Pennsylvania Summer Reliability



Similar documents
PA PUC AERS & Metropolitan Edison Company Site Visit

Hurricane Irene Response Before, During and After the Storm. John D. Rea Director of Operations Support, Penelec. October 12, 2011

Emergency Restoration Plan (ERP) Components

The calm after the storm

David Kline Manager, External Affairs

Electric Operations Manager

Big Data Analytics Applications in Distribution Operations and Risk Assessment

Coordination between Electric and Water Utilities

OPERATIONS CAPITAL. The Operations Capital program for the test years is divided into two categories:

Electric Field Operations Organization

Control Number : Item Number : 298. Addendum StartPage: 0

Storm Restoration. Bill Smeaton Distribution Superintendent Provincial Lines

Agenda do Mini-Curso. Sérgio Yoshio Fujii. Ethan Boardman.

Utilities the way we see it

TRANSMISSION Field Services (January 30, 2014)

Best Practices for Creating Your Smart Grid Network Model. By John Dirkman, P.E.

Systems Operation Department

Wildfires pose an on-going. Integrating LiDAR with Wildfire Risk Analysis for Electric Utilities. By Jason Amadori & David Buckley

Agenda Report. April 8, Honorable Mayor and City Council TO: THROUGH: Finance Committee (April 8, 2013) FROM: Water and Power Department

Potomac Electric Power Company. Comprehensive Reliability Plan. For. District of Columbia. Including

Understanding the Electric Power Industry s Response and Restoration Process

Big Data: Using Smart Grid to Improve Operations and Reliability. LaMargo Sweezer-Fischer Power Delivery Grid Automation Manager FPL July 2014

Attachment 3. Transmission/Substation and Switching Procedures

2014 ELECTRIC SYSTEM RELIABILITY REPORT CITY OF ANAHEIM PUBLIC UTILITIES DEPARTMENT

White Paper. Convergence of Information and Operation Technologies (IT & OT) to Build a Successful Smart Grid

Preparing for Distributed Energy Resources

City of Buffalo Municipal Electric Utility Energy Emergency Response

Comprehensive Asset Performance Management. Power Transmission and Distribution

SERVICES. Designing, deploying and supporting world class communications solutions.

Transmission Function Employees Job Titles and Descriptions 18 C.F.R 358.7(f)(1)

the amount of data will grow. It is projected by the industry that utilities will go from moving and managing 7 terabytes of data to 800 terabytes.

ADMS(Advanced Distribution Management System ) in Smart Grid

Vegetation Management Frequently Asked Questions

Governor s Two-Storm Panel: Distribution Infrastructure Hardening Options and Recommendations

DISTRIBUTION OPERATIONS AND MAINTENANCE

Electric and Natural Gas Distribution Systems. Presented by Brian Beam New Jersey Board of Public Utilities Division of Reliability & Security

AMI and DA Convergence: Enabling Energy Savings through Voltage Conservation

Naperville Smart Grid Initiative

TasNetworks Regulatory Proposal Expenditure Forecasting Methodology

PERFORMANCE REVIEW OF EDCS

Preparing for the Future: How Asset Management Will Evolve in the Age of the Smart Grid

Big Data in Smart Grid. Guangyi Liu China Electric Power Research Institute

Getting Outage Management Systems Ready for Outage Events

STATE OF NEW YORK DEPARTMENT OF PUBLIC SERVICE

RESTORATION PROCESS. Step 1 Empire s storm restoration team assesses the damage to the system. This assessment allows Empire. = Location of damage

SCADA Systems Automate Electrical Distribution

SOLUTION BRIEF. Outage Management. Leveraging the Smart Grid to Improve Reliability

Manage Utility IEDs Remotely while Complying with NERC CIP

Table of Contents ESF

Generation Interconnection Feasibility Study Report-Web Version. PJM Generation Interconnection Request Queue Position Z1-055

Generation Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position X1-114.

Acting on the Deluge of Newly Created Automation Data:

Empowering intelligent utility networks with visibility and control

ComEd Grid Modernization

Oncor Storm Restoration Questions/Answers

Smart Grid Business Case Analysis. Rochester Public Utilities

Jim Sheppard, Director of Business Processes CenterPoint Energy, Texas, USA

Executive summary 2. 1 Introduction 4

Supporting Systems for a Smart Grid World The Role of Workforce, Asset and Network Management Systems in Supporting an Intelligent Electric Network

Emergency Response Plan

Frequently Asked Questions about AMI (Advanced Metering Infrastructure) Meters

Advanced Distribution Management System: Field Client

Advanced Enterprise Work and Asset Management for Performance-Driven Utilities

Load Dispatcher (Class Code 5223) Task List

Master Implementation Plan of Consolidated Edison Company of New York, Inc. for the Final Report Independent Audit of Consolidated Edison Company

NYSEG and RG&E Emergency Response Power Restoration Practices, Priorities and Interactions

Advanced Distribution Grid Management for Smart Cities

ASTRO 25 SYSTEM FOR MISSION CRITICAL DATA LEVERAGE YOUR ASTRO 25 SYSTEM INVESTMENT FOR MISSION CRITICAL DATA

Verizon, 911 Service and the June 29, 2012, Derecho

Table of Contents ESF

Portland General Electric Company P.U.C. Oregon No. E-18 Original Sheet No. C-1 RULE C CONDITIONS GOVERNING CUSTOMER ATTACHMENT TO FACILITIES

San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions August 10, Electric Grid Operations

Monitoring Underground Power Networks

Western Washington University Basic Plan A part of Western s Comprehensive Emergency Management Plan

OREGON STATE UNIVERSITY MASTER EMERGENCY MANAGEMENT PLAN

A MODERN DISTRIBUTION MANAGEMENT SYSTEM FOR REGIONAL ELECTRICITY COMPANIES

APPENDIX III: EMERGENCY SUPPORT FUNCTION 3 - PUBLIC WORKS AND ENGINEERING

Weather-readiness assessment model for Utilities. Shy Muralidharan Global Product Manager Energy Solutions Schneider Electric

Last revised: September 1, 2014 TRANSMISSION FUNCTION TITLES AND JOB DESCRIPTIONS

Project Management for Implementing the Smart Grid By Power System Engineering, Inc. Abstract PM Methodology Using a Repeatable Project Management

SEMANTIC SECURITY ANALYSIS OF SCADA NETWORKS TO DETECT MALICIOUS CONTROL COMMANDS IN POWER GRID

Solution ELECTRIC INFRASTRUCTURE MANAGEMENT

ARRA Grant Case Studies SMUD s Smart Grid Program

IESO Supply Deliverability Guidelines

INFORMATION CONNECTED

How To Integrate Firstenergy'S Integrated Grid

Ohio Supercomputer Center

Transcription:

A. Reliability Enhancement Programs In 2015, Pennsylvania Power Company s ( Penn Power or Company ) reliability plan incorporates projects and programs to enhance overall reliability. The plan is structured into six main components, which include targeted removal of off corridor trees; installation of supervisory control and data acquisition ( SCADA ) and adaptive relaying; deployment of procedural enhancements to speed up restoration; installation of circuit ties, loops or sources; rehabilitation of distribution and transmission lines; and installation of SCADA motor operated air break ( MOAB ) line switches. In addition to the vegetation management work that Penn Power performs, the Company trimmed its worst performing circuits and high SAIDI devices in 2014. Additionally, Penn Power implemented an enhanced tree trimming program to address the large number of tree outages that occur mostly from healthy trees outside the right-of-way. Penn Power plans to continue off corridor tree removals in 2015. Penn Power has also initiated procedural enhancements targeted to improving reliability including items to speed up restoration such as the staging of critical materials for quick access, the installation of remote circuit monitors, and the dispatching of both trouble and line crews to outages on selected circuits in remote areas. Penn Power is starting to roll out new smart meter technology on homes and businesses throughout its service area. This step toward a more modernized electric system will not only enable automated meter readings, but may also enhance Penn Power s ability to respond to outages faster and more efficiently. B. Preventative Maintenance Programs In accordance with 52 Pa. Code 57.198, every two years, Penn Power files a Biennial Inspection, Maintenance, Repair and Replacement Plan. This Biennial Plan is designed to reduce the risk of outages on the Company s system and form the basis for the Company s inspection and maintenance objectives. The Biennial Plan includes programs to conduct vegetation management, pole inspections, distribution overhead line inspections, distribution transformer inspections, recloser inspections and substation inspections. These well-established maintenance programs ensure the existing system will continue to operate in a safe and reliable manner, and serve to identify any potential system issues so that they can be proactively addressed. C. Capacity Planning Penn Power s electric delivery system is able to serve customers needs without problems as a result of ongoing system enhancements and the hard work of employees and contractors. The weather is again expected to be the primary driver of customer demand this summer. 1

Penn Power does not foresee significant concerns with system delivery capacity during the upcoming summer based on its performance during last summer s peak. Ongoing facility enhancements designed to improve reliability, load-bearing upgrades, and customers adoption of energy efficiency and conservation opportunities are being viewed as additional opportunities to strengthen the system. D. 2014/2015 Storm Update and Lessons Learned In calendar year 2014, Penn Power did not experience any major events. Throughout coordination efforts, working safely and efficiently is the main objective. Regional conference calls are executed to plan and prepare logistics. Effective planning allows for the precise deployment of crews, supplies, and equipment. Employees are also staggered around the clock to maximize productivity. After each significant storm event, Penn Power leadership will conduct post storm review meetings to identify and disseminate lessons learned to be used for improving the emergency response plan. E. 2015 Summer Readiness Capacitor Inspections Penn Power is on track to complete inspections by June 1 on all line capacitors banks and completed all necessary repairs or replacements to ensure at least 98% availability. Mobile Substations Penn Power completed a review of the status of its mobile substations and other spare equipment. This included inspections of the mobile trailer, transformer and breaker. Spare equipment includes voltage regulators and substation cooling items such as transformer fans. Aerial Patrols Two aerial patrols are conducted annually in Pennsylvania to inspect transmission facilities. The purpose of routine patrols is to ensure the integrity of inservice transmission lines to maintain safe and reliable service. The first aerial patrol of transmission lines in Penn Power was completed in May and the second will be completed by year end. Capacity Additions Penn Power has determined that no additional projects are required to meet the summer demand for 2015. Transmission Preparedness - Penn Power conducts an annual transmission readiness review with transmission operations to discuss the capability and reliability of the system for the summer. The Company s detailed review did not reveal any significant issues for the summer of 2014. Based on the system conditions modeled, the Penn Power transmission system is expected to sufficiently support the forecasted peak summer loading. During the system assessment, a voltage stability analysis was conducted and produced acceptable Power-Voltage response curves. 2

In addition, PJM has operational procedures identified to effectively control and mitigate contingency outage conditions on the transmission system. Penn Power has operational procedures to implement any PJM required actions and to mitigate contingency conditions on the lower voltage systems (<100kV). Emergency Exercises As part of the FirstEnergy Utilities (FEU) Emergency Preparedness program, Penn Power completed a Company-wide emergency exercise on April 15, 2015. The structure of the exercise facilitated the testing and validation of key emergency response roles, systems and processes. The primary objective of each exercise was to ensure a complete understanding of the restoration process by all participants through exposure to a variety of real-world scenarios and decision making challenges that could be experienced during actual restoration events. Event Preparedness The primary cause for significant effects to the electric transmission and distribution system is the impact of severe weather. FirstEnergy s inhouse meteorologists use highly sophisticated, proprietary data and forecasting models specifically designed to provide actionable intelligence. When predicted weather meets specific criteria, planning and preparation work is immediately initiated, many times days before any impact. As part of the preparation efforts, Penn Power s executive leadership and operations managers locally engage the emergency restoration process. Based on available data and collaboration within Penn Power, resource needs are evaluated and requests are submitted as needed to the FEU Emergency Operations Center for fulfillment. These requests can include, but are not limited to: line resources (both internal to FirstEnergy and external), hazard responders, damage assessors, public protectors, vegetation crews, equipment needs, and material requirements. Depending on the predicted magnitude of the event, staging areas are pre-identified and can be quickly activated to prepare for the efficient deployment of crews and equipment. Refresher Training All employees with emergency response roles receive appropriate refresher training at specified intervals in order to be immediately deployable when an event impacts the system. Expectations for employees to complete appropriate training and verify all equipment and personal protective equipment are available and in proper working order are communicated each year during emergency exercises and verified by Penn Power management. Staffing Penn Power conducts a staffing analysis annually which accounts for attrition, including retirements, to determine the proper staffing levels of craft workers. As a result of this analysis, the Power Systems Institute ( PSI ), which is a unique, two-year program that combines classroom learning with hands-on training, will be reinstated beginning with fall enrollment 2015. The PSI enrollment summary for Penn Power in 2015 includes ten line workers and four substation electricians. 1 Students enrolling in 2015 will graduate in 2017, after which eligible graduates will go through the standard hiring process. The following colleges have partnered with Penn Power to support these line worker and substation electrician development: 1 Enrollment numbers are subject to change. 3

Kent State University (Ohio) Stark State College (Ohio) F. Storm Response Outage Restoration Strategy Information obtained through the use of various tools and resources is critical to determine the type, number and location of resources needed to assure prompt restoration of service. Line personnel, damage assessors and hazard responders are integral resources in providing initial and ongoing assessments of the damage in the field. Line personnel are equipped with mobile data terminals ( MDTs ) in their vehicles and will input damage information directly into the MDT. This information is immediately available for viewing in the Outage Management System ( OMS ). The OMS is the central collection point for all relevant information concerning damage reports, assessment and configuration of the electric distribution system. During emergencies that meet triggering criteria, the circuit quarantine process is used for rapid assessment of heavily damaged circuits. In addition to the resources discussed above, a number of tools are also available for determining the extent of outages and damage, as well as the number of customers affected. These include: aerial patrols, remote indicators, OMS and associated dashboards, customer calls, and police and fire personnel. Communications and Outreach - External Affairs managers establish communications with emergency management agencies, local officials and regulators in advance of and throughout a storm to keep them apprised of preparation and planning efforts. Communications representatives also contact the media to enlist their help in encouraging customers to prepare for the likely storm events and provide information on who to call if they lose power. Proactive email alerts and phone messages are initiated to key stakeholders, critical care, and well water customers alerting them to the potential for extended power outages. These efforts and face-to-face outreach are closely aligned with the Company s service restoration efforts. The Company also provides safety messages via newspapers, radio, and online banner ads. Outage Restoration and Storm Response Best Practices Penn Power has implemented various best practices, tools and technology to continuously improve both the restoration process and communications with key stakeholders and customers during events. Penn Power is making it easier for customers to check the progress of service restoration efforts when they experience a power outage. The Company s 24/7 Power Center outage maps display the status of crews restoring service after a power outage in the Penn Power service territory. Penn Power customers can see when crews have been dispatched, when they are working on a repair, and when additional crews or equipment are needed to complete restoration work. In addition, customers can subscribe to email and text message alert notifications to receive billing reminders, weather alerts in advance of major storms, and updates on scheduled or extended power outages. 4

Hazard Responder iphone App This application allows for direct dispatching of critical information regarding identified hazards to a responder team in the field. The app provides location information, customer call comments, turn-by-turn directions to the location and has the ability to input information and pictures directly into assigned orders. This information is passed directly into the OMS and is available to more accurately prioritize resources and ensure the correct resource and materials are sent to the site for repairs. Enhanced ETR tools Several new and enhanced tools have been developed and implemented that improve and streamline the process of establishing ETRs. Dashboards have also been developed that make it much easier to monitor ETR performance and adherence. Work Prioritization Tool A tool that assimilates and helps prioritize emergency work based on selected inputs and parameters whose purpose is to maximize restoration progress. Staging Site Standardization A full audit of all sites is ongoing to ensure appropriate agreements are in place, facilities are mapped, needed equipment is staged at strategic warehouse locations, and appropriate vendors are immediately deployable. Incident Command System (ICS) Implementation All Penn Power employees are currently undergoing appropriate training on basic ICS principles. Electronic Damage Assessment Damage Assessors are now trained to use the Panasonic Toughpad, a ruggedized mobile display device to provide electronic documentation of damage. The Toughpad provides the Damage Assessor with an electronic field copy of circuit maps, allows for more rapid damage assessments, and can be used to generate an inventory list of damaged equipment. Foreign Crew Texting Penn Power has implemented an innovative program that allows mutual assistance crews to text order status information. The OMS will be directly updated with information received from the field. 5