MAGB HEALTH, SAFETY AND ENVIRONMENT GROUP POLLUTION INCIDENT RESPONSE PLAN



Similar documents
ANNEX 2 Emergency / Pollution Incident Response Plan

PPG21. Pollution Prevention Guidelines. pollution incident response planning: PPG Introduction

CHEMICAL SPILL MANAGEMENT GUIDELINES

Management Toolkit for Small and Medium Sized Businesses

Environmental Management System Procedures

Management Toolkit for Small and Medium Sized Businesses

Chemical Spill Response Guideline

BEHANS LAND RESTORATION LIMITED RESTORATION OF FORMER QUARRY BLACKHALL, CO. KILDARE OUTLINE CONTINGENCY PLAN MAY 2008

WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE

ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN

Spill Clean-up. Flammable Liquids Liquids with flash points below 100 degrees Fahrenheit.

Revision Description By Approved Date Apr 06 Change to Rilta Env. Ltd. CH 26/04/06 Jan 08 Review CH EI 18/01/08

PPG21. Pollution Prevention Guidelines. Incident Response Planning: PPG Introduction. March Who should read these guidelines?

Domestic heating Fuel storage tanks

EMERGENCY PREPAREDNESS & RESPONSE PROCEDURE

Ingredion ANZ Pty Ltd

HYDROCARBON SPILLS PROCEDURE SIG-ENV-PR003

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations

Spill Prevention, Control and Countermeasure (SPCC) Training

Pesticide Spills. Chapter 26. In This Chapter. Keywords. Accidents. Pesticides Act and Environmental Protection Act

SPILL PREVENTION AND RESPONSE PLAN TEMPLATE FOR BUSINESSES IN DAYTON S SOURCE WATER PROTECTION AREA

Good Housekeeping Practices for DPW/Fleet Maintenance Facilities

Appendix J3 - Outline Fuel Spill Contingency Response Plan. Control room receives call on fuel spill from staff or public

RESOURCE RECYCLING SOLUTIONS LTD

Pollution Incident Response Management Plan

SOP 4: Spill Response and Cleanup Procedures SOP 4: SPILL RESPONSE AND CLEANUP PROCEDURES

APPENDIX O. Spill Prevention and Emergency Response Plan. G3 Terminal Vancouver Port Metro Vancouver Project Permit Application APPENDIX O

Stormwater BMPs: Secondary Containment and Spill Control. September 2012

SPILLS & SPILL KITS. Spills -General Guidelines:

Civil Engineering Sector Labour-Management Health and Safety Committee

Chemical Storage and Spill Response Guidelines

UNIVERSITY OF WISCONSIN MADISON

THE UNIVERSITY OF NEWCASTLE- SCHOOL of BIOMEDICAL SCIENCES

ACTIVITY NAME. Training Requirements for Spill Prevention Control and Countermeasures (SPCC) 40 CFR Part 112 Naval Air Station Corpus Christi Texas

SPILL PREVENTION PLAN

History of the SPCC Rule

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT

Emergency procedures instructions to farm staff

Fact sheet 6: for farmers

Spill Control Prevention Plan (SCPP)

Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan

Environmental Site Inspection Checklist

SPILL CONTAINMENT AND CONTROL PLAN

IX. EMERGENCY PLANNING

Safety Manual Title: Spill Prevention & Response Review Date: 6/1/2014

UDOT SPILL PREVENTION and RESPONSE PLAN for CONSTRUCTION SITES

Material Safety Data Sheet

ABC CIRCUITS 10 Circuit Drive Circuit Town, IN SLUG CONTROL PLAN

Guidance sheet 4: Chemical Spill Management

Spill Prevention, Control and Countermeasure (SPCC) Rule

APPENDIX G Materials Storage and Handling Guidelines

Spill Prevention, Control & Cleanup SC-11

Spill Prevention, Control, and Countermeasures (SPCC) Course Material

Clean Water: Supply side potable water, not wastewater. Gray Water/Sewage: Wastewater originating from a drain (sink, toilet, urinal).

Example risk assessment for a motor vehicle mechanical repair workshop

Responding to Accidents and Emergencies

Waste Handling & Disposal

Spill Kits and Incidental Spill Response

CHEMICAL SPILL RESPONSE GUIDE

This plan, its contents, and emergency notification procedures shall be made available to all appropriate University employees.

GUIDANCE FOR DEVELOPMENT OF SPILL AND SLUG PREVENTION CONTROL PLANS AND FACILITIES FOR THE CITY OF ATTLEBORO SEWER USERS

Fact sheet 6: for farmers

Pollution Incident Response Management Plan (PIRMP)

Chemical Reducing Solution CRS

OIL CONTAINMENT AND SPILL MITIGATION M-04 ISSUE: F SEPTEMBER 2001

Company Name Chemical Spill Prevention & Clean-up Procedures Program. Last Revised On 00/00/0000

Routine Maintenance and Inspection

Chapter 5: Spills Response

BASEMENT FLOODING. Prevention Guide for. Homeowners

Carnegie Mellon University s Policy and Procedures for Recombinant and Synthetic Nucleic Acid Materials Spills

HAZARDOUS CHEMICAL SPILL CLEANUP GUIDELINES

Pollution Prevention Guidelines: PPG1 July 2013

Standard Operating Procedure for a Chemical Spill

Outdoor Storage of Raw Materials SC-33

Title: Aircraft Parking

Section 4 EMERGENCY EYEWASH AND SAFETY SHOWER EQUIPMENT

Good? Bad? Why? Training Module 4

CHEMICAL SPILLS. (revised April, 2013)

A cure for water damage in real estate

PPG13. pollution prevention guidelines. Vehicle washing and cleaning: PPG13. This document is out of date was withdrawn 14/12/

Contingency Plan. Facility Name

CITY OF WASHINGTON SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN

Chemotherapy Spill Response:

*GTA HAZARDOUS MATERIAL SPILL RESPONSE PROCEDURES

APPENDIX 7-B. Hazardous Materials Management Plan

Preventing and Responding to a Fuel or Oil Spill. Recommended Practices

Ingredient % content Hazard data Cross linked Sodium Polyacrylite CAS No: Non chemical fillers Zeolite 1-10

DIRECT TRANSFER COAL FACILITY SPILL RESPONSE PLAN

MATERIAL SAFETY DATA SHEET

SILICON VALLEY CLEAN WATER. May 2015

Particularly Hazardous Substances (PHS) Standard Operating Procedure (SOP)

FUELING AND FUEL STORAGE

DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY. August 2012

Cleaning. Wash vehicles over an indoor drain leading to an oil/water separator that flows to the sanitary sewer system.

Appendix J IBC Biohazard Spill Management Plan

Transcription:

MAGB HEALTH, SAFETY AND ENVIRONMENT GROUP POLLUTION INCIDENT RESPONSE PLAN SCOPE: This guidance sets out best practice for producing a Pollution Incident Response Plan to deal with an environmental incident or personal contamination on a malting site. Preparing and following such a plan will help prevent or reduce damage should an incident occur. Risk Assessment Causes of environmental incidents on a malting site include: Delivery or use of materials Overfilling containment vessels Containment failure Equipment failure Oil pipework failure Hydraulic hose bursting on a tipping lorry Discharge of partially treated or raw effluent Fire and explosion Flooding Deliberate acts (vandalism) Before deciding on what measures need to be put in place, a Pollution Risk Assessment should be carried out. A Risk Assessment should consider: the biological, chemical and physical properties of a material that could be spilt the effects of accidents, flooding and failure of containment how materials are stored or moved around site and the condition of storage the location to water courses and to any environmentally sensitive areas e.g. Sites of Special Scientific Interest areas of unsurfaced or porous ground the risks posed to people (including neighbours) and the environment and the extent of possible damage A Risk Assessment should be carried out to: 1. Identify materials stored and used at the maltings and processes that may be a hazard. 2. Identify where hazards may impact on receptors. 3. Assess the likelihood and severity of any potential hazard. Once the Risk Assessment has been completed, the risks should be prioritised to focus on those that will cause most harm. Identify measures needed to reduce the likelihood and severity of a spill. Include these in a Pollution Incident Response Plan. Page 1 of 6

Site Plan(s) There should be plan(s) of the site showing layout and access details. More than one plan can be used if there is too much detail. The Site Plan must be: Stored securely In a location known to employees Readily available to all in the event of an emergency Features that should be shown on the plan are: Buildings and other main constructions The site entrances and exits available to the Emergency Services Drainage: including Foul drainage (red) Surface water drainage (blue) Combined drainage (marked with a red letter C) Drainage: indicate Direction of flow Inspection points to detect pollution Discharge points to the water course or sewer Location of manhole covers and drains Number the drain covers to help identify them Location of any penstock valves and interceptors Utilities: Electricity, gas and water supply isolating switches/valves Other key locations: Storage location of hazardous materials Location of effluent treatment plant Vulnerable receptors Areas of porous or unmade ground Location of mains water supply stopcocks Location of hydrants Any bunded areas, including materials stored and estimated retention capacity. Any watercourse, borehole or well located on or near the site Fire assembly point Page 2 of 6

Key Site and Emergency Contact List Prepare a list of key site and emergency contacts (names, telephone numbers, include out of hours). Site Name and Address: Site contacts: Site Manager Emergency management team Duty Manager(s) H&S Manager Environment Manager First aiders Maintenance Emergency services: Emergency Services (Police/Fire/Ambulance) Local Medical Centre/Hospital Regulators: Health and Safety Executive Local Authority Environmental Regulator Incident Hotline Environmental Regulator Local Contact Natural England Scottish Natural Heritage Utility/key services: Water company Gas supplier Electricity supplier Oil supplier Chemical supplier Waste contractor Specialist haulage contractor (waste transfers) Other key contacts: Head office Neighbours Adjacent landowners Specialist advisors Page 3 of 6

Chemical, Material and Waste Inventory Prepare a table of chemicals, materials and wastes that are stored on site and could cause harm to the environment if they escape e.g. Location Equipment/Substance Construction Capacity Bund Capacity Internal Check Barley Drier Plant Fuel Oil Storage Tanks Steel Tanks with Brick 2 x 54,000lt 110% Monthly Inspection Effluent Plant Treatment/Aeration Tanks Bund Vitreous Glass Tanks on a Concrete Base 2 x 600,000 gallons Monthly Inspection Inspect and record the condition of the equipment on a regular basis. Carry out maintenance as required. Material Safety Data Sheets (MSDS) must be available for any substance that could cause harm to health or the environment. Pollution Prevention Equipment Inventory Record the equipment and materials you have on site to deal with pollution incidents and their locations e.g. Type of Equipment Absorbents Drain mats/covers Pipe blockers Booms Pumps Shovel Sand/Earth Sand bags Vehicle Spill Kits Location Engineers Workshop Yard Barley Intake Pits Provide training in the use of Pollution Prevention Equipment. Activation and Response Plan Clearly define the circumstances when the Plan should be activated. Dealing with a spill may involve one or both of the following: Environmental contamination Personal contamination Ensure there is a documented plan in place for dealing with each scenario. The following will assist in developing a procedure for your site. Action taken will be dependent on the nature and seriousness of the spill. Immediate Response All spills must be reported immediately to your Manager. Page 4 of 6

ONLY TACKLE AN INCIDENT IF YOU HAVE BEEN TRAINED AND IT S SAFE TO DO SO. Identify what has been spilt and assess the risks to health and the environment using MSDS s. Decide if Emergency Services and Environmental Regulators are required or if the situation can be dealt with in-house. Evacuate the site (if necessary). Move people a safe distance away from any fumes etc. Seal off the area to prevent further exposure of people and to prevent further spreading of the spill by people and equipment. Help any injured or exposed people and summon medical help. Prevent liquid spills e.g. effluent plant or firewater from entering natural waterways. Block off drains with Spill Kit Material. Close penstock valves or shut-off valves. Booms can be deployed on hard surfaces or a water course. Contain liquid spills by absorbing with a suitable inert solid (sand, earth) or cover powders to prevent them being blown about. If the spill is as a result of a leak from fixed equipment, or a vehicle, place a container under the leak (if possible) to capture drips until repairs can be made. Stop the leak or spill at source e.g. stand up a knocked over container Clean Up Locate the Material Safety Data Sheets for the spilled material. Review the information given on the potential risks to health, safety and the environment. Put on the recommended personal protective equipment (face shield, goggles, gloves, overalls and protective boots). Assemble the proper materials and equipment for the clean-up. If the spill takes on unusual properties (odour, smoke, bubbling), IMMEDIATELY stop the clean-up, evacuate the area and contact the Emergency Services. Depending on the nature of the spill it may be necessary to neutralise to render it safe. Spills of dry materials must be swept or vacuumed up and not washed to drain. Wash any equipment or floors so that no traces of the chemical remain. Place the contaminated absorbent material and PPE in a container suitable for storage and transportation off-site by a specialist company. Page 5 of 6

Absorb the wash water and place it in the same container with the contaminated absorbent materials. Label the container as containing hazardous material. Store the waste safely until it can be collected. Personal Contamination Know where the nearest eyewash and safety shower is located. For small spills on the skin, eyes or hair, flush immediately with water. For spills on clothing, immediately remove contaminated clothing and stand under running water. Inform your Manager and seek medical advice. Waste Waste must be disposed of legally, safely and properly. Waste material from an incident will come under the Duty of Care from the Environmental Act 1990. The waste must be transferred to a registered waste carrier. If the waste is hazardous or special waste in Scotland, additional requirements will apply and its movement must be accompanied by a waste transfer note. Include procedures in the plan for dealing with any waste arising from the incident. Staff Training All relevant staff must know how and when to contact emergency responders. Train staff in evacuation procedures. Staff must be trained in the use of spill kits, drain blockers and other pollution control equipment and the operation of pollution control devices. Maintain documented records of training. Identify any special methods to deal with substances posing particular health or environmental risks. Identify procedures for recovering spilled product and the safe handling and legal disposal of any waste associated with the incident. Ensure trained staff are available to deal with media enquiries. Plan Testing Test the plan with regular exercises. These are required to demonstrate: Does it work? Develop staff competencies in emergency response Test standard procedures Ideally test the plan as a live exercise. Review and Maintenance Review the plan on a regular basis - at least annually. Update the plan after an exercise or actual incidents. Communicate all changes to staff and other responders as appropriate. Page 6 of 6