Flood Mitigation Efforts in the Red River Basin. Slobodan P. Simonovic University of Manitoba University of Western Ontario



Similar documents
MANITOBA FLOOD PROTECTION PROJECTS Project Justification and Benefits. Science Imagination Collaboration

Assiniboine River and Lake Manitoba Basins Flood Mitigation Study: Providing Greater Protection For Manitobans From Flood Risks

Flooding Fast Facts. flooding), seismic events (tsunami) or large landslides (sometime also called tsunami).

GOVERNMENT FOLLOW-UP ON IJC INTERIM REPORT RECOMMENDATIONS ON RED RIVER FLOODING

Flood Risk Management

Flood Risk Management

Post-Flood Assessment

Basement Flood Risk Reduction City of Winnipeg. Charles Boulet

New Brunswick s Flood Risk Reduction Strategy. Province of New Brunswick PO 6000, Fredericton NB E3B 5H1.

Swannanoa River Flood Risk Management Study

Barre City City-wide Policy and Program Options

Development of Technical Data For Long Term Flood Solutions For the Red River Basin

Water Security Agency. Plan for saskatchewan.ca

Standard Operating Procedures for Flood Preparation and Response

Flood Fighting. in Manitoba. A History and Background of Manitoba s Flood Protection Works

A. Flood Management in Nevada

11.0 City of Winnipeg Flood Protection Infrastructure

2013 Flood Recovery Framework

Burnt River Black River and Gull River Flood Contingency Plan

Animals in Disasters

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1

Lake Manitoba Financial Assistance Program (LMFAP)

Develop hazard mitigation policies and programs designed to reduce the impact of natural and human-caused hazards on people and property.

Flooding and Flood Threats on Trenton Island

Discussion about the practicability of implementing flood risk. management and urban flood insurance in China. Longhua Gao, Xiaoqing Zhou

Flood Emergency Response Planning: How to Protect Your Business from a Natural Disaster RIC005

Flood mitigation program for Gatun lake. Programa de mitigación de inundaciones del lago Gatún

Challenges. Estimated Damages from 100-Year Flood

PLANNING FOR POST-DISASTER RECOVERY BRIEFING PAPERS FLOOD INSURANCE AND DESIGN REQUIREMENTS

FLOOD MANAGEMENT IN CANADA AT THE CROSSROADS

Chehalis River Basin Flood Damage Reduction Capital Budget Approved by Legislature in June 2013

Master Plan on Water Resource Management

MITIGATION STRATEGY OVERVIEW

Floodplain 8-Step Process in accordance with Executive Order 11988: Floodplain Management. New Jersey Department of Environmental Protection

Multi-Jurisdictional Hazard Mitigation Plan

And Flood Resilient Design in Austin, Texas

Reducing Natural Hazard Risks in New Residential Developments

NYSDEC Optional Additional Language Model Local Law for Flood Damage Prevention Optional Additional Language

5.14 Floodplains and Drainage/Hydrology

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project

A Comprehensive Summary

The answers to some of the following questions are separated into two major categories:

INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE ACE GLOBAL RISK ENGINEERING. Flood risk assessment. Introduction

Integrated Water and Sediment Management of Yellow River

THE CITY OF MEMPHIS, TENNESSEE ACTION PLAN FOR DISASTER RECOVERY

Prattsville Berm Removal Project. 1.0 Project Location

How To Prepare For A Flood In Hampshire

Institut de prévention des sinistres catastrophiques. Construction de resilient communities

Public Participation in the Emergency Response Phase of Flooding: A Case Study of the Red River Basin

11.4 Voluntary Purchase House Raising and Flood Proofing

SUFFOLK COASTAL DISTRICT COUNCIL DOMESTIC FLOOD PROTECTION POLICY


Anchorage All-Hazard Mitigation Plan October 2004

Lake Dauphin Emergency Flood Protection Program (LDEFPP) Terms and Conditions

6.01 FEMA National Flood Insurance Program (NFIP)

Flood Emergency Plan Guideline

Flood Damage Reduction Strategies and Tools

Local hazard mitigation plans Disaster recovery plans Flood preparedness activities/public education Mitigation projects (construction) Post-disaster

FLOOD FORECASTING PRACTICE IN NORTHERN CALIFORNIA

IUCN Guidelines to Avoid Impacts of Water Resources Projects on Dams and Other Water Infrastructure

MONTGOMERY COUNTY, KANSAS EMERGENCY OPERATIONS PLAN. ESF14-Long Term Community Recovery

FINAL TECHNICAL MEMORANDUM AWD FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012

London Borough of Merton Local Flood Risk Management Strategy

The 25 Year Saskatchewan Water Security Plan. February 2013

Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000

House Research Department General Fund Appropriations in Flood Relief Bills

Flooding Hazards, Prediction & Human Intervention

Town of Canmore Flood Recovery Action Plan January canmore stands strong canmore stands strong

Track-Risk-Impact-Policy (TRIP) Modeling for the Agricultural Sector

ALTERNATIVE SOURCES OF FUNDING FOR

Indiana Office of Community and Rural Affairs. Disaster Recovery and Mitigation Planning Ft. Worth, Texas February 15, 2012

Chapter 6: Mitigation Strategies

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.

In addition to the terms defined in this By-law, the following terms shall have the corresponding meanings for the purposes of this Section:

Public Law and Non-Structural Alternatives to Levee Repairs

POSITION STATEMENT ON DIVERSIONS AND BULK REMOVAL OF WATER FROM THE GREAT LAKES BASIN

Appendix F Benefit-Cost Analysis of Flood Protection Measures

Introduction. Definitions. Methods

City of London Climate Change Adaptation Strategy Dealing with Extreme Rainfall Events

FLOOD EMERGENCY ACTION PROCEDURES

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES

Objective 4: Enhanced community education, flood awareness and preparedness

2014 Emergency Flood Damage Reduction Program (EFDRP)

Planning Resource Guide. Climate Change Adaptation through Land Use Planning

DEFINING RISK AND ITS ROLE IN DISASTER MANAGEMENT

ESF 14. Long-Term Community Recovery

CHAPTER 3 page 69 LOCAL FLOODPLAIN REGULATIONS AND NFIP STANDARDS

HEADWATERS CONTROL STRUCTURE MANAGEMENT POLICY AND OPERATING PROCEDURES

FLOOD PROTECTION AND ECOSYSTEM SERVICES IN THE CHEHALIS RIVER BASIN. May Prepared by. for the by Earth Economics

Section 19. Basin-wide Mitigation Action Plans

Flood Insurance Repetitive Loss Property

Exhibit A CWCB FLOOD RECOVERY GRANT PROGRAM Statement of Work

Disaster Recovery Financial Assistance

MANITOBA EMERGENCY MANAGEMENT SYSTEM Ver. 2.1

National Operation and Maintenance Manual

Karlstad, Sweden. Local progress report on the implementation of the Hyogo Framework for Action ( )

DISTRICT VALUES STATEMENTS, GOALS, ACTION ITEMS, AND ONGOING TASKS FOR 2015 Adopted by the Board of Directors December 10, Values Statements.

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

SOME COMMON QUESTIONS ABOUT FLOODPROOFING

Summary of the Government s Relief and Recovery Plan and Package (as of 25 October 2011)

Transcription:

Flood Mitigation Efforts in the Red River Basin Slobodan P. Simonovic University of Manitoba University of Western Ontario

Presentation outline Introduction Red River basin experience legislation structural measures nonstructural measures 1997 flood IJC Red River Basin Task Force City of Winnipeg Flood Control Adequacy Study Conclusions

Introduction Mitigation is the cornerstone of emergency management It's the ongoing effort to lessen the impact disasters have on people and property Mitigation involves keeping homes away from floodplains, creating and enforcing effective building codes to protect property from disasters -- and more

Introduction Definition: Mitigation is defined as sustained action that reduces or eliminates long-term risk to people and property from natural hazards and their effects (FEMA, 1995)

Introduction In practice, mitigation can take many forms: Promoting sound land use planning based on known hazards Buying flood insurance to protect your belongings Relocating or elevating structures out of the floodplains Developing, adopting, and enforcing effective building codes and standards Developing and implementing a plan in your business or community to reduce your susceptibility to hazards

Human response cycle (FEMA, 1996)

Mitigation Definition - mitigation is any activity that reduces the effects of the hazard Physical and financial Impediment in Canada: lack of incentive when disasters occurred long time ago public support is much stronger after a disaster Financial incentives and public education

Mitigation Responsibility for mitigation: the federal government (research) joint federal-provincial (reduction of flood damage) the provinces (flood mitigation and setting construction standards) municipal authorities (flood mitigation and enforcing construction standards) public institutions (research) the insurance industry (promoting mitigation) individual homeowners (private mitigation efforts)

Preparing for emergency Definition - development and practice of emergency plans to respond to floods and monitoring to allow timely warnings Responsibility of various agencies Testing emergency plans as a measure to strengthen emergency preparedness

Disaster response and relief Start as soon as a disaster is detected Involves - mobilization and position of emergency equipment; provision of food, water, shelter, and medical equipment Response and responsibility is a function of the size of the disaster Co-ordination (MEMO)

Recovery Recovery from the physical and financial effects of the disaster - final stage Rebuilding can take months, if not years Means are required: financial assistance; etc. Shared responsibility (governments and insurance companies)

Red River basin experience 116,500 km 2 89% in USA 11% in CDN very flat

Flood damage approximations Flood Year 1950 Amount Paid in Assistance Source of Monies $12.5 M Federal X Paid For Damages Other Assistance Comment 1966 $21.0 M Province X Includes home, farms & small business $19.0 M Private To supplement Donations for uncovered $10.0 M Province & Federal (per cost sharing agreement) $1.4 M Province & Federal (per agreement) X Flood fighting & response damages Initial predictions very high, so flood fighting costs inflated

1979 Floodway System Completed $7.8 M Province & Federal (per agreement) X $7.1 M Province & Federal (per agreement) 1996 $12.0 M Province & Federal (per agreement) 1997 $150.0 M Province & Federal (per Disaster Financial Assistance agreement) $120.0 M Province & $200.0 M Federal X X Flood Proofing Flood Proofing Restoration of the floodway and ring dikes for 20 communities Includes individual and municipal damage Damages largely in upper valley. Includes individual and municipal damage Includes c.5100 individual and c. 60 municipal claims* includes c.2450 private applications* *information as of March 1, 1998 $2.0 M Province Temporary housing more expenditures anticipated-70 families still need housing*

Red River experience Legislation Canada Water Conservation Assistance Act (1953) (up to 37.5% of the cost of the works) Canada Water Act (1970) (focused not only on works but also on nonstructural alternatives) Flood damage reduction program (1975) (discourage development in high-risk floodplains; no finances for inappropriate development - no flood disaster assistance - zoning based on flood risk)

Structural measures

The Red River floodway

The Red River floodway Measure excavated channel about 48 km long; capacity 1,698 cms Implementation on advisement of 1958 Royal Commission, based on benefit-cost analysis completed in 1968, at cost of $62.7 million Responsibility operation and maintenance done by Manitoba Natural Resources- Water Resources Branch Goal to divert flood waters in excess of 30,000 cfs around the city of Winnipeg from south to north Efficiency highly successful at protecting Winnipeg, within technological limitations Issues inappropriate development in highly vulnerable areas due to exaggerated sense of security within the protected area institutionalization of flood damage reduction (perception that flood damage reduction is a government function and not a public issue) if flood waters exceed channel capacity, damages could be extremely high capacity insufficient to handle flood equal to that of greatest flood on record (i.e.1826) operation is poorly understood by the public, prompting criticism allegations that operation caused excessive flooding south of structure currently the Floodway is being refurbished, a three year project costing over $3 million provincial government claims Floodway has saved over $4.5 billion in potential damages to Winnipeg

Portage diversion

Portage diversion Measure consists of a diked earth channel, a diversion dam and spillway dam channel is two miles west of city of Portage la Prairie; capacity 700 cms diverts water from Assiniboine River to Lake Manitoba 18 miles to the north Implementation recommended by Royal Commission (1958) completed in 1970 cost $20.5 million Responsibility Water Resources Branch Goals To keep water levels in Winnipeg at acceptable level---below 17 ft. or 18 ft. at James Avenue Protect agricultural land and communities downstream from Portage la Prairie Efficiency highly efficient, subject to problems with ice jams which can significantly reduce diversion channels capacity technological limitations Issues Diversion is most essential when the Red River and the Assiniboine both crest at or close to the same time; Winnipeg floodway would otherwise be heavily taxed Reduces flood damages along lower Assiniboine River, much of which is agricultural land May have contributed to false sense of security along lower Assiniboine River

Shellmouth reservoir

Shellmouth reservoir Measure consists of earthfill dam, overflow spillway, and reservoir Located on Assiniboine River near Russell, Manitoba Reduces peak flow at Winnipeg by 196 cms Implementation Recommended by Royal Commission (1958) Completed in 1972 Cost $10.8 million Responsibility Water Resources Branch Goals provide water storage and control reservoir outflows to minimize downstream flooding in spring or during summer rainfall flood conditions ensure adequate water supply in summer

Primary dikes

Primary dikes Measure 109 km of earth dikes and 31 pumping stations Implementation recommendation of Royal Commission (1958) initially implemented by the Greater Winnipeg Diking Board 1950-52 with involvement of three levels of government, later enhanced initial cost (1950-51) $6 million, cost of enhancements in subsequent years undetermined Responsibility Water Resources Branch (per the Diking Authority Act) Goals protection of Winnipeg property from flood waters pumping stations operate to lift water and sewage waste over boulevard dikes and prevent sewage back-up Efficiency adequate only to a limited water level easily breached under bad weather conditions or in very long duration floods must be properly maintained Issues permanent dikes are insufficient for highest water levels on record some Winnipeg riverbank properties could not be protected by dikes due to proximity to river some residents have removed the dikes on their property for aesthetic reasons, placing entire community at risk

Ring dikes

Ring dikes Measure ring dikes around eight communities (earth); 100 year flood protection Implementation recommended by Royal Commission(1958) cost benefit analysis conducted prior to construction on 8 communities first ring dikes completed in 1972, cost $2.7 million from 1982-1991 new ring dikes and old dike enhancements cost $4 million; this figure is $6.9 million if total expenditures on the diking systems are included (such as pumping stations, communications equipment ) new ring dikes anticipated following the 1997 flood Responsibility Water Resources Branch regional engineering staff (for maintenance and operation) Efficiency adequate, subject to water level heights, weather conditions and maintenance/monitoring of dike Issues dikes must be maintained, monitored and often enhanced during flood conditions dike openings such as roads and railways must be closed with earth during floods adequate pumping facilities must be in place municipal cooperation required for construction and maintenance of dikes

Nonstructural measures

Flood fighting Measure Flood fighting includes those activities done prior to or during a flood with the intent of reducing damages from the flood Responsibility Water Resources Branch of the Department of Natural Resources EMO (Manitoba Emergency Measures Organization) three levels of government individual property owners Issues need for ongoing emergency preparedness and planning, to ensure adequate needs assessment and timely access to human and other resources proactive and long-term planning required versus reactive optimal use of forecasts to determine flood fighting strategies, and provide sufficient warning to at-risk areas improve flood response in some rural municipalities improve public awareness of provincial government s flood fighting activities, including more specific information on the operation of the Floodway gates establish nature of government liability, if any, for damages resulting from inaccurate predictions of water levels improve individual property owners and communities emergency response

Flood forecasting and warning Measure River streamflow forecasting involves complex analysis of the many variables which influence river levels, to ultimately best anticipate levels using probability calculations. Responsibility Water Resources Branch River Forecast Centre Issues enhanced use of modeling techniques needed improved communication of risk to the public improved prediction of overland flows

Post flood recovery

Post flood recovery Measure Activities, programs and policies which assist victims post-flood and restore property, including financial compensation and rehabilitation/ restoration Responsibility EMO Claims Department Three levels of government Charity Organizations Issues Federal and Provincial governments provide post disaster assistance based on the Canadian Federal Disaster Assistance Arrangement. The cost sharing formula which outlines the federal contribution is as follows: 0% of total rehabilitation costs if the disaster costs are less than $1 per capita of provincial population, 50% for the next $2 of eligible provincial expenditures on assistance, 75% for the next $2, and 90% of the remainder. Primary responsibility for recovery rests with the provincial level of government. The willingness of government to pick up a significant amount of costs associated with recovery in recent decades has caused citizens to now see some types of compensation/assistance as government s responsibility. Private and charitable funds are essential to full restoration of victims households and businesses to pre-flood state. There is no source of compensation for some types of damages e.g. flood-related hardship, lost wages. Some citizens want full compensation from government, without a deductible, for damages they feel they incurred because of operation of the flood control system. Increasing land development and property values contribute to rising flood assistance payments

Land use regulation Measure Land use regulation refers to rules of practice and policy governing how land is used within a designated floodplain, as supported by government. Floodplain mapping activity complements land use regulation by delineating the area at risk during floods of specific magnitude; in Manitoba the 100 year flood level is used in regulation. Responsibility Provincial government, with Federal input and legislation Municipal government Issues The use of land use regulation as a means of flood damage reduction has been slow to be effectively adopted in Manitoba Inconsistencies abound in use of Designated Flood Area maps because it is at the discretion of the municipalities Weak land use regulation has allowed for increasing residential development along the river south of the Floodway which is extremely vulnerable to flooding. Poor enforcement of regulations has been an ongoing weakness; legislated ministerial powers have not been used in instances of non-compliance. New legislation is now before the provincial government which is intended to improve the success of land use regulation by more clearly discouraging the building of structures which are not compliant, and improving the inspection process.

Flood proofing

Flood proofing Measure Flood proofing activities are meant to protect individual structures from flood damage; they include diking, terracing, raising buildings, relocation etc. Responsibility Manitoba Water Resources Branch administers the program with the assistance of the Emergency Management Organization. The latter maintains the database of victims and their circumstances. Water Resources Branch provides both technical and financial assistance to communities, businesses and individuals who need help to flood proof. Issues Since summer 1997 the current flood proofing program has been instituted, using the 1997 flood as the design flood. Due to the large personal losses of some victims of the 1997 flood it is difficult for some victims to access sufficient funding to flood proof The flood proofing program will be in operation for five years, with applications required within two years; however, the consequences (if any) of failing to flood proof are unknown if future damages are sustained.

1997 flood 4,587 m 3 /sec - flood of the century - 2,000 km 2 Red Sea 28,000 people evacuated; 8,700 soldiers Many temporary dikes; 6 million sandbags; Brunkild dike (40 km in 72 hours) Lost Grand Point and St. Agathe Many new programs in place International Joint Commission - Red River Basin Task Force (http://www.ijc.org)

The Next Flood: Getting Prepared Final Report of the Final Report of the International Red River Basin Task Force

Report Highlights Flow management Communities at risk (esp. Winnipeg) Resiliency Lower Pembina Lake Traverse Water quality Data/DSS Computer modeling Institutions

Report Report to the IJC from the International Red River Basin Task Force Report makes 9 conclusion and 51 recommendations

Red River Flooding Expect floods even greater than 1997 1826 an historic event that repeat itself

Flow Management Storage options unrealistic Insufficient potential new economically & environmentally acceptable reservoir storage Micro-storage impractical & costly Increased wetland storage not significant for large floods on the main stem

Communities at Risk Good progress to provide structural protection Grand Forks and East Grand Forks Numerous initiatives on both sides of the border to reduce the flood risk in other valley communities Need more inspection of community projects in US

Winnipeg Winnipeg largest city at risk Design flood for Winnipeg should be highest economically feasible, 1826 flood at a minimum Two options to achieve high level of protection expansion of the Floodway or construction of a water detention structure south of Ste. Agathe

Flood Preparedness and Resiliency Need to make communities more resilient in the event of a major flood. 13 recommendations including definition of the floodplain building codes public awareness enforcement of regulations removal of structures

Flood Preparedness and Resiliency Recommendations also include ones for a mitigation program in Canada greater efforts to increase participation in greater efforts to increase participation in flood insurance in the US.

Lower Pembina Pembina flooding affected by dikes and roads on both sides of the border Local groups willing to resolve issue Task Force provided technical support. Propose changes in roads/dikes are modeled prior to construction Continue database, models, and DSS prototype Reactivate Technical Working Group to provide funding mechanism

Lake Traverse Possibility of hydraulic connection during floods and biota transfer Initiate studies to eliminate hydraulic connection at Lake Traverse Governments should implement plan for eliminating hydraulic connection cost to be shared with Canada

Water Quality: Lake Winnipeg A threat from toxic chemicals release during the flood Assessed the impact of toxic release and found no risk to human health Also looked at nutrient loading, but could not determine a long-term impact Need to monitor Remove storage of toxic substances in floodplain

Data and Decision Support System Need to improve & maintain database Continue to improve & maintain hydrometric/meteorological data networks Make Canadian data freely available DEM for the basin should be completed Decisions on continuing the RRBDIN

Computer Modeling UNET and MIKE 11 should be maintained and improved Outputs from Task Force models should be widely available Implement US National Weather Service Advanced Hydrologic Predication System in the Red River Implement/couple atmospheric-hydrologic model

Institutions Need for basin-wide institution to advocate and report on flood-related issues Should be able to deal with federal/ state/provincial governments If IJC pursues watershed board concept, consider establishing initial board in the Red River basin

Key Accomplishments Flood of 1826 proportions becoming accepted as basis for preparedness Set the stage for future cooperative problem-solving in the basin. Hydraulic Models for entire Red River Mike 11, UNET Detailed mapping of basin initiated Tools, data, and process to resolve Lower Pembina Transboundary Flooding Issue

Key Accomplishments Winnipeg Risk Analysis/protection options Even-handed assessment of alternative flood defense proposals

Conclusions Mitigation is good public policy. It saves lives; It saves money; It can protect environmental assets. References: Morris-Oswald, Sinclair, Simonovic, WRRR 38 (http://www.ce.umanitoba.ca/~simon) FEMA, USA (http://www.fema.gov/mit/) The Natural Hazard Center, Colorado (http://www.colorado.edu/hazards/)