HV AC CODE CHECKLISTS



Similar documents
GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL (352) ; FAX: (352)

Arapahoe County Residential Water Heater Installation and Inspection Guide

HVAC INSTALLATION SUCCESS WITH 2012 IECC DELAWARE. for Builders & Trades. Recommended Practices for Optimized Energy Savings

HVAC INSTALLATION. Success with 2015 IECC Northeast & Mid-Atlantic. Checklist for Builders & Trades

BUILDING SAFETY UNIT

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

2010 Residential Water Heater Replacement Check List

HVAC Code Requirements

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

Single Family Residential Basement Finish

Land Use and Environmental Service Agency (Code Enforcement) NC Plumbing Code. Table of Contents

CITY OF FAIRFAX CODE ADMINISTRATION / FAX

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL (352) ; FAX: (352)

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL Phone: (708) Fax: (708)

2. What building projects are exempted? (permit not required)

Uniform Construction Code (UCC) Building Permit Application Package

DESIGN AND INSTALLATION OF RESIDENTIAL FLEXIBLE DUCTWORK SYSTEMS

Georgia Association of Home Inspectors

Plumbing. Helpful Hints Residential Construction. Lincoln County. Bert Polk Plumbing Inspector

2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property

Development Services City of Lawrence, KS

4 Installation Requirements

ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS:

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS

This permit does not include replacement or upgrading of the existing electrical panel or service (a separate electrical permit must be obtained).

CLARK COUNTY DEPARTMENT OF BUILDING COMMERCIAL PLUMBING AND MECHANICAL INSPECTION CHECKLISTS 2006 CODE

GENERAL ELECTRICAL REQUIREMENTS

H:\forms\handouts\bldg049 1 of 11 Revised Mar 2/15/dh

Preparation for 2015 Residential Code Changes Discussion with Local Builders and Designers

2014 British Columbia Building Code Changes

IECC Compliance Guide for Homes in Virginia

GUIDELINES FOR WIRING SINGLE FAMILY DWELLING UNITS

Building Performance Solutions HVAC Design Guide, 2007

Basement Development Construction requirements for the development of basements in residential dwellings.

The Closed Crawl Space: Making the Transition Climate Zones 3A & 4A

Chapter 8. Duct Design and Sealing

Residential Foundations and Basements

GENERAL WIRING RULES FOR HOUSES

City of St. Charles Basement Finish or Remodel

Building Code Inspections and Fees

PLUMBING ROUGH IN INSPECTION

Report for. Dick and Jane Homeowner Lovers Lane, Houston, Texas 77000

Excerpts from the Canadian National Building Code (NBC)

PLAN REVIEW SERVICES CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW

Category Measure Minimum Efficiency / Certification Requirements

DUCT SYSTEM DESIGN CONSIDERATIONS Part 1

City of Elk River BASEMENT Office Use Only

FLORIDA BUILDING CODE MECHANICAL Revisions

STATE OF FLORIDA HOME INSPECTION STANDARDS OF PRACTICE:

RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS

BUILDING PERMIT SPECIFICATIONS

) SIGNIFICANT CHANGES INCLUDING CODE COMMENTARY

#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist

Plumbing Installations. A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling

Questions and Answers for Heating and A/C Contractors

How To Build A Basement House

BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/20/2009)

Home Energy Evaluation Report for Fritz Kreiss and Catherine McQueen

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

GAS PIPING INSTALLATIONS

WMSLW / WMBLWH Series Hydronic Upflow/Horizontal Left or Right, Heating and Cooling Air Handler

Cooktop Low-Profile Ventilation Hoods

RESIDENTIAL ELECTRICAL REQUIREMENTS (REVISED 3/28/2008) PERMIT REQUIREMENTS:

2006 Codes. Please verify the following before calling for inspection

Cooling Capacity CFM in. w.c. (125 Pa)

Orlando Home Inspection Services

Additions and Alterations

INSTALLATION INSTRUCTIONS FOR INTERNATIONAL 9000 SERIES ROOF TOP AIR CONDITIONERS

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM

CHAPTER 4 VENTILATION

INSPECTION PROPERTY ADDRESS: Fort Bend County, Texas

SECTION MORTUARY REFRIGERATORS

Vision Home Inspection

Building Permit Application

Residential Electrical Inspection. Checklist

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

SIGNIFICANT CHANGES to the 2015 Minnesota Residential Codes (MR 1303, 1309 and 1322)

Natural Gas Appliance Testing Action Guidelines (Non ESA/Low Income 5 )

PDmB, Inc. Definitions

Top 10+ Mistakes of DWV plumbing design

Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling

Building Department John Fiedler Construction Official Ext SAMPLE GUIDE FOR 1&2 FAMILY DWELLING BASEMENTS Rev

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,

HVAC Checklist - Long Form

Applications for building permits will not be reviewed until all of the required information has been submitted.

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS

State of Connecticut Department of Public Health RADON PROGRAM

I NI NP R Inspected Items

DRYER VENTING SPECIFICATIONS DRYER SAFETY

Dennis Fire Department Fire Prevention Mark Dellner Fire Chief

800 Communications Circuits

2012 NC Mechanical Code

Builder Specifications for Solar Ready Homes

FINISHED BASEMENT REQUIREMENT GUIDE

Inspecton Report. Property Address:

Evaluate, Clean, and Tune Guidance

October 5, 2015 Dear Client,

energy-saving checklist a guide for rental property owners

Design Options (Tradeoffs) Allowed by the 2012 Building Codes for Properties with Sprinkler Systems. April 2013

INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1

Transcription:

The following text is informational only and shall serve as an informational guide for HV AC contractors, journeymen, and apprentices working in the Heating, Ventilation, and Air Conditioning industry. This document shall NOT be used as a replacement for the 2007 Kentucky Residential Code or 2007 Kentucky Building Code. In accordance with the 2007 Kentucky Residential Code, final interpretation and authority with regard to this text is granted to the inspector. (see IRC R1 04.1) Furthermore, as emphasized in the 2007 Kentucky Building Code, all Heating Ventilation, and Air Conditioning work shall be conducted, installed, and completed in a workmanlike and acceptable manner so as to secure the results intended by the code. HV AC CODE CHECKLISTS Residential Package Dual-Fuel Heat Pump Checklist Ducts 1. Verify unobstructed return duct size from return air openings to unit. Must be a minimum of six (6) sq. in. per 1000 btu 'sfor heat pumps. (Per IRC M1403.1) 2. Verify that return is equipped with a filter allowing even distribution of air flow across the filter. (Per IMC 605.1.3) 3. Verify return path to central return with transfer grills, undercut doors or individual returns. (Per Manual D 1-9) 4. Verify return air is not being taken from any of the following: closet, bathroom, toilet room, kitchen, garage, mechanical room, furnace room, or other dwelling units. (Per IRC M1602.2(4)) 5. Verify supply duct sizing. If design is questionable, a Manual D must be provided. (Per IRC M1601.1) 6. Verify no duct openings are located in garage. Any duct passing through a garage must be 26-guage steel. (Per IRC R309.1.1) 7. Verify supply and return ducts are four inches (4") off the ground. (Per IRC M1601.3.6) 8. Verify all exterior ducts are protected against the elements. (Per IRC M1601.3.4(2)) 9. Verify if vibration isolators are required by MIl. If required, they are not to exceed ten inches (10") in length. (Per IRC 1601.2.2) 10. Verify all joints are sealed on both supply and return ducts with approved tapes or mastics. (Per IRC M1601.3.1) 11. Verify all ducts, supply, return, panning, runs and boots, are insulated to R-4 in unconditioned areas. (Per IRC Nll03.2.1) Insulation has been revised from R-8 to R-4 by the 2007 Kentucky Residential code. 12. Verify penetration of foundations with ducts is rodent proof. (Per IRC 2404.9) 13. Verify all flex ducts are installed as per MIl and are as straight as possible, strapped every four to five feet (4-5') with one and a half inch (1-1/2") wide straps and no kinks or sharp bends. (Per MIl and, ADC) 14. Verify all metal ducts are strapped every ten feet (10'). (Per IRC MI601.3.2) 15. Verify all fire rated assembles penetrated with duct on boots are "fire blocked" with approved fire block material. (Per IRC R602.8(4)) 16. Verify dryer ducts are limited to twenty-five feet (25') in length. One ninety (90) degree = five feet (5'). One forty-five (45) degree = two and a half feet (2 Yz'). Shall be metal with no screws which extend into the duct. (Per IRC M1502.5-2.6) 40

17.'Verify dryer duct terminates to the outside of the building and not less than three feet (3') in any direction from any opening into the building. Duct termination must be equipped with back draft damper and shall not be screened. (per IRC MI502.2) 18. If kitchen exhaust is used, a minimum of one hundred (l00) cfm intermittent, twenty-five (25) cfrn continuous. (Per IRC MI507.3) 19. Verify bathroom exhaust is fifty (50) cfrn intermittent, twenty (20) cfm continuous if no operable windows. (per IRC MI507.3) 20. Verify bathroom exhaust duct is a class 1 or class 0 type ducts and must exhaust to the outside of the building/structure. (per IRC M1601.1.I(2), M1507.2) Drilling and Notching 1. Wood-framed structural members shall be drilled, notched, or altered in accordance with the provisions of sections IRC R502.8, IRC R602.6, IRC R602.6.1, and IRC R802.7. Steel-Framed, load bearing members shall be permitted only in accordance with sections IRC R505.2, IRC R603.2, IRC R804.2, and IRC M1308.1. 2. Any piping through rafters, joists, or studs shall be kept one and a half inches (1.5") from any edge. (Per IRC M1308.2) Equipment 1. Verify heating and cooling equipment and appliances are installed in accordance with the MIl and the requirements of this code. (Per IRC M1401.I) 2. Verify heating and cooling equipment is sized based on building loads calculated in accordance with ACCA Manual J or other approved methods. (per IRC MI401.3) 3. Verify manufacturer's instructions are with appliances and were followed. (Per IRC M1307.I) 4. Verify outside equipment is on a level concrete slab or other approved materials. (per IMC 304.9) 5. Verify heat pumps are three inches (3") off the pad. (Per IRC MI403.2) 6. Verify clearances around equipment. (Per MIl) 7. Verify disconnect is installed and all wiring is protected by conduit on outside equipment. (Per IRC E400 1.5 table and NEC) 8. Verify thermostat wires are protected to resist sunlight and physical damage. (Per IRC E3702.3.2-3.3) 9. Verify a condensate trap is installed. (Per MIl and IMC 307.2.4) 10. Verify breakers are sized as per equipment data plate. (Per MIl and NEC) 11. Verify wiring is sized for maximum load. (Per NEC) Gas 1. Verify gas shut-off is installed within six feet (6') of appliance. (Per IRC G2420.5) 2. Verify sediment trap is installed. Note: ranges and clothes dryers do not need one. (Per IRC G2419.4) 3. Verify hard pipe is used to access exterior of appliance cabinet. (per IRC G2422.1.2.3) Residential Package Heat Pump Checklist Ducts 1. Verify unobstructed return duct size from return air openings to unit. Must be a minimum of six (6) sq. in. per 1000 btu 'sfor heat pumps. (Per IRC MI403.1) 2. Verify return is equipped with a filter allowing even distribution of air flow across the filter. (Per IMC 6.05.1.3) 41

3. Verify return path to central return with transfer grills, undercut doors or individual returns. (Per Manual D 1-9) 4. Verify return air is not being taken from any of the following: closet, bathroom, toilet room, kitchen, garage, mechanical room, furnace room, or other dwelling units. (Per IRCMI602.2(4)) 5. Verify supply duct sizing. If design is questionable, a Manual D must be provided. (Per IRC M1601.1) 6. Verify no duct openings in garage. Any duct passing through a garage must be 26-gauge steel. (Per IRC R309.1.1) 7. Verify supply and return ducts are four inches (4") off the ground. (Per IRC MI601.3.6) 8. Verify all exterior ducts are protected against the elements. (Per IRC M1601.3.4(2)) 9. Verify if vibration isolators are required by MIL If required, they are not to exceed ten inches (10") in length. (per IRC 1601.2.2) 10. Verify all joints are sealed on both supply and return ducts with approved tapes or mastics. (Per IRC MI601.3.l) 11. Verify all ducts, supply, return, panning, runs and boots, are insulated to R-4 in unconditioned areas. (Per IRC Nll03.2.l) Insulation has been revised from R-8 to R-4 by the 2007 Kentucky Residential code. 12. Verify penetration of foundations with ducts is rodent-proof. (Per IRC G2404.9) 13. Verify all flex ducts are installed as per MIl and are as straight as possible, strapped every four to five feet (4'-5') with one and a half inch (1-1/2") wide straps with no kinks or sharp bends. (Per MIl and ADC) 14. Verify all metal ducts are strapped every ten feet (10'). (Per IRC Ml601.3.2) 15. Verify all fire rated assembles penetrated with duct or boots are "fire blocked" with approved fire block material. (Per IRC R602.8(4)) 16. Verify dryer ducts are limited to twenty-five feet (25') in length. One 90 degree = five feet (5'). One 45 degree = two and a half feet (212'). Shall be metal with no screws which extend into the duct. (Per IRC MI502.5-2.6) 17. Verify dryer duct terminates to the outside of the building and not less than three feet (3') in any direction from any opening into the building. Duct termination must be equipped with back draft damper and shall not be screened. (Per IRC MI502.2) 18. If kitchen exhaust is used, a minimum of one hundred (100) cfm intermittent, twenty-five (25) cfm continuous. (Per IRC M1507.3) 19. Verify bathroom exhaust is fifty (50) cfm intermittent, twenty (20) cfm continuous ifno operable windows. (Per IRC M1507.3) 20. Verify bathroom exhaust duct is a class 1 or class 0 type ducts and must exhaust to the outside of the building/structure. (Per IRC M1601.1.1(2), M1507.2) Drilling and Notching 1. Wood-framed structural members shall be drilled, notched, or altered in accordance with the provisions of sections IRC R502.8, IRC R602.6, IRC R602.6.l, and IRC R802.7. Steel-Framed, load bearing members shall be permitted only in accordance with sections IRC R505.2, IRC R603.2, IRC R804.2, and IRC M130S.1. 2. Any piping through rafters, joists, or studs shall be kept one and a half inches (1.5") from any edge. (Per IRe M1308.2) 42

Equipment I. Verify heating and cooling equipment and appliances are installed in accordance with the MIl and the requirements of this code. (per IRC MI401.1) 2. Verify heating and cooling equipment is sized based on building loads calculated in accordance with ACCA Manual J or other approved methods. (per IRC MI401.3) 3. Verify manufacturer's instructions are with appliances and were followed. (Per IRC MI307.1) 4. Verify outside equipment is on a level concrete slab or other approved materials. (Per IMC 304.9) 5. Verify heat pumps are three inches (3") off the pad. (Per IRC MI403.2) 6. Verify clearances around equipment. (per MIl) 7. Verify disconnect is installed and all wiring is protected by conduit on outside equipment. (Per IRC E4001.5 table and NEC) 8. Verify thermostat wires are protected to resist sunlight and physical damage. (per IRe E3702.3.2-3.3) 9. Verify a condensate trap is installed. (per MIl and!mc 307.2.4) 10. Verify total KW of heat strips. (Per MIl) 11. Verify breakers are sized as per equipment data plate. (Per MIl and NEC) 12. Verify wiring is sized for maximum load. (Per NEC) Residential Split- 80% Furnace with Air Checklist Ducts I. Verify that return is equipped with a filter allowing even distribution of air flow across the filter. (Per IMC 605.1.3) 2. Verify return air is not being taken from any ofthe following: closet, bathroom, toilet room; kitchen, garage, mechanical room, furnace room, or other dwelling units. (per IRC MI602.2(4) 3. Verify return path to central return with transfer grills, undercut doors or individual returns. (Per Manual D 1-9) 4. Verify supply duct sizing. If design is questionable, a Manual D must be provided. (per IRC MI60 1.1) 5. Verify no duct openings are located in garage. Any duct passing through a garage must be 26-guage steel. (per IRC R309.1.I) 6. Verify supply and return ducts are four inches (4") off the ground. (Per IRC MI601.3.6) 7: Verify if vibration isolators are required by MIl. Ifrequired, they are not to exceed ten inches (10") in length. (Per IRC 1601.2.2) 8. Verify all joints are sealed on both supply and return ducts with approved tapes or mastics. (Per IRC MI601.3.1) 9. Verify all ducts, supply, return, panning, runs and boots, are insulated to R-4 in unconditioned areas.. (per IRC Nll 03.2.1) Insulation has been revised from R-8 to R-4 by the 2007 Kentucky Residential code. 10. Verify all flex ducts are installed as per MIl and are as straight as possible, strapped every four to five feet (4-5') with one and a half inch (1-1/2") wide straps and no kinks or sharp bends. (Per MIl and ADC) II. Verify all metal ducts are strapped every ten feet (10'). (per IRC MI601.3.2) 12. Verify all fire rated assembles penetrated with duct or boots are "fire blocked" with approved fire block material. (per IRC R602.8(4) 13. Verify dryer ducts are limited to twenty-five feet (25') in length. One ninety (90) degree = five feet (5'). One forty-five (45) degree = two and a half feet (2 Yz'). Shall be metal with no screws which extend into the duct. (Per IRe MI502.5-2.6) 43

14. Verify dryer duct terminates to the outside of the building and not less than three feet (3') in any direction from any opening into the building. Duct termination must be equipped with back draft damper and shall not be screened. (Per IRC M1502.2) 15. If kitchen exhaust is used, a minimum of one hundred (100) cfm intermittent, twenty-five (25) cfm continuous. (Per IRC M1507.3) 16. Verify bathroom exhaust is fifty (50) cfm intermittent, twenty (20) cfm continuous if no operable windows. (Per IRC M1507.3) 17. Verify bathroom exhaust duct is a class 1 or class 0 type ducts and must exhaust to the outside of the building/structure. (per IRC M1601.1.1(2), M1507.2) Drilling and Notching 1. Wood-framed structural members shall be drilled, notched, or altered in accordance with the provisions of sections IRC R502.8, IRC R602.6, IRC R602.6.1, and IRC R802.7. Steel-Framed, load bearing members shall be permitted only in accordance with sections IRC R505.2, IRC R603.2, IRC R804.2, and IRC M1308.1. 2. Any piping through rafters, joists, or studs shall be kept one and a half inches (1.5") from any edge. (Per IRC Ml308.2) Equipment 1. Verify heating and cooling equipment and appliances are installed in accordance with the MIl and the requirements ofthis code. (Per IRC M1401.1) 2. Verify heating and cooling equipment is sized based on building loads calculated in accordance with ACCA Manual J or other approved methods. (Per IRC M1401.3) 3. Verify manufacturer's instructions are with appliances and were followed. (Per IRC Ml307.l) 4. Verify equipment in a garage with an ignition source is raised 18" above the floor. (Per IRC M1307.3) 5. Verify equipment in garage is protected from impact. (Per IRC M1307.3.1) 6. Verify appliances located in compartments, alcoves, basements, or similar spaces have an unobstructed passageway that is 22" wide with a level service space of thirty by thirty inches (30"x30") in front of the appliance door. (Per IRC M1305.1.2) 7. Verify equipment located within compartments or alcoves are at least twelve inches (12") larger than the appliance. (Per IRC M1305.1.1) 8. Verify outside equipment is on a level concrete slab or other approved materials. (Per IMC 304.9) 9~ Verify outdoor equipment is installed three inches (3") above finished grade and is in accordance with MIl. (Per IRC M1308.3) 10. Verify disconnect is installed and all wiring is protected by conduit on outside equipment. (Per IRC E400 1.5 table and NEC) 11. Verify thermostat wires are protected to resist sunlight and physical damage. (Per IRC E3702.3.2-3.3) 12. Verify a condensate trap is installed. (Per MIl and IMC 307.2.4) 13. Verify breakers are sized as per equipment data plate. (Per MIl and NEC) 14. Verify wiring is sized for maximum load. (Per NEC) Combustion Air 1. Verify combustion air is not being taking from any of the following: sleeping rooms, bathrooms, or toilet rooms. (per IRC M1701.4) 2. Verify combustion air method follows manufacturer's instructions. 44

3. The following are some examples of approved combustion air methods: IRe M1702.1 Volume of space in which appliance is installed is greater than 50 cubic feet per 1000 btu's IRe M1702.2 Confined space "using adjacent spaces:" one opening within 12" of the ceiling and one within 12" of the floor but not less than 100 sq. inches. IRe M1703.2 Outside combustion air supplied through openings or ducts, one opening within 12" of the ceiling and one within 12" of the floor, connecting directly with the crawl and attic space. IRe M1703.2.1 Openings communicating directly with the outdoors through vertical ducts: each opening shall have 1 sq. inch per 4000 btu's. IRe, M1703.2.1 Horizontal ducts communicating with the outdoors: each opening shall have 1 sq. inch per 2000btu's. IRe M1703.4-M1703.2(4) Under-floor combustion air using foundation louvers must be 1 sq. inch per 4000 btu's. Venting 1. Verify venting type and method of venting. (Clearance to combustibles, number of appliances connected, horizontal length, 1/4" per foot rise, roof penetration height, etc.) Determine also if chimney liner is needed or required. (Per 2009 NFPA-54) Gas 1. Verify gas shut offis installed within six feet (6') of appliance. (Per IRC G2420.5) 2. Verify sediment trap is installed. Note: ranges and clothes dryers do not need one. (per IRC G2419.4) 3. Verify hard pipe is used to access exterior of appliance cabinet. (PerIRC G2422.1.2.3) Attic Appliances 1. Verify appliances in attics have a minimum 20"x30" clear opening or large enough to remove the largest appliance. Must have an unobstructed passageway of 22" wide & 30" high, no farther away than 20'. A level working space must be provided, 30"wide x 30" deep where access is required. If the passageway is not less than 6' high the appliance can be moved back to 50' away. (Per IRC M1305.1.3 (2)) 2. Verify a light controlled by a switch at the opening and a receptacle near the appliance. (per IRC M1305.1.4.3) 3. Verify primary drain line IS installed to discharge condensate to an approved place for disposal. (per MIl and IRC M1411.3) 4. Verify an auxiliary drain pan is installed under the appliance and is one and a half inches (1 W') deep and three inches (3") wider than the appliance. The pan shall drain to a conspicuous switch, or other approved method. (Per IRC M1411.3.1(1)) 5. Verify a condensate trap is installed. (per MIl and IMC 307.2.4) 6. Verify disconnecting means. (Per IRe E4001.5 table) 7. Verify breakers are sized as per equipment data plate. (Per MIl and NEC) 8. Verify wiring is sized for maximum load. (Per NEC) location, a float Under Floor Appliances 1. Verify appliances under floors have a 22"x30" rough opening or large enough to remove the largest appliance. Must have an unobstructed passageway of 22" wide and 30"high and be no farther away than 45

20'. A level working space must be provided that is 30"wide x 30"deep where access is required. If the passageway is not less than six feet (6') high, the appliance has an unlimited distance. (Per IRC M1305.1.4) 2. Verify a light controlled by a switch at the opening and a receptacle near the appliance. (Per IRC M1305.1.4.3) 3. Verify appliances supported from the ground are on a level concrete slab. Appliances suspended from the floor must have a clearance of six inches (6") from the ground. (Per IRC M13 05.1.4.1) 4. Verify a primary drain line is installed to discharge condensate to an approved location. (Per IRC M1411.3) 5. Verify a condensate trap is installed. (Per MIl and IMC 307.2.4) 6. Verify disconnecting means. (Per IRC E4001.5 table) 7. Verify breakers are sized as per equipment data plate. (Per MIl and NEC) 8. Verify wiring is sized for maximum load. (per NEC) Residential Dual-Fuel Split Heat Pump Checklist Ducts 1. Verify unobstructed return duct size from return air openings to unit. Must be a minimum of six (6) sq. in. per 1000 btu 'sfor heat pumps. (Per IRC M 1403.1) 2. Verify that return is equipped with a filter allowing even distribution of air flow across the filter. (per IMC 605.1.3) 3. Verify return path to central return with transfer grills, undercut doors or individual returns. (Per Manual D 1-9) 4. Verify return air is not being taken from any of the following: closet, bathroom, toilet room, kitchen, garage, mechanical room, furnace room, or other dwelling units. (Per IRC MI602.2(4)) 5. Verify supply duct sizing. If design is questionable, a Manual D must be provided. (Per IRC MI601.1) 6. Verify no duct openings are located in garage. Any duct passing through a garage must be 26-guage steel. (Per IRC R309.1.1) 7. Verify supply and return ducts are four inches (4") off the ground. (Per IRC MI601.3.6) 8. Verify all exterior ducts are protected against the elements. (Per IRC MI601.3.4(2)) 9. Verify if vibration isolators are required by MIL If required, they are not to exceed ten inches (10") in length. (PerIRC 1601.2.2) 10. Verify all joints are sealed on both supply and re~ ducts with approved tapes or mastics. (Per IRC MI601.3.1) 11. Verify all ducts, supply, return, panning, runs and boots, are insulated to R-4 in unconditioned areas. (Per IRC Nll03.2.1) Insulation has been revised from R-8 to R-4 by the 2007 Kentucky Residential code. 12. Verify all flex ducts are installed as per MIl and are as straight as possible, strapped every four to five feet (4-5') with one and a half inch (1-112") wide straps and no kinks or sharp bends. (Per MIl and ADC) 13. Verify all metal ducts are strapped every ten feet (10'). (Per IRC MI601.3.2) 14. Verify all fire rated assembles penetrated with duct or boots are "fire blocked" with approved fire block material. (Per IRC R602.8( 4)) ** Verify dryer ducts are limited to twenty-five feet (25') in length. One ninety (90) degree = five feet (5'). One forty-five (45) degree = two and a half feet (2 Y2'). Shall be metal with no screws which extend into the duct. (Per IRC MI502.5-2.6) 46

15. Verify dryer duct terminates to the outside of the building and not less than three feet (3 ') in any direction from any opening into the building. Duct termination must be equipped with back draft damper and shall not be screened. (Per IRC M1502.2) 16. If kitchen exhaust is used, a minimum of one hundred (l00) cfm intermittent, twenty-five (25) cfm continuous. (Per IRC MI507.3) 17. Verify bathroom exhaust is fifty (50) cfm intermittent, twenty (20) cfm continuous if no operable windows. (Per IRC M1507.3) 18. Verify bathroom exhaust duct must be a class 1 or class 0 type ducts & must exhaust to the outside. IRC,M1601.1.l(2) & IRC, M1507.2 Drilling and Notching 1. Wood-framed structural members shall be drilled, notched, or altered in accordance with the provisions of sections IRC R502.8, IRC R602.6, IRC R602.6.1, and IRC R802.7. Steel-Framed, load bearing members shall be permitted only in accordance with sections IRC R505.2, IRC R603.2, IRe R804.2, and IRC M1308.1. 2. Any piping through rafters, joists, or studs shall be kept one and a half inches (1.5") from any edge. (Per IRC M1308.2) Equipment 1. Verify heating and cooling equipment and appliances are installed in accordance with the MIl and the requirements of this code. (Per IRC MI401.1) 2. Verify heating and cooling equipment is sized based on building loads calculated in accordance with ACCA Manual J or other approved methods. (Per IRC MI401.3) 3. Verify manufacturer's instructions are with appliances and were followed. (Per IRC M1307.l) 4. Verify equipment in a garage with an ignition source is raised 18" above the floor. (Per IRe M1307.3) 5. Verify equipment in garage is protected from impact. (per IRC M1307.3.1) 6. Verify appliances located in compartments, alcoves, basements, or similar spaces have an unobstructed passageway that is 22" wide with a level service space of thirty by thirty inches (30"x30") in front of the appliance door. (Per IRe M1305.1.2) 7. Verify equipment located within compartments or alcoves are at least twelve inches (12") larger than the appliance. (Per IRC MI305.1.1) 8. Verify condensate drain is protected from freezing. 9. Verify a condensate trap is installed. (per MIl and IMe 307.2.4) 10. Verify outside equipment is on a level concrete slab or other approved materials. (Per IMC 304.9) 11. Verify heat pumps are three inches (3") off the pad. (Per IRe MI403.2) 12. Verify disconnect is installed and all wiring is protected by conduit on outside equipment. (Per IRC E400I.5 table and NEC) 13. Verify thermostat wires are protected to resist sunlight and physical damage. (Per IRC E3702.3.2-3.3) 14. Verify breakers are sized as per equipment data plate. (Per MIl and NEe) 15. Verify wiring is sized for maximum load. (Per NEe) Combustion Air 1. Verify combustion air is not being taking from any of the following: sleeping rooms, bathrooms, or toilet rooms. (Per IRC MI701.4) 2. Verify combustion air method follows manufacturer's instructions. 47

Venting 1. Verify venting follows manufacturer's instructions. Gas 1. Verify gas shut off is installed within six feet (6') of appliance. (Per IRC G2420.5) 2. Verify sediment trap is installed. Note: ranges and clothes dryers do not need one. (Per IRe G2419.4) 3. Verify hard pipe is used to access exterior of appliance cabinet. (Per IRe G2422.1.2.3) Attic Appliances Verify appliances in attics have a minimum 20"x30" clear opening or large enough to remove the largest appliance. Must have an unobstructed passageway of 22" wide & 30" high, no farther away than 20'. A level working space must be provided, 30"wide x 30" deep where access is required. If the passageway is not less than 6' high the appliance can be moved back to 50' away. (Per IRe M1305.1.3 (2)) 1. Verify a light controlled by a switch at the opening and a receptacle near the appliance. (Per IRe M1305.1.4.3) 2. Verify primary drain line is installed to discharge condensate to an approved place for disposal. (Per MIl and IRC M1411.3) 3. Verify an auxiliary drain pan is installed under the appliance and is one and a half inches (1 12") deep and three inches (3") wider than the appliance. The pan shall drain to a conspicuous location, a float switch, or other approved method. (Per IRC M1411.3.1 (1) 4. Verify a condensate trap is installed. (Per MIl and IMC 307.2.4) 5. Verify disconnecting means. (Per IRC E4001.5 table) 6. Verify breakers are sized as per equipment data plate. (Per MIl and NEC) 7. Verify wiring is sized for maximum load. (per NEC) Under Floor Appliances 1. Verify appliances under floors have a 22"x30" rough opening or large enough to remove the largest appliance. Must have an unobstructed passageway of22" wide and 30"high and be no-farther away than 20'. A level working space must be provided that is 30"wide x 30"deep where access is required. If the passageway is not less than six feet (6') high, the appliance has an unlimited distance. (Per IRC M1305.1.4) 2. Verify a light controlled by a switch at the opening and a receptacle near the appliance. (Per IRC M1305.1.4.3) 3. Verify appliances supported from the ground are on a level concrete slab. Appliances suspended from the floor must have a clearance of six inches (6") from the ground. (Per IRC M1305.1.4.1) 4. Verify a primary drain line is installed to discharge condensate to an approved location. (Per IRC M1411.3) 5. Verify a condensate trap is installed. (Per MIl and IMC 307.2.4) 6. Verify disconnecting means. (Per IRC E4001.5 table) 7. Verify breakers are sized as per equipment data plate. (Per MIl and NEC) 8. Verify wiring is sized for maximum load. (Per NEC) 48

Residential Package Gas Pack Checklist Ducts 1. Verify that return is equipped with a filter allowing even distribution of air flow across the filter. (Per IMC 605.1.3) 2. Verify return path to central return with transfer grills, undercut doors or individual returns. (Per Manual D 1-9) 3. Verify return air is not being taken from any of the following: closet, bathroom, toilet room, kitchen, garage, mechanical room, furnace room, or other dwelling units. (Per IRC M1602.2(4)) 4. Verify supply duct sizing. If design is questionable, a Manual D must be provided. (Per IRC M1601.I) 5. Verify no duct openings are located in garage. Any duct passing through a garage must be 26-guage steel. (Per IRC R309.1.I) 6. Verify supply and return ducts are four inches (4") off the ground. (Per IRC M1601.3.6) 7. Verify all exterior ducts are protected against the elements. (Per IRC MI601.3.4(2)) 8. Verify if vibration isolators are required by MIl. If required, they are not to exceed ten inches (10") in length. (perirc 1601.2.2) 9. Verify all joints are sealed on both supply and return ducts with approved tapes or mastics. (Per IRC M1601.3.1) 10. Verify all ducts, supply, return, panning, runs and boots, are insulated to R-4 in unconditioned areas. (Per IRC N1103.2.1) Insulation has been revised from R-8 to R-4 by the 2007 Kentucky Residential code. 11. Verify penetration of foundations with ducts is rodent proof. (per IRC 2404.9) 12. Verify all flex ducts are installed as per MIl and are as straight as possible, strapped every four to five feet (4-5 ') with one and a half inch (1-112") wide straps and no kinks or sharp bends. (Per Mil and ADC) 13. Verify all metal ducts are strapped every ten feet (10'). (per IRC MI601.3.2) 14. Verify all fire rated assembles penetrated with duct or boots are "fire blocked" with approved fire block material. (Per IRC R602.8(4)) 15. Verify dryer ducts are limited to twenty-five feet (25') in length. One ninety (90) degree = five feet (5'). One forty-five (45) degree = two and a half feet (2 Yz'). Shall be metal with no screws which extend into the duct. (Per IRe MI502.5-2.6) 16. Verify dryer duct terminates to the outside of the building and not less than three feet (3') in any direction from any opening into the building. Duct termination must be equipped with back draft damper and shall not be screened. (Per IRe MI502.2) 17. If kitchen exhaust is used, a minimum of one hundred (100) cfrn intermittent, twenty-five (25) cfm continuous. (Per IRe M1507.3) 18. Verify bathroom exhaust is fifty (50) dill intermittent, twenty (20) cfrn continuous if no operable windows. (Per IRe MI507.3) 19. Verify bathroom exhaust duct is a class 1 or class 0 type ducts and must exhaust to the outside of the building/structure. (per IRC M1601.1.1(2), M1507.2) Drilling and Notching 1. Wood-framed structural members shall be drilled, notched, or altered in accordance with the provisions of sections IRe R502.8, IRe R602.6, IRe R602.6.1, and IRe R802.7. Steel-Framed, load bearing 49

members shall be permitted only in accordance with sections IRe R505.2, IRe R603.2, IRe R804.2, and IRC M1308.1. 2. Any piping through rafters, joists, or studs shall be kept one and a half inches (1.5") from any edge. (Per IRC M1308.2 Equipment 1. Verify heating and cooling equipment and appliances are installed in accordance with the MIl and the requirements of this code. (per IRC Ml401.l) 2. Verify heating and cooling equipment is sized based on building loads calculated in accordance with ACCA Manual J or other approved methods. (Per IRC MI40l.3) 3. Verify manufacturer's instructions are with appliances and were followed. (Per IRC M1307.l) 4. Verify outside equipment is on a level concrete slab or other approved materials. (Per IMC 304.9) 5. Verify heat pumps are three inches (3") off the pad. (Per IRC MI403.2) 6. Verify clearances around equipment. (Per MIl 7. Verify disconnect is installed and all wiring is protected by conduit on outside equipment. (Per IRC E4001.5 table and NEC) 8. Verify thermostat wires are protected to resist sunlight and physical damage. (Per IRC E3702.3.2-3.3) 9. Verify a condensate trap is installed. (Per MIl and IMC 307.2.4) 10. Verify breakers are sized as per equipment data plate. (Per MIl and NEC) 11. Verify wiring is sized for maximum load. (Per NEC) Gas 1. Verify gas shut-off is installed within six feet (6') of appliance. (Per IRC G2420.5) 2. Verify sediment trap is installed. Note: ranges and clothes dryers do not need one. (Per IRC G2419.4) 3. Verify hard pipe is used to access exterior of appliance cabinet. (Per IRC G2422.1.2.3) Residential Geo- Thermal Checklist Ducts 1. Verify unobstructed return duct size from return air openings to unit. Must be a minimum of six (6) sq. in. per 1000 btu 'sfor heat pumps. (Per IRC M 1403.1) 2. Verify that return is equipped with a filter allowing even distribution of air flow across the filter. (per IMC 605.1.3) 3. Verify return path to central return with transfer grills, undercut doors or individual returns. (Per Manual D 1-9) 4. Verify return air is not being taken from any of the following: closet, bathroom, toilet room, kitchen, garage, mechanical room, furnace room, or other dwelling units. (Per IRC MI602.2(4» 5. Verify supply duct sizing. If design is questionable, a Manual D must be provided. (Per IRC M 160 1.1) 6. Verify no duct openings are located in garage. Any duct passing through a garage must be 26-guage steel. (Per IRC R309.1.1) 7. Verify supply and return ducts are four inches (4") off the ground. (Per IRC MI601.3.6) 8. Verify if vibration isolators are required by MIL If required, they are not to exceed ten inches (l0") in length. (per IRC 1601.2.2) 50

9. Verify all joints are sealed on both supply and return ducts with approved tapes or mastics. (Per IRC MI601.3.1) 10. Verify all ducts, supply, return, panning, runs and boots, are insulated to R-4 in unconditioned areas. (per IRC Nll03.2.l) Insulation has beenrevised from R-8 to R-4 by the 2007 Kentucky Residential code. 11. Verify all flex ducts are installed as per Mil and are as straight as possible, strapped every four to five feet (4-5') with one and a half inch (1 Yz") wide straps and no kinks or sharp bends. 12. Verify all metal ducts are strapped every ten feet (10'). (per IRC MI601.3.2) (Per MIl and ADC) 13. Verify all fire rated assembles penetrated with duct or boots are "fire blocked" with approved fire block material. (Per IRC R602.8(4)) 14. Verify dryer ducts are limited to twenty-five feet (25') in length. One ninety (90) degree = five feet (5'). One forty-five (45) degree = two and a half feet (2 Yz'). Shall be metal with no screws which extend into the duct. (per IRC MI502.5-2.6) 15. Verify dryer duct terminates to the outside of the building and not less than three feet (3') in any direction from any opening into the building. 16. Duct termination must be equipped with back draft damper and shall not be screened. (Per IRC MI502.2) 17. If kitchen exhaust is used, a minimum of one hundred (100) cfm intermittent, twenty-five (25) cfm continuous. (Per IRC M1507.3Verify bathroom exhaust must be 50 cfm intermittent, 20 cfm continuous ifno operable windows. IRC,MI507.3 18. Verify bathroom exhaust is fifty (50) cfm intermittent, twenty (20) cfm continuous if no operable windows. (Per IRC MI507.3) 19. Verify bathroom exhaust duct is a class 1 or class 0 type ducts and must exhaust to the outside of the building/structure. (Per IRC MI601.1.1(2), MI507.2) Drilling and Notching 1. Wood-framed structural members shall be drilled, notched, or altered in accordance with the provisions of sections IRe R502.8, IRe R602.6, IRe R602.6.l, and IRe R802.7. Steel-Framed, load bearing members shall be permitted only in accordance with sections IRe R505.2, IRC R603.2, IRC R804.2, and IRC M1308.1. 2. Any piping through rafters, joists, or studs shall be kept one and a half inches (1.5") from any edge. (Per IRC MI308.2) Equipment 1. Verify heating and cooling equipment and appliances are installed in accordance with the MIl and the requirements of this code. (Per IRC MI401.1) 2. Verify heating and cooling equipment IS sized based on building loads calculated in accordance with ACCA Manual J or other approved methods. (Per IRe MI401.3) 3. Verify manufacturer's instructions are with appliances and were followed. (per IRC M1307.l) 4. Verify loop system holds a 30-minute pressure test at 100psi before backfilling. (Per IRe 2105.1) 5. Verify equipment in a garage with an ignition source is raised eighteen inches (18") above the floor. Per IRe MI307.3) 6. Verify appliances located in compartments, alcoves, basements, or similar spaces have an unobstructed passageway that is 22" wide with a level service space of thirty by thirty inches (30"x30") in front of the appliance door. (Per IRe M1305.1.2). 51

7. Verify equipment located within compartments or alcoves are at least twelve inches (12") larger than the appliance. (Per IRC M1305.1.1) 8. Verify equipment in garages is protected from impact. (Per IRC M1307.3.l) 9. Verify outside equipment is on a level concrete slab or other approved materials. (Per IMC 304.9) 10. Verify heat pumps are three inches (3") off the pad. (Per IRC MI403.2) 11. Verify disconnect is installed and all wiring is protected by conduit on outside equipment. (Per IRC E4001.5 table and NEC) 12. Verify thermostat wires are protected to resist sunlight and physical damage. (Per IRC E3702.3.2-3.3) 13. Verify a condensate trap is installed. (Per MIl and IMC 307.2.4) 14. Verify total KW of heat strips. (Per MIl) 15. Verify breakers are sized as per equipment data plate. (Per MIl and NEC) 16. Verify wiring is sized for maximum load. (Per NEC) Under Floor Appliances 1. Verify appliances under floors have a 22"x30" rough opening or large enough to remove the largest appliance. Must have an unobstructed passageway of 22" wide and 30"high and be no farther away than 20'. A level working space must be provided that is 30"wide x 30"deep where access is required. If the passageway is not less than six feet (6') high, the appliance has an unlimited distance. (Per IRC M1305.1.4) 2. Verify a light controlled by a switch at the opening and a receptacle near the appliance. (Per IRC M1305.1.4.3) 3. Verify appliances supported from the ground are on a level concrete slab. Appliances suspended from the floor must have a clearance of six inches (6") from the ground. (Per IRC M1305.1.4.l) 4. Verify a primary drain line is installed to discharge condensate to an approved location. (Per IRC MI411.3) 5. Verify a condensate trap is installed. (Per MIl and IMC 307.2.4) 6. Verify disconnecting means. (Per IRC E4001.5 table) 7. Verify breakers are sized as per equipment data plate. (Per MIl and NEC) 8. Verify wiring is sized for maximum load. (Per NEC) Residential Split- 90% Furnace with Air Checklist Ducts 1. Verify that return is equipped with a filter allowing even distribution of air flow across the filter. (Per IMC 605.1.3) 2. Verify return air is not being taken from any of the following: closet, bathroom, toilet room, kitchen, garage, mechanical room, furnace room, or other dwelling units. (Per IRC M1602.2(4)) 3. Verify return path to central return with transfer grills, undercut doors or individual returns. (Per Manual D 1-9) 4. Verify supply duct sizing. If design is questionable, a Manual D must be provided. (Per IRC M160 1.1) 5. Verify no duct openings in garage. Ducts passing through a garage must be 26 gauge steel. IRC,R309.1.1 6. Verify supply and return ducts are four inches (4") off the ground. (Per IRC M1601.3.6) 7. Verify if vibration isolators are required by MIL If required, they are not to exceed ten inches (10") in length. (Per IRC 1601.2.2) 52

8. Verify all joints are sealed on both supply and return ducts with approved tapes or mastics. (Per IRC M1601.3.l) 9. Verify all ducts, supply, return, panning, runs and boots, are insulated to R-4 in unconditioned areas. (Per IRC Nl103.2.l) Insulation has been revised from R-8 to R-4 by the 2007 Kentucky Residential code. 10. Verify all flex ducts are installed as per MIl and are as straight as possible, strapped every four to five feet (4-5') with one and a half inch (1-112") wide straps and no kinks or sharp bends. (Per MIl and AD C) 11. Verify all metal ducts are strapped every ten feet (10'). (Per IRC M1601.3.2) 12. Verify all fire rated assembles penetrated with duct or boots are "fire blocked" with approved fire block material. (Per IRC R602.8(4)) 13. Verify dryer ducts are limited to twenty-five feet (25') in length. One ninety (90) degree = five feet (5'). One forty-five (45) degree = two and a half feet (2 Yz'). Shall be metal with no screws which extend into the duct. (Per IRC MI502.5-2.6) 14. Verify dryer duct terminates to the outside of the building and not less than three feet (3') in any direction from any opening into the building. Duct termination must be equipped with back draft damper and shall not be screened. (Per IRC MI502.2) 15. If kitchen exhaust is used, a minimum of one hundred (100) din intermittent, twenty-five (25) cfrn continuous. (Per IRC MI507.3) 16. Verify bathroom exhaust is fifty (50) cfm intermittent, twenty (20) cfm continuous if no operable windows. (Per IRe M1507.3). 17. Verify bathroom exhaust duct is a class 1 or class 0 type ducts and must exhaust to the outside of the building/structure. (Per IRC MI601.1.1(2), MlS07.2) Drilling & Notching 1. Wood-framed structural members shall be drilled, notched, or altered in accordance with the provisions of sections IRC R502.8, IRC R602.6, IRC R602.6.1, and IRC R802.7. Steel-Framed, load bearing members shall be permitted only in accordance with sections IRC RSOS.2, IRC R603.2, IRC RS04.2, and IRC MI30S.1. 2. Any piping through rafters, joists, or studs shall be kept one and a half inches (1.5") from any edge. (Per IRC M1308.2) Equipment 1. Verify heating and cooling equipment and appliances are installed in accordance with the MIl and the requirements of this code. (Per IRC M1401.1) 2. Verify heating and cooling equipment is sized based on building loads calculated in accordance with ACCA Manual J or other approved methods. (Per IRC MI401.3) 3. Verify manufacturer's instructions are with appliances and were followed. (Per IRC M1307.l) 4. Verify equipment in a garage with an ignition source is raised 18" above the floor. (Per IRC M1307.3) 5. Verify equipment in garage is protected from impact. (Per IRC M1307.3.1) 6. Verify appliances located in compartments, alcoves, basements or similar spaces have an unobstructed passageway 22" wide, with a level service space of 30"x 30" in front of the appliance door. (per IRC M130S.l.2) 7. Verify equipment located within compartments or alcoves are at least 12" larger than the appliance. ~Per IRC MI305.1.1) 53

8. Verify condensate drain is protected from freezing. (Per MIl) 9. Verify a condensate trap is installed. (Per MIl and IMC 307.2.4) 10. Verify outside equipment is on a level concrete slab or other approved materials. (Per IMC 304.9) 11. Verify outdoor equipment is installed three inches (3") above finished grade and is in accordance with MIL (Per IRC M1308.3) 12. Verify disconnect is installed and all wiring is protected by conduit on outside equipment. (Per IRC E4001.5 table and NEC) 13. Verify thermostat wires are protected to re Verify thermostat wires are protected to resist sunlight and physical damage. (Per IRC E3702.3.2-3.3) 14. Verify breakers are sized as per equipment data plate. (Per MIl and NEC) 15. Verify wiring is sized for maximum load. (Per NEC) Combustion Air 1. Verify combustion air is not being taking from any of the following: sleeping rooms, bathrooms, or toilet rooms. (per IRC MI70I.4) 2. Verify combustion air method follows manufacturer's instructions. Venting 1. Verify venting follows manufacturer's instructions. Gas 1. Verify gas shut of is installed within six feet (6') of appliance. (Per IRC G2420.5) 2. Verify sediment trap is installed. Note: ranges and clothes dryers do not need one. (Per IRC G24I9.4) 3. Verify hard pipe is used to access exterior of appliance cabinet. (Per IRC G2422.I.2.3) Attic Appliances 1. Verify appliances in attics have a minimum 20"x30" clear opening or large enough to remove the largest appliance. Must have an unobstructed passageway of 22" wide & 30" high, no farther away than 20'. A level working space must be provided, 30"wide x 30" deep where access is required. If the passageway is not less than 6' high the appliance can be moved back to 50' away. (Per IRC MI305.1.3 (2» 2. Verify a light controlled by a switch at the opening and a receptacle near the appliance. (Per IRC M1305.1.4.3) 3. Verify primary drain line is installed to discharge condensate to an approved place for disposal. (Per MIl and IRC MI4I1.3) 4. Verify an auxiliary drain pan is installed under the appliance and is one and a half inches (1 Yz") deep and three inches (3") wider than the appliance. The pan shall drain to a conspicuous location, a float switch, or other approved method. (per IRC MI4I1.3.1(1» 5. Verify a condensate trap is installed. (Per MIl and IMC 307.2.4) 6. Verify disconnecting means. (Per IRC E400I.5 table) 7. Verify breakers are sized as per equipment data plate. (per MIl and NEC) 8. Verify wiring is sized for maximum load. (Per NEC) Under Floor Appliances 1. Verify appliances under floors have a 22"x30" rough opening or large enough to remove the largest appliance. Must have an unobstructed passageway of 22" wide and 30"high and be no farther away than 20'. A level working space must be provided that is 30"wide x 30"deep where access is required. If the 54

passageway is not less than six feet (6') high, the appliance has an unlimited distance. (Per IRC M1305.1.4) 2. Verify a light controlled by a switch at the opening and a receptacle near the appliance. (Per IRC M1305.1.4.3) 3. Verify appliances supported from the ground are on a level concrete slab. Appliances suspended from the floor must have a clearance of six inches (6") from the ground. (PerIRC M1305.l.4.1) 4. Verify a primary drain line is installed to discharge condensate to an approved location. (Per IRC M1411.3) 5. Verify a condensate trap is installed. (Per MIl and IMC 307.2.4) 6. Verify disconnecting means. (Per IRC E4001.5 table) 7. Verify breakers are sized as per equipment data plate. (Per MIl and NEC) 8. Verify wiring is sized for maximum load. (per NEC) Residential Split Heat Pump Checklist Ducts 1. Verify unobstructed return duct size from return air openings to unit. Must be a minimum of six (6) sq. in. per 1000 btu 'sfor heat pumps. (per IRC M 1403.1) 2. Verify return is equipped with a filter allowing even distribution of air flow across the filter. (per IMC 605.1.3) 3. Verify return path to central return with transfer grills, undercut doors or individual returns. (Per Manual D 1-9) 4. Verify return air is not being taken from any of the following: closet, bathroom, toilet room, kitchen, garage, mechanical room, furnace room, or other dwelling units. (Per IRCM1602.2(4)) 5. Verify supply duct sizing. If design is questionable, a Manual D must be provided (Per IRC M160 1.1) 6. Verify no duct openings in garage. Any duct passing through a garage must be 26-gauge steel. (Per IRC R309.1.1) 7. Verify supply and return ducts are four inches (4") off the ground. (per IRC M1601.3.6) 8. Verify if vibration isolators are required by MIL If required, they are not to exceed ten inches (10") in length. (Per IRC 1601.2.2) 9. Verify all joints are sealed on both supply and return ducts with approved tapes or mastics. (Per IRC M1601.3.1) 10. Verify all ducts, supply, return, panning, runs and boots, are insulated to R-4 in unconditioned areas. (Per IRC Nll03.2.l) Insulation has been revised from R-8 to R-4 by the 2007 Kentucky Residential code. 11. Verify all flex ducts are installed as per MIl and are as straight as possible, strapped every four to five feet (4'-5') with one and a half inch (1-1/2") wide straps with no kinks or sharp bends. (Per MIl and AD C) 12. Verify all metal ducts are strapped every ten feet (10'). (Per IRe M1601.3.2) 13. Verify all fire rated assembles penetrated with duct or boots are "fire blocked" with approved fire block material. (Per IRC R602. 8(4)) 14. Verify dryer ducts are limited to twenty-five feet (25') in length. One 90 degree = five feet (5'). One 45 degree = two and a half feet (2 ~'). M1502.5-2.6) Shall be metal with no screws which extend into the duct. (per IRC 55

15. Verify dryer duct terminates to the outside of the building and not less than three feet (3') in any direction from any opening into the building Duct termination must be equipped with back draft damper and shall not be screened. (Per IRC MI502.2) 16. If kitchen exhaust is used, a minimum of one hundred (100) cfm intermittent, twenty-five (25) cfm continuous. (Per IRC M1507.3) 17. Verify bathroom exhaust must be 50 cfm intermittent, 20 cfm continuous if no operable windows. IRC,MI507.3 18. Verify bathroom exhaust is fifty (50) cfm intermittent, twenty (20) cfm continuous if no operable windows. (Per IRC MI507.3) Drilling & Notching 1. Wood-framed structural members shall be drilled, notched, or altered in accordance with the provisions of sections IRC R502.8, IRC R602.6, IRC R602.6.1, and IRC R802.7. Steel-Framed, load bearing members shall be permitted only in accordance with sections IRC R505.2, IRC R603.2, IRC R804.2, and IRC M1308.1. 2. Any piping through rafters, joists, or studs shall be kept one and a half inches (1.5") from any edge. (Per IRC MI308.2) Equipment 1. Verify heating and cooling equipment and appliances are installed in accordance with the MIl and the requirements ofthis code. (Per IRC M1401.1) 2. Verify heating and cooling equipment is sized based on building loads calculated in accordance with ACCA Manual J or other approved methods. (Per IRC M1401.3) 3. Verify manufacturer's instructions are with appliances and were followed. (Per IRC M1307.1) 4. Verify outside equipment is on a level concrete slab or other approved materials. (Per IMC 304.9) 5. Verify appliances located in compartments, alcoves, basements or similar spaces have an unobstructed passageway 22" wide, with a level service space of 30"x 30" in front of the appliance door. (Per IRC M1305.1.2) 6. Verify equipment located within compartments or alcoves are at least 12" larger than the appliance. (Per IRC M1305.1.1) 7. Verify equipment in garage is protected from impact. (Per IRC M1307.3.1) 8. Verify outside equipment is on a level concrete slab or other approved materials. (Per IMC 304.9) 9. Verify heat pumps are three inches (3") off the pad. (Per IRC M1403.2) 10. Verify disconnect is installed and all wiring is protected by conduit on outside equipment. (Per IRC E400 1.5 table and NEC) 11. Verify thermostat wires are protected to resist sunlight and physical damage. (Per IRC E3702.3.2-3.3) 12. Verify a condensate trap is installed. (Per MIl and IMC 307.2.4) 13. Verify total KW of heat strips. (Per MIl) 14. Verify breakers are sized as per equipment data plate. (Per MIl and NEC) 15. Verify wiring is sized for maximum load. (Per NEC) Attic Appliances 1. Verify appliances in attics have a minimum 20"x30" clear opening or large enough to remove the largest appliance. Must have an unobstructed passageway of 22" wide & 30" high, no farther away than 20'. A 56

level working space must be provided, 30"wide x 30" deep where access is required. If the passageway is not less than 6' high the appliance can be moved back to 50' away. (per IRC M1305.1.3 (2)) 2. Verify a light controlled by a switch at the opening and a receptacle near the appliance. (Per IRC M1305.1.4.3) 3. Verify primary drain: line is installed to discharge condensate to an approved place for disposal. (Per MIl and IRC M1411.3) 4. Verify an auxiliary drain pan is installed under the appliance and is one and a half inches (1 12") deep and three inches (3") wider than the appliance. The pan shall drain to a conspicuous. switch, or other approved method. (Per IRC M1411.3.1(1)) 5. Verify a condensate trap is installed. (Per MIL and IMC 307.2.4) 6. Verify disconnecting means. (Per IRC E4001.5 table) 7. Verify breakers are sized as per equipment data plate. (Per MIl and NEC) 8. Verify wiring is sized for maximum load. (Per NEC) location, a float Under Floor Appliances 1. Verify appliances under floors have a 22"x30" rough opening or large enough to remove the largest appliance. Must have an unobstructed passageway of22" wide and 30"high and be no farther away than 20'. A level working space must be provided that is 30"wide x 30"deep where access is required. If the passageway is not less than six feet (6') high, the appliance has an unlimited distance. (Per IRC M1305.1.4) 2. Verify a light controlled by a switch at the opening and a receptacle near the appliance. (per IRC M1305.1.4.3) 3. Verify appliances supported from the ground are on a level concrete slab. Appliances suspended from the floor must have a clearance of six inches (6") from the ground. (per IRe M1305.1.4.l) 4. Verify a primary drain line is installed to discharge condensate to an approved location. (Per IRC M1411.3) 5. Verify a condensate trap is installed. (Per MIl and IMC 307.2.4) 6. Verify disconnecting means. (per IRC E400 1.5 table) 7. Verify breakers are sized as per equipment data plate. (Per MIl and NEC) 8. Verify wiring is sized for maximum load. (Per NEC) 57