WORKPLAN: DATABASE FOR WORK PACKAGE PRODUCTION SCHEDULING
|
|
|
- Emerald Randall
- 10 years ago
- Views:
Transcription
1 WorkPlan: Database for Work Package Production Scheduling WORKPLAN: DATABASE FOR WORK PACKAGE PRODUCTION SCHEDULING Hyun Jeong Choo 1, Iris D. Tommelein 2, Glenn Ballard 3, and Todd R. Zabelle 4 ABSTRACT A database program called WorkPlan has been created to systematically develop weekly work plans. WorkPlan adopts the Last Planner methodology, which implements several lean construction techniques. A week prior to conducting work, WorkPlan guides the user step by step through the process of spelling out work packages, identifying constraints, checking constraint satisfaction, releasing work packages, and allocating resources; then at the end of the week, collecting field progress data and reasons for plan failure. This systematic approach helps the user create quality work plans and learn from understanding reasons for failure. The functionality of WorkPlan is detailed in this paper. Various ways of displaying work package data are illustrated. WorkPlan is to our knowledge the first computer tool designed specifically to implement lean production philosophy in construction. KEY WORDS WorkPlan, weekly work plan, database, lean construction, production scheduling, screening, work package, constraint, percent of planned completed (PPC) Ph.D. Student, Constr. Engrg. and Mgmt. Program, Civil and Envir. Engrg. Dept., 215 McLaughlin Hall #1712, Univ. of California, Berkeley, CA 94720, [email protected] Associate Professor, Constr. Engrg. and Mgmt. Program, Civil and Envir. Engrg. Dept., 215 McLaughlin Hall #1712, Univ. of California, Berkeley, CA 94720, [email protected] Lecturer at U.C. Berkeley and Director of the Lean Construction Institute, 4536 Fieldbrook Rd., Oakland, CA 94619, [email protected] President, Pacific Contracting, Inc., 222 Sutter Street, Suite 310, San Francisco, CA 94108, [email protected] Proceedings IGLC 98
2 Choo, Tommelein, Ballard, and Zabelle INTRODUCTION Scheduling of construction work is usually done with the support of computer tools that implement the critical-path method (CPM). These tools have served project managers well in their effort to plan and oversee construction projects in the process of administering contracts. They also have presented a common representation (based on activities of given duration and unit resources allocated to them, as well as predecessor relationships between activities) for different parties involved in a construction project to communicate with one another whom should be doing what work and when. However, these tools are inadequate in terms of use and expressiveness when it comes to supporting production planning and control, that is, supporting those who are performing construction work in the field. The ability to actually get work done at the construction work face depends heavily on the availability of resources. CPM provides no mechanism for explicitly checking resource availability. Moreover, the resources that are relevant to field workers, namely erection drawings, materials, equipment and tools, and methods specifications, rarely if ever are explicitly described in CPM schedules. Not only is it tedious to do so, but it also requires a different mind set. Project management's schedules are therefore useless to those doing the work. Accordingly, field workers have created their own, special-purpose planning systems to create weekly work plans. Although systems tend to differ from one company to the other, the information in them is usually work-to-be-done, assigned people and equipment, and assigned hours. Even though actual resource allocation and checking is done in preparation of the weekly work plan, resources do get cross-allocated or overallocated, resulting in conflict. This occurs because there is no easy mechanism to verify resource assignment when the weekly work plan is spelled out on paper. In this paper, we present ways to overcome this deficiency in current practice with regards to weekly work planning. More importantly, we have implemented lean construction techniques in a database application called WorkPlan. WorkPlan systematically guides the user through the steps required for creating a quality work plan. Its underlying data-checking mechanism helps maintain data consistency. WorkPlan allows the data to be organized in various ways to serve accounting purposes and display performance measures. CURRENT PRACTICES IN FIELD LEVEL PLANNING Weekly work planning is planning with the highest level of detail prior to having (skilled) laborers carry out the work. Actual resource allocation and checking is done in the preparation stage of the weekly work plan. Currently, most weekly work plans are drawn up by hand, using pen and paper. If a work package spans more than one week, its description will have to be rewritten each time a new plan is made, week after week. Also, information regarding laborers and equipment required in multiple work packages will have to be duplicated from one form to the next. Most paper-based weekly work plans are discarded after they have served their purpose: crew supervisors use them as cribsheets to sequence work, assign work, and mobilize resources. Russell and Froese (1997) therefore referred to such plans as throw-away schedules. The opportunity for supervisor or management feedback and learning is thereby lost. Guaruja, Brazil
3 WorkPlan: Database for Work Package Production Scheduling In addition, weekly work plans bear little relationship to the project s CPM. More surprisingly, they are not used to track labor hours spent (time cards) or the completion of work. Once construction has been carried out, progress is recorded in timesheets, which are used to pay for labor and track costs, which also requires paying attention to detail. The irony of this practice is that weekly work plans and time sheets essentially pertain to the same information, namely work to be done for a given week, though one looks one week into the future and the other looks one week back. Nevertheless, two separate forms are typically used and there appears to be no explicit relationship between them. Tying the two together is the missing link between production and project management. RELATED WORK The application of lean production techniques in construction has been triggered by its success in manufacturing (Womack and Jones 1996). A number of studies were conducted to date in order to refine the thinking process and to develop appropriate methods to implement lean construction. However, to our knowledge, no computer tools have yet been developed for field-level use. Several lean production techniques (after Womack and Jones 1996) have been implemented in our system, namely: 1. Clearly documenting, updating, and constantly reporting the status of all process flows to all involved, so each person knows what others do and understands the implications of quality of their own work on the quality of the process output. WorkPlan stores all work planning information in a database and generates relative information from it. 2. Synchronizing and physically aligning all steps in the production process so there is little wait time for people or machines, and virtually no staging of partially completed products. WorkPlan tries to eliminate unnecessary wait time on site by helping its users screen work packages (Ballard and Howell 1997). Releasing work packages only when all the resources are ready allows the construction to be carried out with minimum chance of being interrupted. As a result, fewer partially-completed work packages are being assigned to crews on site. 3. Stopping the assembly line to immediately repair quality defects. While this usually is very disruptive for the process as a whole, there are several advantages to doing so: (1) the flawed processing step can be corrected right away, before numerous other assemblies have undergone the same treatment, resulting in additional defects; (2) it is substantially easier and less costly to discover and repair a quality defect early on in a process rather than at the end, after an assembly has been completed. Our implementation makes it possible to identify defects every week (i.e., reasons for deviation from the schedule) so that the scheduling process can be rectified immediately in other to prevent the same defect from happening again. Proceedings IGLC 98
4 Choo, Tommelein, Ballard, and Zabelle APPLICATION OF LEAN CONSTRUCTION TECHNIQUES TO WEEKLY WORK PLANNING Weekly work plans can be developed as valuable tools for production planning and control through the application of lean construction techniques. In the application we developed, weekly work plans are generated using a database. This database comprises information about work packages to be assigned and resources that can be used, i.e., the laborers and equipment available to a company to conduct its work. Resource information often already exists in electronic format in the company, possibly in the form spreadsheets or word processor files, but it may not be readily available for use throughout the project. One technique for reengineering the information process is to capture information once and at the source (Hammer 1990), and this has been achieved in WorkPlan. Preparing a weekly work plan is the process of assigning specific laborers and equipment to work packages that need to be carried out. In order to determine the required amount of time and resources, the scope of each work package needs to be defined clearly. Traditionally speaking, from a project management viewpoint, a work package is a sub-element of a construction project on which both cost and time data are collected for project status reporting. The set of work packages for a project constitutes its work breakdown structure (Halpin 1985). The literature is vague on exactly how one is to clearly define a work package's scope. Therefore, it is even harder to define what resources are needed to meet those scope requirements. Our definition of work package is that it defines a definite amount of work to be done using specific design information, material, labor, and equipment, and with prerequisite work completed. These requirements therefore act as constraints that must be satisfied in order for a work package to be carried out successfully, productively and without interruptions. These constraints are categorized in five types, as constraints on contract, engineering, material, labor, equipment, and prerequisite work. Contract Is this work package in the contract? Is it the result of a newly-issued change order? Has all coordination information been confirmed? Has the subcontract been issued? Engineering Have all submittals been turned in? Have they all been approved? Have all shop drawings been turned in? Have they all been approved? Are there any outstanding requests for information (RFIs)? Have all methods and procedures been decided? Have assembly drawings been received? Materials Have all fabrication drawings been produced? Have all material requirements and sources for procurement been established? Have all requests for quotation (RFQs) been sent? Have all materials been purchased? Have they all been fabricated? Have all materials been delivered? Have they all been allocated? Guaruja, Brazil
5 WorkPlan: Database for Work Package Production Scheduling Labor and equipment Has the work package been scheduled? Are the required laborers available for the duration of the work? Is the required equipment available for the duration of the work? Prerequisite work Has all prerequisite physical work been completed? Have all work areas been cleared so that the work package can begin? Even though a specific work package may require constraints in addition to those provided here, at least the most frequently recurring constraints have been listed. If any of these constraints is not met for a specific work package, that work package should not be started or its execution will likely be slowed down or interrupted during construction. Once all constraints on a work package have been satisfied or are expected to be met before the work is executed, the work package can be released for construction. Specific laborers and equipment can then be assigned. Generating a weekly work plan on a computer is not only timesaving, the process can also be made error-proof. A real-time cost generation function can be used to compare alternative resource allocations. A cross-allocation checking function can detect resource conflicts (assignment of the same resource to different work packages at the same time) before they arise on the site. Once a work package has been completed, the actual schedule can be input into the database and compared with the original schedule. The update can be used to generate timesheets when needed for accounting purposes. However, tracking this information provides not only the basis for the cost calculation but also important measurement of the reliability of the current scheduling system. Plan reliability can be measured by PPC (Percent of Planned Complete). PPC is calculated by dividing the number of completed assignments by the total number of assignments each week (Ballard and Howell 1997). To enable continuous leaning, each work-package s completion status must be accompanied by reasons for failing to meet the schedule. The identified reasons can then be studied and possibly remedied in order to prevent them from recurring in subsequent construction work. Every time a modification is made to the schedule, the scheduler has the option of updating the estimate of the remaining work. In WorkPlan, this information is not generated within the database itself. It has to be based on the estimates made by the scheduler based on the amount of work left. By each week having to estimate the total cost of work remaining to complete a work package, a realistic target cost can be set. This approach contrasts sharply with traditional project control practice, where forecast-tocomplete is usually based on actual-cost-to-date. Accordingly, the forecast to complete is either an extrapolation of the average throughout the project or the average over a certain number of weeks. In our system, neither the budget nor actual-cost-to-date is a factor in determining the target cost. Much emphasis is placed on the planner s expectation and forecast of how work will be executed and progress. Comparison of actual cost incurred or estimated against budget is done separately. IMPLEMENTATION OF WORKPLAN Since construction information presents itself in groupings of similar data that are tightly inter-linked, a database provided a perfect platform for developing the application. From Proceedings IGLC 98
6 Choo, Tommelein, Ballard, and Zabelle the variety of database management systems on the market, Microsoft Access 7.0 was chosen because it can be easily programmed through VBA (Visual Basic for Applications). It was also chosen because the program can be distributed with the runtime version of Access so that the user does not have to purchase Access to just run the WorkPlan database. Since we expect that specialty contractors will be the main users of this application, affordability was one criteria for software platform selection. Figures 1, 2, 4, and 5 give actual screen dumps from the WorkPlan database system. Figures 3 and 4 show reports generated by WorkPlan. The Work Package Entry Form allows the user to enter information about the work package s number, project number, description, duration, and budget cost (Figure 1). In the same manner, information about labor and equipment is input (Figure 2). Figure 1: Work Package Input Screen Figure 2: Laborer Information Input Screen For each work package that is input by the user, WorkPlan generates five categories of constraints by default to refer to (1) contract, (2) engineering, (3) materials, (4) labor and Guaruja, Brazil
7 WorkPlan: Database for Work Package Production Scheduling Figure 3: Work Package Constraints Input Screen equipment, and (5) prerequisite work. Figure 6 shows how the program user can detail the problems and solutions for each category. The problems may be selected from the preloaded list (see section Application of Lean Construction Techniques to Weekly Work Planning ) or be typed in by the user if items need to be added or other wording is found to be more appropriate. At the bottom of this screen are problems that are still outstanding; at the top those that have been solved. Once an outstanding problem has been solved (checked), it automatically moves up to the top. Solved problems are not deleted from the database even though they require no further attention. Keeping them displayed confirms they have been attended to. The list of solved problems can also be used to construct a knowledge base of constraints to help anticipate future problems with related work. Once all constraints on a work package have been met, the work package can be released for construction. Only work packages that have been released can be assigned and scheduled for execution. Once all constraints for a work package are satisfied, the work package can be released for construction. Figure 4 shows this process. By pressing the down-arrow button, an unreleased work package can be released; by pressing the up-arrow, a released work package can be unreleased. The latter should occur in exceptional circumstances only, if a previously unidentified constraint crops up at the last minute or a constraint is not satisfied to the extent it was anticipated. Proceedings IGLC 98
8 Choo, Tommelein, Ballard, and Zabelle Figure 4: Work Package Release Screen Figure 5: Resource Assignment Screen Guaruja, Brazil
9 WorkPlan: Database for Work Package Production Scheduling The Resource Assignment Screen (Figure 5) allows the actual scheduling of a released work package. Each available resource can be assigned to a specific work package. As shown in this screen capture, the names of laborers and equipment are selected from a drop-down list using data stored in the database. The hours represent the time each resource will work on the specific work package. Once the schedule is set, the total number of hours committed for each resource is checked. The WorkPlan user, i.e., the Last Planner, is notified if any resource is assigned for more than eight hours per day. Remaining work is used in estimating the total cost of the work package based on the expected unit cost and quantity of work. The Last Planner has the option of changing the expected amount whenever the plan is updated. Figure 6 shows a weekly work plan generated from this screen. This plan can be printed out and handed to the field crew. In turn, the crew is expected to fill out the actual number of hours they worked on each specific assignment, and check whether or not their assignment was completed as planned. If not, they must provide reasons for variance. This data is then entered into the computer by means of the Resource Assignment Update Screen. Figure 6: Sample Weekly Work Plan The left side of the resource assignment update screen (Figure 7) represents the scheduled work and the right side is used in inputting the actual schedule. The default value of the right side is as scheduled. Changes can easily be made by selecting resources and typing numbers. The Remaining Work section appears as it did on the Resource Assignment Screen. The option button to record the completion of the work package lets the planner specify that the work package for the whole project is complete therefore can be removed from the workable backlog. Once all information has been recorded, the reasons for the variance (difference between scheduled and actual ) are input. This is shown in Figure 8. These reasons are divided into seven categories, namely (1) Contract, (2) Engineering, (3) Material, (4) Labor and Equipment, (5) Prerequisite work, (6) Weather, and (7) Accident. In turn, WorkPlan uses this data to create the PPC Report that represents the reliability of the current planning system (Figure 9). The vertical axis on the left is for PPC whereas the vertical axis on the right is for the number of occurrences for each category. The solid line represents PPC and the bar chart corresponds to the number of occurrences. The occurrences can be used for deciding where to focus management attention in order to improve the reliability of the current planning system. Proceedings IGLC 98
10 Choo, Tommelein, Ballard, and Zabelle Figure 7: Resource Assignment Update Screen Figure 8: Reasons for Incomplete Screen Figure 10 shows a sample timesheet generated by WorkPlan. By grouping the actual work completed by each laborer, the timesheet can be created automatically. The cost for each work package is also provided. Figure 11 shows one of many useful reports that can be generated from the data that resides in WorkPlan. The report shown provides a high-level view of what the project entails. Guaruja, Brazil
11 WorkPlan: Database for Work Package Production Scheduling Figure 9: PPC Report Figure 10: Sample Timesheet Figure 11: Work Package Listing Proceedings IGLC 98
12 Choo, Tommelein, Ballard, and Zabelle SUMMARY Existing CPM-based project management tools used in construction do not appropriately support production scheduling. As an alternative, we have presented a computer tool that assists schedulers with detailed production scheduling. By allowing the reuse of relevant information and the automatic checking of cross allocation of resources, the scheduler is able to work more accurately and save time as compared to developing work plans using pen and paper. WorkPlan not only allows detailed scheduling of work packages, it also integrates various kinds of construction data so that the relationships between them are easier to see. Most important, however, is that the WorkPlan system adopts the Last Planner methodology. WorkPlan guides the user step by step through the process of spelling out work packages, identifying constraints, checking constraint satisfaction, releasing work packages, and allocating resources; then at the end of the week, collecting field progress data and reasons for plan failure. This systematic approach helps the user create quality work plans and learn from understanding reasons for failure. The WorkPlan system is straightforward in concept and implementation. Nonetheless, it is an extremely valuable tool for keeping track of a large amount of tedious details describing resources, that, when not available, could seriously hamper the productivity of field crews. ACKNOWLEDGMENTS The first implementation of WorkPlan was supported with funding from the University of California, Berkeley. Further research to expand its capabilities is being funded by grant CMS from the National Science Foundation (NSF) whose support is gratefully acknowledged. Any opinions, findings, conclusions, or recommendations expressed in this paper are those of the authors and do not necessarily reflect the views of NSF. REFERENCES Ballard, G. and Howell, G. (1997). Shielding Production: An Essential Step in Production Control. Technical Report No. 97-1, Construction Engineering and Management Program, Civil and Envir. Engrg. Dept., University of California, Berkeley, CA. Halpin, D. (1985). Financial and Cost Concepts for Construction Management. John Wiley & Sons. Hammer, M. (1990). Reengineering Work: Don t Automate, Obliterate, Harvard Business Review, July-August, pp Russell, A. and Froese, T. (1997). "Challenges and a Vision For Computer-Integrated Management Systems For Medium-Sized Contractors." Canadian Journal of Civil Engineering, 24 (2) , April. Womack, J.P. and Jones, D.T. (1996). Lean Thinking: Banish Waste and Create Wealth in Your Corporation. Simon & Schuster, New York, NY, 350 pp. Guaruja, Brazil
A PRODUCTION PLANNING SUPPORT SYSTEM FOR CONSTRUCTION PROJECTS
A PRODUCTION PLANNING SUPPORT SYSTEM FOR CONSTRUCTION PROJECTS Luis F. Alarcón 1 and Rodrigo Calderón 2 ABSTRACT This paper describes a computer system developed by the Production Management Center of
The Combination of Last Planner System and Location-Based Management System
Seppänen, Olli, Glenn Ballard & Sakari Pesonen (2010) The Combination of Last Planner System and Location- Based Management System Lean Construction Journal 1 2010 pp 43-54 Abstract The Combination of
Linbeck Construction used the Last Planner system of production control on a $22 million remodel of the Chemistry Building at Rice University.
Linbeck Construction used the Last Planner system of production control on a $22 million remodel of the Chemistry Building at Rice University. This was one of four innovative practices was described by
THE OOPS GAME: HOW MUCH PLANNING IS ENGOUGH?
THE OOPS GAME: HOW MUCH PLANNING IS ENGOUGH? ABSTRACT Gregory Howell 1 & Min Liu 2 The future is unknown and unknowable. In the face of this reality, planning tries to assure an outcome certain. The Oops
Constraint-Directed Scheduling for Multi-Storey Building Projects
Constraint-Directed Scheduling for Multi-Storey Building Projects Pasit Lorterapong* and Osama Moselhi** ** Department of Civil Engineering, King Mongkut ' s Institute of Technology Thonburi, Pracha u-tid
How To Implement Ppc In Korea
IMPLEMENTING PPC IN KOREA S CONSTRUCTION INDUSTRY Chul-woo Lim 1, Jung-ho Yu 2, and Chang-duk Kim 3 ABSTRACT Developed by the Lean Construction Institute, the Last Planner System (LPS) consists of four
LAST PLANNER, LOOK AHEAD, PPC: A DRIVER TO THE SITE OPERATIONS
LAST PLANNER, LOOK AHEAD, PPC: A DRIVER TO THE SITE OPERATIONS Antonio Sergio Itri Conte 1 ABSTRACT The paper describes the experience of a civil engineering company of a small town in São Paulo State
DEVELOPING A MODEL FOR PLANNING AND CONTROLLING PRODUCTION IN SMALL SIZED BUILDING FIRMS
Developing a Model for Planning and Controlling Production in Small Sized Building Firms DEVELOPING A MODEL FOR PLANNING AND CONTROLLING PRODUCTION IN SMALL SIZED BUILDING FIRMS Carlos T. Formoso 1, Maurício
Spec. Standard: 11/27/06 01310-1 Revision: 11/27/06
SECTION 01310 CONSTRUCTION SCHEDULES PART 1 - GENERAL 1.01 SCOPE: A. Construction Progress Schedule: The CONTRACTOR shall submit a detailed work progress schedule showing all work in a graphic format suitable
IMPLEMENTING LEAN CONSTRUCTION: UNDERSTANDING AND ACTION
IMPLEMENTING LEAN CONSTRUCTION: UNDERSTANDING AND ACTION Greg Howell 1 and Glenn Ballard 2 ABSTRACT Lean thinking is a new way to manage construction. Born in manufacturing, the goals demand a new way
APPLICATION OF LEAN PRINCIPLES & PRACTICES IN CONSTRUCTION MANAGEMENT
APPLICATION OF LEAN PRINCIPLES & PRACTICES IN CONSTRUCTION MANAGEMENT John Gresh, Drexel University The Big Deal about Lean Lean as a production philosophy can often be credited to the Toyota Production
APPLYING A STOCHASTIC LINEAR SCHEDULING METHOD TO PIPELINE CONSTRUCTION
APPLYING A STOCHASTIC LINEAR SCHEDULING METHOD TO PIPELINE CONSTRUCTION Fitria H. Rachmat 1, Lingguang Song 2, and Sang-Hoon Lee 2 1 Project Control Engineer, Bechtel Corporation, Houston, Texas, USA 2
CONSTRUCTION SUPPLY CHAINS: TURKISH SUPPLY CHAIN CONFIGURATIONS FOR CUT AND BENT REBAR
CONSTRUCTION SUPPLY CHAINS: TURKISH SUPPLY CHAIN CONFIGURATIONS FOR CUT AND BENT REBAR Gul Polat 1 and Glenn Ballard 2 ABSTRACT This paper presents current supply chain configurations for concrete reinforcement
IMPROVING THE DESIGN-CONSTRUCTION INTERFACE
Improving the Design-Construction Interface IMPROVING THE DESIGN-CONSTRUCTION INTERFACE Luis F. Alarcón 1 and Daniel A. Mardones 2 ABSTRACT In building projects customer requirements, constructive aspects
AUTOMATED CONSTRUCTION PLANNING FOR MULTI-STORY BUILDINGS
AUTOMATED CONSTRUCTION PLANNING FOR MULTI-STORY BUILDINGS Tang-Hung Nguyen 1 ABSTRACT This paper outlines a computer-based framework that can assist construction planners and schedulers in automatically
Applying the Chronographical Approach to the Modelling of Multistorey Building Projects
Applying the Chronographical Approach to the Modelling of Multistorey Building Projects A. Francis, E. T. Miresco Department of Construction Engineering, École de technologie supérieure, University of
Implementing Lean Construction: Stabilizing Work Flow *
Implementing Lean Construction: Stabilizing Work Flow * GLENN BALLARD Department of Civil Engineering, University of California, Berkeley, CA 94720 GREG HOWELL Department of Civil Engineering, University
PREPLANNING METHOD FOR MULTI-STORY BUILDING CONSTRUCTION USING LINE OF BALANCE
PREPLANNING METHOD FOR MULTI-STORY BUILDING CONSTRUCTION USING LINE OF BALANCE Ricardo Mendes Jr. 1 and Luiz Fernando M. Heineck 2 ABSTRACT This paper reports one aspect of a research program devoted to
KANBAN IN CONSTRUCTION
KANBAN IN CONSTRUCTION Roberto Arbulu 1, Glenn Ballard 2 and Nigel Harper 3 ABSTRACT Kanban is a lean approach developed in the automotive industry to pull materials and parts through production systems
OVERVIEW. Microsoft Project terms and definitions
PROJECT 2003 DISCLAIMER: This reference guide is meant for experienced Microsoft Project users. It provides a list of quick tips and shortcuts for familiar features. This guide does NOT replace training
PROJECT CHANGE MANAGEMENT SYSTEM
PROJECT CHANGE MANAGEMENT SYSTEM By C. William Ibbs, 1 Clarence K. Wong, 2 and Young Hoon Kwak 3 ABSTRACT: Changes in projects are common and may be deleterious or beneficial whether you see a change as
THE MARRIAGE OF CPM AND LEAN CONSTRUCTION
THE MARRIAGE OF CPM AND LEAN CONSTRUCTION Bob Huber 1, Paul Reiser 2 ABSTRACT Critical Path Method (CPM) scheduling is the hallmark of current project management practice. This paper explains how one practitioner
OPTIMIZING PRODUCTION
REAL WORLD SCENARIOS Volume 2 Cases 7-12 OPTIMIZING PRODUCTION SQUEEZE MORE OUT OF PRODUCTION OPTIMIZING SCHEDULING PRODUCTION FLOW IMPROVEMENTS INTEGRATED MAINTENANCE PLANNING INTEGRATED PROJECT MANAGEMENT
A PROPOSED CONSTRUCTION DESIGN CHANGE MANAGEMENT TOOL TO AID IN MAKING INFORMED DESIGN DECISIONS
A PROPOSED CONSTRUCTION DESIGN CHANGE MANAGEMENT TOOL TO AID IN MAKING INFORMED DESIGN DECISIONS H.Hindmarch 1, A.W.Gale 1 and R.E.Harrison 2 1 Department of Mechanical, Aerospace and Civil Engineering,
Introduction. http://www.alexsbrown.com/ Page 1
Modeling Tough Scheduling Problems with Project Management Software Alex S. Brown, PMP, Strategic Planning Manager, Mitsui Sumitomo Marine Management (U.S.A.), Inc. Introduction Despite year-over-year
How To Compare Six Sigma, Lean and the Theory of Constraints
P R O C E S S M P R O V E M E N T How To Compare Six Sigma, Lean and the Theory of Constraints A framework for choosing what s best for your organization WTHN THE AMERCAN business community a multitude
MDM AS A PROCESS MAPPING TOOL IN LEAN CONSTRUCTION
12 TH INTERNATIONAL DEPENDENCY AND STRUCTURE MODELLING CONFERENCE, DSM 10 22 23 JULY 2010, CAMBRIDGE, UK MDM AS A PROCESS MAPPING TOOL IN LEAN CONSTRUCTION Fabian Furtmeier 1, Martin Graebsch 1, Fatos
TOOL FOR MAPPING MANUFACTURING CRTICAL-PATH TIME IN JOB SHOP ENVIRONMENT Chong Kuan Eng 1, How Whee Ching 2 1,2 Faculty of Manufacturing Engineering,
Sci.Int.(Lahore),26(4),1585-1589,2014 ISSN 1013-5316; CODEN: SINTE 8 1585 TOOL FOR MAPPING MANUFACTURING CRTICAL-PATH TIME IN JOB SHOP ENVIRONMENT Chong Kuan Eng 1, How Whee Ching 2 1,2 Faculty of Manufacturing
Alexandria National Cemetery SECTION 01 32 16.13 NETWORK ANALYSIS SCHEDULE
SECTION 01 32 16.13 PART 1 - GENERAL 1.1 DESCRIPTION: A. The Contractor shall develop a Microsoft Project 2003 (or latest version) Bar Chart schedule demonstrating fulfillment of the contract requirements.
EXHIBIT 2-2-C PROGRESS SCHEDULES
EXHIBIT 2-2-C PROGRESS SCHEDULES PART 1 GENERAL 1.01 SUMMARY A. The work specified in this section consists of furnishing transportation, labor, materials, equipment and incidentals necessary for preparation,
EVALUATING BUILDING SYSTEMS BASED ON PRODUCTION PROCESS MANAGEMENT AND LEAN CONSTRUCTION CONCEPTS
Evaluating Building Systems Based on Production Process Management and Lean Construction Concepts EVALUATING BUILDING SYSTEMS BASED ON PRODUCTION PROCESS MANAGEMENT AND LEAN CONSTRUCTION CONCEPTS Alberto
IMPLEMENTATION OF LINE-OF-BALANCE BASED SCHEDULING AND PROJECT CONTROL SYSTEM IN A LARGE CONSTRUCTION COMPANY
IMPLEMENTATION OF LINE-OF-BALANCE BASED SCHEDULING AND PROJECT CONTROL SYSTEM IN A LARGE CONSTRUCTION COMPANY Mika Soini\ Ilkka LeskeHi 2, Olli Seppanen 3 ABSTRACT Line-of-Balance has been successfully
IMPROVING THE PRODUCTION PLANNING AND CONTROL SYSTEM IN A BUILDING COMPANY: CONTRIBUTIONS AFTER STABILIZATION
IMPROVING THE PRODUCTION PLANNING AND CONTROL SYSTEM IN A BUILDING COMPANY: CONTRIBUTIONS AFTER STABILIZATION Alexandre C. Soares 1, Maurício M. S. Bernardes 2 and Carlos T. Formoso 3 ABSTRACT Several
MODEL SCHEDULING SPECIFICATION
MODEL SCHEDULING SPECIFICATION Introduction (Not part of the specification) Before implementation, we recommend that your contract and this provision be reviewed and modified to ensure compatibility with
Project Management Guidebook
METHOD 12 3 empowering managers to succeed Project Management Guidebook ISBN 0-473-10445-8 A bout this e-book This e-book was created by Method123 (see www.method123.com) to help provide you with a simple
SECTION 01310 COST LOADED CRITICAL PATH SCHEDULE
SECTION 01310 COST LOADED CRITICAL PATH SCHEDULE 1.0 General 1.1 Description The Work specified in this Section consists of developing and maintaining an accurate cost loaded critical path schedule in
108-C-215 CRITICAL PATH METHOD SCHEDULE. (Revised 03-24-10)
CRITICAL PATH METHOD SCHEDULE (Revised 03-24-10) The Standard Specifications are revised as follows: SECTION 108, BEGIN LINE 177, INSERT AS FOLLOWS: 108.04.1 Critical Path Method Schedule (a) General Requirements
Internal Control Systems
Business and Information Process Rules, Risks, and Controls Internal Control Systems Internal controls encompass a set of rules, policies, and procedures an organization implements to provide reasonable
Using Simulation to Understand and Optimize a Lean Service Process
Using Simulation to Understand and Optimize a Lean Service Process Kumar Venkat Surya Technologies, Inc. 4888 NW Bethany Blvd., Suite K5, #191 Portland, OR 97229 [email protected] Wayne W. Wakeland
ONLINE SUPPLEMENTAL BAPPENDIX PROJECT SCHEDULES WITH PERT/CPM CHARTS
ONLINE SUPPLEMENTAL BAPPENDIX PROJECT SCHEDULES WITH PERT/CPM CHARTS Chapter 3 of Systems Analysis and Design in a Changing World explains the techniques and steps required to build a project schedule
PROJECT COST MANAGEMENT
7 PROJECT COST MANAGEMENT Project Cost Management includes the processes required to ensure that the project is completed within the approved budget. Figure 7 1 provides an overview of the following major
TenStep Project Management Process Summary
TenStep Project Management Process Summary Project management refers to the definition and planning, and then the subsequent management, control, and conclusion of a project. It is important to recognize
MCQ: Unit -2: Operation processes
MCQ: Unit -2: Operation processes 1.What type of process would a Cement plant be most likely to use? a. Continuous flow b. Project c c. Job shop d. Flow shop 2. Process selection is primarily considered
The Last Planner System of Production Planning & Control. Glenn Ballard Trondheim, Norway May 21, 2014
The Last Planner System of Production Planning & Control Glenn Ballard Trondheim, Norway May 21, 2014 Outline Peculiarities of ETO projects Characteristics of construction and shipbuilding Last Planner
How To Increase Employee Productivity And Increase Wrench Time At An Oil Refinery
Employee Productivity Improvement Strategies In Oil Refinery Environments Automated Workforce Management Helps Reduce Maintenance Backlogs, Increase Safety Compliance and Improve Profitability CONTENTS
Infasme Support. Incident Management Process. [Version 1.0]
Infasme Support Incident Management Process [Version 1.0] Table of Contents About this document... 1 Who should use this document?... 1 Summary of changes... 1 Chapter 1. Incident Process... 3 1.1. Primary
Understand How and Where Computers are used in Manufacturing
H. RESOURCE MANAGEMENT AND MANUFACTURING COMPUTING H1 Understand How and Where Computers are used in Manufacturing H1.1 List possible computer applications in manufacturing processes. Performance Objective:
CRITICAL PATH METHOD (CPM) SCHEDULES
96 CRITICAL PATH METHOD (CPM) SCHEDULES How-to for Reading, Understanding, and Using CPM Schedules (without Direct Primavera Access.) 1 Objectives Learn to read, understand, and use CPM schedules (without
QUALITY MANAGEMENT SYSTEM REQUIREMENTS
QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR TRADE CONTRACTORS 2014 400 Prince George s Blvd. Upper Marlboro, MD 20774 800.638.8556 HomeInnovation.com TABLE OF CONTENTS Introduction... iii Notes... iii
Construction Management Standards of Practice
Construction Management Standards of Practice 2010 Edition Advancing Professional Construction/ Program Management Worldwide. 7926 Jones Branch Drive, Suite 800 McLean, VA 22102-3303 USA 703.356.2622 703.356.6388
VALUE STREAM MAPPING & VM
VALUE STREAM MAPPING & VM William C. Thorsen, AVS, LEED AP VM Program Manager Worldwide Facilities Group Capital Projects General Motors Corporation Pontiac, MI 48341 USA 248-753-5897 [email protected]
What makes a good process?
Rob Davis Everyone wants a good process. Our businesses would be more profitable if we had them. But do we know what a good process is? Would we recognized one if we saw it? And how do we ensure we can
WHITE PAPER. Lean Construction. Technology Advances in Lean Construction
WHITE PAPER Lean Construction Technology Advances in Lean Construction Contents 1. Introduction... 1 2. Origins of Lean Construction... 2 3. Lean Construction Principles... 4 4. Advancements in Lean Construction
The power to transform your business
The power to transform your business Optimus 2020 continues to be the number one choice for litho and packaging printers worldwide. What is the secret of our longevity? Constant research and forward thinking
WE NEED A THEORY OF CONSTRUCTION. Lauri Koskela 1
WE NEED A THEORY OF CONSTRUCTION Lauri Koskela 1 INTRODUCTION The guidelines for White Papers for Berkeley-Stanford CE&M workshop suggest deriving research needs from the practical needs of the industry.
PERCEPTION PERT-PAC Using Microsoft Project 2000
PERCEPTION PERT-PAC Using Microsoft Project 2000 to Plan & Schedule A Training Tutorial (Sample Hull Block Construction) 1 This training tutorial outlines the basic features of the Microsoft Project 2000
UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS
USACE / NAVFAC / AFCEC / NASA UFGS-01 32 16.00 20 (February 2015) Change 2-11/15 ----------------------------------- Preparing Activity: NAVFAC Superseding UFGS-01 32 16.00 20 (November 2009) UNIFIED FACILITIES
REAL-TIME SUPPLY CHAIN MANAGEMENT USING VIRTUAL DESIGN AND CONSTRUCTION AND LEAN
212 REAL-TIME SUPPLY CHAIN MANAGEMENT USING VIRTUAL DESIGN AND CONSTRUCTION AND LEAN ABSTRACT Sangwoo Cho 1 and Martin Fischer 2 Supply chain management in construction has evolved in response to various
MAXIMO SCHEDULER 7.5.1 Bouke Spoelstra
MAXIMO SCHEDULER 7.5.1 Bouke Spoelstra 1 Topics To Be Covered Scheduler - Our revised view of Work Management Licensing & Pricing Target Markets & Differentiators Detailed Functionality by Role Key Contacts
The Redwood City Public Works Services (PWS) Department is comprised of four operating divisions:
City of Redwood City, Public Works Services (PWS) Work Process Needs Assessment By: Russell Narahara, Management Analyst II The purpose of this document is to provide an overview of how field work is currently
Designer & Builder Symposium Construction Scheduling. Glenn Saito NAVFAC Pacific Construction Division December 1, 2010
Designer & Builder Symposium Construction Scheduling Glenn Saito NAVFAC Pacific Construction Division December 1, 2010 FOCUS AREAS Current processes (where implemented) Scheduling specification changes
Technique (LOBST) for a Real estate sector
Journal Paper: Application of Line of Balance Scheduling Technique (LOBST) for a Real estate sector Authors: 1. Prof: Siddesh K Pai Assistant professor National Institute of construction Management & Research(NICMAR)
www.stephenbarkar.se Lean vs. Agile similarities and differences 2014-08-29 Created by Stephen Barkar - www.stephenbarkar.se
1 www.stephenbarkar.se Lean vs. Agile similarities and differences 2014-08-29 Purpose with the material 2 This material describes the basics of Agile and Lean and the similarities and differences between
Lean Silver Certification Blueprint
The Lean Certification Blueprint provides additional useful information beyond the Body of Knowledge. The Body of Knowledge specifies the competencies, topics, and subtopics required by different types
IJSRD - International Journal for Scientific Research & Development Vol. 3, Issue 10, 2015 ISSN (online): 2321-0613
IJSRD - International Journal for Scientific Research & Development Vol. 3, Issue 10, 2015 ISSN (online): 2321-0613 Planning, Scheduling and Resource Optimization for A Villa by using Ms-Project 2010 Mr.
RCM Success Starts with CMMS
RCM Success Starts with CMMS Ruth Olszewski, President CMMS data group, inc. 5701 N. Sheridan Road, Suite 17Q Chicago, Illinois 60660 Phone: (773) 275-8846 Fax: (801) 991-6567 [email protected]
10 Steps to Building a More Profitable Construction Business. Leslie Shiner, MBA Sage Certified Consultant
10 Steps to Building a More Profitable Construction Business Leslie Shiner, MBA Sage Certified Consultant Introduction is a pragmatic approach to developing business practices that result in greater profitability.
The Project Management Life Cycle By Jason Westland (A book review by R. Max Wideman)
The Project Management Life Cycle By Jason Westland (A book review by R. Max Wideman) 11/17/07 Introduction Editor's Note: We liked so much of this book that we asked for the author's permission to quote
Time is Money: Justifying the Switch to Automated Time Collection
Time is Money: Justifying the Switch to Automated Time Collection Can I Justify Switching to Automated Time Collection? Every employee in your organization is affected by how time and attendance data is
PROJECT MANAGEMENT FRAMEWORK
PROJECT MANAGEMENT FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Executive Assistant to
BIM.03. Leveraging the Power of 4D Models for Analyzing and Presenting CPM Schedule Delay Analyses
BIM.03 Leveraging the Power of 4D Models for Analyzing and Presenting CPM Schedule Delay Analyses Mr. Kevin Coyne, PE PSP T his paper explores the use of 4D models, which provide a virtual construction
Lean Kitting: A Case Study
Lean Kitting: A Case Study Ranko Vujosevic, Ph.D. Optimal Electronics Corporation Jose A. Ramirez, Larry Hausman-Cohen, and Srinivasan Venkataraman The University of Texas at Austin Department of Mechanical
Introduction to Cost Accounting
Introduction to Cost Accounting Learning Objectives By the end of this chapter, you should be able to: Define cost accounting. State the five areas in which cost accounting can assist management. List
5.1 Project Control Overview
5.1 Project Control Overview Project Control is a formal process in project management. In most respects, there is not a lot of room for creativity in the Control Phase of project management. The PMBOK
WHAT KIND OF PRODUCTION IS CONSTRUCTION?
WHAT KIND OF PRODUCTION IS CONSTRUCTION? Glenn Ballard 1 and Greg Howell 2 ABSTRACT Applicability of lean principles to construction might seem to require that construction s differentiating characteristics
PROJECT MANAGEMENT PLAN CHECKLIST
PROJECT MANAGEMENT PLAN CHECKLIST The project management plan is a comprehensive document that defines each area of your project. The final document will contain all the required plans you need to manage,
763XXX Timing Analysis, Critical Path Method (CPM) Project Schedule
763XXX Timing Analysis, Critical Path Method (CPM) Project Schedule Description: This work shall reflect a Contractor s anticipated work plan for constructing the project using a Critical Path Method Project
Dynamic Change Management for Fast-tracking Construction Projects
Dynamic Change Management for Fast-tracking Construction Projects by Moonseo Park 1 ABSTRACT: Uncertainties make construction dynamic and unstable, mostly by creating non value-adding change iterations
Governance in the Project Management World Published January 2013.
Governance in the Project Management World Published January 2013. 12/6/12 Executive Summary This paper examines "governance", its potential role in project management and the governance environment in
LEAN PROJECT DELIVERY THROUGH DESIGN-BUILD
LEAN PROJECT DELIVERY THROUGH DESIGN-BUILD Presented to Arizona State University DBIA Student Chapter Co-sponsored by DBIA Arizona Chapter and LCI Arizona CoP February 24, 2015 In the Beginning + 80 percent
BPMN and Simulation. L. J. Enstone & M. F. Clark The Lanner Group April 2006
BPMN and Simulation L. J. Enstone & M. F. Clark The Lanner Group April 2006 Abstract This paper describes the experiences and technical challenges encountered by the Lanner group in building a Java based
CASE STUDY - OVERHEAD COSTS ANALYSIS
CASE STUDY - OVERHEAD COSTS ANALYSIS Yong-Woo Kim 1 and Glenn Ballard 2 ABSTRACT Construction projects become complicated and fragmented so that many specialty contractors are involved. In such changed
Cash flow is the life line of a business. Many start-up
PM.02 ABC of Cash Flow Projections Mark T. Chen, PE CCE Cash flow is the life line of a business. Many start-up companies fail because of insufficient cash flow. From the perspectives of both owner and
Audit of the Test of Design of Entity-Level Controls
Audit of the Test of Design of Entity-Level Controls Canadian Grain Commission Audit & Evaluation Services Final Report March 2012 Canadian Grain Commission 0 Entity Level Controls 2011 Table of Contents
DEVELOPMENT OF A DISTRIBUTED CONSTRUCTION PROJECT MANAGEMENT GAME WITH COTS IN THE LOOP
Proceedings of the 2013 Winter Simulation Conference R. Pasupathy, S.-H. Kim, A. Tolk, R. Hill, and M. E. Kuhl, eds DEVELOPMENT OF A DISTRIBUTED CONSTRUCTION PROJECT MANAGEMENT GAME WITH COTS IN THE LOOP
City of Vallejo REQUEST FOR PROPOSAL WORKERS COMPENSATION CLAIMS AUDIT
City of Vallejo REQUEST FOR PROPOSAL WORKERS COMPENSATION CLAIMS AUDIT Date original issued: September 28, 2015 Qualifications Statements due: The City of Vallejo will consider Proposals submitted in response
