5.0. Establishing a comprehensive monitoring network Stage 2



Similar documents
3.0. Acquisition of hydrogeological and related petroleum engineering data

Exploration for natural gas

How To Manage A Gdf Project

MAC-ENC-PRO-062 GROUNDWATER MONITORING PROGRAM

WILLOCHRA BASIN GROUNDWATER STATUS REPORT

Professional Resumé of Geoffrey Hokin

December 2015 Quarterly Report & Appendix 5B

Multilevel Monitoring and Characterization of the Edwards and Trinity Aquifers of Central Texas

The Role of Groundwater in Alberta s Tight Water Supply Environment. Ken Baxter, M.Sc., P.Geol. Dan R. Brown, M.Sc., P.Geol.

Matt Harris, Golder Associates (NZ) Ltd. The value of geophysics as a non-intrusive method for site characterisation

Norwest Energy NL. Northern Perth Basin Farm-In Opportunities. PESA Deal Day Brisbane Shelley Robertson Asset Manager.

Social impact assessment. Guideline to preparing a social impact management plan

How To Prepare A Geotechnical Study For A Trunk Sewer Project In Lincoln, Nebraska

Groundwater Flooding: a UK Perspective

Guideline: Works that interfere with water in a watercourse watercourse diversions. September 2014

Guidelines for the Estimation and Reporting of Australian Black Coal Resources and Reserves

AGL UPSTREAM INVESTMENTS PTY LTD

Groundwater flow systems theory: an unexpected outcome of

WELL LOGGING TECHNIQUES WELL LOGGING DEPARTMENT OIL INDIA LIMITED

2011 MAJOR PROJECTS UPDATE - EAST WELLFIELD EXPANDED HYDROGEOLOGICAL STUDY AND WASTEWATER TREATMENT PLANT ZERO IMPACT ANALYSIS

Monitoring strategies for CO 2. Nick Riley Jonathan Pearce. Storage

Instrumentation and Real Time Monitoring of a Landslide on Highway No. 302 Near Prince Albert, Saskatchewan

The successful integration of 3D seismic into the mining process: Practical examples from Bowen Basin underground coal mines

For personal use only

Nutrient Reduction by Use of Industrial Deep Injection Wells, Miami-Dade County, Florida

GUIDELINES FOR GEOTECHNICAL INVESTIGATION OF BRIDGE STRUCTURES. Materials Engineering Report No M (Supersedes Report No.

For personal use only

Petrophysical Well Log Analysis for Hydrocarbon exploration in parts of Assam Arakan Basin, India

Forecasting coal seam gas water production in Queensland s Surat and southern Bowen basins Technical report

Chapter 1 Introduction

Water Forever: South West Margaret River Forum

National Groundwater Conference Canberra, November 2010

Drinking Water Quality Management Plan Review and Audit Guideline

How To Map A Lake In The North Of The Holland (Fiji)

Recommended Practices Associated with Hydraulic Fracturing Operations

Water Resource (Great Artesian Basin) Plan Sale of general reserve unallocated water: Tender assessment report

Reservoir Characterization and Initialization at Little Mitchell Creek

Building the Wireline Database and Calculation of Reservoir Porosity

Trevor Lloyd Director

Oil and Gas Exploration and Production Oil and gas exploration and production... 22a-472-1

WATER-SOURCE HEAT PUMPS*

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015

ources of Drinking Water

Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION

Building an Unconventional Gas Business in Australia:

Understanding Hydraulic Fracturing

NOTE FOR MINING AND OIL & GAS COMPANIES - JU N E

NuGeneration Ltd Site Investigations

1 What is the purpose of this document?

Groundwater Training Course SOPAC, April Electromagnetic (EM) Induction method for Groundwater Investigations

Barometric Effects on Transducer Data and Groundwater Levels in Monitoring Wells D.A. Wardwell, October 2007

4 Water supply description

Sustainable Groundwater Management for Tomorrow s Livelihoods

Treatment Practice for Controlling Water Damage in the Annular Space of Shaft Freezing Hole

Geologic Criteria for Eastern Kentucky Permanent CO 2 Storage (Saline reservoir test)

For personal use only

Frequently Asked Questions on the Alberta Tier 1 and Tier 2 Soil and Groundwater Remediation Guidelines. February 2008

Preliminary Environmental Information Report: Appendix 16.C. Flood Warning and Evacuation Plan

QUARTERLY REPORT. PERIOD ENDING 31 December power earth. from the

Certificate Programs in. Program Requirements

IEAGHG Monitoring Network Updates from June meeting

* 765 million tons of recoverable reserves as of 1970; W.E. Edmonds, Pennsylvania Geologic Survey

Appendix C - Risk Assessment: Technical Details. Appendix C - Risk Assessment: Technical Details

GROUNDWATER CONDITIONS

ASX ANNOUNCEMENT JUNE 2015 QUARTERLY REPORT 31 JULY 2015

Shale Energy Fluids Management Practices

BASIN MANAGEMENT OBJECTIVES CHEROKEE SUBINVENTORY UNIT

Advances in Slope Instrumentation: TDR and Remote Data Acquisition Systems

Well-logging Correlation Analysis and correlation of well logs in Rio Grande do Norte basin wells

How can we make the most of magnetic data in building regional geological models?

Cabot Oil & Gas Corporation

Submission to the Queensland Competition Authority. Regulated Retail Electricity Prices Transitional Issues & Cost Components and Other Issues

Site Assessment for the Proposed Coke Point Dredged Material Containment Facility at Sparrows Point

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 DECEMBER 2015

Deep Geothermal energy and groundwater in

ASX Announcement GOOD OIL CONFERENCE PRESENTATION OUR FOCUS. The Company Announcement Officer ASX Ltd via electronic lodgement COOPER BASIN

Water Resource Plan 2015 (Summary Report) Ensuring customers have clear, fresh, safe drinking water to 2040 and beyond

1 INTRODUCTION. Kayenta Complex Page 9 December 2011 Cumulative Hydrologic Impact Assessment

Water Supply and Wells

Opportunities and Challenges for Australian Gas Presentation by James Baulderstone at the Australia Gas Conference

A GIS BASED GROUNDWATER MANAGEMENT TOOL FOR LONG TERM MINERAL PLANNING

EVALUATING THE IMPROVEMENT FROM IMPACT ROLLING ON SAND

Lists of estimated quantities to be performed and prices Estimated quantities to be performed. Prices

(

Transcription:

5.0 Establishing a comprehensive monitoring network Stage 2

56 5.0 Establishing a comprehensive monitoring network Stage 2 Conditions 49, 52 and 65 to 67 5.1 Introduction As planned, QGC has progressed the establishment of an extensive monitoring program to being able to monitor changes in aquifer status (both water level and quality) across its production tenements for the life of the project. The monitoring points were selected across and around production tenements to capture the potential regional extent and effect of CSG extraction activities. QGC's monitoring program includes the construction of standpipe groundwater monitoring bores and multi-level Vibrating Wire Piezometer (VWP). A high priority during the Stage 1 WMMP was the phased establishment of the monitoring well network encompassing the QCLNG gas field areas. This included construction of 13 bores by the end of 2011 in the Gubberamunda Sandstone and Springbok Formations in the existing central and future southern development areas. The Stage 2 drilling program is currently underway, with eight out of 32 bores completed into a number of Surat Basin aquifers and aquitards as of August 2012. Once installed, these bores will provide ongoing aquifer monitoring of: Free-standing water levels for specific aquifers of interest Aquifer-specific pressures Water quality through collection of aquifer water samples (standpipe bores only). 5.2 MONITORING NETWORK OBJECTIVES The object of the monitoring wells network is to generate ongoing data streams for analysis of any groundwater level changes due to natural occurring processes (e.g. rainfall recharge, barometric and earth tide fluctuations), CSG activities and/or other groundwater usage. In support of this objective, specific secondary monitoring network program objectives are: To enable baseline and ongoing groundwater monitoring in order to predict any impacts from CSG activities on aquifers and EPBC listed springs To acquire additional geological and hydrogeological data from the new bores to assist in the characterisation of Surat Basin geological formations To monitor planned appraisal pilot trials in support of connectivity studies prior, during and after testing in order to identify possible leakage from adjacent formations To monitor aquifer injection trials ( near-field and far-field monitoring of potential response) To comply with Australian and Queensland regulatory requirements (in particular, QWC and State environmental authorities) To support reservoir development activities To inform other QGC programs and research as required.

57 Pressures WCM CSG wells (WCM M&V) Pressures WCM Cored wells converted into monitoring wells (WCM M&V) Multiple pressures Cored wells converted into monitoring wells (WCM and Springbok M&V) Multiple pressures NEW VWP Monitoring wells (Top WCM to surface) Multiple pressures NEW VWP Monitoring wells (Eurombah to Precipice) Water level / quality NEW nested monitoring wells Deep nested wells Shallow nested wells Water level / quality Private bores converted into monitoring bores (after baseline assessment) Shallow Data loggers Gubberamunda Formation VWP Water level Gubberamunda water monitoring Water level Westbourne Formation VWP Westbourne water monitoring Springbok Sandstone PDHG VWP Springbok water monitoring Walloon Subgroup PDHG PDHG PDHG Aquifer / aquitard pressure monitoring Shallow aquifer monitoring pressure and water quality Eurombah Formation Reservoir performance pressure Reservoir and aquifer pressure monitoring VWP Eurombah water monitoring Hutton Sandstone VWP Hutton water monitoring Evergreen Formation VWP Precipice Sandstone VWP Precipice water monitoring Permo-triassic or basement Aquifer / aquitard pressure monitoring Aquifer monitoring pressure and water quality Figure 22 Schematic of nested monitoring bores and VWPs 5.3 MONITORING BORE RATIONALE In the development of QGC s monitoring bore network, these objectives (above) were considered and a rationale has subsequently been developed regarding the selection of each bore location and formation to be monitored. Stage 2 Monitoring Bore program is scheduled to be finalised with QWC during the Draft UWIR Consultation period. The rationale for each bore location and design/construction and depth, comprises a series of elements. A bore may be located to satisfy only one element or, alternatively, a bore location will satisfy a number of elements. The more elements a bore satisfies, the stronger its design rationale. Detailed below are the elements QGC considered when defining its rationale for each bore. Table 7 present the determined monitoring bore locations, their target aquifer and the elements satisfied. The seven elements identified determine the 3D spatial distribution of the monitoring network while the requirements of QWC s UWIR will also influence network design. In broad terms, the two highest risk aquifers, namely the Springbok and Hutton, have received highest priority.

58 5.3.1 Statistical methods for groundwater monitoring network design QGC is of the view that statistically-based methods for the design of groundwater monitoring networks (for example, as discussed in Merrick, 1998, and Theodossiou and Latinopoulos, 2006) are of limited use because there are many different factors (as discussed below in detail) which determine the location of monitoring bores. Nonetheless, QGC proposes to undertake a review of the adequacy of the groundwater monitoring network once the UWIR requirements are finalised and the results of the GEN3 modelling are providing history matched groundwater drawdown results. When QGC is confident that good quality groundwater drawdown projections are available, then QGC will evaluate the use of statistical methods to assist the design of the network. This will be reported in April 2013. 5.3.2 Hydrogeological approach to groundwater monitoring network design in the dawson river catchment Seven elements have been considered for siting and designing bore types for QGC's regional groundwater monitoring network. These are discussed in detail below. Table 7 provides details of all completed and planned monitoring bores and summarises the rationale basis for each monitoring bore including its primary purpose. Rationale Element 1 Aquifer Connection to MNES/Sensitive Receptors/Current Use The protection of identified EPBC listed springs is a key requirement of both SEWPAC and QWC. To this end, a monitoring bore s location and depth is partly defined by its ability to provide an early warning in the source aquifers for these springs. For example, part of the rationale for bores QGC drills in the northern tenements is to monitor aquifers feeding EPBC listed springs, so bore depths intersecting Hutton and Precipice aquifers are selected in these areas. Bores drilled in the south do not have the requirement to monitor springs but Hutton and Precipice bores will be completed from a regional water use perspective. Rationale Element 2 Development of Baseline Datasets, Establishing Trends Baseline aquifer monitoring is crucial in the establishment of aquifer conditions prior to commencing CSG activities. A valid aquifer baseline dataset enables assessment of natural fluctuations such as earth tides, seasonal variations and drought or anthropogenic inputs like local farm bore or commercial, agricultural or industrial use extraction. Consequently, one siting element rationale is to ensure bores are sited in areas and aquifers where groundwater may already be subject to natural or anthropogenic influences so as to allow characterisation. An example is in the southern area where the Springbok Formation outcrops at surface and may be sensitive to direct rainfall recharge events influencing the rationale for the Springbok bores drilled in the Poppy field. The positioning of these bores in appropriate locations to assess response is an important component in defining baseline conditions prior to CSG activities. Bore-by-bore baseline monitoring of aquifers will allow QGC to produce a base water level and water quality trend for each aquifer of interest, allowing natural or anthropogenic influences to be clearly defined.

59 Rationale Element 3 Ongoing Monitoring, Assessing Impacts Following on from the establishment of individual aquifer conditions, QGC will undertake an extensive, ongoing monitoring program for the life of the operation and beyond. This ongoing monitoring program will continue the program developed during the baseline works, utilising the same bores but with flexibility to expand as needed into specific areas. This will enable rapid assessment of: Changes in aquifer conditions towards and around EPBC listed springs or other sensitive receptors Changes in aquifer conditions and inter-formation leakage in and around areas of CSG operation Aquifer response to future re-injection activities. For example, a well may be sited in relation to the long-term field development plan so that when a CSG field is commissioned the bore has a valid baseline dataset and is positioned to monitor accurately any aquifer responses. The bores drilled at Woleebee Creek in 2012 illustrate this element as part of the rationale for their location, design and depth (including all assessment points). Rationale Element 4 Supporting Connectivity Studies A fundamental QGC focus is on assessing and quantifying the potential connectivity of the Walloon Coal Measures to aquifers above and below the formation prior to and during CSG activity. Monitoring hydraulic heads (via pressure or standing water level) of specific aquifers during pilot tests and then over the life of the operation helps develop connectivity profiles for aquifers of interest. In relation to pilot trials planned for various CSG fields, QGC has identified three specific areas within its tenements where extensive monitoring and assessment of aquifer connectivity will occur. These areas are Woleebee Creek in the Northern Gas Fields and Kenya East and Ruby-Jo in the Central and Southern Gas Fields. At each of these locations, multiple wells are proposed with each targeting a specific aquifer or aquitard. In this way, during production trials and later during general operations, hydraulic heads can be monitored, pressure differentials between formations recorded and changes noted. Changes in pressure regimes may then be quantified to determine potential leakage between aquifers. Rationale Element 5 Field Development and Tenement Coverage This element, referenced against QGC field development plans, relates to the location and scheduling of monitoring bores to be drilled and installed. Considerations include: Field development plans aligning drilling and installation with a CSG field s scheduled pilot or full-scale production Planning installation timing to allow for the establishment of baseline conditions Planned water extraction rates Achievement of good spatial coverage of QGC tenements Access to selected locations, in relation to landholder negotiation, compensation and ongoing access needs Coverage of QGC tenure Availability of existing QGC infrastructure, such as existing pads, to minimise the drilling footprint. Each of these factors is considered when developing a monitoring bore drilling schedule, as summarised in Table 7. Rationale Element 6 Conceptual Siting Numerical Modelling A key component in defining bore rationale relates to conceptual and numerical regional hydrogeological models. Monitoring programs are designed to inform refinement and continual development so that these models can accurately reconcile measured groundwater level and pressure data against tested model assumptions.

60 Based on inputs, hydrogeological numerical models can identify areas within each aquifer where depressurisation and drawdowns may be expected. Model outputs and associated pressure zones are considered when examining bore locations to determine if this will assist in confirming modelled depressurisation. This is a key mechanism for undertaking future numerical model reconciliation. Rationale Element 7 Geological and Hydrogeological Data Acquisition A number of geological and hydrogeological models are utilised by QGC across a number of disciplines. Drilling these monitoring bores generates new data to complement and expand existing datasets. Bore location and depth address any known data gaps in existing models and supports ongoing model refinement. 5.3.3 Boxvale and Mooga Units The elements defined above have been utilised in the aquifer assessment process for all but two of the geologic units within QGC's tenements in the Surat Basin. Detailed below is a discussion on the units that were not considered as part of the monitoring program and some detail on their geologic occurrence within the basin. Based on these assessments QGC have considered the installation of monitoring infrastructure into these units unnecessary at this time. Should future assessment works demonstrate that there is a clear need to monitor these units then under QGC's adaptive management approach additions to the monitoring network may be considered. Boxvale Sandstone member The Boxvale Sandstone Member is located between the upper and lower Evergreen formation. The Boxvale Sandstone Member is laterally present across most of the Northern Surat Basin. It is locally thin, comprising 10-40 m thickness, average of 29 m, and does not exceed 35 m thickness in any of the deep wells within QGC's northern tenements. The unit is not typically one discrete interval; rather it is often split into several arenaceous sections divided by clay rich shales. QGC has considered the need for monitoring of the Boxvale Sandstone member and believes that this is not necessary because there is extensive monitoring of the overlying (Hutton Sandstone) and underlying (Precipice Sandstone) units which are the main source aquifers for EPBC listed springs in the region. Also the trigger response criteria of the adjacent units are identical, hence it is believed that any effects felt in the adjacent units would be felt in the Boxvale Sandstone. The very preliminary assessments at the EPBC listed springs identified the Boxvale as a possible secondary source aquifer at Cockatoo Creek. Should further assessments at the EPBC listed springs identify the Boxvale as a credible source aquifer, QGC would then consider the usefulness of any monitoring bores. Note: The QWC UWIR Spring Management Strategy does not require monitoring of the Cockatoo Creek Springs. Mooga Sandstone The Mooga Sandstone conformably overlies the Orallo Formation across most of the eastern edge of the Surat Basin. Towards the western Nebine Ridge where the Orallo Formation thins, the Mooga Sandstone rests directly on the Gubberamunda Sandstone. The unit thickens into the centre of the basement however overall it ranges between 0 m and 50 m within the QCLNG project area. QCLNG project tenements are largely situated on or beyond the outcrop extents of the Mooga Sandstone. The lack of Mooga Sandstone presence across much of QCLNG project development areas and the well developed presence of the Orallo Formation hydraulically separating the Gubberamunda and Mooga Sandstones, infers that the likelihood of impact from QGC CSG operations in this region is effectively negligible. QGC is committed to long-term groundwater monitoring of the Gubberamunda Sandstone as well as the Springbok Sandstone. If this monitoring shows impacts caused by CSG operations in excess of current modelling, then under QGC's adaptive approach, monitoring can be considered. Hence QGC is of the view that there is little benefit of monitoring the Mooga sandstone. Nonetheless in some tenements, VWPs will be constructed into the Mooga sandstone, as shown in Table 8.

61 5.4 Monitoring BORE Types Once the locations are selected based on the rationale defined above then the bore type is defined. The type of bore drilled at each location considers the elements of the rationale, regulator requirements and internal QGC data needs. Based on the outcomes of this assessment a bore type is selected. In broad terms: Where only water level data is required an open standpipe bore could be utilised, or a VWP pressure bore installed Where water levels and water quality are required an open standpipe bore will be installed. The different styles of monitoring bore available are presented in Figure 22. Table 7 provides details of QGC's proposed standpipe monitoring and VWP construction program. Table 8 outlines the planned VWP borehole conversion program. 5.5 Current Program Status Due to technical and legislative requirements, the nested bore drilling program was planned as two subprograms: A shallow nested bore program (above the WCM and typically up to 350 m in depth) to monitor the Gubberamunda, Westbourne and Springbok Formations (Stage 1 was completed in 2011) A deep nested bore program (below the WCM and typically more than 350 m in depth) to monitor the Eurombah, Hutton and Precipice Formations (Stage 2 commenced in 2012 and is currently in progress). In some cases VWP installations may used. The Stage 1 Program was completed in Q4, 2011, with 13 bores drilled, as detailed in Table 7. The Stage 1 Bore Completion Report documents this work and findings and is attached as Appendix H. Complete Area Tenure Location Well Name Primary Function Rationale Element Target Monitoring Year Stage 1 Complete (Shallows) Central PL201 Berwyndale South #50 Berwyndale South GW1 Monitoring 3, 5, 6 Gubberamunda P&W 2011 Central PL201 Berwyndale South #50 Berwyndale South GW2 Monitoring 3, 5, 6 Springbok P&W 2011 Central PL180 Lauren #14 Lauren GW1 Monitoring 3, 5, 6 Gubberamunda P&W 2011 Central PL180 Lauren #14 Lauren GW2 Monitoring 3, 5, 6 Springbok P&W 2011 South ATP648 Camp Pad Kenya East GW1 Connectivity 2, 3, 4, 5, 6 Gubberamunda P&W 2011 South ATP648 Camp Pad Kenya East GW2 Connectivity 2, 3, 4, 5, 6 Springbok P&W 2011 South ATP648 Poppy #2 Poppy GW1 Connectivity 2, 3, 5, 6 Springbok (upper) P&W 2011 South ATP648 Poppy #2 Poppy GW2 Connectivity 2, 3, 5, 6 Springbok (lower) P&W 2011 North ATP651 Woleebee Creek #7 Woleebee Creek GW1 Connectivity 2, 3, 4, 5, 6 Gubberamunda P&W 2011 North ATP651 Woleebee Creek #7 Woleebee Creek GW2 Connectivity 2, 3, 4, 5, 6 Springbok P&W 2011 Central ATP648 Kenya East #28 Kenya East GW3 Connectivity 2, 3, 4, 5, 6 Gubberamunda P&W 2011 Central ATP648 Kenya East #28 Kenya East GW4 Connectivity 2, 3, 4, 5, 6 Springbok P&W 2011 Central PL247 Bellevue #1M Bellevue GW2 Monitoring 3, 5, 6 Springbok P&W 2011 Stage 2 Complete (Deep) North ATP651 Woleebee Creek #7 Woleebee Creek GW3 Connectivity 1, 2, 3, 4, 5, 6, 7 Hutton P&W 2012 North ATP651 Woleebee Creek #7 Woleebee Creek GW8 Connectivity 1, 2, 3, 4, 5, 6, 7 Eurombah P&W 2012 North ATP651 Woleebee Creek #7 Woleebee Creek GW9 Connectivity 1, 2, 3, 4, 5, 6, 7 Springbok P&W 2012 North ATP651 Woleebee Creek #7 Woleebee Creek GW7 Connectivity 1, 2, 3, 4, 5, 6, 7 Westbourne P&W 2012 North ATP651 Woleebee Creek #7 Woleebee Creek GW4 Connectivity / Injection Trial 1, 2, 3, 4, 5, 6, 7 Precipice P&W 2012 Central ATP648 Kenya East #28 Kenya East GW7 Connectivity 2, 3, 4, 5, 6, 7 Precipice P&W 2012 Central ATP648 Kenya East #28 Kenya East GW6 Connectivity 2, 3, 4, 5, 6, 7 Hutton P&W 2012

62 In Progress Area Tenure Location Well Name Primary Function Rationale Element Target Monitoring Year Stage 2 Ongoing Central ATP648 Kenya East #28 Kenya East GW5 Connectivity 2, 3, 4, 5, 6, 7 Precipice P&W 2012 North ATP651 MAR 1H Monitoring Woleebee Creek GW10 Injection Trial Monitoring 1, 2, 3, 4, 5, 6 Precipice VWP deep 2012 South ATP648 Ruby-Jo #12 Ruby-Jo GW4 Connectivity 2, 3, 4, 5, 6, 7 Precipice VWP deep 2012 South ATP648 Ruby-Jo #12 Ruby-Jo GW3 Connectivity 2, 3, 4, 5, 6, 7 Hutton P&W 2012 South ATP648 Ruby-Jo #12 Ruby-Jo GW2 Connectivity 2, 3, 4, 5, 6, 7 Springbok P&W 2012 South ATP648 Ruby-Jo #12 Ruby-Jo GW5 Connectivity 2, 3, 4, 5, 6, 7 Springbok VWP shallow 2012 Central PL180 Lauren #66 Lauren GW4 Monitoring 2, 3, 4, 5, 6, 7 Precipice P&W 2013 Central PL180 Lauren #66 Lauren GW3 Monitoring 2, 3, 4, 5, 6, 7 Hutton P&W 2013 Central ATP620 Kenya #148 Kenya GW2 Monitoring 2, 3, 4, 5, 6, 7 Springbok P&W 2013 North PLA464 Charlie Charlie GW2 Springs Early Warning 1, 2, 3, 4, 5, 6 Precipice P&W 2013 North PLA464 Charlie Charlie GW1 Springs Early Warning 1, 2, 3, 4, 5, 6 Hutton P&W 2013 North PLA399 Cassio Cassio GW2 Springs Early Warning 1, 2, 3, 4, 5, 6 Precipice P&W 2013 North PLA399 Cassio Cassio GW1 Springs Early Warning 1, 2, 3, 4, 5, 6 Hutton P&W 2013 North PLA402 Charlotte #1 Charlotte GW2 Springs Trigger Monitoring 1, 2, 3, 4, 5, 6 Precipice P&W 2013 North PLA402 Charlotte #1 Charlotte GW1 Springs Trigger Monitoring 1, 2, 3, 4, 5, 6 Hutton P&W 2013 North ATP768 CHAR1584 CHAR1584 GW2 Springs Trigger Monitoring 1, 2, 3, 4, 5, 6 Precipice P&W 2013 North ATP768 CHAR1584 CHAR1584 GW1 Springs Trigger Monitoring 1, 2, 3, 4, 5, 6 Hutton P&W 2013 North ATP574 Peebs #14 Peebs GW6 Monitoring 1, 2, 3, 4, 5, 6 Precipice VWP deep 2013 South ATP648 Broadwater #134 Broadwater GW11 Monitoring 2, 3, 4, 5, 6, 7 Precipice VWP deep 2013 South ATP648 Broadwater #134 Broadwater GW4 Monitoring 2, 3, 4, 5, 6, 7 Springbok P&W 2013 South ATP648 Broadwater #134 Broadwater GW1 Monitoring 2, 3, 4, 5, 6, 7 Alluvium P&W 2013 South ATP648 Broadwater #134 Broadwater GW2 Monitoring 2, 3, 4, 5, 6, 7 Gubberamunda P&W 2013 South ATP648 Broadwater #133 Broadwater GW7 Monitoring 2, 3, 4, 5, 6, 7 Alluvium P&W 2013 South PLA262 Teviot #2 Teviot GW1 Monitoring 2, 3, 5, 6, 7 Precipice VWP deep 2013 South PLA261 Will #1 Will GW1 Monitoring 2, 3, 5, 6, 7 Precipice VWP deep 2013 P&W: Pressure and water quality. Table 7 Monitoring bore development plan (existing and future)

63 Stage 2 is focused primarily on the deeper Eurombah, Hutton, Evergreen and Precipice Sandstones. At some locations, there are also bores targeting the shallower Gubberamunda, Westbourne and Springbok Formations. Regional MNES early warning threshold and Trigger Monitoring Bores (Hutton and/or Precipice Sandstones) at four locations are planned for construction in 2012 and 2013 in the Northern Gas Fields. The Stage 2 Program is currently underway, with eight wells completed into a number of Surat aquifers and aquitards at Woleebee Creek (northern leases) and Kenya East (southern leases) as of August 2012. Both programs are intended to monitor production pilots and complement QGC s existing monitoring network of bores and VWPs in current operational areas. Moving forward, a tentative monitoring bore drilling program is outlined in Table 7. QGC s program reflects bore locations and proposed arrangements with other CSG proponents for spring early warning and trigger monitoring bores in the region of the northern leases. QGC s monitoring bore program may be expanded following finalisation of the joint industry spring monitoring approach and the Monitoring Bore Implementation submission to QWC in February 2013. QGC commits to evaluate and incorporate where necessary any additional monitoring bore requirements into its program by the end of February 2013. Locations of Stage 1 and proposed Stage 2 monitoring bores and VWPs are shown in Figure 23. Groundwater monitoring bores and VWPs Towns Roads Watercourses Springs for QGC survey Other springs VWP well conversions (WCM and shallow aquifers) Pressure monitoring (VWPs) Shallow formations Deep formations Water quality and water level monitoring Condamine Alluvium Mooga Gubberamunda Westbourne Springbok Walloons Eurumbah Hutton Precipice QCLNG EIS Area QGC Field QCLNG PL QCLNG ATP 0 20 40 60 80 Kilometers Scale 1:1,000,000 (A3) Refer to the A3 sized version in the Figures compendium appendix Figure 23 Groundwater monitoring bores and VWPs

64 Additional groundwater monitoring activities proposed for 2012/2013 include: Retrofitting existing exploration core holes or CSG wells with VWPs in the Gubberamunda (where present) Springbok Sandstone and WCM formations. Installation of VWPs in up to 23 existing core holes. Investigation of existing bores on QGC land for monitoring purposes Identification of suitable private landholder bores for ongoing monitoring. Bore Aquifer Monitoring purpose Polaris #22, Thackery #6, David #7, Woleebee Creek #17M, Broadwater #14, Glendower #13, Kathleen #18, Cam #17 S, WCM Future production area Sean #17M, Sean #19M S, WCM Future production area Matilda-John VWP1 G, S, WCM Future production area Table 8 VWP borehole conversion plan 5.6 Monitoring Data Needs, Monitoring Timing Once installed, bores will be monitored for water levels and pressure and also for water quality in order to meet regulatory requirements and support and inform a number of QGC programs. Water levels required as part of this monitoring program will be collected via: Dedicated nested monitoring bores Private bores VWPs. Levels in these wells will be collected using a blend of manual measurements supported by automated pressure and water level data logger instruments with telemetry connections to QGC's Brisbane office. Automated water level monitoring systems will be established to record data at a minimum of twice per day. In new development areas, water level data is planned to be collected initially to support aquifer baseline trend development and later to assess potential CSG impacts. 5.7 Baseline Monitoring Periods Considering the program plan (see Tables 7 and 8) and the current field development plan, QGC has determined the following planned well locations to provide expected baseline periods:

65 Northern Gas Fields Groundwater monitoring bores have been installed on the Woleebee Creek block in multiple aquifers (Gubberamunda, Westbourne, Springbok, Hutton, Durabilla and Precipice) for monitoring a four-well production pilot scheduled to commence in December 2012. Between one and 11 months of baseline monitoring is available for the various bores to assess pilot program performance. In addition, two VWPs with multiple gauges in the Springbok and WCM will record groundwater pressure changes. Typically, each well is individually tested for 30 days and all wells are tested together for at least 180 days. Early warning and Trigger Monitoring Bores are scheduled for construction at four locations between QCLNG tenements and Scott s Creek and Dawson River 8 springs in the Hutton and/or Precipice Sandstone aquifers between March and July 2013. Deep VWPs for monitoring the Precipice Sandstone are also proposed at Woleebee Creek (injection test monitoring) and on Peebs block (monitoring regional groundwater level in the vicinity of the inferred groundwater divide between the Dawson River Valley and Surat Basin groundwater systems). Production area depressurisation from the northern leases is expected to commence in October 2014. Consequently, more than two years pre-production groundwater level monitoring data will have been collected from the Woleebee Creek bores and at least 12 months of data from the early warning and Trigger Monitoring Bores. Central Gas Fields Gas production from QGC s Berwyndale South, Kenya, Argyle, Bellevue and Codie/Lauren fields have been brought on line progressively between 2005 and 2012. Groundwater monitoring of the shallow Gubberamunda Sandstone aquifer commenced at the Kenya field in 2008. Several monitoring bores were installed in the Mooga and Gubberamunda Sandstones. The Walloon Coal Measures VWPs have been monitored across the Central area gas fields since 2006. Continuous automatic groundwater level recorders were installed in the Gubberamunda and/or Springbok Formation bores at the Berwyndale South, Lauren and Bellevue fields in 2011. QCLNG water production in the Central area is expected to start in October 2013. Additional monitoring bores scheduled for construction in the Central Area include: Kenya block, existing production area, Springbok Formation Lauren block, existing production area, Hutton and Precipice Formations. Southern Gas Fields Groundwater monitoring bores have been installed on the Kenya East block in multiple aquifers and aquitards (in the Gubberamunda, Westbourne, Springbok, Eurombah and Hutton Formations) for monitoring a four-tofive well production pilot scheduled to commence in October 2012. Up to six months of baseline monitoring data is available for various wells to assess pilot program performance. In addition, numerous VWPs with multiple gauges in the Springbok and Walloon Coal Measures will record groundwater pressure changes. Additional monitoring bores and VWPs proposed for the southern blocks in 2012 include: Ruby-Jo pilot monitoring and connectivity studies with bores in the Springbok, Hutton and Precipice Formations in 2012 Ruby-Jo 1M VWP monitoring the Springbok in 2012 Production area depressurisation from the southern leases is expected to commence in November 2013, so at least 12 months of monitoring data will be available from bores at Kenya East, Poppy (continuous water level records) and VWPs at Isabella and Jen with six to 12 months baseline data from the Ruby-Jo bores and VWPs. Additional monitoring bores and VWPs proposed for the southern blocks in 2013 include: Broadwater regional monitoring bores (Alluvium (x2), Gubberamunda, Springbok) 2013 Broadwater GW11 VWP, Precipice 2013 Teviot GW1 VWP, Precipice 2013 Baseline data periods prior to QCLNG production are indicated on Figure 24.

66 TAROOM IVER ) (H, P) harlie (H, P) athleen 18 6 Woleebee Creek (P) YULEBA 150 E TAROOM DAWSON RIVER Kathleen 18 Woleebee Creek (P) WANDOAN Woleebee Creek (G, W, S, E, H, P) Woleebee Creek 8 Ross 6 26 30'S Woleebee Creek (G, W, S, E, H, P) Woleebee Creek 8 Peebs (P) DULACCA Peebs (P) 150 E MILES Bellevue 1 Bellevue (S) Bellevue 2 Berwyndale 1 Berwyndale 19 Berwyndale 4 Berwyndale 20 Berwyndale South (G, S) 150 30'E CONDAMINE RIVER 150 30'E Legend Town Coochiemudlo (H, P) Coochiemudlo (H, P) Major Road Major Road Major River Major River Current Production Blocks QCLNG Project Area QCLNG Northern Current Production Vibrating Wire Blocks Piezometers Charlotte (H, P) Existing, More than 1 year of data before QCLNG Production Starts Gas Field production QCLNG Project Area Proposed, More than 1 year of data before QCLNG Production Starts commences in October Vibrating Wire Piezometers Monitoring Bores Cassio (H, P) 2014 Existing, More than Existing, 1 year More than of data 1 year before of data before QCLNG QCLNG Production Starts Proposed, More than 1 year of data before QCLNG Production Starts 26 S Proposed, More than 1 year of data before QCLNG Production Starts 26 S Charlie (H, P) Proposed, Less than 1 year of data before QCLNG Production Starts Monitoring Bores Data Availability by QGC Block Existing, More than More than 1 year 1 year of of data before QCLNG Production Production Starts Starts WANDOAN Less than 1 year of data before QCLNG Production Starts Proposed, More than 1 year of data before QCLNG Production Starts Other QGC Blocks Proposed, Less Formation than to 1 be year Monitored of data before QCLNG Production Starts 26 S QCLNG Central Gas Field production commences in October 2013 Legend Town AUBURN RIVER AUBURN RIVER Data Availability by A QGC AlluviumBlock G Gubberamunda More than 1 year of data before QCLNG Production Starts W Westbourne Formation Less than 1 year S Springbok of data Sandstone before QCLNG Production Starts Other QGC Blocks E Eurombah Sandstone H Hutton Sandstone Formation to be Monitored P Precipice Sandstone A Alluvium G W S E H P Gubberamunda Westbourne Formation Springbok Sandstone Eurombah Sandstone Hutton Sandstone Precipice Sandstone CHINCHILLA 151 E 151 E 26 30'S JANDOWAE 26 30'S DULACCA CONDAMINE Argyle 6 Depressurisation Kenya 2 (S) commenced in 2005 for Matilda-John 1 Kenya East 1 domestic gas production MILES Lauren (G, S) Kenya East (G, S, E, H, W) Lauren (H, P) KOGAN Bellevue 1 Kenya East (G, S) Kenya East (P) David 7 Bellevue (S) Bellevue 2 Sean 17 CHINCHILLA Sean 19 RubyJo (S, H, P) Berwyndale 1 Berwyndale 19 Poppy (S) Isabella 6 Berwyndale 4 Berwyndale 20 Celeste 6 Isabella 7 QCLNG Southern RubyJo 1 Jen 1 Berwyndale South (G, S) Gas Field production TARA Broadwater (A) commences in October CONDAMINE Argyle 6 2013 Will (P) Broadwater (P) Broadwater (A, G, S) Kenya 2 (S) Matilda-John 1 Kenya East 1 Teviot (P) Lauren (G, S) Kenya East (G, S, E, H, W) 27 30'S 150 E Lauren (H, P) 150 30'E 151 E KOGAN Kenya East (G, S) Kenya East (P) David 7 QCLNG Project QCLNG Area Groundwater Project Area Data Stage Baseline 1 Monitoring Periods Bore Data Availability Sean 17 Sean 19 RubyJo (S, H, P) ± 0 9 18 27 36 4.5 Kilometres Poppy (S) Isabella 6 27 S 27 S 27 30'S 0 9 18 27 36 Kilometers Map Projection: GDA 94 SCALE: Scale 1:600,000 (A3) DATA SOURCE: Towns, Major Rivers - GA Major Roads - StreetPro Tenements - DME 1:600,000 (A3) CONDAMINE RIVER Note: Every effort has been made to ensure this information is spatially accurate. The location of this information should not be relied on as the exact field location. MOONIE RIVER "Based on or contains data provided by the State of Queensland (Department of Environment and Resource Management) 2012. In consideration of the State permitting use of this data you acknowledge and agree that the State gives no warranty in relation to the data (including accuracy, reliability, completeness, currency or suitability) and accepts no liability (including without limitation, liability in negligence) for any loss, damage or costs (including consequential damage) relating to any use of the data. Data must not be used for direct marketing or be used in breach of the privacy laws." TARA Celeste 6 DATE: CREATED BY: 20/09/2012 RubyJo 1 TM MAP NO: Jen 1 REV NO: M_19927_03 Broadwater (A) 27 S Isabella 7 A JANDOWAE CONDAMINE RIVER CECIL PLAINS CONDAMINE RIVER Figure 24 QCLNG Project Area Groundwater Data Baseline Periods MOONIE RIVER Will (P) Teviot (P) Broadwater (P) Broadwater (A, G, S) 27 30'S

67 Water chemistry will be defined through water quality sampling and analysis utilising the deep and shallow nested bores and any private bores considered suitable for monitoring. It is proposed that water quality sampling and analysis be completed on a six-monthly basis. 5.8 DATA REPORTING QGC intends that both water level and water chemistry data from these bores be made available via technical reports (such as bore completion reports), and that this same data will form an integral part of annual aquifer reporting requirements to Australian and Queensland government agencies. QGC commits to providing an interpretation of groundwater monitoring data on an annual basis and an upgraded regional groundwater model on a triennial basis. The annual reports will include a trend analysis of both groundwater level and quality. Raw data will be provided in the annual reports. The timing of these reports will be such as to inform QWC s UWIR modelling and reporting cycle. 5.9 INSTALLING BORES FOR MONITORING Groundwater monitoring bore construction varies according to purpose and installation depth. For example, standpipe bores are used for water level and quality monitoring while VWPs focus on groundwater pressure. Shallow bores are installed above the WCM according to 'Minimum Construction Guidelines for Water Bores in Australia'. Below the WCM bores are constructed in accordance with the Petroleum and Gas (Production and Safety) Act 2004. Consequently, all bores penetrating the WCM are fitted with surface blow-out preventers. Open standpipe bores use one of two designs, namely 'shallow 'and 'deep'. Shallow well designs less than 300 m deep and above the WCM. They are constructed of 5" DN upvc casing with 5 m or 10 m of wire-wound screen. Using 5" or 6" DN upvc casing allows for the future installation of an electro-submersible pump for aquifer pumping tests and well purging when sampling. VWP bores run up to six individual vibrating wire gauges set at target depths into an open borehole with cement grouting up to the surface. After drilling and before bore construction, boreholes are geophysically logging using various tools including neutron gamma, neutron/density, caliper, spontaneous potential, resistivity and deviation. Final well screen intervals or VWP gauge installation depths are selected using geophysical logs which identify geology, stratigraphic formations and permeable zones. VWP gauges are cemented in place inside the bore, thereby isolating the various formations and the gauges from each other. These longlife and accurate instruments will give pressure data for various formations. Groundwater monitoring wells which penetrate the WCM are constructed in accordance with the stricter Petroleum and Gas Act 2004, and these wells also ensure that shallow aquifers and the WCM are isolated from each other. These deeper monitoring bores require more engineering than shallower bores since the bores are targeting the lower part of the GAB and hence isolation of overlying aquifers and other formations is required. Long term monitoring of the deeper GAB aquifers require these wells to be constructed with steel casing in accordance with industry best practice. These wells also have a deeper well head to shallower bores, which provides long-term safe and efficient access for sampling and water level monitoring. The deeper wells can also be converted for installation of VWP gauges for measuring groundwater pressures in various layers.

68 5.10 VWP Installation The design purpose of a multi-level vibrating wire piezometer (VWP) is to measure fluid or pore-water pressures. VWPs will be installed to record responses to nearby depressurisation activities. VWPs do not allow for the collection of groundwater samples as instruments are grouted into the drilled hole using a cement slurry. VWPs will be installed in boreholes, or adapted to redundant CSG exploration coreholes, in each of the main QGC production areas. VWPs allow monitoring of aquifer pressures in a number of vertical units cost-effectively at a single location. The sensor of the VWP consists of a pressure transducer with an internal thin resonating wire connected to a sensitive perpendicular diaphragm. Water pressure exerted against the diaphragm wall causes it to deflect and alter the tension of the wire and this in turn causes the wire to resonate at different frequencies. An electromagnetic field induced from coils adjacent to the vibrating wire causes it to be plucked and resonate at a frequency signal which is sent through the signal cable to a readout unit or logger at the ground surface. 5.11 CORING SEQUENCES Various bores are being earmarked for core runs from yet-to-be-selected horizons in zones of interest. A total of 3,000 m of coring is planned. A core of the complete Surat Basin sequence (excluding the WCM) was collected at the Woleebee Creek location, totalling some 1,100 m. Additional core collection is planned for Kenya East and the program will be reviewed and updated once this core has been recovered and inspected. Cores will be stored and selectively sampled for various permeability and porosity testing with results feeding into future groundwater model development. Commitments Incorporation of potential additional UWIR groundwater monitoring requirements into Stage 2 Bore Construction Program Completion of Stage 2 Monitoring Bore and VWP conversion programs (as outlined in this Plan) Submission of Annual Report including (from October 2013) reporting results of ongoing GEN3 model recalibration Construction of additional UWIR monitoring bores (if deemed necessary) Collation and reporting of groundwater monitoring results Collection of six-monthly groundwater quality samples and analysis Target completion date February 2013 December 2013 October 2013 and annually thereafter In accordance with UWIR timing requirements. Either December 2013 or December 2016 April 2013 and annually thereafter Bi-annually The above commitments are aimed at satisfying Conditions 49b and 52c (i) - (iv).