INDIANA DEPARTMENT OF TRANSPORTATION



Similar documents
SH 183 MANAGED LANES PROJECT

LBJ Freeway in Dallas

Appendix C: Toll Sensitivity Analysis

Intelligent Transportation Systems in Illinois

Public Works Financing

CITY OF GARY INDIANA

PROPRIETARY MEETINGS. Are they legal in Washington? Robynne Thaxton Parkinson, J.D, DBIA

EXECUTIVE SUMMARY. Salini Impregilo / Healy / GLF Joint Venture

COOK COUNTY OFFICE OF THE CHIEF PROCUREMENT OFFICER CONTRACT AWARD RECOMMENDATIONS. Company, Inc. A Lamp Concrete Contractors, Inc.

The Illinois Tollway Professional Services Bulletin 14-1 Selection Committee Results October 7, 2014

Belvedere Assisted Living Community

TAB 1: QUALIFICATIONS AND EXPERIENCE

ESI Consultants, Ltd. PROJECT EXPERIENCE

Michael I. Schneider Senior Vice President and Managing Director HDR / InfraConsult

Clark County Public Works SOQ

5.0 List of Preparers

WISCONSIN DEPARTMENT OF TRANSPORTATION County Rd A Black River Falls WI Grossman Drive

Learning Outcomes for This Session: Who we are What we do Organization Structure How PODS Association operates Current Projects How to get involved

A Common Sense Guide To Procurement Under Indiana s Public Design-Build Statute Patrick M. Miller

The Indiana Experience

S T A T E O F T E N N E S S E E OFFICE OF THE ATTORNEY GENERAL PO BOX NASHVILLE, TENNESSEE January 10, Opinion No.

Selection Results 8/21/2015

Clark County Public Works SOQ LIST

Commonwealth of Virginia County of Henrico Department of Building Construction and Inspections. Commercial Plumbing Permits May 2015

6.0 List of Preparers

EC Certificate - Full Quality Assurance System Directive 93/42/EEC on Medical Devices, Annex II excluding Section 4

QBS USER S GUIDE THE PROCESS FOR SELECTION


Open.PD.FIRM

ENR TOP INTERNATIONAL CONTRACTORS

Quality Counts! Qualifications Based Selection (QBS)

Request for Qualifications. Architectural/Engineering Services for the Roof Replacement at the Durham County Detention Center. (RFQ No.

I-595 Corridor Roadway Improvements Value for Money Analysis

Judgment Rendered December Appealed from the Nineteenth Judicial District Court. Attorneys for Plaintiff Appellant

Awards of Merit. Award of Merit, Private Building. Calpine Center, Houston. LakeHouse Spa and Pool Barn at Lake Austin Spa Resort, Austin

Investors G u i d e Investors Guide 2011

Request for Information #: Description: COTS Maintenance Management Software

Case Studies - Concrete Overlays

Project Financial Plan 2014 Update

BID RESULTS CF2013 ASPHALT REPAIRS AT HAWK VIEW APARTMENTS., RENO

Location: First National Bank of Martinsville Building (1882? 1953); 239 North Jefferson Street (1953 )

Risk Management in the Development of a Penta-P Project

John Dew, Executive Director Florida CCOC Barrington Circle Tallahassee, Florida

HERS_IN. HIGHWAY ECONOMIC REQUIREMENTS SYSTEM (for) INDIANA. AASHTO Transportation Estimator Association Conference October 16, 2001

KU KLUX KLAN, CROWN POINT, INDIANA (LAKE COUNTY) RECORDS,

IH-635 MANAGED LANES PROJECT, SEG. 3.2

CDOT Resources for Small Businesses

Agenda. Presentation of SNC-Lavalin Capital Projects presentation PPP Definition Stakeholders Major risks

11% GROWTH AVG. 20 YEAR CUMULATIVE RATE

The Electronic On-Ramp, Inc.

Report to the Business Administration Committee. Recommendation to Award a Fixed Base Operator Contract at Washington Dulles International Airport



Chapter Name Here D.4.9 CONSTRUCTION QUALITY PLAN

Post-Graduation Survey Results 2014 College of Engineering Civil Engineering Bachelor of Science

City of Balch Springs, Texas. Request for Proposal (RFP ) Pipe Bursting Sewer Line Replacement

How To Build A Road In The United States

INTERIOR DESIGNER Competency Profile

ONTARIO SUPERIOR COURT OF JUSTICE (COMMERCIAL LIST)

WYNNCHURCH CAPITAL, LTD.

MCR Health Services Inc. Request for Proposal For Air Conditioning Unit Replacement Authorized Vendor

DINUBA UNIFIED SCHOOL DISTRICT East El Monte Way Dinuba CA Request for Qualifications For Construction Management Services

Getting Connected with the Colorado Department of Transportation (CDOT)

Illinois Tollway and Chicago Department of Transportation Construction Networking Event. March 13, 2015

REPORT ON ORGANIZATION OF THE FDM PREFERRED INSURANCE COMPANY, INC. AS OF FEBRUARY 9, 2009

Architectural Consulting Services for a New Automotive Building. Lakes Region Community College, Laconia, NH

HOME LOAN SERVICING SOLUTIONS, LTD.

MAJOR INFRASTRUCTURE WORKS LED BY SPANISH COMPANIES

VILLAGE OF DOWNERS GROVE PLAN COMMISSION MEETING PUBLIC HEARING OCTOBER 5, 2015, 7:00 P.M.

Liberty Utilitiec. Samson. Local Plant, Domestic Supply. 4~NORTHSTAR ~i~~~industriesllc ENERGY. ~LH~PJi~C~ La~ Exhibit F~LE

Transcription:

INDIANA DEPARTMENT OF TRANSPORTATION News Release FOR IMMEDIATE RELEASE January 14, 2014 Six Teams Respond to RFQ for Indiana Portion of Illiana INDIANAPOLIS The Indiana Finance Authority (IFA) and Indiana Department of Transportation (INDOT) are pleased to announce receipt of six responses to the Request for Qualifications (RFQ) to develop, design, build, finance, operate and maintain the Indiana portion of the Illiana Corridor and I-65 added capacity projects. Nearly five dozen local, national and international firms with extensive expertise in large public infrastructure projects partnered to form six teams. A full listing of the six teams may be viewed at: www.in.gov/ifa/files/illiana_soq_teams.pdf The IFA and INDOT are honored to see interest from such qualified and experienced companies, said Indiana Public Finance Director Kendra York. We will thoroughly review the teams qualifications and announce a short list of proposers that be invited to respond to a final Request for Proposals. The Illiana Corridor is a proposed 47-mile access controlled highway facility that extends from I-55 in Illinois on the west to I-65 in Indiana on the east. The preferred corridor is located in Will County in Illinois and Lake County in Indiana. When built, the Illiana will reduce the strain of truck traffic on local roads, thereby improving safety, travel times, and accessibility to jobs. Procurement of the Illinois portion is being handled separately by the Illinois Department of Transportation (IDOT). IDOT announced on Dec. 20 that five teams responded to its RFQ. IDOT and INDOT are working together to coordinate technical requirements, tolling policy, the federal environmental approval process, and construction schedules for the two-state project. For more information about the project, visit: www.illianacorridor.org/p3. --30-- MEDIA CONTACTS: Jim Pinkerton, 219-325-7455 or jpinkerton@indot.in.gov Will Wingfield, 317-233-4675 or wwingfield@indot.in.gov

1. PROPOSER: ILLIANA OPEN ROAD INNOVATORS SNC-Lavalin Capital USA Inc. UIF GP, LLC Zachry Resources, Inc. Illiana Corridors Constructors- Indiana (JV) - Zachry Construction Corporation - SNC-Lavalin Constructors, Inc. - James McHugh Construction Co. URS Corporation ProTrans USA, LLC Rieth-Riley Construction Co., Inc. Applied Research Associates, Inc. Beam, Longest and Neff, LLC Butler, Fairman & Seufert, Inc. CTL Engineering of Indiana, Inc. 2. PROPOSER: ILLIANA EAST MOBILITY PARTNERS Cintra Infraestructuras, S.A Ferrovial Agroman US Corp. White Construction, Inc. Janssen & Spaans Engineering, Inc. Cintra Infraestructuras, S.A 3. PROPOSER: INDIANA CORRIDOR TRANSPORTATION GROUP ACS Infrastructure Development, Inc.

Fengate Capital Management Ltd. Dragados USA, Inc. F.H. Paschen, SN. Nielsen & Associates LLC William Charles Construction Company, LLC Jacobs Engineering Group Inc. ACS Infrastructure Development, Inc. Fengate Capital Management Ltd. Bernardin, Lochmueller & Associates, Inc. 4. PROPOSER: WM INDIANA- IllIANA PARTNERS, LLC Meridiam Infrastructure Illiana IN, LLC Walsh Investors, L.L.C Walsh Construction Company II, LLC Parsons Transportation Group Inc. Meridiam Infrastructure Illiana IN, LLC Walsh Investors, L.L.C Superior Construction Co., Inc Bloomsdale Excavating Company, Inc. Milestone Contractors L.P. Walsh & Kelly, Inc. Terracon Consulting Engineers and Scientists Hanson Professional Services, Inc. United Consulting Knight E/A (Engineers & Architects) Infrastructure Engineering Incorporated GeoSolutions, Inc. Debevoise & Plimpton

5. PROPOSER: ISOLUX INFRASTRUCTURE NETHERLANDS B.V. LIMITED LIABILITY COMPANY Isolux Infrastructure Netherlands B.V. AZTEC Engineering Group, Inc. TYPSA Corsan-Corviam Construction, S.A. Isolux Infrastructure Netherlands B.V. Limited Liability Company Burgess & Niple, Inc. Michael Baker Jr., Inc Gradex, Inc. Halverson Construction Co., Inc. E&B Paving, Inc. 6. PROPOSER: INDIANA MOBILITY PARTNERS Fluor Enterprises, Inc. Plenary Group USA Ltd. Indiana Mobility Constructors (JV) -Fluor Enterprises, Inc. -The Lane Construction Corporation -Granite Construction Company HDR Engineering, Inc. Indiana Mobility Operators -Fluor Enterprises, Inc. -Plenary Group USA Ltd. -DBi Services, LLC CHA Consulting, Inc.

Alfred Benesch and Company Crawford Murphy & Tilly, Inc. Dunnet Bay Construction Company Kleinfelder Central, Inc. (Kleinfelder) The Transtec Group, Inc.