KODAK VERSAMARK, INC.



Similar documents
FIVE YEAR CERTIFICATION REPORT

ELECTRIC/DIESEL FIRE PUMP CHECK LIST

Fire Sprinkler System Maintenance and Testing Page 1 MAINTENANCE AND TESTING OF FIRE SPRINKLER SYSTEMS

Risk Control Bulletin Inspection, Testing & Maintenance (ITM) of Water-Based Fire Protection Systems

SELF-INSPECTION PROGRAM FOR FIRE PROTECTION EQUIPMENT

NFPA 25 FAQs. 1. When inspecting an old system (60 years or older), when/where does NFPA 25 require a system to be upgraded to present standards?

TECHNICAL ADVISORY BULLETIN

INSPECTION, TESTING AND MAINTENANCE OF FIRE PROTECTION SYSTEMS AND EQUIPMENT

Division 21. Fire Suppression

Inspection and Testing Program Fire Protection Equipment

INSTRUCTIONS FOR BUILDINGS WITH FIRE PROTECTION EQUIPMENT

EXHIBIT A SCOPE OF WORK

Fire Alarm System Standpipes Sprinkler Systems Fire Drills Commercial Cooking Hood and more

Depending on your facility and the equipment contained within, all or part of the checklists/logs can be printed for use.

ALBERTA FIRE CODE SAFETY EQUIPMENT MAINTENANCE REQUIREMENTS

CITY OF PHILADELPHIA DEPARTMENT OF LICENSES AND INSPECTIONS ANNUAL CERTIFICATION FOR FIRE ALARM SYSTEMS

MAINTENANCE AND SERVICE OF AUTOMATIC FIRE EXTINGUISHING SYSTEMS

Inspection and Testing of Water-Based Systems

EFSN Training i Module Minutes

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST RESIDENTIAL FIRE SPRINKLERS NFPA 13D

Winnipeg Fire Department Fire Prevention Branch

Automatic Fire Sprinkler Submittal Requirements

Maintaining Fire Protection Systems

Fighting Fire in Sprinklered Buildings. Student Guide

City of Columbus Department of Building and Zoning Services

FAIRBANKS NIJHUIS PACKAGED FIRE PUMP SYSTEMS.

Oil and Coolant Circulating Heating System. Model - OCSM

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST RESIDENTIAL FIRE SPRINKLERS NFPA 13R

Potter Electric Sprinkler Monitoring Training Manual

Clark County Fire Prevention

3", 4", 6" & 8" Model H Series Alarm Check Valve Installation and Maintenance Guide

FAIRBANKS NIJHUIS FIRE PUMPS.

FIRE PROTECTION SYSTEMS ACCEPTANCE INSPECTION AND TESTING PROCEDURE

CHAPTER. Fire Pumps FIRE PUMP OVERVIEW. Fire Pump Unit Defined. Fire Pump Unit Responsibility

Quik Lining Systems Heater Owners Guide

BERMAD Fire Protection

FIRE SUPPRESSION INSTALLATION CITY OF HARRISONBURG, VIRGINIA

MERCER ISLAND FIRE DEPARTMENT FIRE COMMERCIAL SPRINKLER STANDARDS

ENVIRONMENTAL HEALTH AND SAFETY. Fire Protection System Impairment Procedure

Environment of Care Fire Safety Management Plan 2014

Fire Pump Plan Review March 2010

Transformer Deluge Systems

Inspection, Testing and Maintenance

Appendix B Forms for Inspection, Testing, and Maintenance

WATER MEASUREMENT USING TWO INCH (50 mm) DRAIN TESTS

BERMAD Fire Protection

1.0 General. Inspection, Testing, and Maintenance 1 of 8

Replacement of Heating, Ventilation, Air Conditioning (HVAC) Units In Apartments Located at 641 Fifth Avenue. Photo Essay

Preventing Overheated Boiler Incidents

Cat Electronic Technician 2015A v1.0 Product Status Report 6/3/2015 4:41 PM

Revised April (May) 2015

ENGINEERING SPECIFICATION. Engineering Specification SAPPHIRE 42 Bar

Model: 400E-2M. Bermad Electrically Controlled Deluge Valve with Easy Lock Manual Reset. Installation Operation Maintenance. Application Engineering

Element D Services Plumbing

SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT

Restaurant & café guide

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

SPP Pumps Inc. Atlanta

Sprinkler and Fire Alarm Systems for the Building Official

HERNANDO COUNTY FIRE ALARM GUIDELINES

RESIDENTIAL SPRINKLER INSTALLATION GUIDE

Pressure Limiting Driver (PLD)

Design & Construction Standards, Revised January

Pr o d u c t In f o r m at i o n V008.0

EXETER TOWNSHIP DRY OR WET CHEMICAL FIRE SUPPRESSION SYSTEMS

Sprinkler Guards Model C Model D

FIRE ALARM SYSTEM SUBMITTAL CHECKLIST AND APPLICATION

FIRE SPRINKLER SYSTEM SUPERVISORY SERVICE User s Guide (DamarNet RAR Service)

USERS GUIDE. LOGIC Combi 24, 30, 35. For installation guide see reverse of book

USERS GUIDE. LOGIC Heat 12, 15, 18, 24, 30. For installation guide see reverse of book

! WARNING. McDonnell & Miller Installation & Maintenance Instructions MM-217(I) Series 150S and 157S (Snap Switch, All Models except 157S-RB-P)

USER INSTRUCTIONS FOR GET PORTABLE 12k BTU AIR CONDITIONER MODEL No. GPACU12HR

FIRE-FIGHTING DESIGN BRIEF REPORT

Program No Section Heading

Reduced Pressure Principle Assembly 3 Valve Procedure

Michael Catalano 24 Nassau Avenue, Islip NY Phone (631) Chief Fire Marshal Fax (631)

To: All Shipowners, Ship Managers, Ship Masters and Classification Societies

WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE

IDENTIFICATION BROCHURE FOR Central RESIDENTIAL WET SPRINKLERS

General Fire Code Requirements Within Commercial Tenant Spaces

F.Y.I. Specifying Fire Protection Systems Using Division 13

BUILDING OWNERS - SERVICE RELATED ISSUES FOR FIRE ALARM SYSTEMS

Air Conditioner Water Heater - A Product of HotSpot Energy LLC

User's Instructions. Alpha HE CB25/33 and HE SY25

SPRINKLER SYSTEM PLANS AND CALCULATIONS CHECK LIST

FIRE SAFETY SELF-INSPECTION FORM FOR CULTURAL INSTITUTIONS

On-Site Risk Management Audit Checklist for Program Level 3 Process

FIRE SAFETY SELF-INSPECTION FORM FOR CULTURAL INSTITUTIONS. 1. All Floors (inspect from top floor to basement): Yes No

Dehumidifier D 850E. - Instruction manual version 02

DELAWARE STATE FIRE MARSHAL FIRE ALARM SYSTEM CERTIFICATE OF INSTALLATION

Wet alarm valves. Wet alarm valves. FM trim

USER S, MAINTENANCE and SERVICE INFORMATION MANUAL

Model 800 Residential Steam Humidifier Owner s Manual. Includes Safety & Operating Instructions and Warranty Information

Model SW-20 and SW K-factor Extended Coverage Ordinary Hazard Horizontal Sidewall Sprinklers (Standard Response) General Description

Not required for most applications Not required for most applications High pressure ( provided) High pressure ( provided)

Emergency Evacuation Plan: 232 King St.

Fire Alarm System Monitoring - CAN/ULC-S561-03

Transcription:

KODAK VERSAMARK, INC. PREPARED BY : Gary Rowland 6/6/06 Kodak Versamark, Inc. 3000 Research Blvd. Dayton, Ohio 45420 APPROVED BY : Fire Suppression System Inspection, Testing and Maintenance SHEET 1 OF 9 3000022-902

REVISION DATE RLSE REVISIONS APVD REVISION DATE RLSE REVISIONS APVD 001 6/6/06 -------------- Original Release K6372 ---------------------------------------------------------- G. Rowland ------------------ DWN Gary Rowland DATE: 6/06/06 CHK DSGN ENG Kodak Versamark, Inc. DFTG MFG ENGR 3000 Research Blvd. Dayton, Ohio 45420 APVD MATL ENG NAME :Fire Suppression System Inspection, Testing and Maintenance FIRST USED ON NO. 3000022-902 ORIG CHG NO. SHEET 2 OF 9 RELEASED

Page 3 of 9 Kodak Versamark, Inc. Fire Suppression System Inspection, Testing and Maintenance TABLE OF CONTENTS I. Scope II. III. IV. References Applicability Operating Policy A. Inspection B. Testing V. Responsibilities A. Health, Safety & Environmental B. Building Maintenance Appendix A: Appendix B: Appendix C: Appendix D: Fire Protection System Inspection / Test, Weekly check-off sheet Fire Protection System Inspection / Test, Monthly check-off sheet Fire Protection System Inspection / Test, Quarterly check-off sheet Fire Protection System Inspection / Test, Yearly check-off sheet

Page 4 of 9 I. Scope This policy sets forth the procedures for controlling the inspection, testing and maintenance of water based fire suppression systems at Kodak Versamark, Inc. This policy is to insure that all water based fire suppression systems are maintained to provide a working fire suppression system at all times. II. References The regulatory requirements for the inspection and maintenance of water based fire suppression systems are specified by the National Fire Protection Association (NFPA). These requirements are found in NFPA-25 titled Standard for the Inspection, Testing and Maintenance of Water-Based Fire Protection Systems. III. Applicability This policy applies to all water based fire suppression systems both wet and dry systems located within all buildings located in Dayton, Ohio and operated by Kodak Versamark, Inc. IV. Operating Policy A. Inspection 1. Inspection of water based fire protection systems is accomplished by inspection of the system at four intervals, yearly, quarterly, monthly and weekly. The outcome of each inspection is tracked in a spread sheet and by hard copy check-off sheets. Weekly Inspection: Inspection of all valves, chains, locks on each sprinkler riser and the inspection of all pilot and warning lights for the fire pump control. (Appendix A) Monthly Inspection: Inspection of all valves, chains, locks on each sprinkler riser for proper position (open / closed). Inspection of all sprinkler riser gauges. (Appendix B) Quarterly Inspection: Inspection for proper location of hydraulic plates and stickers on each sprinkler riser and inspect for physical damage to alarm devises. (Appendix C) Yearly Inspection: Inspection of all valves, chains, locks on each sprinkler riser for proper position (open / closed). Inspect all fire hose connections for objects in the connections and their accessibility. Check the spare sprinkler head storage boxes for proper number of each type of spare sprinkler heads. Inspect fire department connection for objects in the connections and check for accessibility for the local fire department. (Appendix D) B. Testing 2. Testing of water based fire protection systems is accomplished by testing of the system at four intervals, yearly, quarterly, monthly and weekly. The outcome of each test is tracked in a spread sheet and by hard copy check-off sheets. Weekly Testing: Testing the electric fire pump is accomplished by running fire pump at churn for 10 minutes. The fire pump is started automatically by dropping the pressure on the control sensor. The start, suction and discharge pressures are monitored and recorded. (Appendix A)

V. Responsibilities Page 5 of 9 Monthly Testing: Testing of the six riser flow switches to check for reporting to the Simplex Fire Alarm System. This is accomplished by opening each riser s fire department test / drain and checking for activation of the fire alarm panel. (Appendix B) Quarterly Testing: Testing of the six riser flow and tamper switches to check for reporting to the Simplex Fire Alarm System. Testing of the riser flow switches are accomplished the same way as the monthly testing. The riser tamper switches are tested by turning each riser control valve until they report a trouble to the fire alarm system. A main drain test is performed on each riser to check the static return time. Each riser s static return time is recorded. (Appendix C) Yearly Testing: The yearly water based fire suppression system is tested by a certified fire suppression system testing company. The tests are done in accordance with NFPA-25 and are documented by the testing company. A copy of the results is kept on file with the records for the system. (Appendix D) A. Health, Safety & Environmental 1. Interpret local, state and federal codes on installation, modification, maintenance and testing of water based fire suppression systems. 2. Oversee all installation, modification, maintenance and testing by contractors or in-house maintenance staff. 3. Maintain records for installation, modification, maintenance and testing of all water based fire suppression systems. 4. Communicate any work on the suppression system to upper management that could cause a potential hazardous work environment to the employees. 5. Oversee that all permits are acquired by the contractors that are required by local building officials. 6. Fill out all Hot Work permits as required by Kodak Versamark, Inc. processes and procedures. B. Building Maintenance 1. Assist outside contractors with any services required to make the installation, maintenance, modification or testing of the suppression system safe for Kodak Versamark, Inc. and contractor employees. 2. Assist with communications to the contractors on the requirements of drawings, bill of materials and cost of any installation, maintenance, modification or testing of the suppression system. 3. Assist with overseeing all installation, modification, maintenance and testing by contractors or in-house maintenance staff. 4. Inspection of all materials used in the installation, modification, maintenance and testing of the suppression system. 5. Inspection of the final installation, modification, maintenance and testing of the suppression system.

Page 6 of 9 Appendix A Fire Protection System Inspection / Test Date : Weekly Inspected By : ITEM Fire Pump Inspection / Test Pump room heat maintained above 40 F.? Piping valves ( suction, discharge and bypass ) open? ( Test header valve is closed ) Pump started automatically by dropping pressure? Start pressure psi Pump running suction pressure normal? psi Pump running discharge pressure normal? psi Pump packing glands have slight water drip? ( The water drip cools the bearings ) Circulating relief valve has adequate flow while pump is running? (Cools pump ) Pump casing temperature within proper range ( not hot to the touch )? Piping in good condition ( no leaks from joints, cracks, ect. )? Pump run at churn ( no flow ) for 10 minutes? Pump controller pilot light ( yellow power on ) illuminated? Reverse phase light ( red ) off? Pump alarm panel Supervisory Voltage Normal light on? Pump alarm panel Pump Controller Voltage light on? Low Suction Pressure light off? Sprinkler System Inspection Are all riser control valves chained and locked in the open position? Are the Fire Pump by-pass valves chained and locked in the open position? Is the Fire Pump test outlets valve chained and locked in the closed position? STATUS Yes No A no response above indicates the need for investigation and corrective action to restore the system to normal operation. Comments :

Page 7 of 9 Appendix B Fire Protection System Inspection / Test Date : Monthly Inspected By : Fire Pump Inspection / Test ITEM STATUS Yes No Sprinkler System Inspection Are all riser control valves chained and locked in the open position? Are the Fire Pump by-pass valves chained and locked in the open position? Is the Fire Pump test outlets valve chained and locked in the closed position? Piping in good condition ( no leaks from joints, cracks, ect. )? Riser gauge inspection and readings Riser #5 ( FP1-1, FP1-3, FP2-1, FP2-3 ) Riser #4 ( FP1-2, FP2-2 ) Riser #1 ( FP1-5 ) Riser #3 ( FP1-4 ) Riser #2 ( FP1-6, FP2-4 ) Riser #6 Clean Room ( FP1-6 ) ( located in ink plant, north wall ) Top Gauge Reading Bottom Gauge Reading Riser flow switches reported to Simplex Alarm System Riser 5, Riser 4, Riser 3, Riser 2, Riser 1 A no response above indicates the need for investigation and corrective action to restore the system to normal operation. Comments :

Page 8 of 9 Appendix C Fire Protection System Inspection / Test Date : Quarterly Inspected By : Fire Pump Inspection / Test ITEM STATUS Yes No Sprinkler System Inspection / Test Are all the hydraulic plates or stickers attached to each riser? Are all alarm devises free of physical damage? Do all riser tamper switches report to the alarm panel? Do all riser pressure switches report to the alarm panel? Does the outside water flow alarm activate with water flow? Main Drain Test Riser #5 ( FP1-1, FP1-3, FP2-1, FP2-3 ) Static pressure return time Riser #4 ( FP1-2, FP2-2 ) Static pressure return time Riser #1 ( FP1-5 ) Static pressure return time Riser #3 ( FP1-4 ) Static pressure return time Riser #2 ( FP1-6, FP2-4 ) Static pressure return time Riser #6 Clean Room ( FP1-6 ) (ink plant ) Static pressure return time Supply Gauge Pressure Before Supply Gauge Pressure After A no response above indicates the need for investigation and corrective action to restore the system to normal operation. Comments :

Page 9 of 9 Appendix D Fire Protection System Inspection / Test Date : Yearly Inspected By : ITEM Fire Pump Inspection / Test Did the Fire Pump pass all tests performed by the outside contractor? ( A-1 Sprinkler ) Are all riser control valves chained and locked in the open position? Are the Fire Pump by-pass valves chained and locked in the open position? Is the Fire Pump test outlets valve chained and locked in the closed position? STATUS Yes No Sprinkler System Inspection Are the fire hose connections at the north & south ends of the stockroom unblocked? Is the Fire Department Connection free of obstructions? Spare Sprinkler Head Inventory Required On Hand Chrome pendent, Model A, 155 F. 4 Recessed pendent, Model A, 155 F. 4 Upright, Model A, 155 F. 4 Upright, Model A, 200 F. 2 Horizontal Sidewall, Model A/Q-71, 155 F. 1 ESFR-1 Pendent, 165 F. 7 A no response above indicates the need for investigation and corrective action to restore the system to normal operation. Comments :