. service). Plan sets must be submitted as a single multi-page PDF in page number order. 330-7.B (1) G. Township Filing Fee. Check or money order payable to Exeter Township. 330-7.C BUT NOT SUBMITTED in the space provided in the Submission Checklist. The following responses should be used: This response on the part of the Applicant or his Consultant may result in the Submission made by:

EXETER TOWNSHIP SKETCH PLAN OF RECORD APPLICATION CHECKLIST SUBMISSION CHECKLIST: Items A through K ARE REQUIRED for the first submission of a Sketch Plan of Record. Only Item C is required for the submission of revisions to dully filed Sketch Plan of Record unless revisions are requested. A. Three (3) completed Applications for Review of Sketch Plan of Record. 330-7.B (1) B. Two completed Department of Fire Codes site/subdivision plan examination permit application 330-7.B (1) C. Six (6) black-on-white prints on paper of the Sketch Plan of Record. (after the initial submission fewer copies required - please check with the Township for amount needed) 330-7.B (1) D. One (1) completed Site Visit Authorization. 330-7.B (1) E. Three (3) copies of site aerials 330-12.A (13) F. All submissions shall be provided in digital PDF format in a manner approved by the Township service). Plan sets must be submitted as a single multi-page PDF in page number order. 330-7.B (1) G. Two completed Drainage Plan Apps. (Appendix C - Stormwater Management Ordinance) 330-7.B (1) 1. Three (3) copies of the Drainage Plan (Section 404 Stormwater Management Ordinance) H. Three(3)copies of the Subdivision Sewage Disposal Report, for On-Lot sewage disposal. 330-8A.(3)(b)[7] I. If plan includes lot annexation, a copy of the proposed deed for the parcel being annexed must be submitted for review. 330.11.H (1) J. Township Filing Fee. Check or money order payable to Exeter Township. 330-7.C K. Berks County Planning Commission Application for Review and Filing Fee. Check or money order payable to County of Berks. 330-7.B (1) BUT NOT SUBMITTED in the space provided in the Submission Checklist. The following responses should be used: This response on the part of the Applicant or his Consultant may result in the

Submission made by: EXETER TOWNSHIP PRELIMINARY PLAN APPLICATION CHECKLIST SUBMISSION CHECKLIST: Items A through K ARE REQUIRED for the first submission of a Preliminary Plan. Only Item C is required for the submission of revisions to dully filed Preliminary Plan unless additional information is requested. A. Three (3) completed Applications for Review of Preliminary Plan. 330-8.(3)(b)[1] B. Two completed Department of Fire Codes site/subdivision plan examination permit application 330-8.A(3)(b)[2] C. Six (6) black-on-white prints on paper of the Preliminary Plan. (after the initial submission fewer copies required please check with the Township for amount needed) 330-8.A(3)(b)[3] D. One (1) completed Site Visit Authorization, unless submitted at Sketch Plan stage. 330-8.A(3)(b)[5] E. Township Filing Fee. Check or money order payable to Exeter Township. 330-8.A(3)(b)[9][a] F. Berks County Planning Commission Application for Review and Filing Fee. Check or money order payable to County of Berks. 330-8.A(3)(b)[9][b] G. Two completed Drainage Plan Applications (Appendix C - Stormwater Management Ordinance) 1. Three (3) copies of the Drainage Plan (Section 404 Stormwater Management Ordinance) H. Three(3)copies of the Subdivision Sewage Disposal Report, for On-Lot sewage disposal. 330-8A.(3)(b)[7] I. If plan includes lot annexation, a copy of the proposed deed for the parcel being annexed must be submitted for review. 330.11.H (1) J. Three (3) copies of all other information and plans, which are required by 330-13 1. Erosion and Sedimentation Control Plan and Report (if construction will start with Preliminary Plan approval) 330-13.E 2. Stormwater Management Report 330-13.F(3) 3. Preliminary designs of any bridges or culverts. 330-13.F(4) 4. Indicate that a Wetland delineation has been conducted. 330-13.F(11)(b)

PLANS AND DOCUMENTS REQUIRED FOR SUBMISSION (Preliminary Plan continued) 5. Traffic Impact Study, if required by 330-47 - 330-13.F(12) 6. Environmental Assessment Statement. 330-13.F(13) 7. Environmental Hazard Report. 330-13.F(14) 8. Responses from the Pennsylvania Biological Survey and/or Pennsylvania natural Diversity Inventory regarding the presence of Habitats of Threatened Species of Special Concern in Pennsylvania. 330-13.F(16) 9. Proof that all Historic and Archaeological Resources existing on the site or within 50-feet of the site have been identified or that none exist. 330-13.F(16) 10. Water Resources Study, unless exempt by 330-48 - 330-13.F(17) 11. Submission of three (3) copies of site aerials 330-13.(F)(18)(a) 12. For all commercial, industrial structures and multi-family dwellings, renderings or colored elevations of all sides. 330-13.F.(8) K All submissions shall be provided in digital PDF format in a manner approved by the Township. service). Plan sets must be submitted as a single multi-page PDF in page number order. 330-8.A.(3)(b)[9] BUT NOT SUBMITTED in the form of a letter with reference to the item number in the Submission Checklist. The letter shall accompany the Submission Checklist. The following responses should be used: This response on the part of the Applicant or his Consultant may result in the Submission made by:

EXETER TOWNSHIP FINAL PLAN APPLICATION CHECKLIST SUBMISSION CHECKLIST: Items A through P ARE REQUIRED for the first submission of a Final Plan. Only Item C is required for the submission of revisions to dully filed Final Plan unless additional information is requested. A. Three (3) completed Applications for Review of Final Plan. 330-9.A(3)(b)[1] B. Two completed Department of Fire Codes site/subdivision plan examination permit application (unless previously submitted and approved during Preliminary Plan stage) 330-9.A(3)(b)[2] C. Six (6) black-on-white prints on paper of the Final Plan. (after the initial submission fewer copies required- check with the Township for the amount needed) 330-9.A(3)(b)[3] D. One (1) completed Site Visit Authorization, unless submitted at Previous Plan stage. 330-9.A(3)(b)[5] E. Township Filing Fee. Check or money order payable to Exeter Township. 330-9.A(3)(c)[1] F. Berks County Planning Commission Application for Review and Filing Fee. Check or money order payable to County of Berks. (If not previously submitted) 330-9.A(3)(c)[2] G. If plan includes lot annexation, a copy of the proposed deed for the parcel being annexed must be submitted for review. 330.11.H (1) (if not previously submitted and approved) H. Two completed Drainage Plan Applications (Appendix C - Stormwater Management Ordinance) 1. Three (3) copies of the Drainage Plan (Section 404 Stormwater Management Ordinance) I. Three (3) copies of all other information and plans, which are outlined in 330-14 1. Landscape plan showing the number, location, size and species of all trees and shrubbery to be planted within the subdivision or land development. 330-14.E 2. Final grading plan. 330-14.F J. Two copies of all other required information including the following (if applicable) 330-9.A(3)(b)(8) 1. All offers of dedication and covenants governing the reservation and maintenance of undedicated open space which shall be approved by the Township Solicitor. 330-9.A(3)(b)(8)[a] 2. Private deed restrictions. 330-9.A(3)(b)(8)[b] 3. Approval letter for water supply from the Private Water Company. 330-9.A(3)(b)(8)[d] 4. Letters from utility companies indicating they have received Final Plans. 330-9.A(3)(b)(8)[e]

PLANS AND DOCUMENTS REQUIRED FOR SUBMISSION (final plan continued) 5. Letter from the Exeter Township Sewer Authority indicating that sufficient capacity exists to accommodate the proposed development. 330-14.N 6. Responses from the Pennsylvania Biological Survey and/or Pennsylvania natural Diversity Inventory regarding the presence of Habitats of Threatened Species of Special Concern in Pennsylvania. If such habitats exist on the tract, the measures proposed to protect the habitats shall be indicated. 330-14.O 7. Proof that all Historic and Archaeological Resources existing on the site or within 50-feet of the site have been identified or that none exist. 330-14.P 8. Wetland Encroachment Permit. 330-14.D(9) K. Two PA DEP Sewage Facilities Planning Module approval letter. 330-14.K L. Three (3) copies of the Erosion and Sediment Control Plan approved by the PA DEP or the Berks County Conservation District for the entire tract. 330-14.G M. Two copies of Penn DOT Highway Occupancy Permit (if applicable). 330-9.A(3)(g) N. Submission of three (3) copies of site aerials (if not previously submitted) 330-13.(F)(18)(a) O. Submission of two Lighting Catalog Cuts. 330-9.A(3)(b)[6] P. All submissions shall be provided in digital PDF format in a manner approved by the Township. service). Plan sets must be submitted as a single multi-page PDF in page number order. 330-9.A.(3)(b)[9] BUT NOT SUBMITTED in the form of a letter with reference to the item number in the Submission Checklist. The letter shall accompany the Submission Checklist. The following responses should be used: This response on the part of the Applicant or his Consultant may result in the Submission made by: