Economic Analysis of Small Hydropower Project A Case Study of Lower Khare Small Hydropower Project



Similar documents
CHAPTER 3 RESEARCH DESIGN

Chattichai WAISURASINGHA 1*, Prinya CHINDAPRASIRT 1, Winai SRI-AMPORN 1 and Sinee CHUANGCHAM 2

Clean Development Mechanism Project Opportunities in Indonesia

MICRO/MINI HYDRO POLICIES AND PLANS IN NEPAL

Sustainability of Micro-hydropower in Nepal: A case study of Rukum District

Frequently Asked Questions (FAQs) on Hydropower

Technology Fact Sheet for Mitigation B. Small Hydropower Technology i 1. Introduction 1.1. Historical - All over the World, hydropower sector is

Pico Power: A Boon for Rural Electrification

Comparison of Electricity Supply and Tariff Rates in South Asian Countries

ESTIMATION OF PROJECT COSTS AND BENEFITS

Indonesian Microhydro Power Development

Potential of Solarhomesystems, Biogas-plants and Micro-hydro in Nepal and Opportunities for MFI

MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT. By: Payman Hassan Rashed

What are the Benefits?

A Green Sector Overview

Economics Training Series Introductory Course. Cost Estimation

Analytical Approach for Cost Estimation of Low Head Small Hydro Power Schemes

Sample Micro Hydro Initial Report

Feasibility of Hydrogen Production from Micro Hydropower Projects in Nepal

Amir Bashirzadeh Tabrizi, Nassir Gifani. TOOSSAB Consulting Engineers Company

An Introduction to. Micro- Hydropower. Systems. Natural Resources Canada. Ressources naturelles Canada

Project Finance Structuring: Case Study - Nam Theun 2

COMPARISON OF ELECTRICITY GENERATION COST OF NPP WITH ALTERNATES IN PAKISTAN

Sustainable and Renewable Energy Development Authority (SREDA) of Bangladesh Role and Responsibility

Electricity Generation from Renewable Energy in Sri Lanka: Future Directions

AN ECONOMICAL AND TECHNICAL CASE STUDY FOR A SMALL HYDROPOWER SYSTEM

MICRO-GRIDS FOR RURAL ELECTRIFICATION Case Study from Zambia on the Zengamina Micro-Hydro Power Grid

Scientific and Technological References. Energy Technology Indicators

Marketing Methodology of Solar PV Power Packs

PICO HYDROPOWER PROMOTION PROJECT

Micro-Hydro. Module Introduction. Tokyo Electric Power Co. (TEPCO)

FIXED CHARGE: This is a cost that goes towards making the service available, including

Electricity Rates Forecasting:

Chameliya Hydroelectric Power Project

National Electric Power Regulatory Authority

Business Opportunities Seminar

Regulation for Renewable Energy Development: Lessons from Sri Lanka Experience

: Promoters Contribution : Term Loan Total Profitability at optimum level. : Optimum Utilization(3 rd Year)

Solar Irrigation in Bangladesh

POWER AFRICA GEOTHERMAL ROADSHOW. Presented by Mekuria Lemma Ethiopian Electric Power Strategy & Investment Head SEP 28 Oct 3, 2014

DEBT SUSTAINABILITY ASSESSMENT

The Prospects for Small Hydropower in Mexico

Glossary of Energy Terms. Know Your Power. Towards a Participatory Approach for Sustainable Power Development in the Mekong Region

Asian Journal on Energy and Environment

OFF-GRID SOLAR CASE STUDY AND OPPORTUNITIES IN KENYA J.M.P. MBITHI Deputy Director, Renewable Energy MINISTRY OF ENERGY AND PETROLEUM

Wind Energy in Egypt

PERFORMANCE EVALUATION OF SMALL HYDROPOWER PROJECTS IN MAHARASHTRA

Micro-hydro power: an option for socio-economic development By Dr Smail Khennas, and Andrew Barnett

SECTOR ASSESSMENT (SUMMARY): ENERGY 1

FOCUS: ENERGY & ENVIRONMENT

Hydro Power Projections Report. Jennifer Palmer

Techno - socio - economic Assessment of Pico Hydropower Installations in the Northern Region of Thailand

Telefónica South America Feasibility Studies

2. Place of renewable energy in the context of developing global energy at present stage

Minihydro to boost local economic growth The case of Nepal

Cu r r e n t i s s u e s a n d p ro s p e c t s

Sensitivity Analysis for Small Hydropower Plant (SHP)

S.1 Introduction to the Case Study on Micro-Hydro Power Plants

Micro-hydro applications in rural areas

SECTOR ASSESSMENT (SUMMARY): ENERGY 1

Construction of Micro Hydropower plant aimed at Energy self-supporting system

B. ENERGY Government Focal Point Ministry of Works and Energy Responding Ministry/Office Department of Energy Progress made in implementation

Kyrgyzstan: Power Generation & Transmission

Geneva, March 2009 COUNTRY REPORT: MALAWI

IEA ETSAP - Technology Brief E12 - May Hydropower

Proposal for the Establishment of an World Small Wind Turbine Test and Training Center" in China)

INDONESIA S COUNTRY REPORT ENCOURAGING CLEAN ENERGY INITIATIVE

Electricity Demand and Supply in Myanmar

Overview of the Electricity Sector in Egypt

NATIONAL POLICY FOR OFF-GRID HYDRO POWER GENERATION

Ex-Ante Evaluation (for Japanese ODA Loan)

Handbook for Developing MICRO HYDRO In British Columbia

GRID CONNECTION Introduction Technical The grid Electricity production

Renewable Energy Strategy for 2020 and Regulatory Framework. Eng. Hatem Amer Egyptian Electric Regulatory and Consumer Protection Agency

International Workshop on Renewable Energy Policies in Developing Countries, November 22-23, 2010 Washington, DC

Hydropower in Rwanda: Ongoing Initiatives & New Investment Opportunities. Yves Muyange Director General Energy Water & Sanitation Authority

2010 MTEF: Budgeting for infrastructure and capital expenditure guidelines

Hydroelectric Power (3 Semester Hours)

Smart Power for Environmentally-Sound Economic Development (SPEED), Initiative in Development. power sources

MICRO-HYDRO POWER. Technical

Table 2.1: Component construction costs of some representative MHPs Present Value (10%) Unit cost, $ Project Civil Gen. Equip.

TARIFF AND GOVERNANCE ASSESSMENT

Fact Sheet on China s energy sector and Danish solutions

Analysis of the EU Renewable Directive by a TIMES-Norway

Job Profile Senior Adviser Management (N1) National Rural and Renewable Energy Programme Nepal

Exploring the potential of energy recovery using micro hydropower systems in water supply systems

e7/ppa Workshop on Renewable Energy - TEST ANSWER -

Energy Economics. Rangan Banerjee

COST-BENEFIT ANALYSIS - TOOL FOR ALLOCATION OF FINANCIAL RESOURCES FOR MAJOR PROJECTS

TURKEY S HYDROPOWER POTENTIAL and

Empowering Rural India: Expanding Electricity Access by Mobilizing Local Resources

ETSAP ETechDS Data Normalisation Project

China s Small Hydropower in Rural Energy Development

Tanzania s Experience in Establishing a Regulatory System for Promoting Grid and Off-Grid Small Power Producers (SPPs)

Transcription:

Economic Analysis of Small Hydropower Project Ravi Kishor Dutta, Tri Ratna Bajracharya, Shree Raj Shakya Department of Mechanical Engineering, IOE, Central Campus, Pulchowk, Tribhuvan University, Nepal Corresponding Email: ravi_31@hotmail.com Abstract: Hydropower projects promoted by government agencies and multi-lateral donor agencies in Nepal such as World Bank, Asian Development Bank etc. take decision to develop the projects on the basis of economic indices which includes the quantified socio-economic cost and benefits. However, by virtue being the nature of private company, the projects being developed by private sectors in Nepal focus mainly on financial indices for the profitability rather than social responsibility. Since, the promulgation of hydropower development policy 2001, private sectors are allowed to develop hydropower projects on a competitive basis with the Build-Own-Operate- Transfer (BOOT) model in Nepal. The BOOT-administered project may require that the contractor be responsible partially or completely for design and financing, and completely responsible for the construction (the build element), own, operation (operate), and maintenance activities for a specified number of years. This time horizon is 35 years including construction period as per the electricity generation license. After this time period, the owner becomes the government when the ownership is transferred (transfer). Thus, when ultimately the ownership is transferred to government, it seems importance of economic analysis for the small hydropower projects (SHPPs). This article has tried to perform economic analysis of a small hydropower project to be developed in Dolakha district of Nepal. Keywords: Small hydropower project; Standard Conversion Factor (SCF); Economic analysis; Economic net present value; Economic internal rate of return; Benefit cost ratio; Risk analysis 1. Introduction Hydropower has been recognized as a sustainable source of energy. Its benefits include it is nonpolluting, it has low operating and maintenance cost, its technology offers reliable and flexible operation, and hydropower plants have increased efficiencies along with long life. Keeping in mind increasing competency, effectiveness, managerial capacity and financial resources of the private sector and the country s urgency to divert financial resources to other noncommercial sectors (e.g. health, education, social security etc.), the Government of Nepal (GoN) has adopted a liberal economic policy. As a consequence, Hydropower Development Policy (HDP), 1992 was approved and accordingly Electricity Act (EA), 1992 and Electricity Regulation (ER), 1993 were enacted to motivate national and foreign private sector investment for the development of hydropower projects. Consequently, the private sector has become interested in the development of small hydropower and the previous active role of the public sector in the construction of small hydropower has been reduced. Presently, 17 small hydropower projects (SHPPs) have signed power purchase agreement (PPA) with a total installed capacity of 70.10 MW, are currently being constructed by private developers (NEA, 2013). Hence, it is an endeavor to perform economic analysis of SHPPs to be constructed by private sectors in Nepal. 2. Literature Review 2.1 SHPPs Definition Hydropower classification according to size has led to concepts such as small hydro and large hydro, based on installed capacity measured in MW as the defining criterion. Small hydropower projects (SHPPs) are more likely to be run-of-river facilities than are larger hydropower projects, but reservoir (storage) hydropower stations of all sizes will utilize the same basic components and technologies. Nevertheless, there is no worldwide consensus on definitions regarding size categories (Egre and Milewski, 2002). Various countries or groups of countries define small hydropower projects differently. Some examples are given in Table 1. Table 1: Small hydropower projects by installed capacity (IPCC, 2011) Country Installed Capacity Reference Declaration (MW) Brazil 30 Brazil Government Law (1998) Canada <50 Natural Resources Canada (2009) China 50 Jinghe (2005); Wang (2010) European Union (EU) 20 EU Linking Directive (2004) 348

India Norway 25 10 Sweden 1.5 USA 5-100 2.2 SHPPs in Nepal Ministry of New and Renewable Energy (2010) Norwegian Ministry of Petroleum and Energy (2008) European Small Hydro Association (2010) UN National Hydropower Association (2010) In Nepal, till date, there is no any standard has been set to define SHPPs by any government institution. But, according to Sovacool (2011), Nepal adheres to the generally accepted small hydropower definition of capacity range 1 10 MW. Table 2 shows the status of SHPPs in Nepal under different stages. As shown in table, there are 26 SHPPs in Nepal with an aggregated installed capacity of nearly 101.61 MW. Out of these 26 SHPPs, 19 projects were built on a BOOT (Build-Own-Operate-Transfer) basis and are operated by Independent Power Producers (IPPs). Table 2: Small hydropower projects in Nepal Under Different Stages SHPPs Installed by private sector on BOOT basis Installed by public sector PPA concluded and projects under construction Issued survey license Issued generation license No. of Projects Capacity (MW) Reference 19 84.29 NEA (2013) 7 17.32 NEA (2013) 17 70.10 NEA (2013) 65 300.23 DoED (2014) 52 262.54 DoED (2014) 2.3 Earlier works performed for SHPPs economic analysis There are some organizations that have performed economic analysis of micro-hydropower (MHP) projects (capacity less than 100 kw, SREP, 2011). Practical Action Nepal, Water and Energy Commission Secretariat (WECS), Asian Development Bank (ADB) and Department of International Development (DFID, UK) are some organizations who have tried to perform financial and economic analysis of MHP projects. In most of the reports, financial analysis is only focused. Similarly, Economic evaluation of micro hydro power project with special reference to Agretar MHP Kavre district, Nepal has been conducted by Singh (2004). This report has tried to incorporate some parameters to quantify economic cost and benefit for MHP plants. All these works are focused in MHP areas only. In Nepal, we rarely observe the economic analysis performed for SHPPs. Thus, it as an endeavor of this research work to perform an economic analysis of Lower Khare Small Hydropower Project (8.26 MW) considering social costs and benefits and its quantification in accordance with ADB and World Bank (WB) guidelines to be constructed in Dolakha district of Nepal. 3. Methodology Calculation of economic indices of the selected small hydropower project considering both tangible & intangible benefits and costs is based on data collected from the detailed project report (DPR) and initial environment examination (IEE) report. Similarly, other necessary relevant data have been collected from public relation officer employed in the project site. The tangible benefit is the sale of electrical energy, based on approval by country regulators, Nepal Electricity Authority (NEA) in Nepal. The tangible costs are investment cost (civil construction costs, electromechanical equipment costs, power transmission line costs, engineering and design (E&D) cost, supervision and administration (S&A) cost, inflation cost during construction); annual costs (viz. operation & maintenance (O & M) cost, replacement & renovation cost) etc. Similarly, the intangible benefits cover the increase in agriculture production, local employment generation, saving in fuel wood, reduction in fossil fuel consumption for lighting & cooking, saving from extended time for work, saving from battery use etc. The intangible costs are forest destruction, fish collection loss, accidental expenses etc. The financial costs and benefits obtained from DPR have been converted to economic costs and benefits by Standard Conversion Factor (SCF) approach using foreign exchange rate numeraire used by ADB and WB. After collecting the required data and arranging in spreadsheet, the project s economic results are find out. These results are discounted payback period, ENPV, EIRR and B/C ratio etc. Further, risk analysis and scenario analysis is performed with the help of Crystal Ball using Monte Carlo Simulation. Proceedings of IOE Graduate Conference, 2014 349

3.1 Assumptions for economic analysis The construction period is approximated as 3 years (DPR,2013) Capital investment in different time line of project (Hosseini et. al., 2003, 2005) 37% in Year 1 56% in Year 2 7% in Year 3. 4. Lower Khare Small Hydropower Project 4.1 Introduction Lower Khare Small Hydropower Project is located in Chankhu, Khare and Suri village development committees of Dolakha district in central development region of Nepal. Geographically, the project area is located between latitudes of 26º 45 53 N to 26º 45 00 N and longitudes of 86º 13' 52'' E to 86º 11 30 E as per the issued survey license (2009). 350 The economic life of the project is assumed as 35 years including construction period (DoED, Generation License, 2012). Normal outages, self consumption, forced outages; line loss, interconnection loss etc. are considered for saleable energy from gross energy generation (NEA, 2013). Discount Rate or opportunity cost of capital is taken 10 % (ADB, 1997). Rate of sale of energy is considered as NRs 4.80 per unit in wet months and NRs 8.40 per unit for the dry months as per present posted rate of NEA (NEA, 2013). 3% tariff escalation is considered in present posted rate for 5 years after commercial operation date (NEA, 2013). The royalty is calculated as applicable to SHPPs (GoN, Electricity Act, 1992). Interest payment and repayment of principle for the loan amount are not considered in the analysis (WB, 2001). Interest during construction (IDC) is not considered (WB, 2001). Transfer payments such as taxes and subsidies are not considered (ADB, 1997). Physical contingencies represent expected real costs and, unlike price contingencies, they are included in project economic costs in the analysis (ADB, 1997). Financial prices are converted to economic prices by using Standard Conversion Factor (SCF) approach (ADB, 1997) i.e. Economic Cost = SCF Financial Cost The financial cost is the market value of the various components and SCF varies from 70% to 90% (ADB, 1997). 4.2 Salient features of project The salient features of the project have been presented in Table 3. Particulars Project Capacity Catchment Area Table 3: Salient feature of project Features 8,260 kw 180 sq. km. Design Discharge 9.40 m 3 /sec (at Q 42%) Net Turbine Head Penstock Pipe Turbine Generator Transmission Line Saleable Energy 5. Calculation and Results 5.1 Economic cost of project 104.73 m 2,887 m; 2 m diameter; 22 mm thick Francis, 2 units Synchronous brushless, 2 units; 3 phase AC Single circuit, 132 kv 48.34 GWh The total project s economic cost has been presented in Table 4 by adjusting financial values to reflect economic costs. Table 4: Economic cost of project S. No. Particulars Amount, (NRs, 000) 1 Civil Construction 428,023 2 Metal Works 414,594 3 Plant and Machinery 306,249 4 Transmission Line & Switchyard 76,366 5 Land Purchased & Development 3,679 6 Environment Mitigation 13,250 7 Logistics & Office equipments 2,100 8 Project Supervision, Engineering & Management 62,213 9 Project Insurance 12,443 Total Economic Cost of Project 1,318,917 Economic Analysis of Small Hydropower Project

5.2 Results Case I: When the energy reduction is 20% A. Discounted payback period In this case, there is 90% certainty that the discounted payback period will be 6.07 years. The risk analysis shows that the project discounted payback is ranging from 5.66 to 7.66 years. The most probable region of discounted payback period is around 6.56 years according to the result shown. Figure 3: Risk analysis for EIRR D. Benefit cost (B/C) ratio In this case, there is 90% certainty that the B/C ratio will be 1.73. The risk analysis shows that the project B/C ratio is ranging from 1.57 to 1.78. The most probable region of B/C ratio is around 1.68 according to the result shown. Figure 1: Risk analysis for discounted payback period B. Economic net present value (ENPV) In this case, there is 90% certainty that the ENPV will be NRs. 707 million. The risk analysis shows that the project ENPV is ranging from NRs. 632 million to NRs. 860 million. The most probable region of ENPV is around NRs. 752 million according to the result shown. Figure 4: Risk analysis for B/C ratio Similar analysis is performed for case-ii viz. project cost increased by 20% and case-iii viz. combined scenario for energy reduction by 20% and project cost increased by 20%. The summary is presented in Table 5. Conditions Table 5: Results of risk analysis PBP (Year) ENPV (Mill NRs) EIRR (%) B/C Figure 2: Risk analysis for NPV Base Case 4.84 972 17.96 1.88 C. Economic internal rate of return (EIRR) In this case, there is 90% certainty that the EIRR will be 15.99%. The risk analysis shows that the project EIRR is ranging from 15.42% to 17.14%. The most probable region of EIRR is around 16.33% according to the result shown. Case-I: Energy reduction by 20% Case-II: Project cost increased by 20% Case-III: Combined of Case- I & Case-II 6.07 707 15.99 1.73 5.52 781 15.75 1.60 7.05 567 14.31 1.43 Proceedings of IOE Graduate Conference, 2014 351

6. Conclusion & Recommendation The economic analysis of a Lower Khare Small Hydropower Project to be developed in Dolakha district of Nepal shows the following results: EIRR, NPV, B/C ratio and payback period are found positive in economic analysis. The project is economically acceptable even at 90% certainty level when there is reduction in energy generation by 20%; increase in project cost by 20% or in both combinations. In the combined scenario, the EIRR, ENPV & B/C ratio is marginally convincing at 90% certainty, but the project is feasible. Thus, economic analysis helps analysts and decision makers to look at hydropower projects from the country s viewpoint (to ensure that projects contribute more resources to the economy than they use), from the financial and fiscal viewpoint (to ensure that the implementing agencies will have the resources to implement projects as designed) and from the viewpoint of the people who are most affected by projects (to ensure that the distribution of costs and benefits is acceptable to society). It is equally important to perform economic analysis for the hydropower projects being developed by public sector and private sector. Therefore, government should enforce in hydropower development policy to perform economic analysis while issuing electricity generation license, transmission license and power purchase agreement for sustainable development of hydropower projects in Nepal. [6] A. D. Karlis et. al., A systematic assessment of the technical feasibility and economic viability of small hydroelectric system installations, Journal of Renewable Energy, 2000. [7] K Goldsmith, Economic and Financial Analysis of Hydropower Projects, Norwegian Institute of Technology, Division of Hydraulic Engineering, Norway, 1993. [8] The International Renewable Energy agency (IRENA), Renewable energy technologies: Cost analysis series, Vol-1, Power Sector," 2012. [9] Hanggoro, The Economic Analysis of mini/micro hydropower plant in Indonesia, 12 CEPSI, Pattaya, Thialand, 1998. [10] Irvin G., Modern cost-benefit methods, The Macmillan Press Ltd, Great Britain, 1978. [11] The International Bank for Reconstruction and Development/The World Bank, Economic analysis of investment operations, The World Bank Institute, U.S.A., 2001. [12] Asian Development Bank, Guidelines for the economic analysis of projects, Economics and Development Resource Center, Philippines, 1997. [13] Hydropower projects under different stages, URL: www.doed.gov.np [14] PPA status of hydropower projects, URL: www.nea.org.np [15] Ministry of Water Resources, Hydropower Development Policy, Nepal, 2001. [16] Nepal Electricity Authority, A Year in Review, Nepal, 2013. References [1] Hosseini, S.M.H., et. al., An approach to the investment analysis of small and medium hydro-power plants, Journal of Energy policy, 2006. [2] Hosseini, S.M.H., et. al., Determination of optimal installation capacity of small hydropower plants considering technical, economic and reliability indices, Journal of Energy policy, 2005. [3] B. K. Sovacool, Saroj Dhakal, et. al., Halting Hydro: A review of the socio-technical barriers to hydroelectric power plants in Nepal, Journal of Renewable Energy, 2011. [4] D. Diakoulaki, F. Karangelis, Multi criteria decision analysis and cost-benefit analysis of alternative scenarios for the power generation sector in Greece, Journal of Renewable & Sustainable Energy, 2005. [5] A. Pascale, Tania Urmee et. al., Life cycle assessment of a community hydroelectric power system in rural Thailand, Journal of Renewable Energy, 2011. 352 Economic Analysis of Small Hydropower Project