All bidders shall indicate in their bid/proposal that this Addendum has been received and considered in their bid proposal.



Similar documents
Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

From the Office of: MAHLUM ARCHITECTS 71 Columbia Street Floor 4 Seattle, WA 98104

TruexCullins Architecture Fairfield Center School Bid Documents Kitchen and Bathroom Renovation March 1, 2015

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

Estimating Database Checklist

ADDENDUM # 1 To: RFP for: Various Construction Maintenance & Repair Services

Gramercy Place Condo Association, Inc.

Rehab Inspection Report Page 1

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL Phone: (708) Fax: (708)

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

Building Permits Permit Counter

Substantial Improvement/Damage (FEMA 50% Rule) Frequently Asked Questions and Information

DOCUMENT ADDENDA ADDENDUM NUMBER ONE (1) A. Project Name: BHFC New Single Family Dwelling Unit Dahlia Circle

Home Inspection Report

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

Does Wall Township require an inspection by the building department on resale of a home?

Building Condition Assessment Report

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

A.C.E. Home Inspection Service St. Peters, MO (636)

ADDENDUM NO. 1. DATE: February 10, 2015 INVITATION FOR BID: IFB K Commerce Road Renovations Project DATED: February 9, 2015

Home Inspection Report

ELIGIBLE REPAIR PROJECT PARAMETERS

Building Condition Assessment Report

Estimator: Miami Estimates Business: (305) Date Entered: 04/30/2008

SECTION ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C.

2014 British Columbia Building Code Changes

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

PUBLIC MINUTES PROPERTY MAINTENANCE APPEALS BOARD. Wednesday, November 25, 2015, 3:46 p.m. Committee Room B, City Hall

REPAIRING YOUR HOME CONSTRUCTION LOAN PROCEDURES

THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM SHALL BECOME A PART OF THIS SOLICITATION. Amend Invitation to Bid 14-MC-2194 as follows:

REQUEST FOR PROPOSALS. Unit Make Ready Services for Public Housing for HOUSING AUTHORITY OF THE CITY OF MCKINNEY, TEXAS

Irvinton Village Apartments 2901 Fulton Houston, Texas Houston Housing Authority J. Allen Management Managing Agent

Total Home Inspection Checklist

Report Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10

SUMMARY OF WORK FOR GENERAL CONTRACTOR

YOU VE BEEN HIRED AS A GENERAL CONTRACTOR

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS

Vari Inspection Services

Mike and Jen Sample 111 Main St. Tabb, VA SPECIFICATION LIST

SWF Home Inspections

Inspecton Report. Property Address:

RFQ # PR Replace Kitchen Equipment in the CGR

PROPERTY INSPECTION REPORT

Stanley Neighborhood Series

SECTION NOTICE TO BIDDERS IVY TECH COLLEGE OF INDIANA NMC INFRASTRUCTURE IMPROVEMENTS INDIANAPOLIS, INDIANA

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Inspection Report. provided by: Delaware Property Inspection. Inspector: Richard Hiddemen (302)

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES

QUOTATION FOR EXAMPLE BATHROOM RENOVATION

Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN Phone (260) Sales Fax (260)

Point Auditorium Design Narrative PROJECT NAME: Point Auditorium DATE: 06/25/15 TO: Lance Francis FROM: Leslie Ellsworth

Additions and Alterations

Larry Haight's Residential Roofing Co, Inc NE 95th Street Redmond, Washington Phone: (425) Fax: (425)

IMPROVEMENT COST ESTIMATE powered by HomeFixers

Prestige Home Inspection LLC

#1) BEFORE Purchasing Land Here Is A Checklist Of Things You Should Check

Latigos Trail 911 Latigos Trail ~ Des Peres, Missouri $428,500

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

GeorgiaHomePros.com Yellow Creek Road Ball Ground, GA Inspected By: Scott Webb

Summit Series Single Section and Double Section Homes

Home Inspection Report

City of St. Charles Basement Finish or Remodel

Quality Home Inspections, LLC 4433 Tennyson Street Denver, Colorado

Name of course: Residential Construction Site Management (RCSM) Level 1

Home Energy Evaluation Report for Fritz Kreiss and Catherine McQueen

Windbrooke Townhome Association, Inc. Maintenance & Service Responsibility Chart

If you are a web registered user of ArlingontPermits.com you may also request an inspection at:

If there are any further questions with regards to the report or inspection, please call.

Cut Construction Costs: 20 Proven Techniques

COMPREHENSIVE PROPERTY INSPECTIONS

Pre-Drywall Inspection Report

Inspection Tech. (330) Inspected By: Aaron Westerburg

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

Inspection Report. Prepared For: Sampath Sample. Property Address: Waterside Drive. Alpharetta, GA Atlanta Home Inspections

Exhibit C: Scope of Work and Schedule of Deliverables

HOME INSPECTION REPORT

RICHARD B. HUDGENS ARCHITECT, INC.AIA

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

Inspecting to a higher standard.

TOWN OF MILFORD REQUEST FOR QUALIFICATIONS DESIGNER SERVICES FOR LIBRARY ROOF REPLACEMENT

Georgia Home Inspection Services

Structure Survey Findings:

VOLUME I PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

Cost of Repair Worksheet

Inspection Item COMMENTS

NOTICE TO CONTRACTORS

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

CHARLOTTE COUNTY Community Development Department

SEMINOLE COUNTY REHABILITATION STANDARDS FOR: NSP, HOME, CDBG and SHIP For New Construction, Re-Construction, and Rehabilitation Projects

Transcription:

Addendum #1 Fire Damage Repairs 4316 City View Terrace, Units A and B City View Terrace, OH5-13C, AMP 4 IFB #14-03 October 23, 2014 Greater Dayton Premier Management 400 Wayne Ave. Dayton, Ohio 45410 This Addendum modifies and shall become a part of the original Contract Documents and is hereby made part of the Bidding Documents for the referenced project. All bidders shall indicate in their bid/proposal that this Addendum has been received and considered in their bid proposal. The Addendum items are intended to supplement, clarify or correct parts of the bid proposal package. Items in the addendum shall take precedence over items corrected and shall be of equal value with items supplemented or clarified. Any questions in reference to this addendum must be directed, in writing, to: Jonathan Schaaf RDA Group Architects 7945 Washington Woods Drive Dayton, Ohio 45459 937.610.3440 937.610.3441 Fax jrs@rda-group.com Addendum Items: 1. Pre-Bid Meeting: Pre-Bid Meeting Minutes, agenda, and sign-in sheet have been attached to this addendum. 2. Contractors shall include $1,250 in their bid for the cost of permits. RDA has applied for the building permits with the City of Dayton. The contractor will pickup the permits and pay the applicable cost. 3. Clarification: All electrical wiring in the attic/ceiling space shall be removed/replaced or reworked as required by the removal of the existing roof system/structure. The intent is to provide a new installation matching the original. Contractor shall confirm all conditions as applicable. 4. Clarification: All existing plumbing vent stacks, HVAC flues, exhaust stacks, etc. shall be removed/replaced or reworked as required by the removal of the existing roof system/structure. The intent is to provide a new installation matching the original. Contractor shall confirm all conditions as applicable. Flash all roof penetrations watertight with new boots, flashing, etc. 5. Clarification: Existing wall mounted exterior lights at the rear entry shall remain. End of Addendum #1.

Pre Bid Conference Fire Damage Repairs 4316 City View Terrace, Units A and B City View Terrace, OH5-13C, AMP 4 IFB #14-03 October 16, 2014 Meeting Minutes Compiled by Jonathan Schaaf, RDA Group Architects A. Sign In. 1. Meeting was brought to order at 10:00 am by Roderick Long of GDPM. 2. Attendees signed in. B. Introductions 1. Individual attendees made introductions. C. Purpose of Pre-Bid Conference 1. Review bidding process 2. Review bidder requirements 3. Review project scope D. Discussion of Bidding Process 1. Bidders shall submit all forms and exhibits required in the bidder s packet. Be sure to notarize any forms that are noted as such. All forms shall be COMPLETELY filled out / completed. 2. Refer to exhibits for specific requirements for MBE/DBE/Section 3 participation. a. Rod Long reviewed the Section 3 and MBE participation requirements for the contract. Follow forms and information provided in the bid documents. b. Refer any questions regarding requirements to GDPM. 3. Schedule: a. Questions from Contractors October 23, 2014 b. Response from Architect October 27, 2014 c. Bid Opening November 3, 2014 at 3:00 pm at GDPM Central Office. d. Board Update November 19, 2014 e. Notice to Proceed issued November 2014 4. Contractors shall check the GDPM and MRC Reprographics [mrcrepro.com] website for any addendums and/or clarifications. All must be acknowledged on the bid form. a. MRC will notify all registered plan holders by email of any addenda, etc. b. It is the responsibility of the bidder to confirm addenda. Feel free to contact RDA or MRC to confirm if any addenda have been issued. 5. Bid Documents are available at MRC Reprographics and at mrcrepro.com 6. MRC Reprographics is holding the plan holders list and will distribute any addendums. E. Discussion of the plans and specifications 1. Work of the Project includes the fire damage repairs to 2 housing units [4316 Cityview Terrace Units A & B] at Cityview Terrace. No change to unit configuration/composition. a. Exterior Building Improvements: 1. Remove existing roof structure, roof system, fascias, and soffits complete. 2. Installation of a new pre-engineered wood truss roof system at half of the building [units A and B]. 3. Installation of new wood sheathing, fire rated sheathing, underlayment, shingle roof, and flashing/accessories. 4. Installation of new aluminum gutters, connect to existing downspouts.

5. Installation of new fiber cement fascias, vented soffits, and trim. 6. Other exterior work related to the scope as defined. 7. Painting of affected building components. b. Interior Improvements: 1. Remove all remaining interior finishes [plaster/gypsum board] to expose framing in all locations. Remove batt insulation from wall cavities. 2. Remove other existing components as required by the work. Note that most demolition has been previously completed by others. 3. Spray seal all exposed framing members. 4. Repair all fire damaged wood framing members in like kind. 5. Install new batt insulation at the walls and blown in insulation at attic. 6. Install new gypsum board wall and ceiling finishes throughout. 7. Repair or replacement of any deteriorated/damaged framing or finishes. 8. Install new plumbing, mechanical, and electrical rough ins as scheduled. 9. Installation of kitchen cabinets, countertops, appliances, and accessories. 10. Installation of new bathroom plumbing fixtures, finishes, and accessories. 11. Installation of new interior doors, frames, and casing. 12. Installation of new interior trim components. 13. Installation of new floor finishes. 14. Painting of all non-prefinished building components. 15. Repair existing vinyl windows to remain. 16. Installation of new interior window shades. 17. Plumbing system modifications. 18. Install new water heaters. 19. Install new washer and dryer hookups. 20. Modify existing, install new HVAC / ductwork system. 21. Install new high-efficiency HVAC system. 22. Install new electrical fixtures and devices and associated wiring. 23. Modify existing load centers and upgrade as indicated. 24. Electrical system modifications for arc-fault, tamper resistant, and ground fault improvements. 25. Protect any finishes scheduled to remain. 26. Final cleaning. 2. Bid Form/Submission: a. Bidders need to fill out the bid form in its ENTIRETY. The project will be awarded to one contractor based upon the total base bid with consideration of the alternates identified. b. Bidder shall fill out appropriate unit costs, overhead & profit, and completion information requested. Failure to include the unit costs on the bid form may deem the bid non-responsive. c. Refer to the bid form and specifications for the alternates identified for the project. d. Bid submissions shall be stapled or clipped with a binder clip. Please do not bind them. 3. The time of completion for the project is 60 days. Refer to the breakdown of the contract period to ensure that there is adequate time for Punchlist and project closeout. 4. Project schedule: Other units in the building will be occupied for the duration of the project.

End. a. Bidders shall take the appropriate action for protection of work, protection of residents / furnishings, etc. when completing work. 5. Substitutions need to be submitted by the general contractor no later than October 23 for review by the architect. After this date, RDA Group Architects will expect to see the products specified in the contract documents during shop drawing review. If a product is submitted that was not included in the contract documents, RDA Group Architects has the right to reject that submittal. 6. All project questions and substitution requests shall be directed to RDA Group Architects and be submitted thru a bidding contractor. 7. Products: Contractors shall utilize American Products to the extent possible. 8. Temporary utilities: by Contractor 9. Contractor shall provide a portable toilet for contractor use. 10. Contractor shall provide all required safety measures while working on the buildings to maintain safe ingress and egress from the units and around the project site. 11. The project site will have a strict NO SMOKING policy. 12. All change orders must be fully executed prior to completing any additional work. GDPM will try to process the change order as quickly as possible, typically within 3 days after receipt of the contractors proposal. 13. Wage Rates: This is a Davis Bacon prevailing wage project. Refer to the wage rates included in the bid documents. The contractor will be required to submit payroll reports for the project. 14. Submittals shall be electronic, PDF. F. Questions [will be noted in the addendum] G. Closing 1. Addendums will be issued as necessary to clarify the work of the project. Acknowledge receipt of addenda on the Bid Form. 2. MRC Reprographics is maintaining the plan-holders list for the project. H. The meeting adjourned.