IMPLEMENTING LEAN SIX SIGMA: A CASE STUDY IN CONCRETE PANEL PRODUCTION



Similar documents
Six Sigma-Based Approach to Improve Performance in Construction Operations

Making Improvement Work in Pharmaceutical Manufacturing Some Case Studies. Ronald D. Snee

Six Sigma in Action. Data-driven process improvement. Process Improvement Brief February

Six Sigma. Breakthrough Strategy or Your Worse Nightmare? Jeffrey T. Gotro, Ph.D. Director of Research & Development Ablestik Laboratories

Lean Silver Certification Blueprint

Improving Healthcare at. Lean Six Sigma

Body of Knowledge for Six Sigma Green Belt

The Power of Two: Combining Lean Six Sigma and BPM

Certified Six Sigma Yellow Belt

Purchasing Success for the Service Sector: Using Lean & Six Sigma.

Service Relationship Management Driving Uptime in Commercial Vehicle Maintenance and Repair

Lean Six Sigma Lean 201 Introduction. TECH QUALITY and PRODUCTIVITY in INDUSTRY and TECHNOLOGY

BQF Lean Certification Process

CONSTRUCTION SUPPLY CHAINS: TURKISH SUPPLY CHAIN CONFIGURATIONS FOR CUT AND BENT REBAR

KPMG Lean Six Sigma The right place and the right time is here and now

MANUFACTURING EXECUTION SYSTEMS INTEGRATED WITH ERP & SIX SIGMA FOR PROCESS IMPROVEMENTS

BODY OF KNOWLEDGE CERTIFIED SIX SIGMA YELLOW BELT

Creating Supply Chain Resilience Through Agile Six Sigma By Professor Martin Christopher & Christine Rutherford

VALUE STREAM MAPPING FOR SOFTWARE DEVELOPMENT PROCESS. Ganesh S Thummala. A Research Paper. Submitted in Partial Fulfillment of the

THE PROCESS CAPABILITY ANALYSIS - A TOOL FOR PROCESS PERFORMANCE MEASURES AND METRICS - A CASE STUDY

Unit 1: Introduction to Quality Management

Lean, Six Sigma, and the Systems Approach: Management Initiatives for Process Improvement

Developing a Formidable Business / Continuous Improvement Methodology in Africa. By: Frederick O Popoola

Lean Six Sigma Analyze Phase Introduction. TECH QUALITY and PRODUCTIVITY in INDUSTRY and TECHNOLOGY

Lean Management. KAIZEN Training of Trainers. KAIZEN Facilitators Guide Page to.

Readiness for Lean/Six Sigma Key success factors for integrating Lean/Six Sigma in a Healthcare setting

Lean Test Management. Ban Waste,Gain Efficiency. Bob van de Burgt Professional Testing

EVALUATING BUILDING SYSTEMS BASED ON PRODUCTION PROCESS MANAGEMENT AND LEAN CONSTRUCTION CONCEPTS

Simulation and Lean Six Sigma

Achieving Basic Stability By Art Smalley

The Impact of Lean Six Sigma on the Overall Results of Companies

IN AMERICA, HEALTH CARE COSTS

Implementing Lean Construction: Stabilizing Work Flow *

LEAN PROJECT DELIVERY THROUGH DESIGN-BUILD

Literature Review of Business Process Improvement Methodologies: Executive Summary

WORKPLAN: DATABASE FOR WORK PACKAGE PRODUCTION SCHEDULING

Business Improvement. Intro. The shining of the compass metal needle. The one leading all the individual units of the fleet toward the same goal.

IMPROVING THE DESIGN-CONSTRUCTION INTERFACE

Lean Healthcare Metrics Guide

Lean Manufacturing Practitioner Training

Sigma (σ) is a Greek letter used to represent the statistical term standard deviation

Louisiana Tech University Lean Manufacturing Courses

APPLICATION OF LEAN PRINCIPLES & PRACTICES IN CONSTRUCTION MANAGEMENT

Masters of Business Administration MBA Semester 2 MB0044 Production & Operations Management Assignments

Incorporating Lean Six Sigma into an Aviation Technology Program

Lean Specialist Certification Program

Lean manufacturing in the age of the Industrial Internet

LEAN CERTIFICATION BODY OF KNOWLEDGE RUBRIC VERSION 3.0

How To Implement Ppc In Korea

Lean and Six Sigma Healthcare Fad or Reality. Vince D Mello President

Lean Six Sigma Consulting

Using Lean Six Sigma to Accelerate

A PRODUCTION PLANNING SUPPORT SYSTEM FOR CONSTRUCTION PROJECTS

Lean Six Sigma Black Belt-EngineRoom

g We bring good things to life What Is Six Sigma? The Roadmap to Customer Impact

Processing of Insurance Returns. An EMC Lean Six Sigma Project. Author: Aidan Trindle. Editor: Mohan Mahadevan

Study of Productivity Improvement Using Lean Six Sigma Methodology

SIX SIGMA IN HOSPITAL AND HEALTH CARE MANAGEMENT

Confidence Intervals for Cp

Four Key Elements of an Effective Continuous Process Advantage Series White Paper By Jeff Gotro, Ph.D., CMC

Certified Quality Improvement Associate

Lean Principles by Jerry Kilpatrick

THE SIX SIGMA BLACK BELT PRIMER

REAL-TIME SUPPLY CHAIN MANAGEMENT USING VIRTUAL DESIGN AND CONSTRUCTION AND LEAN

How Lean Six Sigma can Change Higher Education. Norma Simons Performance Innovation LLC Secretary ASQ Education Division

Lean Six Sigma. Shail Sood

INFLUENCE OF MEASUREMENT SYSTEM QUALITY ON THE EVALUATION OF PROCESS CAPABILITY INDICES

UTILIZAÇÃO DA LEAN METODOLOGIA. Desmistificando Aplicações Reais Para CME. Apresentado por John Kimsey

BEGINNING THE LEAN IMPROVEMENT JOURNEY IN THE CLINICAL LABORATORY

The Combination of Last Planner System and Location-Based Management System

GE Capital. Driving change and continuous process improvement. how-to

Confidence Intervals for Cpk

APPROXIMATING THE PROCESS CYCLE EFFICIENCY OF NON-PHYSICAL PRODUCTION SYSTEMS

CAPABILITY PROCESS ASSESSMENT IN SIX SIGMA APPROACH

LEAN SIX SIGMA TO IMPROVE SUPPLY CHAIN MANAGEMENT AT IRON SYSTEMS

Chapter 8: Project Quality Management

LEAN 101 CRASH COURSE. Presented by Jacob McKenna and Seaver Woolfok

DEVELOPING A MODEL FOR PLANNING AND CONTROLLING PRODUCTION IN SMALL SIZED BUILDING FIRMS

SPC Response Variable

THE OOPS GAME: HOW MUCH PLANNING IS ENGOUGH?

STUDY GUIDE FOR THE LEAN SIX SIGMA (LSS) CERTIFICATION EXAM

I. INTRODUCTION A. There are two aspects to an effective operating system: 1. Design 2. Control.

The Tie Between the Speaker & the Topic

EFFECTIVENESS OF LEAN PRINCIPLES IN CONSTRUCTION

IMPLEMENTING LEAN CONSTRUCTION: UNDERSTANDING AND ACTION

Lean Manufacturing and Six Sigma

A Six Sigma Approach for Software Process Improvements and its Implementation

Six Sigma DMAIC Model and its Synergy with ITIL and CMMI

Metrics-Based Process Mapping (MBPM)

Six Sigma Certificate. Industrial and Systems Engineering San José State University September, 2008

Basic Quality Tools in Continuous Improvement Process

LEAN, SIX SIGMA, AND ERP:

3. Deployment CHAMPION (CENTER MANAGER) Master Black Belt. Black Belt (GE-TS group) Black Belt (AUTOMATION group) Black Belt (GE-PS group)

Michael Kickuth and Thomas Friedli

Transcription:

IMPLEMENTING LEAN SIX SIGMA: A CASE STUDY IN CONCRETE PANEL PRODUCTION Celep Oguz 1, Yong-Woo Kim 2, John Hutchison 3, and Seungheon Han 4 ABSTRACT Lean Six Sigma method is recognized widely and has been implemented predominately in manufacturing rather than in the construction industry. To illustrate the point, this paper draws attention to the adoption of Lean Six Sigma in the construction industry with a case study. The combination of Lean tools and Six Sigma methodology is used on projects to improve the process by eliminating the variations and creating workflow in a process. Despite its relatively new introduction to the construction industry, it has been popularized by several organizations and adopted as the primary improvement process. The hypothesis of this experimental study was that the Six Sigma technique can be applied to the construction-based production system along with lean construction techniques. To test the hypothesis, we applied Lean Six Sigma methods on concretepanel production system in a multi-housing complex project. The paper shows how the production rate of concrete panel was improved and stabilized along with the use of Lean Six Sigma tools. Also the case study uses the variation of panel production as a critical total quality (CTQ) to measure the performance indicator of Six Sigma system. KEY WORDS Lean Six Sigma, Case Study, Critical Total Quality (CTQ) INTRODUCTION Many construction projects suffer delays from variability stemming from single or multiple causes. An associated principle with waste removal is variability reduction (Bertselen and Koskela 2002). In the construction industry, sources of variability include late delivery of material and equipment, design errors, change orders, equipment breakdowns, tool malfunctions, improper crew utilization, labor strikes, environmental effects, poorly designed production system, accidents, and physical demands of work (Abdelhamid and Everett 2002). Koskela (1992) pointed out that architects, engineers, and construction practitioners have for the longest time focused on conversion activities and 1 Civil Engineer, Bechtel Corporation, M.S. Candidate in Construction Management, University of Washington, Seattle, WA 98195. oguzcelep@yahoo.com 2 Associate Professor, P.D.Koon Endowed Professor of Construction Management, College of Built Environments, University of Washington, Seattle, WA 98195, USA, Phone +1 206/616-1916, yongkim@uw.edu 3 Engineer, Bechtel Corporation, Saudi Arabia. 4 Professor, Department of Civil and Environmental Engineering, College of Engineering, Yonsei University, shh6018@yonsei.ac.kr

Kim, Oguz, Hutchison, and Han overlooked issues of flow. Therefore, it is important to create flow by eliminating waste. Flow is important because work or materials that do not flow sit idle in inventory, tying up money as well as space (Tommelein and Weissenberger 1999). On the other hand, Six Sigma is a statistical-based project-driven approach to improve the organization s products and production system to achieve near perfection or closest to zero-defect product by focusing on defect rates; in other words, eliminating variations in a process. The combination of Lean tools and Six Sigma methodology is used on projects to improve the process by eliminating the variations and creating workflow in a process. The objective of this research paper is to investigate how Lean and Six Sigma methodologies are implemented together on construction projects through a case study and to measure the process capability index (Cp) to measure the performance of Six Sigma efforts. We claim that Lean Six Sigma can be used in construction. The paper tries to support the claim with a case study where Lean and Six Sigma are used concurrently. LITERATURE REVIEW SIX SIGMA In 1985, Bill Smith of Motorola developed and implemented an approach to achieve near-perfection in product manufacturing called Six Sigma (Breyfogle, Cupello and Meadows 2001). The focus on defect rates and the explicit recognition of the correlation among the number of product defect, high operating costs, and the level of customer satisfaction makes Six Sigma unique amongst other process improvement initiatives (Abdelhamid 2003). In the context of the Six Sigma approach, sigma has been used as a metric that reflects the ability of a company to manufacture a product or provide a service within prescribed specification limits (or within zero defects) (Abdelhamid 2003). There are two methodologies used to achieve Six Sigma goals; Define, Measure, Analyze, Improve and Control (DMAIC) and Define for Six Sigma (DFFS), the latter is not part of this paper; therefore, it is not discussed here. DMAIC, a five phase closed-loop problem solving pattern that eliminates unproductive steps, and applies technology for continuous improvement. DMAIC is generally used on business process that fails to meet customer requirements. Defining and understanding the critical requirements, key factors and expectations of the customer which affects the process output. Measuring the process and relevant data to the process primary through Six Sigma metrics. Analyzing the causes of defects and sources of variation using statistical quality control tools. Improving the process by deriving in the analysis phase the most critical source of variation. Controlling and monitoring the process variations using a statistical process strategy to sustain the gains and improvements. Proceedings for the 20th Annual Conference of the International Group for Lean Construction

Implementing Lean Six Sigma: A Case Study in Concrete Panel Production Deming and many others defined two kinds of variation: common cause and special cause variation. In Figure 1, Xn represents the inputs to the process and Y is the output. Due to variations in the inputs (common or special causes), the resulting Y will also be variable (Abdelhamid 2003). Six Sigma is a data-driven problem solving approach, where process inputs (Xn) are identified and optimized to impact the output (Y). The fundamental equation that drives Six Sigma is: Y: output (things important to business) Y= f(x) f: Function (how to treat and manage interrelationships) X: Variables that must be controlled to consistently predict Y Figure 1: Typical single-stage manufacturing/service process (Abdelhamid 2003) In 2002, Bechtel Corporation, one of the largest engineering and construction companies in the world, reported savings of $200 million with an investment of $30 million in its Six Sigma program to identify and prevent rework and defects in everything from design to construction (Kwak et al. 2004). Further examples of Six Sigma implementation in engineering are applied on a national telecommunication project to help optimize the management of cost and schedule, and on a chemical project to streamline the process of neutralizing chemical agents (Moreton 2003). THE SYNERGY OF LEAN SIX SIGMA Hahn et al. (1999) addressed the issue that Six Sigma has escaped canonical in both the academic and the practitioner literature. This is primarily caused by lack of an abstraction of the underlying theory of Six Sigma approach. It is believed that Six Sigma does not directly address process speed and so the lack of improvement in lead time, and only modest improvement in Work in Process (WIP) and finished goods inventory turns are achieved (George 2002). But Lean methods aren t the answers either. Many of the firms that have shown little on the improvement in inventory turns have in fact attempted to apply Lean methods. Furthermore George (2002) describes the Lean Six Sigma methodology as follows: Lean Six Sigma is a methodology that maximizes shareholder value by achieving the fastest rate of improvement in customer satisfaction, cost, quality, process speed and invested capital. Production Planning and Control

Kim, Oguz, Hutchison, and Han George (2002) also concluded that rapid improvement in an organization requires both; Lean and Six Sigma. How do Lean and Six Sigma complement each other? The answer is that Lean cannot bring a process under statistical control, and Six Sigma alone cannot dramatically improve process speed or reduce invested capital. This research paper concentrates on the DMAIC Six Sigma methodology proposed in Six Sigma literature and the Lean principles proposed in Lean literature. CRITICAL TOTAL QUALITY (CTQ) AS SIX SIGMA PERFORMANCE INDICATOR Critical total quality (CTQ) is one of process performance indicator used in previous Six Sigma projects (Han et al 2008). In implementing Six Sigma principle, CTQ is a main indicator in the phases of DMAIC (Han et al 2008). In this paper the reliability of panel production rate of each day was a main CTQ, because the process in study depends mainly on the production rate. The study adopts the process capability index (Cp) to measure the performance of Six Sigma efforts on the reliability of panel production rate. Cp can be calculated using the following equation (Montgomery 2004): Cp (process capability index) = (USL LSL) / (6 x STDEV) (1) If only USL and LSL given Where USL = upper specification given; LSL = lower specification given; STDEV = standard deviation of the data. Process capability indices are constructed to express more desirable capability with increasingly higher values. Even though Cp value recommended for new process is 1.5 (Montgomery 2004), recommended level for construction process was not fully discussed in the industry. Previous Six Sigma application to construction processes showed that the value of Cp was less than 1.0 (Han et al 2008). A CASE STUDY Due to the lack of available information and many organizations reluctance to disclose Lean Six Sigma Process Improvement Project (PIP) case study, we were able to study only one case study. The case study is presented in this paper to investigate the Lean Six Sigma methodology and the implementation in the construction industry. A brief description of this case study project is given to provide the context. A description of the analysis and key findings from this case study is also explained. CASE BACKGROUND The owner company is developing the Phase II of the Jubail Industrial City in Saudi Arabia. Part of the Jubail Phase II development is to provide 405 villas for the community. Due to the speed and efficiency in production and installation, it was decided to construct the villas using precast wall and floor panels. Proceedings for the 20th Annual Conference of the International Group for Lean Construction

Implementing Lean Six Sigma: A Case Study in Concrete Panel Production Figure 2: Erection of Villas However, one year after issuance of Notice to Proceed (NTP) to the contractor, the contractor was 25% behind the schedule. In order to avoid the high risk of additional delays and shortage of housing, a Lean Six Sigma study was undertaken by Bechtel s Six Sigma Black Belt team. The aim of the study was to understand and solve the problem by achieving following goals; 1) Improve productivity of fabricating and delivering pre-cast insulated panels to construction site, 2) Establish causes for delay, address inefficiencies at the pre-cast plant & propose remedial measures, 3) Operate at takt time interval, and 4) Achieve all critical milestones per contract terms and conditions Figure 3: Pre-cast Plant FINDINGS: LEAN SIX SIGMA PROCESS A Lean Six Sigma study starts with a problem statement followed by defining the primary metric, which aids to focus on the problem area and measures the output or resulting Y. The primary metric for this case study was the Number of Exterior Insulated Panels Delivered to Construction Site per Day. The current state baseline production rate was 18 panels/day, and in order to recover the schedule, 75 panels/day was targeted. To illustrate common cause and special cause variation in a typical Six Sigma process, the critical X s which are the input to the process are represented in Figure 4. Figure 4 clearly indicates how Lean tools were integrated with Six Sigma Production Planning and Control

Kim, Oguz, Hutchison, and Han methodology by identifying the critical X s in this process. The Value Stream Mapping (VSM) is the first step to determine the potential X s. It shall be noted that the output or resulting Y may also be variable, due to variations in the inputs. In this case, the prime Y is the daily production rate of the pre-cast panels. Figure 4: Lean Implementation Matrix Following are examples of actions taken care of for some Critical X to improve the productivity (All actions for each critical X are not shown here for the reason of space allowed): X1: Improve Leadership / Supervision Deploy dedicated plant manager; Appoint general superintendent Appoint four foreman, each dedicated to 6 production Hire full time Project Quality Engineer X2: Optimize process flow by increasing Resource Utilization Dedicate two (2) Gantry Cranes for production area Add one (1) concrete bucket to allow simultaneous work on multiple tables Start use of Ready-mix Trucks for grey concrete delivery Add night shift to recover schedule X3: Eliminate Waste through improved Inventory Management Reconfigure stockyard for better access and control Reduce Inventory Level to maximum of 250 Use Visual Controls to display product status (red-curing day 1, yellow curing day 2, green ready for blasting) Status inventory and develop Electronic Inventory Logs to track storage and deliveries X6: Document Standard Work & Improve Logistics Prepare a list of standard activities with clear roles, responsibilities and accountabilities Proceedings for the 20th Annual Conference of the International Group for Lean Construction

Implementing Lean Six Sigma: A Case Study in Concrete Panel Production Measure cycle times and reduce lead time by eliminating waste Streamline deliveries by loading trucks with panels for one lot only By identifying the problems on the VSM (Figure 5), and tackling over the critical X s, the production rate of 75 panels/day was achieved (Figure 6). Concrete materials Supplier Information Information Control CO1 & C02 Customer Demand: 75 pieces per Day (Takt Time 16 minutes) Information? Information? 4-6 panels per truck, 5 trucks Total C/T = 3 hours Mix Concrete batch Cast Concrete Radiant curing remove & transfer Wet curing move and sand blast Finish and repair Load Truck 4 1 46 pcs 300 pcs 2 300 pcs 6 300 pcs Total C/T = 30 mins. Total C/T = 0.75 hrs. 24 pcs Total C/T = 1 hrs. 24 pcs Total C/T = 8 h. 24 pcs Total C/T = 2.5 hrs. Total C/T = 48 hrs. Total C/T = 1 hrs. Total C/T = 3 hrs. 80 hrs. 80 hrs. 0.75 hrs. 1 hrs. 8 hrs. 2.5 hrs. 1 hrs. Figure 5: Value Stream Map 3 hrs. 80 hrs. 0.5 hrs. Lead Time = 257 hrs. Processing Time = 16.7 hrs. PCE = 6.52% Figure 6: Performance Improvement Furthermore, Figure 6 shows the statistical control chart which is used to isolate common from special cause variation. The chart in Figure 6 shows hypothetical dimension figures, which is in this case the No. of Panels Delivered per day, for the product of Y plotted against time for month of July. The Upper and Lower Control Limits (UCL and LCL) shown are a function of the process mean, process range, and the standard deviation of the measured data (Montgomery 2001; Abdelhamid 2003; Breyfogle 2003). Production Planning and Control

Kim, Oguz, Hutchison, and Han The chart clearly indicates that the process is under statistical control. In Six Sigma, a process is considered under statistical control if all the data points fall within the LCL and UCL. The Cp (process capability index) is calculated using the equation (1) as follows: Cp (process capability index) = (USL LSL) / (6 x STDEV) = (143.2-42.3) / (6 x 18.76) = 0.90 (2) The value of Cp is 0.9, which is less than 1.5,, a recommended level for a new production in manufacturing-based environment. However, the value seems acceptable taking into account the differences of production context in the industry. Figure 6: Sustained Performance Control Chart DISCUSSION Observation on the case studies has revealed that Lean tools were used to identify and to improve some critical X s in a process. In some cases one of the critical X may be related to technical problems (such malfunction of crane or concrete pump, etc.), which then neither Lean nor Six Sigma would apply to solve and improve the critical X. However, it would be fair to say, that Lean is best to use to address production (or physics) problems (Ballard 2000) where flow in the process is not optimal, whereas Six Sigma is to identify the defects. It has been seen that adoption of Six Sigma production tools to improve the organization s products and production system were not sufficient, as it fails to achieve a reliable workflow. The above case study makes use of both Lean and Six Sigma tools together to solve construction problems. It is considered neither of the methods in isolation would have been fully successful. However, the combination has a multiplier effect of the ability to reach a successful outcome. Large organizations are more willing to Proceedings for the 20th Annual Conference of the International Group for Lean Construction

Implementing Lean Six Sigma: A Case Study in Concrete Panel Production adopt the Lean Six Sigma methodology to improve and solve business problems on daily activities. CONCLUSIONS This research paper explores the use of combined Lean and Six Sigma in the construction industry. This research has included a review of literature, interview and case studies of Lean and Six Sigma in the construction industry. Some of the conclusions drawn from the literature review and case studies, and can be summarized as follows; (1) Both Six Sigma and Lean are strong production management tools and the combination complements each other. Lean in principle eliminates anything that doesn t add value to the customer and achieves reliable workflow. On the other hand Six Sigma aims to control and reduce the variations by understanding the root cause. As discussed in this paper, as well as in Abdelhamid (2003), the combination of both tools can lead to a very useful methodology to improve any process. (2) The complexity of the construction project has its own unique and uncertain environments, which made the use of Lean Six Sigma methodology somehow different from the other industries, especially manufacturing. However, as seen on the case study, major Lean Six Sigma tools have been successfully applied to improve the process. (3) The methodology of Lean Six sigma was effective in reducing variability of daily panel production rate. However, taking into account inherited uncertainty in construction processes, the value of Cp can be applied flexibly to construction processes. Construction companies already adopting Six Sigma may recognize that Six Sigma by its own is not sufficient to tackle problems, as it lacks to achieve a reliable workflow. Lean Six Sigma promotes continuous improvement of processes by both analyzing root cause of variation and eliminating waste. Therefore, and in order to be competitive and innovative, construction companies need to apply both tools to tackle their business problems. REFERENCES Abdelhamid, T. (2003). Six Sigma in Lean Construction Systems: Opportunities and Challenges, Proceedings IGLC-11, Blacksburg Virginia, August 2003 Abdelhamid, T., and Thanveer, B. (2005). Production Planning Process in Residential Construction using Lean Construction and Six Sigma Principles, Construction Research Congress, San Diego, CA. Ballard, G. (2000). The Last Planner System of Production Control; Ph.D. Dissertation, The University of Birmingham, U.K. Bertselen, S. and Koskela, L. (2002). Managing the three Aspects of Production in Construction, Proceedings of the 10 th Conference of the International Group of Lean Construction, Gramado, Brazil, August 2002, 6-8. Breyfogle, F.W.(2003). Implementing Six Sigma, 2 nd Edition, Wiley, New York. Breyfogle, F.W., Cupello, J. M., Meadows, B. (2001). Managing Six Sigma: A Practical Guide to Understanding, Assessing, and Implementing the Strategy that Yields Bottom Line Success; Wiley, New York. Production Planning and Control

Kim, Oguz, Hutchison, and Han George, Michael L. (2002). Lean Six Sigma: Combining Six Sigma Quality with Lean Speed, McGraw-Hill, New York, NY. Hahn, G., Hill, W., Hoerl, R., Zingkraf, S. (1999). The impact of Six Sigma Improvement a glimpse into the future of statistics, The American Statistician, 53(3), 208-215. Han, S., Chae, M., Im, K., and Ryu, H. (2008). Six Sigma-Based Approach to Improve Performance in Construction Operations, Journal of Management in Engineering, 24(1), 21-31. Koskela, L (1992). Application of the New Production Philosophy to the Construction Industry; Center of Integrated Facilities Engineering (CIFE), Dept. of Civil Engineering, Technical Report# 72, CA. Kwak, Y. and Anbari, F. (2004). Benefits, obstacles, and future of Six Sigma Approach, Technovation, 2004, 1-8. Montgomery, D. (2004). Introduction to Statistical Quality Control, John Willey & Sons, Inc., New York, NY. Moreton, M. (2003). Featured Company: Bechtel; ASQ Six Sigma Forum Magazine, 3(1), 2003, 44. Tommelein, I. and Weissenberger, M. (1999). More Just-in-Time: Location of Buffers in Structural Steel Supply and Construction Processes, Proceedings IGLC-7, University of California, Berkeley, CA, USA, July 1999, 110-120. Proceedings for the 20th Annual Conference of the International Group for Lean Construction