PANAJI SMART CITY DRAFT PROPOSAL for Citizen s Review. Request for Comments



Similar documents
Chandigarh Smart City Proposal. Citizen Consultation on Smart City Proposal November 2015

Rajkot Municipal Corporation. Maru Smart Rajkot. Draft Smart City Proposal (SCP) Follow us on

SMART CITY VARANASI. Presentation based on Smart City Challenge. Overview of Progress & Way ahead

2010 Salida Community Priorities Survey Summary Results

Preparation of SMART CITY PLAN & PROPOSAL. JAGAN SHAH Director National Institute of Urban Affairs

Examples of Eligible Projects. Project Category Description Examples

Integrated Public Transport Control Systems Information Day

Los Angeles Union Station, CA Sustainable Neighborhood Assessment. April 22-23, 2014

Draft Smart City Proposal for Diu Municipal Council. NCPE Infrastructure India Private Limited, Hyderabad

Student Seminar Building climate resilient cities: Exploring theories, practices and prospects Feb 2015

Training Program on Urban Climate Change Resilience April, 2015 Database Management System for coastal cities

THE SMART CITY OF THE FUTURE

KEYPORT COMMUNITY PLAN

Create a greener community by championing strategies for reducing waste while encouraging the sustainable development and use of renewable energy.

Comparison of Goals and Policies Between Draft Plan (November 28, 2012) and Final Draft Plan (March 20, 2013)

CHIPPEWA FALLS RIVERFRONT PARK

Climate Action Revenue Incentive (CARIP) Public Report for 2013

Adapting Northern Adelaide - Submission towards the new Climate Change Strategy for South Australia

Smart Solutions for Cities. R. Chandrashekhar President 25th June 2015

Permanent Secretary Office of Environmental Services Lagos State Ministry of the Environment At. Dar es Salaam, Tanzania

Downtown Tampa Transportation Vision

Attachment B Policy Audit Template

OFFICIAL PLAN REVIEW ENVIRONMENTAL STAKEHOLDERS FEEDBACK REPORT

URBAN PUBLIC TRANSPORT PLANNING IN TEHRAN AND THE OUTCOME OF THE IMPLEMENTED BRT LINES

Investing in Smart Cities

Chair Tom Galloway and Members of the Administration and Finance Committee UPDATE - CORPORATE ENVIRONMENTAL SUSTAINABILITY STRATEGY

Green Mobility - an action plan for the way forward

Empowering Local Clean Energy Action FEDERAL POLICY AGENDA FOR 2011

Chicago Climate Action Plan Update

4.4 ECOCITY Tampere - Vuores

"Description of the urban and architectural development conceptual design of the historical city centre of Gorzow Wlkp. R3DC4T

Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk

As amended at General Meeting 04 November 2015 (Item )

City of DeLand. Strategic Plan

Planning the Urban Forest

While these requirements are mandated only for communities of 50,000 or more, the Town has chosen to address them as optional elements.

Sustainable city development through smart urban planning

The city of Malmö, Sweden

Sustainable urban mobility: visions beyond Europe. Brest. Udo Mbeche, UN-Habitat

Green Growth Platform questionnaire Answers submitted by Rahm Emanuel. Chicago s Climate Change Solutions and Clean Energy Future

Downtown South Salt Lake Redevelopment City of South Salt Lake

Table of Contents ALPHABETIZED LIST OF CIP PROJECTS... 1 CIP 5 YEAR SUMMARY BY CATEGORY SMART CITY CIP 5 YEAR SUMMARY BY VISION...

Envision Venice Strategic Plan for Fiscal Year Ending. September 30, Preserving and Enhancing the Venice Quality of Life.

DRAFT MASTER PLAN

Smart Cities. by MTR Digital. The future of advanced urban management. MTR Digital

Tiruchirappalli Corporation Draft Smart City Proposal


Draft Goals and Objectives Wadena Comprehensive Plan City of Wadena, Minnesota. Land Use Goals:

Iowa Smart Planning. Legislative Guide March 2011

IF THEN SURVEY RESULTS

Proposed General Plan Update Goals, Policies, and Implementation Actions

We make Smart Cities a reality. Schneider Electric Smart Cities

BARASAT MUNICIPALITY NORTH 24 PARGANAS

GARFIELD BOULEVARD. concept planning 54TH PL CALUMET AVE ELLSWORTH DR CTA STATION STUDY AREA GAS STATION GARFIELD BLVD PRAIRIE AVE

VANDERBILT COMPARISON

Appendix "B" - Development Checklist

Visakhapatnam. Hyderabad Kakinada. Amaravati. Kurnool. Bay of Bengal. Port. Railway Station. Tirupati. Airport. Chennai. Bengaluru.

Call to Action on Smart Sustainable Cities

Transparent Chennai. Best Practice Documentation June Researched and Documented By. OneWorld Foundation India

Toronto s Wet Weather Flow Master Plan

Rapid City Downtown Area Master Plan. Draft Plan Concepts April 2016

SCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose

Citizen Advisory Group Meeting #1 December 8, :00 p.m.

2

Policy GRN The City will adopt a Go Green Initiative to implement strategies to reduce greenhouse gas emissions within the City s borders.

MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements

Larnaca Urban Sustainable Development Strategy

Introduction to the Envision Sustainability Rating System

Planning should achieve high quality urban design and architecture that: Contributes positively to local urban character and sense of place.

WORKSHOP ON CHALLENGES OF URBANISATION IN INDIA WITH FOCUS ON SOLID WASTE MANAGEMENT

Milwaukee Metropolitan Sewerage District STRATEGIC PLAN

Reconstruction & Renewal of Bhuj City

URBAN MOBILITY IN CLEAN, GREEN CITIES

Smart Cities - A European Initiative

Center for Sustainable Business Growth

How To Amend A Stormwater Ordinance

State of Green Infrastructure in the Gauteng City-Region

STRATEGIC PLAN

Lesson 2: Technology Applications Major Transit Technologies Grouped by Function

01/31/13 ACHIEVING THE VISION FOR RESTON. Reston Master Plan Special Study Task Force

A Developer s Guide: Watershed-Wise Development

Implementing Instructions - Sustainable Locations for Federal Facilities

Engineering Major Service Actual Budget Projected Request Executive Adopted

Smart Cities & Integrated Corridors: from Automation to Optimization

COPYRIGHT MATERIAL. Geof Syphers, PE, LEED AP BD+C Codding Enterprises 2010

Smart City Expo World Congress

Schenk-Atwood Neighborhood Business District Master Plan

CITY OF FERNDALE EAGLE Checklist

Green economy boosts local viability

INSTITUTIONAL MASTER PLAN NOTIFICATION FORM / PROJECT NOTIFICATION FORM BOSTON UNIVERSITY MEDICAL CENTER

PROJECT PREPARATORY TECHNICAL ASSISTANCE

FY 2011 OHIO SMALL CITIES COMMUNITY DEVELOPMENT BLOCK GRANT COMPREHENSIVE DOWNTOWN REVITALIZATION PROGRAM

Transcription:

PANAJI SMART CITY DRAFT PROPOSAL for Citizen s Review Request for Comments

PANAJI SMART CITY PROPOSAL - PLANNING PROCESS Phase I CONCEPT PLAN 10 th Oct to 25 Oct 2015 Citizen Engagement SWOT ANALYSIS KPIs Phase II DRAFT PROPOSAL: PAN CITY AND AREA BASED 26 Oct to 25 Nov 2015 Pan City: IT Enabled municipal Service Delivery Eco-mobility & Public Transport Phase III FINAL PROPOSAL DETAILING IMPLEMENTATION AND FINANCING PLAN 25 Nov to 10 Dec 2015 Area-Based Proposal Retrofit 2 Sq. km Smart cities Challenge: 15 December 2015

PANAJI SMART CITY PROPOSAL KEY EVENTS Sr. CITIZEN ENGAGEMENT EVENT DATE LOCATION 1 Panaji SCP Launch (Press Conference) 13 th Oct CCP Town Hall 2 1 st Stakeholder Consultation Workshop (Launch Workshop) 14 th Oct Hotel Fidalgo 3 Municipal Councilors Consultation 17 th Oct Menezes Braganza hall 4 Cycling rally in support of cycling for Smart City Panaji 17 th Oct Divja Circle - Gasper Dias, Miramar 5 Bandstand (Musical Performance combined with Smart City Interaction) 18 th Oct Garcia de Orta Garden 6 City Expert Panel Discussion 18 th Oct Nalanda Hall 7 Panaji SCP Progress Round 1- (Press conference) 28 th Oct Nalanda hall 8 Zonal Workshop (public meeting) 28 th Oct Ribandar 9 Presentation of Proposed Maps(Area based and Pan city 29 th 3 rd Oct Garcia de Orta Garden 10 2 nd Stakeholder consultation Workshop (Tech Fair(CII)) 3 rd Nov Hotel Fidalgo 11 Climate Core team meeting (city self-assessment checklist) 6 th Nov Nalanda hall 12 Prize distribution of Essay competition 6 th Nov Garcia de Orta Garden 13 FC Goa supporting Smart city Panaji 15 th Nov Garcia de Orta Garden 14 3 rd Stakeholder Consultation Workshop (on Panaji Smart City proposed projects) 15 State Level High Powered Steering Committee (SLHPSC) (Meeting on Financial Plan of Panaji Smart City Proposal) 27 th Nov Hotel Fidalgo 27 th Nov Secretariat, Porvorim 16 Municipal Council Meeting on Panaji Smart City Proposal 1 st Dec CCP Town hall

DEFINING THE SMART CITY PROPOSAL Citizen Feedback SWOT Analysis Gap Identification & KPIs

VISION & SUB-GOALS Transforming the City of Panaji into a world-class, environmentally sustainable and liveable city for all, while preserving its heritage, cultural diversity and ecosystems through innovation and smart solutions. 1. Enhance quality of life for all citizens by providing good quality municipal services in a sustainable manner 2. Promote Heritage and Cultural Diversity for Local Economic Development and Social Progress 3. Develop a productive knowledge society through adoption of participatory governance and smart solutions 4. Adopt environmentally sustainable approaches: eco-mobility & multi-modal transit, biodiversity conservation, renewable energy & a landfill-free city

VISION STATEMENT No 5% Yes 95% 95% of Stakeholders, agreed to the vision statement of Panaji: Transforming The City of Panaji into a world-class, environmentally sustainable and liveable city for all, while preserving its heritage, cultural diversity and ecosystem through innovation and smart solutions.

Sub-goals enhance quality of life for all citizens 13% 13% 26% heritage and cultural diversity 48% Knowledge society through participatory governance environmentally sustainable approaches

24 Smart Plan Features Citizen Participation Identity and Culture Economy and Employment Selection of top 5 sectors Education Health Mixed Use Compactness Open Spaces Housing and Inclusiveness Transportation and Mobility Walkability IT Connectivity Intelligent Govt Services Waste Water Management Energy Source Energy Supply Water Supply Water Quality Air Quality Energy Efficiency Underground electric wiring Sanitation Waste Management Safety

AREA BASED PROPOSALS

Area Based Solutions 16% 30% 12% 42% Upgradation of Conservation zone Redevelopment of urban poor pockets Redevelopment of govt colony St. Inez Greenfield

Congestion Pollution of Creek Loss of mangroves Pockets of urban poor: Infrastructure Pedestrian safety (Church) Heritage conservation Environmentally sensitive areas Two islands Church square: Image of city Building byelaws Rich in culture and heritage Water bodies (Creek, Springs, Lake) Biodiversity abd Tourists Space in Patto Employment generation potential Bridging the islands

SUB GOALS Enhance quality of life for all citizens by providing good quality civic and social services in a sustainable manner PARTICIPATORY GOVERNANCE CIVIC AND SOCIAL SERVICES CULTURE Preserve and promote heritage and cultural diversity for local Economic development and social progress Develop a productive knowledge society through adoption of participatory governance and smart solutions HERITAGE AND SUSTAINABILITY Adopt environmentally sustainable approaches: ecomobility and multi modal transit, biodiversity conservation, renewable energy and a landfill free city.

BLUE GREEN SUSTAINABILITY IMPROVED CIVIC AND SOCIAL SERVICES MOBILITY PUBLIC SPACES REJUVENATION OF CHURCH SQUARE INTERLINKING CORE CITY AND PATTO AREA FOR CITIZENS AND TOURISTS: A. UPGRADATION OF RUA DE OUREM CREEK AND PATTO AREA, B. REVITALIZATION OF MALA LAKE HERITAGE AND CULTURE WATER URBAN POOR AND BASIC SERVICES HERITAGE CONSERVATION INTEGRATED URBAN WATER MANAGEMENT SERVICE PROVISION FOR URBAN POOR IN MALA HERITAGE ZONE PROVISION OF BASIC SERVICES PARTICIPATORY GOVERNANCE CONSERVATION OF HERITAGE AND CULTURE BIODIVERSITY

REJUVENATION OF CHURCH SQUARE Traffic congestion Passenger safety (Church) Chaos Poor condition of walkways Air and Noise pollution Identity and heritage character of the area gets subdued by traffic Semi pedestrianization Improvement of front garden Pedestrian friendly walkways Table top junction in front of the Church Pedestrianization of part of 18 th June road (in front of Urban health centre) Open street restaurant Semi permanent stands for portraying art and culture Digital information boards Wi fi hotspots CCTV Shortage of public toilets LKS

INTERLINKING CORE CITY AND PATTO AREA FOR CITIZENS AND TOURISTS: A. UPGRADATION OF RUA DE OUREM CREEK AND PATTO AREA Isolated pocket Wastewater discharge from STP Environmentally sensitive area Waste management facility Patto - vacant during night Poor condition of promenade Safety Lack of public facilities Deteriorating condition of bridge Lack of vehicular connectivity to core city UPGRADATION OF STP SHIFTING OUT OF WASTE PLANT INTEGRATION OF URBAN SPACES ACROSS CREEK GREEN BELT PROPOSAL LANDSCAPING ALONG JETTY MANGROVES GOA CENTRE FOR ART, CULTURE AND SKILL DEVELOPMENT ABANDONED KIOSKS CREEK BANK RESTAURANTS 3 PEDESTRIAN LINKS ROAD BRIDGE FOOD AND WINE FESTIVAL PATTO AREA PARKING BRINGING THE GAP INTEGRATION Vanessa and

Graphics by Vanessa and Oriana

Graphics by Vanessa and Oriana

TOURISM DEPARTMENT

Graphics by Vanessa and Oriana INTERLINKING CORE CITY AND PATTO AREA FOR CITIZENS AND TOURISTS: B. REVITALIZATION OF MALA LAKE ABANDONED LAKE SILTATION POOR INFRASTRUCTURE POOR ACCESS LAKE BEAUTIFICATION PEDESTRIANIZATION ALONG LAKE ARTIST ZONE ALONG LAKE NATURE TRAIL SKILL CENTRE ARTIST ZONE IN HERITAGE CENTRE DESILTATION

NEARLY 40% T&D LOSSES POOR CONDITION OF SPRINGS FLOODING AND WATER LOGGING WASTEWATER DISCHARGE INTO CREEK POOR CONDITION OF MALA LAKE INTEGRATED URBAN WATER MANAGEMENT SMART METER SCADA GIS WATER (Covered under Pan city) UPGRADATION OF PATTO STP RECYCLING PLAN FOR THE CITY REJUVINATION OF RUA DE WASTEWATER OUREM CREEK STORMWATER REJUVINATION OF FONT PHOENIX BOCA DE VACA NATURE TRAIL 5000 TREE INITIATIVE FLOOD CONTROL IN MALA ZERO DISCHARGE IN CREEK BY 2020 CATCHMENT CONSERVATION OF SPRINGS FAMILY ADOPTION OF TREES RUA DE OUREM CREEK SPRINGS LAKE CLOSING THE URBAN WATER LOOP

SERVICE PROVISION FOR URBAN POOR IN MALA HERITAGE ZONE POCKETS OF URBAN POOR LACKING BASIC INFRASTRUCTURE FACILITIES EXTENSION OF CHALLENGE FUND INITIATIVE BASIC SERVICES COMMUNITY AREAS COMBINED UTILITY TRENCH SURFACE IMPROVEMENT CCF

PROVISION OF BASIC SERVICES POOR CONDITION OF ROADS NEARLY 40 YR OLD SEWER LINES IRREGULAR PLACEMENT OF ELECRICITY INFRASTRUCTURE IMPROPER WASTE COLLECTION INADEQUATE STREETLIGHTING WATER LOGGING LACK OF PUBLIC TOILETS INFRASTRUCTURE BUT NOT SMART INFRASTRUCTURE ROAD IMPROVEMENT UTILITY TRENCH WATER ELECTRICITY TELECOM GAS STORM WATER DRAINAGE SEWERAGE LED STREETLIGHTING IMPROVED OPEN SPACES PUBLIC TOILETS CNG AND PNG NETWORK ROOF TOP SOLAR PV

CONSERVATION OF HERITAGE AND CULTURE LACK OF MAINTENANCE DUE TO LACK OF INCENTIVES LACK OF POLICY NEED FOR TRANSPARENCY FOR TDR CITIZEN CONNECT WITH HERITAGE IS BREAKING BUILDING BYELAWS ARE REDUNDANT TRANSPARENCY GIS platform Can be linked to TDR Ward characterization BUILDING BYELAWS TO ADDRESS ISSUES RELATED TO PARKING, CONSERVATION, INCENTIVES FOR SUSTAINABLE PRACTICES HERITAGE CONSERVATION DIRECT CSR IN HERITAGE HERITAGE CELL UNDER CCP View of Mala lake Restoration SIGNAGE STRENGTHEN CITIZEN CONNECT Crowdsourcing Art and Artisan mapping Resources needed to sustain / maintain Old Secretariat proposed to be developed as museum and art gallery PROMOTING PANAJI AS A FILMING LOCALE, WITH FOCUS ON HERITAGE, FESTIVALS, CARNIVAL

BIODIVERSITY LOSS OF SPECIES MANGROVE DEPLETION JOGGERS PARK MALA LAKE RUA DE OUREM CREEK BUTTERFLY GARDEN BAMBOO CORNER BUTTERFLY GARDEN LAKE RESTORATION HERBAL GARDEN NATURE INTERPRETATION CENTRE MANGROVE PLANTATION FUTURE CONSERVATION LEADERS FOR BIODIVERSITY

PAN CITY PROPOSALS

Sector Prioritization Pan City Education 13% E Governance 15% Transportatio n 39% Health 13% Waste Management 20%

PAN-CITY INITIATIVES ICT ENABLED MUNICIPAL SERVICES SOLID WASTE MANAGEMENT E-GOVERNANCE SMART METERING FOR WATER SUPPLY SMART TECHNOLOGY FOR STREET LIGHTING SMART GRID ECO MOBILITY, PUBLIC TRANSPOTATION AND ITS PUBLIC TRANSPORTATION - ITES BUSES AND FERRIES NON MOTORIZED TRANSPORT SMART BIKE SHARING SMART TICKETING PEDESTRIANIZATION SMART PARKING COMMAND AND CONTROL CENTRE FOR ITS

ICT ENABLED MUNICIPAL SERVICES SOLID WASTE MANAGEMENT E- GOVERNANCE WATER SUPPLY LED STREET LIGHTING Smart Grid RFID ENABLED WASTE MANAGEMENT ZONAL WASTE MONITORIN G SYSTEM CENTRAL MONITORIN G SYSTEM E-GOV & MIS SYSTEM FOR CCP GIS MAPPING FOR CITY ZONAL CITIZEN KIOSKS CITIZEN APPS SMART METERING SCADA SYSTEM RFID ENABLED FIXTURES ~5500 MICRO CONTROLLER BASED CENTRALIZED CONTROL & MONITORING SYSTEM Advance Metering Infrastructure (AMI) Other Smart Grid Components

TRANSPORT NON MOTORIZED PUBLIC TRANSPORTATION INTELLIGENT TRANSPORT SYSTEM SMART SYSTEMS FOR FERRY SYSTEM SMART PARKING PEDESTRIANIZATION SMART DOCKS SMART CARDS SMART BIKE SHARING SYSTEM PASSENGER INFORMATION SYSTEM AUTOMATIC VEHICLE LOCATION SYSTEM/GPS AUTOMATED FARE COLLECTION SYSTEM MIS SOFTWARE FOR CENTRALIZED MONITORING TRAFFIC SIGNAL PRIORITY SYSTEM COMMAND AND CONTROL SYSTEM CRAFT LOCATION SYSTEM AND INTEGRATION WITH SMART CARD SYSTEM SMART PARKING MOBILE APPLICATION AUTOMATED PARKING FARE COLLECTION & PARKING INFORMATION DISPLAY SYSTEM PEDESTRIANI ZATION ALONG IMPORTANT LOCATIONS/C ORE CITY AREA

SWM SMART SOLUTIONS

PAYMENT OF PROPERTY TAX UTILITY MANAGEMENT BUILDING APPROVALS PROCUREMENT & MONITORING HEALTH & SANITATION LICENSES PERSONNEL MANAGEMENT E-GOVERNANCE UTILITY BILLS, COMPLAINT REDRESSAL: LINKED TO A CITIZEN APP (ONLINE & MOBILE BASED APP 3 ZONAL CITIZEN SERVICE KIOSKS

LEGEND INTEGRATED MAP Proposed Parking Proposed Areas for pedestrianization Proposed Bus Route CBD Area Pedestrianization Cycle Stations Cycling Network

PUBLIC BIKE SHARING A flexible public transport service involving creation of a dense network of cycle rental stations with ease of renting and returning cycles to and from any station in the system Source: urbancincy.com

PROPOSALS - PUBLIC BIKE SHARE SYSTEM Fully automated PBS System Stations spread across the 8.12sqkm area of the city with at least one station every 250m in the city Higher Station density in the Central Business District (Central Panjim), Panjim Market and St.Inez area than the rest of the city Details of the PBS system proposed: No of Cycles : 1044 Cycles No. of cycle stations : 66 stations (with 1560 Docks) Smart components of PBS will be implemented under Smart City Proposal

PUBLIC BIKE SHARE SYSTEM SMART ELEMENT SMART DOCKING SYSTEM : Docks themselves are designed to lock and unlock each cycle, rather than the terminal handling this function Card holders able to check out cycles at docks without use of terminals Indicates Bicycle availability for use and if properly locked when returned (It is recommended that the Panaji PBS system use Individual Docking units at all stations except for the large stations where Cycle Parking areas are recommended) CONTROL CENTRE: Real time monitoring, enabling the operator to track the availability of cycles at every station Data gathered can also be used to make long term planning decisions SOFTWARE SYSTEM: Software to support station monitoring, redistribution of bicycles, defect and maintenance issues, billing, and customer data Authorisation device on the docking station connected to the central control room through the IT system SMART CARDS Equipped with RFID technology, making it easy for the system to track the exact user The docking stations/ parking areas are equipped with smart card readers which lets the user unlock the cycle using the card (It is recommended that the operator and CCP in Panaji ensure that the payment system can handle not just card transactions but also cash transactions) WEBSITE + MOBILE PHONE APP: Enabling software to manage the interactions of the system with its users.

PUBLIC BIKE SHARE SYSTEM SMART ELEMENT Smart Docks Smart Payment Real time data monitoring - Control Centre

BUS TRANSPORT SMART ELEMENTS www.data-display.com Automatic Vehicle Location System (AVLS)/ GPS on buses republicanherald.com Passenger Information system (PIS) en.wikipedia.org Smart Signals Automated Fare collection system

PUBLIC TRANSPORT - SMART ELEMENTS AUTOMATIC VEHICLE LOCATION SYSTEM (AVLS)/ GPS ON BUSES Carried out through installation of GPS, transmits the location of the vehicle to central control room Enable development of Real Time Passenger Information services PASSENGER INFORMATION SYSTEM (PIS) FOR BUS STOPS Use of technologies to track the locations of buses in real time The information is used to generate predictions of bus arrivals at stops along the route information is disseminated to passengers by wired or wireless media SMART SIGNALS Technique to speed up bus public transport services at intersections (or junctions) with traffic signals Buses normally signal their impending arrival (via radio systems, for example) and on their arrival at the intersection receive a green light AUTOMATED FARE COLLECTION SYSTEM Integrated hand held ticketing machine with GPRS system

PROPOSALS FERRY SYSTEM Ferry line- 1: Panaji- Betim Ferry line- 2: Between both borders of the Mandovi Bridge. It was used when the Old Mandovi Bridge collapsed, now it is in disuse. Ferry line-3: Ribandar- Chorao Island Ferry line-4: Ribandar- Divar Island Ferry line-5: Old Goa- Divar Island Boat line from Dona Paula to Vasco Boat line from Panaji to Baga Boat line from Panaji to Old Goa New Ferry line from Reis Magos to Kala Academy Betim Panaji Ferry line should be maintained

PARKING STRATEGY SMART ELEMENTS Parking with display system and automatic collection system with mobile application development Smart Parking Application Display system and automatic collection

Thank You!