Industrial Advanced Turbine Systems Program Overview 1



Similar documents
Micro-Turbine Combined Heat & Power Generators (CHP) Cold Climate Applications 2014 Polar Technology Conference Richard S.

OVERVIEW OF GENERAL ELECTRIC S ADVANCED TURBINE SYSTEMS PROGRAM

GE Energy LMS100. Flexible Power

ABSTRACT DCMCCT PROJECT OVERVIEW

Introduction of the Solar Turbines Titan 250 Gas Turbine System

Shared Technologies in the Development of the Titan 250 TM Gas Turbine System

Outlook on Integrated Gasification Combined Cycle (IGCC) Technology

Low Load Operational Flexibility for Siemens G-class Gas Turbines

PHOENIX ENERGY of NEVADA, LLC (PENV) (PENV)

Combined Heat & Power. Discussion with Connecticut Energy Advisory Board. February 23, 2010

Siemens Gas Turbines over 100 MW

High Natural Gas Prices and the Updated Market For CHP

US Heavy Duty Fleets - Fuel Economy

Industrial Power. SGT-800 Gas Turbine. Power Generation: (ISO) 47.5 MW(e) / 50.5 MW(e) / energy

The SGT5-8000H proven in commercial operation

Energy Storage Activities at New York Power Authority

Design and Test Operation Performance of 1,500 C Class Gas Turbine Combined-Cycle Power Plant:

METERING BILLING/MDM AMERICA

Siemens turbine solutions for urban cogeneration

University of Melbourne Symposium on ICT Sustainability Dan Pointon 25 November 2008

Tehachapi Wind Energy Storage Project (TSP)

Smart solutions for fleets of all types & sizes of power generation. Marcus König, E F IE SGS / September 2013

Dharam V. Punwani President, Avalon Consulting, Inc. Presented at Turbine Inlet Cooling Association Webinar April 9, 2014

Construction Services. Furnishing Energy Solutions

Power Island. Industrial Power Plants. / energy

CENTAUR 40 Gas Turbine Generator Set

ENERGY EFFICIENCY IN POWER PLANTS

Totally Integrated Power SIESTORAGE. The modular energy storage system for a reliable power supply.

How To Evaluate Cogeneration

Columbia University Master Planning & Optimization

THM Gas Turbines Heavy duty gas turbines for industrial applications

Wesleyan University. Electrical Power Study

Fuel Cell Systems for Telecom Backup Power

Rules on Southern Companies Energy Auction Participation

Energy Systems Integration

How PURPA is driving utility scale solar in North Carolina By QF Solutions April 7, 2015

Last update: January 2009 Doc.: 08A05203_e

Biomass-to-Fuel-Cell Power For Renewable Distributed Power Generation

DISTRICT HEATING & COOLING INTEGRATION OF CHP. BURNS & MCDONNELL October 2014

Infrastructure Interdependencies

Top Technology for Industry, Agriculture, Business and Communities

SGT5-8000H SCC5-8000H 1S. Experience of Commercial Operation at Irsching 4. ANIMP-ATI, Sesto San Giovanni 26 June 2012

Renewable Energy on Regional Power Grids Can Help States Meet Federal Carbon Standards

Containerized Infrastructure Solutions Fast and efficient deployment, anywhere, anytime

SGT5-4000F Trusted Operational Excellence

Emissions from Traditional & Flywheel Plants for Regulation Services

AREVA SOLAR. Presentation title Presenter/ref August p.1

Solar Turbines Incorporated recently celebrated a significant landmark in the history of the company when

Adapting Gas-Power Generation to New Role in Low-Carbon Energy Systems

THE PRODUCTION OF ELECTRICITY FROM WOOD AND OTHER SOLID BIOMASS

SGT5-4000F Gas Turbine and Combined Cycle Power Plant Evolution reflecting the changing Market Requirements

Statement for the Record

P O W E R I N G T H E G L O B A L E N E R G Y D E M A N D. Discover the Power of Cogeneration

Vogt Power Emission Control Solutions

OPERATIONS CONTROL CENTER

SGT-800 GAS TURBINE CONTINUED AVAILABILITY AND MAINTAINABILITY IMPROVEMENTS. Dr. Vladimir Navrotsky Lena Strömberg Claes Uebel

Emissions Comparison for a 20 MW Flywheel-based Frequency Regulation Power Plant

Cleaner Air with Electricity Infrastructure Renewal

Study of a Supercritical CO2 Power Cycle Application in a Cogeneration Power Plant

Perspective on R&D Needs for Gas Turbine Power Generation

Mount Wachusett Community College. Energy Conservation & Conversion : A Cost Sharing Approach

THE EUROPEAN GREEN BUILDING PROGRAMME. Technical Module on Combined Heat and Power

SOLARRESERVE. BASELOAD SOLAR Power. Improving Mining Economics with Predictable Energy Costs

GE Oil & Gas. Industrial modules. Turnkey power-generation and compression solutions to increase efficiency, reliability & power in restrictive areas

PREVENTIVE MAINTENANCE PROGRAM AND NOVEL TECHNIQUES TO REDUCE DOWNTIME AND INCREASE OPERATING EFFICIENCY AT DISTRIBUTED COGENERATION FACILITIES

Clean Energy Jobs Plan

Company Profile. New and overhauled Power Plants for sale

GEOil&Gas. Liquefied Natural Gas. Reliable innovation for the entire LNG value chain

GENERATION TECHNOLOGY ASSESSMENT

Hitachi H-25 Gas Turbine in Oil and Gas Market

LIQUID FUEL POWER PLANTS

Power Plant Operations and Maintenance. Maximize Your Plant s Bottom-Line Results

1. Summary. electric grid, strengthen saving programs sponsored by utilities. The project

Impact of Renewable generation

Torino Nord. Cogeneration Plant. The gas turbine. The steam generator. The Torino Nord cogeneration plant produces electricity and heat for district

Abstract Process Economics Program Report 136A PLANT UTILITIES COSTS (January 1995)

Module 7 Forms of energy generation

World s Greenest High Performance Data Center

BRASH Air-Steam Hybrid Technology for Combined Heat and Power (CHP)

Efficiency Metrics for CHP Systems: Total System and Effective Electric Efficiencies

Gas-Fired Power HIGHLIGHTS

ON-LINE MONITORING OF POWER PLANTS

National Heavy Duty Truck Transportation Efficiency Macroeconomic Impact Analysis

INTEGRATION OF MICROTURBINE-BOILER

Micro cogeneration. Affordable, efficient and innovative

Your partner of choice for integrated energy solutions

CHP and CCHP Systems Today

Preparatory Paper on Focal Areas to Support a Sustainable Energy System in the Electricity Sector

New business segments for the energy saving industry Energy efficiency and decentralised energy systems in the building & housing sector

POWER GENERATION: GAS TURBINES, CO- GENERATION, COMBINED CYCLE PLANTS, WIND POWER GENERATION, AND SOLAR POWER:

Understanding Tier 4 Interim and Tier 4 Final EPA regulations for generator set applications

Copyright 1984 by ASME. NOx ABATEMENT VIA WATER INJECTION IN AIRCRAFT-DERIVATIVE TURBINE ENGINES. D. W. Bahr. and T. F. Lyon

Bergen Engines Products and Applications

Transcription:

Industrial Advanced Turbine Systems Program Overview 1 Introduction Early in this decade, the U.S. Department of Energy (DOE) recognized the fact that gas turbines were playing an ever-expanding role in the power generation industry. Despite the fact that such machines have been in existence for more than 50 years, their improvements in efficiency, emissions, cost and reliability have been largely incremental, having typically followed improvements in materials and other enabling technologies. In response to this dichotomy, DOE initiated the four phase Advanced Turbine Systems program in 1990 and chartered the program with the following goals relative to then state-of-the-art industrial turbine products: 10% improvement in busbar cost of electricity. 15% improvement in efficiency. Single-digit NOx emissions. Reliability equal to or greater than currently available products. Now, more than 8 years into the future, the development program undertaken by this unprecedented public-private partnership is entering its fourth and final phase. The design phase of the program is behind us and the comprehensive field evaluation phase of Solar Turbines ATS program is now well underway and will continue for the next year. With one field evaluation S. Gates (619) 595-7428 (steve_gates@solarturbines.com) Solar Turbines Incorporated P.O. Box 85376 San Diego CA 92186-5376 1 Research sponsored by the U.S. Department of Energy s Federal Energy Technology Center, under contract DE-FC21-95MC31173 and the Chicago Operations Office, under contract DE-AC02-92CE40960 with Solar Turbines Incorporated, 2200 Pacific Highway, P.O. Box 85376, San Diego CA 92186-5376. 1 machine in operation and 5 more scheduled to follow in short order, we will address the status of the Solar s Mercury 50 program and its progress vs. the four fundamental goals that were set forth more than 8 years ago. The Mercury 50 was introduced to the public in December 1997 at the ASME Turbomachinery symposium in Orlando, Florida as a single shaft, optimized recuperated engine, nominally sized at 4.3 MWe with better than 40% efficiency at the busbar. This environmentally superior system incorporates a highly flexible combustion system that can be configured for either ultra-lean premixed or catalytic combustion. The Mercury 50 is targeted to meet the rapidly expanding demand for highly efficient, environmentally superior turbine-based power systems in the industrial power generation and emerging distributed generation markets. Development Efforts Formal development of the Mercury 50 began in September 1995 and emphasized the use of system-level design solutions that take advantage of a wide variety of demonstrated technological advancements, each providing sufficient margin to assure the superior durability and availability that are required by industrial gas turbine users. A combination of innovative

primary and backup design solutions have been carefully blended to offer maximum cycle efficiency and emissions reductions with minimal risk, as adequate design margin is maintained within each selected technology. The materials used in the manufacture of the Mercury 50 turbine are a key element in the durability equation and represent a mix of current turbine materials as well as next-generation alloys that are relatively new to industrial turbines. One of the most significant Mercury 50 innovations is the layout of the core engine, around which the package has been synergistically designed. The resulting design offers significant advantages in terms of cost, performance and maintainability and is central to its ability to meet the key product goals stated at the beginning of the program. Solar s Mercury 50 engineering design activities were concluded in July 1998. The engine test phase of the program commenced in December 1998 to evaluate the performance and durability capabilities of this unique engine prior to the commencement of field evaluation tests. The fourth and final industrial system demonstration phase of the program begins in December 1999 and will be marked by startup of the DOE Host Site demonstration machine at Rochelle Municipal Utilities. This machine is scheduled to run for 8,000 hours, during which time it will demonstrate its capability to meet the four fundamental goals of the program. As a precursor to this milestone event, evaluation of an early pre-commercial version of the Mercury 50 began in September of 1999, coincident with startup of the machine at a remote mining site in Australia. Summary Solar s Mercury 50 is the culmination of a development effort that has been more than 8 years in the making and represents a revolutionary approach in an industry that has long depended upon evolutionary solutions. It has been designed to offer superior performance and operating flexibility at a price that is competitive with alternative power generating technologies. It represents a balanced approach to the tradeoff between the benefits of new technology, low cost and high reliability that is targeted directly at the needs of the industrial power generation marketplace. This report highlights Solar s ATS program progress over the past year and will discuss the design activities, test results and field evaluation preparations along with a brief overview of future plans, commercialization efforts and marketplace activities. 1 Research sponsored by the U.S. Department of Energy s Federal Energy Technology Center, under contract DE-FC21-95MC31173 and the Chicago Operations Office, under contract DE-AC02-92CE40960 with Solar Turbines Incorporated, 2200 Pacific Highway, P.O. Box 85376, San Diego CA 92186-5376. 2

Dave Esbeck Vice President, Engineering ATS99-002

Program Sponsorship ATS Program Management DOE Office of Industrial Technology Chicago Operations Office Steve Waslo - Contracting Officer s Technical Representative Washington Headquarters Denise Swink - Deputy Assistant Secretary, Industrial Technology William Parks - Director, Cross-Cutting Technologies Patricia Hoffman - ATS Program Manager FETC - Morgantown Mary Gabrielle - Contracting Officer ATS99-003

Introduction Introduction & Overview Review of Accomplishments Mercury Engine Design 2nd Generation Hardware Package Design Summary of Test Results Commercialization Activities - Overview Update - Rochelle Site Preparations Dave Esbeck Steve Gates Mr. Ray Schwartz Rochelle Municipal Utilities ATS99-004

Mercury 50 Layout Industrial Single-Shaft Generator Set Optimized Recuperated Cycle Modular Construction 10-Stage Axial Compressor 2-Stage Axial Turbine Annular Combustor 4.2 MWe 40% Busbar Efficiency ATS99-005

Program Goals Efficiency Environment Fuel Flexibility Reliability and Maintainability Cost of Power ATS99-006

Program Goals - Efficiency 15% Improvement in Efficiency Based on Lower Heating Value (LHV) of Natural Gas Compared to Best Available 1991 Industrial Turbomachinery Technology Comparable in Size Range ATS99-007

Program Goals - Environment Environmental Superiority Under Full- and Part-Load Conditions No Post-Combustion Cleanup Devices Emissions Acceptable in Severe Non-Attainment Areas - NOx, CO, UHC Single-Digit NOx ATS99-008

Program Goals - Fuel Flexibility Natural Gas Fired ATS Systems Adaptable to Biomass and Coal-Derived Fuels ATS99-009

Program Goals - Reliability Reliability and Maintainability - Equivalent to Best Available Circa 1991 Addressing RAM-D ATS99-010

Program Goals - Cost of Power Busbar Energy Costs at 10% Less than 1991 State-of-the-Art Turbine Systems Total Cost of Ownership (Fuel, Maintenance, Amortization) ATS99-011

Steve Gates Director, Developmental Engineering ATS99-015

Mercury 50 Engine Design Overview ATS99-016

Mercury 50 Layout Center Frame RECUPERATOR COMPRESSOR TURBINE COMBUSTOR ATS99-019

Mercury 50 Layout Combustor Module 8 ULP Injectors Augmented Backside-Cooled (ABC) Combustor Liner Closed-Loop CO Control Compensating Geometry Design Flexible Design - Accommodates Either Ultra Lean-Premixed (ULP) or Catalytic Combustion Extension of SoLoNOx Technology ATS99-020

Mercury 50 Layout Turbine Module 2nd-Stage Design, 2125 F TRIT 1st-Stage Bladed Disk Vortex-Cooled Leading Edge Cooling Circuit Film / Impingement Cooled Unshrouded; Highly Loaded Uncooled 2nd-Stage Bladed Disk Shrouded Blade Design Nominal Stage Loading ATS99-021

Mercury 50 Layout ACE Compressor Module Variable Geometry Control 10-Stage Axial Design 9.1 Pressure Ratio 3-D Wide Chord Airfoils 40% Reduction in Blade Count ATS99-022

Test Results ATS99-023

ATS Mercury 50 Accomplishments Commissioned Dedicated Mercury 50 Development and Production Test Cells Completed 1st Round of Development Testing on Engines #1 & #2 Completed On-site Package Serviceability and Installation Kaizen Review Created Significant Commercial Interest in ATS Product Built, Tested and Shipped First Commercial Unit on Schedule ATS99-024

Rolling Element Bearings All Bearings in Excellent Condition Thrust Bearing Like New Skidding Non-Existent No Pitting or Contamination ATS99-030

2nd Turbine Disk Assembly Shrouded Blade Design Shroud Z-Notch Interlock Functioning per Design Intent No FPI Indications at Attachments Blade Removal Blade Z-Notch Interlock ATS99-031

Mercury 50 Development Test Summary Emissions: Exceeding Goal in Test Cell Engine Performance on Plan Mercury-50 Test Program 900 800 700 Over 700 Hours of Test 2 Phases, 4 Engines, 5 Builds 300+ Start Cycles Critical New Content Functioning As Designed Hours on Test 600 500 400 300 200 100 0 SN001/1 SN002/1 SN002/2 SN003/2 SN004/1 Test Engine ATS99-032

Mercury 50 Package Maintainability Kaizen Demonstration Service/ Maintenance/ Safety Audit Review Assembly/ Installation Plans Evaluate Field Tooling ATS99-044

ATS99-045

ATS99-046

ATS99-048

ATS99-048

ATS99-049

ATS99-050

ATS99-051

ATS99-052

ATS99-053

ATS99-054

ATS99-055

ATS99-056

ATS99-057

ATS99-058

ATS99-059

ATS99-060

ATS99-061

ATS99-062

ATS99-063

Engine #1 Modular Disassembly Combustor and Turbine Modules Compressor Module My Jacket ATS99-065

ATS99-066

ATS99-067

ATS99-068

ATS99-069

ATS99-070

ATS99-071

ATS99-072

Commercialization ATS99-073

Opportunity in Current Energy Market ENERGY USERS Requirement for Competitive and Reliable Electricity ENERGY PROVIDERS Need to Optimize Profits on Energy Sales, Whether Gas or Electricity, While Delivering Competitive and Reliable Energy ATS99-074

Broad Appeal in Diverse Applications Small Utility Base Load Grid Support On-Site Generation Remote Power CHP / Cogeneration ATS99-075

Initial Customer Installations Rural Utility Colorado Municipal Utility Chicago, Il San Diego, Cal 1. Manufacturer 2. Hospital ESCO Laredo, TX University S. Carolina Phosphate Mine Queensland, Australia ATS99-076

Manufacturer San Diego, California ATS99-077

Phosphate Mine Queensland, Australia Mercury 50 ATS99-078

Ray Schwartz Rochelle Municipal Utilities ATS99-079

City of Rochelle, Illinois Located in North Central Illinois Intersection of I-39 and I-88 Intersection of BNSF and UP - 120 Trains/Day Population at 10,000 and Growing 972228-006 ATS99-080

Rochelle Industrial Base Growth from 19 to 38 Industries in 6 Years Food Processing and Distribution Center - Rochelle Foods (Hormel) Food Processing - Kraft Foods Food Processing - Erie Foods International Food Processing - Del Monte Corp Canned Food Distribution Center - Total Logistics Control Frozen Food Distribution Center - Americold Frozen Food Distribution Center Other Industries - Eaton Corporation Electrical Parts - Silgan Container Corp Can Manufacturing 972228-008 ATS99-081

Physical Profile Service Area 100 Square Mile - Municipal and Rural Population - 18,000 Surrounded by Commonwealth Edison Power Generation at Three Locations - Diesel Plant 20.0 MW from 10 Oil/Gas-Fired Diesel Units - Cogen Plant 11.5 MW from Steam Turbine Generator - Peaker Plant 5.0 MW from 2 Oil/Gas-Fired Diesel Units Dual 138KV Transmission Connections to Com-Ed Grid Two 138/13.8KV Substations ATS99-082

Power Supply Purchase 95 to 98% of Power Wholesale - Several Varying Blocks of Firm/Interruptible Power - Hourly Interruptible Power for Load Following Generation Assets - Current Function - Economic Dispatch (Market Hourly vs In-House Cost) - Firm Up Interruptible Power - Sales to Wholesale Market - Emergency Back-up Total Output 1998: 180,000,000 kw-hr ATS99-083

Annual Load Duration Curves L O A D, 40 35 30 25 20 15 10 0 1000 3000 5000 7000 9000 TIME SPENT AT/ABOVE LOAD, HOURS ATS99-084

Why Distributed Generation? Places Capacity Nearer Load Reduces Impact of Transmission Curtailments Age of In-House Generation Assets Cost of Service ATS99-085

Why the Mercury 50? Operational Flexibility - Base Loading for Hedge Against Supply Interruptions - Intermediate Loading for Economic Dispatch - Peak Loading for Load Following and Economic Dispatch Multiple Location Potential - Commercial / Industrial Sites - Existing Cogen Plant - Existing Diesel Plant - Sub-Stations Low Environmental Impact Competitive Operating Costs ATS99-086

Mercury 50 / Rochelle Site Layout EXISTING STEAM PLANT BUILDING LUBE OIL COOLER EMISSIONS MONTIORNG TRAILER FUEL GAS SKID CONTROL ROOM GENERATOR SET SERVICE AREA SERVICE AREA EXISTING OVERHEAD ELECTRICAL PARKING LOT OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE NEW ROAD EXISTING FENCE x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x NEW x x x x ACCESS CARON ROAD (30-0 ASPHALT) GATE ATS99-087

Mercury 50 / Rochelle Site Photo ATS99-088

Mercury 50 / Rochelle Site Photo ATS99-089

Mercury 50 / Rochelle Interface Direct Connection to 13.8KV System Unmanned Site Remote Start/Stop Fiber Optic Connection to SCADA ATS99-090

Rochelle Future Continued Steady Growth Intermodal Facility Strong Possibility Distributed Generation Role - Essential Element of Generation Fleet - Replacement for Existing Central Plant - Siting on Customer Premises Anticipated - Cogeneration Applications - Enhance Rochelle s Competitive Edge ATS99-091

Summary Mercury 50 on Track for Full-Production Release in 2000 Initial Development Activities Are Complete Exceeded Original ATS Program Goals Only Durability Remains to Be Proven Field Evaluation Units Being Built and Shipped Continue Further Refinements to Achieve Stretch Goals Generated Significant Market Interest in ATS Product Clear Commitment to Commercialize ATS99-092